Bridge_Inspection_Report_5140-077P.pdf
PDF 4 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
About this file
Bridge Inspection Report_5140-077P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf | ||
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG PINE CREEK BRIDGE #3
BLUE RIDGE PARKWAY OVER BIG PINE CREEK
BLUE RIDGE PARKWAY
LS
STRUCTURE NO. 5140-077P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/9/15
Report prepared by: WD
MILE POINT: 223.78
Federal Highway Administration KILOMETER POINT: 360.11 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-077P
BIG PINE CREEK BRIDGE #3 INSPECTION DATE: 6/9/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS
MAIN SPAN TYPE: ............... SLAB
# OF BEAMS, MAIN SPAN: .. 1
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... BITUMINOUS
ABUT. FOUNDATIONS: ........ UNKNOWN
PIER FOUNDATION(S): ........ UNKNOWN
ABUTMENT / PIER MAT'L: ... MASONRY / CONCRETE
PROJ./PLAN REF. NO: ......... 2A2 / NONE
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1982-WEARING SURFACE PLACED.
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
69.8 FT (21.3 M)
26.5 FT (8.1 M)
36.7 FT (11.2 M)
33.3 FT (10.1 M)
N/A 22 °
NO
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 223.78 (KM PT 360.11)
STATE: ................................. NORTH CAROLINA LOCATION: 1.3 MILES FROM NC ROUTE 1463
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. BIG PINE CREEK
STRUCTURE EVALUATION SUMMARY
This concrete slab bridge is in poor condition overall. The main structural problem is deterioration of the concrete deck slab, with severe cracking, delamination, spalling with exposed steel reinforcement, and heavy efflorescence present along the sides of the slab.
Other problems noted include spalling of the north pier; deterioration of the stone masonry mortar joints in the abutment breastwalls and wingwalls; and settlement and cracking of the asphalt pavement at both ends of the bridge.
Site-related problems include migration of the channel toward the north; as a result, debris and sediment has collected in the south and center spans. Other issues include scour at the upstream end of the piers, and sloughing of the channel banks at both ends of the north abutment.
It should also be noted that the bridge railing system does not meet current safety requirements for traffic barriers.
This bridge is scheduled for replacement in the near future under Project BLRI 2A16.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-077P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58, 59, 60 REPLACE BRIDGE. 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Bridge is scheduled for replacement in the near future under Project BLRI 2A16.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-077P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 4 ITEM REFERENCE AND REMARKS
P1. DECK SLAB
N2. EXPANSION JOINTS
F3. WEARING SURFACE
G4. RIDEABILITY
N5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
F7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 4
N
2. GIRDERS OR BEAMS
1. BEARING DEVICES
N
P3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
N6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 6
58.1, 59.3 SEVERE CRACKING, SPALLING, AND DELAMINATION ON EAST SIDE
OF DECK OVERHANG WITH EXPOSED STEEL REINFORCEMENT IN
CENTER AND SOUTH SPANS. SEVERE CRACKING, SPALLING, AND
DELAMINATION ON WEST SIDE OF DECK OVERHANG IN NORTH
SPAN. VEGETATION GROWING IN AREAS OF DETERIORATION
ALONG BOTH DECK SIDES. MODERATE CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF EAST OVERHANG. MINOR
CRACKING WITH EFFLORESCENCE ON WEST OVERHANG IN NORTH
SPAN. MINOR CRACKING WITH EFFLORESCENCE AND LEAKAGE ON
UNDERSIDE OF SLAB THROUGHOUT. HEAVY EFFLORESCENCE
ALONG CONSTRUCTION JOINT ON DECK UNDERSIDE FOR FULL
LENGTH OF BRIDGE.
58.3 MODERATE TRANSVERSE CRACKING OF WEARING SURFACE OVER
BOTH ABUTMENTS; VEGETATION GROWTH IN CRACK OVER SOUTH
ABUTMENT AT CURBLINES. MINOR LONGITUDINAL CRACKING OF
WEARING SURFACE ALONG WEST CURBLINE WITH VEGETATION
GROWTH IN CRACK. POTHOLE IN SOUTHBOUND LANE NEAR
SOUTH ABUTMENT.
58.6, 222.3 TWO RAIL CONNECTIONS NOT FULLY TIGHTENED IN WEST RAIL
OVER SOUTH SPAN.
58.7, 59.10 PVC DRAINS HAVE BEEN INSTALLED THROUGH DECK
APPROXIMATELY 2' FROM OUTSIDE EDGE BUT WATER CONTINUES
TO FLOW OVER EDGE DUE TO LACK OF CURB. RUNOFF DUE TO
SUPERELEVATION OF ROADWAY CONTRIBUTES TO DETERIORATION
OF DECK OVERHANG ON EAST SIDE. MINOR VEGETATION GROWTH
IN EAST CURBLINE.
60.1 MODERATE DETERIORATION OF MORTAR JOINTS WITH
EFFLORESCENCE AT WEST SIDE OF SOUTH ABUTMENT, MINOR
ELSEWHERE. LEAKAGE STAINS FROM DECK ON BOTH ABUTMENTS.
60.6 MODERATE DETERIORATION OF WINGWALL MASONRY MORTAR
JOINTS WITH EFFLORESCENCE AND MOSS GROWTH IN JOINTS.
MODERATE TO SEVERE DETERIORATION OF STONE MASONRY AT
SOUTHEAST WINGWALL.
ABUTMENTS
BREASTWALLS OR COLUMNS1. F
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. N
BACKWALLS AND/OR BULKHEADS 4. N
FOUNDATIONS 5. N
WINGWALLS 6. F
WEEP HOLES7. P
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR9. F
SETTLEMENT OR DEFLECTION10. G
SLOPE PROTECTION11. N
OTHER 12. N
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. G
FOUNDATIONS 16. N
EROSION AND/OR SCOUR17. G
SETTLEMENT OR DEFLECTION18. G
OTHER 19. N
FIELD INSPECTION REPORT STRUCTURE NO. 5140-077P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F F N P N
MED
SUFF
7 FT.
GRAVEL, SAND, SILT
222. APPROACHES 6
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N G F G F N F N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.7 SEVERAL WEEP HOLES ARE BLOCKED AT SOUTH ABUTMENT, WEEP
HOLES AT NORTH ABUTMENT ARE AT OR BELOW NORMAL
WATERLINE; STREAM FLOW HAS CONTRIBUTED TO LOSS OF FILL
MATERIAL (PROBE REACHES UP TO 6' BEHIND WEEP HOLES).
60.9, 61.2 MODERATE SCOUR HOLE AT UPSTREAM SIDE OF SOUTH
ABUTMENT. MINOR CHANNEL EROSION ON UPSTREAM SIDE OF
SOUTH CHANNEL BANK. MODERATE SLOUGHING OF CHANNEL
BANKS AT BOTH SIDES OF NORTH ABUTMENT RESULTING FROM
CHANNEL MIGRATION.
60.13 MINOR CRACKING OF PIER WALLS WITH EFFLORESCENCE. MINOR
SPALL WITH EXPOSED STEEL REINFORCEMENT ON NORTH FACE OF
NORTH PIER AT WEST SIDE.
60.17, 61.2 MINOR TO MODERATE SCOUR AT UPSTREAM SIDE OF BOTH PIERS;
HOWEVER, FOOTINGS ARE NOT EXPOSED AT THIS TIME. MINOR
SCOUR AT NORTHEAST AND NORTHWEST CHANNEL BANKS DUE TO
CHANNEL MIGRATION.
61.1 STREAM MIGRATING TOWARD NORTH. STREAM FLOW IS
CONCENTRATED ENTIRELY THROUGH NORTH SPAN (SEE ALSO 60.9,
61.2 AND 61.4).
61.4 HEAVY SILT AND SEDIMENT ACCUMULATION UNDER SOUTH AND
CENTER SPANS. MINOR DEBRIS ACCUMULATION IN CENTER SPAN
ON UPSTREAM SIDE OF NORTH AND SOUTH PIERS. MINOR DRIFT IN
NORTH SPAN. ONE FALLEN TREE ACROSS UPSTREAM CHANNEL
222.3 5TH POST FROM SOUTH END OF WEST RAIL HAS BEEN MISALIGNED
6" FROM ROADWAY DUE TO COLLISION (DAMAGE HAS BEEN
PATCHED).
222.4,6 MODERATE TRANSVERSE CRACKING AND MINOR SETTLEMENT
(OVER 1") OF PAVEMENT AT BOTH APPROACHES.
222.8 BRIDGE IS IN CURVE WITH LIMITED SIGHT DISTANCE AT BOTH
APPROACHES.
36.A,C,D RAILING HEIGHT OF 1'-7" DOES NOT MEET CURRENT HEIGHT
REQUIREMENT OF 2'-3" FOR TRAFFIC BARRIERS. RAIL ENDS ARE
NOT TERMINATED SAFELY. NORTHEAST GUARDRAIL FACE IS 2'-11"
FROM EDGE OF PAVEMENT.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-077P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 25 23 42 38
TYPE 3 21 19 35 31
TYPE 3S2 31 28 52 47
TYPE 3-3 40 36 67 61
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-077P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #3 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-077P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK
(207) ROAD SECTION NO: .......... 077P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140077P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.3 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2A2 (11) MILE POINT: ............................. 223.78 (KM PT 360.11)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
01 - SLAB
26.5 FT (8.1 M)
69.8 FT (21.3 M)
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 25.2 TONS (22.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 42.1 TONS (38.2 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-077P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°29'49.02" (51) CURB TO CURB WIDTH: ........... 33.3 FT (10.1 M)
(17) LONGITUDE: ......................... 80°57'52.32" (52) DECK WIDTH: ............................ 36.7 FT (11.2 M)
(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 29.0 FT (8.8 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 21.0 FT (6.4 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 22 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 33.3 FT (10.1 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 7 - TIMBER
DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at eachLATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.58 FT (0.48 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0000
(75A) TYPE OF WORK: .............. 38 - OTHER STRUCT. WORK
(75B) WORK DONE BY: ............. 1 - CONTRACT
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
B - MAJOR
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1982-WEARING SURFACE PLACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-077P
PHOTOGRAPHS STRUCTURE NO. 5140-077P
PHOTO #1 - LOOKING NORTHBOUND TOWARD CUMBERLAND KNOB
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - TYPICAL SETTLEMENT AT APPROACHES, NORTH
APPROACH SHOWN
PHOTO #5 - TYPICAL LONGITUDINAL CRACKING OF WEARING
SURFACE OVER BRIDGE NEAR SOUTH END
PHOTO #6 - TYPICAL TRANSVERSE CRACKING OF PAVEMENT AT
APPROACH, SOUTH APPROACH SHOWN; NOTE POTHOLE IN
SOUTHBOUND LANE
PHOTO #7 - CRACKING WITH VEGETATION
GROWTH AND DEBRIS ACCUMULATION ALONG
WEST CURBLINE
PHOTO #8 - DELAMINATION AND SCALING OF
EAST EDGE OF DECK WITH EXPOSED REBAR
PHOTO #9 - TYPICAL SPALLING AND
DELAMINATION ALONG DECK EDGES, WEST
DECK EDGE OVER NORTH SPAN SHOWN
PHOTO #10 - VEGETATION GROWTH AND
DEBRIS ACCUMULATION ALONG EAST
CURBLINE
PHOTO #11 - DISPLACED STONE AT END OF NORTHWEST WINGWALL
PHOTO #12 - TYPICAL APPROACH GUARDRAIL END, NORTHEAST RAIL
END SHOWN
PHOTO #13 - CLEARANCE FROM FACE OF
GUARDRAIL TO EDGE OF ROADWAY LESS
THAN 3 FT, NORTHEAST BRIDGE END SHOWN
PHOTO #14 - DAMAGED STEEL BACKED
TIMBER RAIL ALONG WITH TWO DISPLACED
SECTIONS OF TIMBER RAIL, NORTHWEST
APPROACH RAIL
PHOTO #15 - TYPICAL LOOSE RAIL CONNECTIONS, WEST RAIL OVER
SOUTH ABUTMENT SHOWN
PHOTO #16 - ROTATED TIMBER APPROACH RAIL, NORTHEAST
APPROACH
PHOTO #17 - GENERAL UNDERSIDE VIEW LOOKING EAST, CENTER
SPAN
PHOTO #18 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE, EAST SIDE OF NORTH SPAN SHOWN
PHOTO #19 - CRACKING WITH WATER LEAKAGE ON DECK UNDERSIDE,
SOUTH SPAN
PHOTO #20 - CRACKING WITH EFFLORESCENCE, SPALLING, AND
DELAMINATION OF EAST EDGE OF DECK IN NORTH SPAN
PHOTO #21 - TYPICAL SPALLING AND DELAMINATION ALONG DECK
EDGE AT SOUTH AND CENTER SPAN, EAST DECK EDGE SHOWN; NOTE
EXPOSED REBAR
PHOTO #22 - EXPOSED STIRRUPS AND MAIN REINFORCEMENT ALONG
EAST EDGE OF DECK, SOUTH SPAN
PHOTO #23 - SPALL WITH EXPOSED REBAR AT EAST EDGE OF DECK,
CENTER SPAN
PHOTO #24 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #25 - TYPICAL SLOUGHING OF CHANNEL BANKS AT BOTH ENDS
OF NORTH ABUTMENT, UPSTREAM CHANNEL BANK SHOWN
PHOTO #26 - GENERAL VIEW OF NORTH FACE OF NORTH PIER; NOTE
DEBRIS ACCUMULATION
PHOTO #27 - SPALLING WITH EXPOSED STEEL REINFORCEMENT ON
WEST END OF NORTH PIER ON UPPER PORTION OF NORTH FACE;
NOTE ALSO EFFLORESCENCE ON DECK OVERHANG
PHOTO #28 - TYPICAL FULL HEIGHT VERTICAL CRACKING WITH
EFFLORESCENCE ON PIERS, NORTH PIER SHOWN
PHOTO #29 - TYPICAL EFFLORESCENCE ALONG CONSTRUCTION
JOINTS ON UNDERSIDE OF DECK, CENTER SPAN SHOWN
PHOTO #30 - DEBRIS AND SEDIMENT ACCUMULATION AT CENTER SPAN
PHOTO #31 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #32 - TYPICAL DETERIORATION OF ABUTMENT BREASTWALL
MASONRY MORTAR JOINTS, WEST SIDE OF SOUTH ABUTMENT SHOWN
PHOTO #33 - WATER LEAKAGE THROUGH CENTER OF ABUTMENT,
SOUTH ABUTMENT SHOWN
PHOTO #34 - SCOUR ALONG UPSTREAM SIDE OF SOUTH ABUTMENT
PHOTO #35 - DEBRIS ACCUMULATION AT UPSTREAM END OF NORTH
PIER AND CENTER SPAN
PHOTO #36 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS,
SOUTHEAST WINGWALL SHOWN
PHOTO #37 - UPSTREAM CHANNEL; NOTE FALLEN TREE FALLEN IN
CHANNEL
PHOTO #38 - DOWNSTREAM CHANNEL