WA NPS OLYM 2016(1), Spruce Railroad Trail Segment A, Olympic National Park, Clallam, WA
The work consists of grading, drainage, clearing/grubbing, minor rockfall work (scaling, bolting) and other small items of work.
Project length: 0.8 miles
Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Tentative Advertisement Date: Spring 2017
Estimated Price Range: Between $500,000 and $1,000,000.00
Location: approximately 20 miles west of Port Angeles, WA.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll
3127 LF
451 LF
DIVISION 200 – Earthwork 201 Clearing & Grubbing 2.5 Acres 202 Additional Clearing & Grubbing (clearing & grubbing) – Removal of individual tree 50 EA 203 Removal of Structures & Obstructions (structures, demolition) 204 Excavation & Embankment Roadway Excavation Roadway Embankment
2678 CY
1619 CY
207 Earthwork Geosynthetics Sparation-Stabilization Geotextile, Class 1,Ty A Geotextile Filter Fabric Class 1, Type A
6376 SY
1370 SY
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Placed Riprap, Method A, Class 2 418 CY 260 Rock Bolts & Dowels 240 LF
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 3466 T
DIVISION 600 – Incidental Construction 602 24-inch pipe Culverts End Sections for 24” pipe culvert 225 LF 603 Structural Plate Structures (culverts & drains) 14 EA 622 Rental Equipment Yes 623 General Labor (slope scaling, other) Yes 624 Conserved Topsoil 6145 SY 625 Mulching – Dry method Mulching, hydraulic method, bonded fiber mat.
1.2 Acres
0.2 Acres
635 Temporary Traffic Control LPSM 647 Mitigation, Landscaping logs 35 EA