TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan(plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
NPDES Con.st.ruction Generali. Permit or corresponding State Pe:rmit
3:
A sign or other notice will be posted conspicuously near the main entrance of the construction site. For linear projects, the sign or other notice will be posted at a publicly accessible location near the active part of the construction project.
If displaying near the main entrance is infeasible, the notice can be posted in a local public building such as the town hall or public library. ·
The sign or other notice will contain the following information:
1. A copy of the completed Notice of Intent (NOI) as submitted to the EPA Stormwater Notice Processing Center or State Authorization; and
2. The current location of the SWPPP and the name and telephone number of the contact person for scheduling SWPPP viewing .
l.
• J r , f 1., .. ' . ' ~-f
. f.
'" .. '1 ·~. "',. • • . • . .,··
' ,J,-. . ' .
- i·
• " '. 1 ~
.!: " .:::. ,..l, " l .,.·,,.
r, , . 1:.
L ·· - . A -1-
. f ...
~ t: r ,f ' ... ., • r : ': : ' } • • :t • '., • :, >
•.,, r_r:i I' ~ r
.... .... i ·" . : !">· f
CONTRACTOR:
WASHINGTON AND IDAHO PROJECTS ON.LY:
File electronic NOi with EPA at http://cfpub.epa.gov/npdes/stormwater/cgpenoi.cfm
If you do not have an existing CDX account with EPA, follow EPA instructions to register.
When filling out your NOi, use the same information as the FHW A NOi in tab 3 AND the following:
• Section III. Operator Information. Complete this section using information for
YOUR COMP ANY.
• Section IV. Project/Site Information. Question. Are you requesting coverage under this NOi as a "federal operator" as defined in Appendix A? ANSWER
YES.
• · Section IV. Project/Site Information. Question. Have stormwater discharges from your project/site been covered previously under an NPDES permit? ANSWER YES. Provide the FHWA Permit Tracking Number in the EPA acknowledgement email in Tab 3.
• Section VII. Stormwater Pollution Prevention Plan (SWPPP) Information. Use - .
contact information for YOUR COMPANY
• Section X. Certification Information. NOi must be certified by YOUR responsible corporate officer as defined in CGP I.11.1. If your Certifying Official is a different person than the one preparing the NOi, then the Certifying Official must also have an EPA CDX account.
When the NOi has been completed, it will be electronically delivered to the email address of your Certifying Official. Follow the instructions in the email to complete the Certification of the NOi.
When you have successfully completed and certified your NOi, the preparer and Certifying Official will receive an email from EPA acknowledging that your CGP NOi Certification is complete. Provide a copy of this acknowledgement email to the CO.
File copy of Contractor's NOI and EPA Acknowledgement e-mail in Tab 3.
f i;
r ., .t
. .t l l iT
! I~~
;c c' J,.1;.,·.
. " :,•I
·I·' J.
'· 1)-
'i j.
l.
.l l
• r •. , ~
', I
5:
Location of the construction site and waters of the United States within one mile of the site.
t
. t
. f r ' } l 1
I·
Jr l i
,.·r:·· ..
.. ' i
. 1 ! " ,. ~'!'
Sheets
Eirosfon/Se.diment Control Pfan Sheets induding majoir stru.du:rnl and rwn·structu.rnl BMPs and typical detail§"
.l·
"''i f.
'' .f l f
:i
1:-' t
.l i .r
I
" ;' l:!.
1' f.> ''. i'
'J .... , ,1 "
•'/ .l"
,._' l·
7:
r l r f i l = f '· .·•
?~ ('. ' ' ,l
.- ·~ ' 1 l
.J
. .I' 1- ··.~ l r ' I.
f ~~· l
'1 I ~· i·
Tab7·
FHWA:
Insert Revcgetation Plan (FS, NPS, Consultant) IF APPLICABLE.
If revegetation is being performed by others, inform the Contractor here
CONTRACTOR:
ALL STATES
This revegetation plan is for SWPPP documentation only.
The Contractor's responsibility for revegetationis specified in the Contract.
Please Insert Permanent Soil Stabilization Structures such as Retaining Walls, Riprap
Slope Stabilization and Revegetation Plans from the Plan Sheets
• \I.,.
.t, "' f
1. ' l, 1 l:
1 '"
1-.• f t .. t.
8:
•'J / .. 'I' -~.. I:,.. ·.·4!:.
l' ', i.
. t r
1,r l.
• '•:) ,r'./; I -k" -~ • ' ' -~ t''
Inspection Requirements for NPDES Compliance
EPA Construction General Permit Part 4 inspection requirements for NPDES compliance:
Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.
You must specify in your SWPPP which schedule you will be following.
1. At least once every 7 calendar days, OR
2. At least once every 14 calendar days and within 24 hours of the end of a stonn event of 0.5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site~ The SWPPP should also include a daily rainfall log.)
Case-by-Case Reductions in Inspection Frequency: You may reduce your inspection frequency to at least once every month if:
l . The entire site is temporarily stabilized, 2; Runoff is unlikely due to winter _conditions (e.g., site is covered with snow, ice, or the ground is trozen), or
3. Construction is occurring during seasonal arid periods in arid areas and semi-arid areas.
Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is av~ilable until one month before thawing conditions are expected to result in a discharge if all of the following requirements are met:
· 1. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month); .
2. Land disturbance activities have been suspended; and
3. The beginning and ending dates of the waiver period are documented in the SWPPP.
Qualified Personnel: Inspections must be .conducted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact stormwater quality and t(> assess the effectiveness of any sediment and erosion control measures selected to control the quality of stormwater discharges from the construction activity. ·
Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation. Inspectors must look for evidence of, or the potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to aseertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.
All reports required by this permit, including the SWPPP, S.WPPP amendments, and inspection reports must be signed by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.
l. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated fucility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures lo assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for pennit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
2. For a partnership or sole proprietorship: By a general partner or the proprietor, respectiv~ly; or
· 3. For a municipality, state, federal, or other public agency: By either a principal executive( officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit ofthe agency (e.g., Regional Administrator of EPA). ·
A person is a duly authorized representative only if:
The authorization is made in writing by a person described in Appendix G, Subsection 11.A;
The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and ·
The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. · ftDERAL :UIGHWAY .ADMIMSTIL\.'t~ON , wan--.. nmEBAL LANDS
BlGRWAY PlVI810N
SWPPP CONSTRUCTION SITE INSPECTION R.EPO~T
Type 11J1f !ltlls]p>edlim11:
D Regular D Post-storm.event D Reduced inspection frequency period
Hru!l ll:ihleire lbieeltll a sll:llJiJrl]]]l eveltllll: s]llllce ll:Jhle lrusdlllls]p>ecll:follll'I' 0 Yes 0 No Ilf ye$? JPllrllliVii«lle:
Estimated Stoln). Start Date & Time:_·-----~- Estimaied Storm Duratio:µ (lrrs):
Approximate Amount of Precipitation (in): _____ _
Weather alt tnme lllifll:llnii§ :illllsjpledlilllillll?
0 Clear 0Cloudy D Rain 0 Sleet 0Fog 0 Snowing 0 High Winds D Other:
Temperature: ______ _
WJFUID 157-2 (5/2®1:ft)
I
5 .
Site-specific BMPs
• BMP- Describe and give the location of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation sheets. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precip'itation.
• BMP Installed~ If a BMP should be installed a.t the current phase of the project and you marked "No" in the "BMP Installed'' column, then you must check "Yes" in the "BMP Action Required?" colu.mn
• BMPAction Required? .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.
• BMP Action Required, Complete by Date - Before certifYing the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a lJMP Action is NOT required, leave the "Complete by Date" blank.
• DescribeBMPAction, ifNeeded~Anytimeyou check "Yes"for "BMPAction Required", then you must also fill in the "Describe BMP Action" column.
• Delawd Action Item Report - When a BMP Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met Keep the Delayed A9tion Item Report in the SWPPP. ·
• Corrective Action Log - When a BMP Action is required as noted in this report, you must also enter all the
· information for this action in the Corrective Action Log.
BMP & Location BMP BMPAction Describe BMP Action) if Needed Installed? Reauired?
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes 0No
Complete by Date:
0Yes 0No 0Yes UNo
Complete by Date:
Page2 Project Name:
Inspection Date:
BMP & Location BMP BMPAction BMP Action, if Needed Installed? Required?
9 lJYes 0No 0Yes UNo
Complete by Date:
10 0Yes c;lNo UYes 0No
Complete by Date:
11 0Yes 0No 0Yes LJNo
Complete by Date.:
12 0Yes 0No lJYes UNo
Complete by "
Date:
13 0Yes lJNo lJYes lJNo
Complete by Date:
14 0Yes 0No 0Yes LJNo
Complete by' Date:
15 0Yes 0No 0Yes 0No
Complete by Date:
16 0Yes 0No 0Yes 0No
Complete by Date:
17 0Yes 0No 0Yes 0No
Complete by Date:
18 0Yes 0No 0Yes 0No
Complete by Date:
19 0Yes 0No 0Yes ONo
Complete by Date:
20 0Yes 0No 0Yes 0No
Complete by Date:
21 lJYes 0No 0Yes 0No
Complete by Date:
• use continuation sheets to list.
Page3 Project Name:
l
Overall Site Issues
• BMP or Activity These are some general ~ite issues that must be assessed during inspections.
• Implemented? - If a BMP or activity should be implemented at the current phase· of the project and you check "No", then you must mark "Yes" in the "Corrective Action Required?" column.
• Corrective Action Required? When maintenance or some other corrective action is required, check
"Yes" in this column.
• Corrective Action Required, Complete by Date - When a corrective action is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave the; "Complete by Date" blank.
• Describe Corrective Action, if Needed-Anytime you check "Yes" in the "Corrective Action Required?"
column, you must fill in the "Describe Corrective Action" column as well.
• Delayed Action Item Report - When a Corrective Action is required and th.e Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed Action Item Report in the SWPPP.
• Corrective Action Log When a Corrective Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.
BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed Action Required?
Have stabilization UYes 0No 0Yes 0No measures been initiated on slopes and disturbed Complete by areas not actively being Date:
worked?
Are natural resource 0Yes 0No 0Yes 0No areas (e.g., streams, wetlands, mature trees, Complete by etc.) required by the Date:
SWPPP to be delineated in the field, identified with barriers or markings?
Are perimeter controls 0Yes 0No 0Yes 0No and sediment barriers adequately installed Complete by (keyed into substrate) .Date:
and maintained?
Are storm drain inlets 0Yes 0No 0Yes 0No properly protected? Complete by
Date:
Are the construction 0Yes UNo OY~s UNo ' exits preventing sediment from being Complete by tracked into the street? Date:
Is trash/litter from work 0Yes 0No 0Yes 0No areas collected and placed in covered Complete by dumpsters? Date:
Are washout facilities 0Yes 0No UYes 0No (e.g., paint, concrete) available, clearly Complete by marked, and maintained? Date:
Page 4 Project Name:
BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed ' Action
8 Are vehicle and equipment fueling, 0Yes 0No Reouired?
0Yes 0No cleaning, and Complete by maintenance areas free Date:
of spills, leaks, or any other deleterious material?
9 Are materials that are 0Yes 0No 0Yes 0No potential stormwater Complete by contaminants stored Date:
inside or under cover?
10 Are non-stormwater UYes 0No 0Yes 0No discharges (e.g., wash Complete by water, dewatering) Date:
properly controlled?
Overall Site Issue Answer to Corrective Question Action Describe Corrective Action and Location, if Needed
Reauired?
1 At the time of 0Yes 0No 0Yes 0No inspection, ate the Complete by discharge points and Date:
receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See ( continuation page for list of discharge points)
2 Since the last inspection, LJYes 0No 0Yes LJNo are the discharge points Complete by and receiving waters free Date:
of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)? (See continuation page for list . of discharge points)
3 Has Spill Response kit 0Yes 0No 0Yes 0No been used since the last Complete by inspection? If yes, has Date:
stock been maintained?
4 . Are any additional 0Yes 0No 0Yes 0No BMPs ne.eded? Complete by
Date:
5 (Other) 0Yes 0No LJ Yes 0No Complete by Date:
5 Name:
Scope of Inspection
Did you inspect all areas of the project that are LJYes 0No If you did not inspect any required .areas, list those required to be inspected by the CGP (areas locations here and explain why they weren't inspected.
disturbed by construction activity, areas used for storage of materials that are exposed to precipitation, discharge locations and locations .where vehides enter or exit the site)?
• Check the box below if the project is in compliance with the CGP and the SWPPP:
0 I certify that on the date of this inspection, this project was found to be in compliance with the terms of its Storm Water Pollution Prevention Plan and the curr~t Construction General Permit.
• If there are incidences of non-compliance, then do not check the box above.
• When you don 't check the box above, then you must describe each incident of non-compliance and the actions that are needed to bring the project into compliance.
• If there is an Action Item described in the non-compliance box.that does not already have a "Complete by
Date" assigned elsewhere in this report, then add a completion date within the box.
Non-Compliance
Incidence of Non-compliance:
Action Item and Complete by Date:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifieant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Contractor's Duly Authorb·,ed Representative FHW A's Duly Authorized Representative
Print name: PrintNamei
Title: Superintendent Title:
Signature: Signature:
Page6 Project Name:
r·' .J:
.f r ..., J;
.t.
(' .. , f
·"'1 r .l
1 Log
.\. ~."; . ~ l' ·., . l-.
.• I
: f / r ~ r . ..,., 11:
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retain.ed, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least 3 years from the date of the sample, measurement, report or application.
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual(s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques .or methods used; and
6. The results of such analyses.
··~ I
.i· , , I , , '' L.',, f
J,· ·~; . "
"' ,f '"" " ' 1_ ' , Please I11sert ater uali Monitorin Re uirements and 401 Permit i .
.< i' r·1'
,J,J, i
.. ' J:
f
.t u t'
.. ' l.'
·-:1
I"'.
FEDERALIDGBWAY ADMINISTRATION.
WESTERN FEDERAL LANDS
mGBWAY DIVISION
SWPPP TRAINING LOG
~"'"'''"'"'"''"' C@ntr@l!NPDES
Projed Name:~~=~~-~=~=-==~==~
Course Title:
T.r::uiinmg Tillipks:
D Ero§irnm Control BMPs
D Sediment C~n1l:rol BMPs
D Non-Stmrm Water BMlP's
Name ofAtte1r11.dee
WFLHD 157-3 (5/2011)
D Good Holll!sellmeping BMPs
SWPPP Provisions
D Condluctiing lbmspections
Turbidity Monitoring
D Other (Specify)
Company /Agency
FEDERAL ID.GHWAY ADMINISTRATION
HIGHWAY DIVISION
SWPPP TRAINING LOG
Sediment and·Erosion Control/NPDES Training
Project Name:-----------------------------
Course Title:---'-----------------------------
. Instructor's Name(s)/Title(s): ___________ .....,.. ____________ _
Course
Training Topics:
· D Erosion Control BMPs
D Sediment Control BMPs
D Non-Storm Water BMPs
D Emergency Procedures
Course Length (hours): ______ _
D Good Housekeeping BMPs
0 · SWPPP Provisions
D Conducting Inspections
D Tm·bidity Monitoring
D Other (Specify)
Attendee Roster: (attach additional pages as necessary)
Nam:e()f1\tte114¢:¢ ·.· .. .. ·>/\. ·.· .. ..···. \ ... , < Pf?mpi\n,y/ Ag~ncy
WFLHD 157-3 (5/2011)
FEDERAL HIGHWAY ADMINISTRATION
HIGHWAY DIVISION
SWPPP TRAINING LOG
Sediment and Erosion Control/NPDES Training
Project Name:~-----------------------------~
Course Title:
Instructor's Name(s)/Title(s): _____________ ......,.,. ___________ _
Course Date: ___________ _ Course Length (hours): __ ~----
Training Topics:
D Erosion Control BMPs
D Sediment Control BMPs
D Non-Storm Water BMPs
D ·Emergency Procedures
D Good Housekeeping BMPs
D SWPPP Provisions
D Conducting Inspections
D Turbidity Monitoring
D Other (Specify)
Attendee Roster: [attach additional pages as.necessary)
Name ()f Attepdee Company/ Agency
HIGHWAY DIVISION
SWPPP TRAINING LOG
Sediment and Erosion Control/NPDES Training
Project Name: ______________________________ _
Course Title:-------------------------------
Instmctor·'s Name(s)/Title(s): _________________________ _
Course Location: _____________________________ _
Course Date: ___________ _ Course Length (hours): ______ _
Training Topics:
D Erosion Control BMPs
D Sediment Control BMPs
D Non-Storm Water BMPs
D Emergency Procedures
D Good Housekeeping BMPs
D SWPPP Provisions
D Comfo.cting Inspections
D Turbidity Monitoring
D Other (Specify)
Attendee Roster: (attach additional pages as necessary)
Name of Attendee Company/ Agency
HIGHWAY DIVISION
SWPPP TRAINING LOG
Sediment and Erosion Co:ntrol/NPDES Training
Project Name:-------------------------------
Course Title:-------------------------------
Instructor's Name(s)/Title(s):. _________________________ _
Course Date: ___________ _ Course Length (hours): ______ _
Training Topics:
D Erosion Control BMPs
D Sediment Control BMPs
D Non':"Storm Water BMPs
D Emergency Procedures
D Good Housekeeping BMPs
0 SWPPP Provisions
D Conducting Inspections
D Turbidity Monitoring
D Other (Specify)
Attendee Roster: (attach additional pages as necessary)
Company/ Agency Name of Attendee ·c
-., I l
T t ·.j
.~I ·"
,J: l."
.L
' }! "' r:
,1
:1 ··~
.f
J l r .:..i.).,.
l
"J., 'l
I
.J ~' /~'' .>
Please Insert Waste or Borrow Site Plan Sheets r i l l r ..,, .
) 1 ·) ;~~ i
,I (i
·O .tr
., r· I, 1,·
. l', .I
.1'.
f .
Please Insert Grading and Stabilization Log
T /'?""' .-. L f ,_ .'!;!., • . - 1
,1 ! ·' ·'
; ,. f"". r.' · . . .. ::.: ,• :'. ·. , .
l
;' J ';.l r·-1 •. .., '-' ,._ 1~ .. l
·' ' ,_ .i ·:;-t r· .'-I
} 1 ~
.' ' l
.-1.
.I ...
t t'"J i 'L l ' ..
Please Insert Hazardous S ill Plan
. Agency
,f t· / \-,,.
'' ·:t''1
.l : .. .''~ f f
! t:
\. •• J ·v
- .l
,• ,{· C··
;_1 l' ·.-, -·-1
.f l :...J',.
r ,, Please Insert the 404 Permit r ., J~ I I ,_ 1.
·r
.i
.r
.I.
r' '" "
.: '~. t
17:
r, t
.c.
i
I
Quality Assurance
' ', •1 " " ... ·'
' ' ·~ "): J .. ~"'< 71 c .. '« ''1 .. •'~,~: •l, 1 :i ~~
·, \ J •. •. l .. ~ .
·~ I • .',I
NPDES Quality Assuram.-:teL Checklist
D:a11:e of Iirnspedfon:
--=-~~~~~--1-~~~~~~~~~~~~~~~~~~-'-~--~~~-~~~~-,----1
Project Revfiewed fory:
Da11:e of Mrnd Recemnl:
Amerullmen1l: or Modific:atiol!ll~ tlhte SWPfP s~gllllage properly aimd col!llspkira®IDisly posted? DlYe$ C!No (Si nage should include where the SWPPP. is loc&ted, who to contact for viewing t"Qe SWPPP, a11d a copy ofthe NOI(s) if~ .iicable)
Are tlhle §WJP'P:P lfllairr:atilve :am:l! plrul1 slhaeets beilmg updated fo accID!rate~y reflect 1tlhe 111rogres!ii of the project?
DlYes DlNo ·
Illilspedfon Freqirneirncy Rel!Jlirnihred Jhiy §WPPlP': 0 At least once every 14 calendar days and within 24 hours of the end of a stonu~v>ent of0.5 inches or i;eater,.
Are ]ns]pJediolllis bemg perfoirmei!:l! aIDllill dl(llcume!lll;fod !ll1t above sfa1l:ed freq1UleIDJcy? OYes DlNo
C!Yes hrnrw111,.v;;..v miul!/mr waide sites decll-km11:ed fo 1l:lhle project imispeded as pairt of the SWPPP colll)t1t1l:ft1dilrnm site llll§iliJl\\:lli!tll<rnrf OYes ·
UYes DINo lJNo
Are tempoirairy all!lii:ll permanent erosfolll\ practices prnpeidy i~sfaUed ed effectively maintail!lled withilffi th~ timeframe? UYes
Are temporairy and pcrmalll\e!llt setrll!!!en,;tcontrnl practices prnpedy installed :null eff0ctively m11bmfailll!ed?
OJYes ONo · , ·ls the SWPP.P being updated and revised as needed to address problems i:m,d relllect changes in the eontracto.r,s operntiolllls? !JYes ONo (SWPPP must be updated within 7 days of revisions, amendments, and modifications)
ONo
Are the BMPs adequate ,fo miIDrimize poll.utairnts in stormwater disch!llrge ne~essairy to meet water quiall,ty staJtullards as stated by tlhle Sfate Water Quality Certifieatirnrn a:mll/m: NPDES? ONo (S,tate Water Quality Certification found in Tab 16 ofthe SWPPP; NPDES permit found in Tal? 2 of the SvVPPP)
WFLHD 157-1 (2/2011)
1 - .
r .
1~·
I f
I
I~
1 1
'···. -~ ~ ~ t
I~ '
1: .. '. /
· .. ' 1 '
•J
Please Insert NPDES Notice of Termination
| Table of Contents |
| Tab 1 |
| Tab 2 |
| Tab 3 |
| Tab 4 |
| Tab 5 |
| Tab 6 |
| Tab 7 |
| Tab 8 |
| Tab 9 |
| Tab 10 |
| Tab 11 |
| Tab 12 |
| Tab 13 |
| Tab 14 |
| Tab 15 |
| Tab 16 |
| Tab 17 |
| Tab 18 |
File details come from the government source that posted it. Updated .