WA NPS OLYM 2016(1), Spruce Railroad Trail Segment A, Olympic National Park, Clallam, WA

The work consists of grading, drainage, clearing/grubbing, minor rockfall work (scaling, bolting) and other small items of work.

Project length: 0.8 miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Tentative Advertisement Date: Spring 2017

Estimated Price Range: Between $500,000 and $1,000,000.00

Location: approximately 20 miles west of Port Angeles, WA.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Base Schedule

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll

3127 LF

451 LF

DIVISION 200 – Earthwork 201 Clearing & Grubbing 2.5 Acres 202 Additional Clearing & Grubbing (clearing & grubbing) – Removal of individual tree 50 EA 203 Removal of Structures & Obstructions (structures, demolition) 204 Excavation & Embankment Roadway Excavation Roadway Embankment

2678 CY

1619 CY

207 Earthwork Geosynthetics Sparation-Stabilization Geotextile, Class 1,Ty A Geotextile Filter Fabric Class 1, Type A

6376 SY

1370 SY

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Placed Riprap, Method A, Class 2 418 CY 260 Rock Bolts & Dowels 240 LF

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Base Schedule

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 3466 T

DIVISION 600 – Incidental Construction 602 24-inch pipe Culverts End Sections for 24” pipe culvert 225 LF 603 Structural Plate Structures (culverts & drains) 14 EA 622 Rental Equipment Yes 623 General Labor (slope scaling, other) Yes 624 Conserved Topsoil 6145 SY 625 Mulching – Dry method Mulching, hydraulic method, bonded fiber mat.

1.2 Acres

0.2 Acres

635 Temporary Traffic Control LPSM 647 Mitigation, Landscaping logs 35 EA