MT SWEETGRASS 210(1), Main Boulder River Road Improvements, Sweet Grass and Park County, Montana
The work consists of grading, base, drainage, structures, and other small items of work.
Bridge Info: The project includes construction of a single span, 126-foot long precast, prestressed concrete decked bulb 65-inch tee girders bridge [with 2-inch fiber reinforced concrete overlay deck]. Abutments are founded on H-piles [The work includes demolition of the existing steel thru truss with timber stringers bridge upon completion of the new structure.] The project also includes construction of a single span, 73-foot long precast, prestressed concrete box beam type B1-48 bridge [with 5-inch concrete overlay deck]. Abutments are founded on H-piles [The work includes demolition of the existing timber bridge upon completion of the new structure.]
Project length: 2.53 Miles
Tentative Fixed Completion Date:
Base: Winter 2016/2017 Base and Option: Spring 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $5 million and $7 million
Location: 23 Miles south of Big Timber, MT.
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Base Schedule Option A
Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes 153 Contractor Quality Control and Assurance (yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence 8000 LF 200 LF 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 8000 LF 800 LF 157 Soil Erosion & Sediment Control (erosion control devices Temporary Diversion Channel 1000 LF
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Base Schedule Option A Schedule
157 Soil Erosion & Sediment Control (erosion control devices Temporary Diversion Berm 1800 LF 157 Soil Erosion & Sediment Control (erosion control devices Temporary Soil Stabilization 12 ACRES 2 ACRES 157 Soil Erosion & Sediment Control (erosion control devices Silt Barrier 500 LF 400 LF 158 Watering for Dust Control 2600 MGAL 400 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 14 ACRES 2.5 ACRES 203 Removal of Structures & Obstructions (structures, demolition) 1 1 204 Excavation & Embankment 19000 CY 7000 CY 205 Rock Blasting: 10000 CY 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No No 207 Earthwork Geosynthetics 15000 SY 5000 SY 208 Structure Excavation 300 CY 200 CY 211 Roadway Obliteration 100 SY
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 6500 CY 1200 CY 252 Rockery, Special Rock Embankment, and Rock Buttress 200 CY 255 MSE Retaining Walls (contractor completed designs) 14000 SF
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses 8-inch compacted depth 30000 SY 4500 SY
DIVISION 550 – Bridge Construction 551 Driven Piles 1500 LF 720 LF
552 Structural Concrete (concrete – major structures) 150 CY 200 CY
553 Prestressed Concrete 650 LF 550 LF
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Base Schedule Option A Schedule
554 Reinforcing Steel 15000 LBS 16000 LBS 556 Bridge Railing 200 LF 200 LF 564 Bearing Devices 10 32 569 Concrete Overlays For Bridge Decks 500 SY
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures)
100 CY
602 Culverts & Drains (both) 1500 LF 602 Reinforced Concrete Box Single Barrel 12’ x
8’ 50 LF
603 Structural Plate Structures (culverts & drains) 125 LF
605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) 2100 LF 619 Fences, Gates, Cattle Guards & Bollard Posts 6500 LF 622 Rental Equipment (yes/no) Yes Yes 623 General Labor (yes/no) Yes Yes 624 Topsoil (landscaping & related items) 13 ACRES 3 ACRES 625 Turf Establishment (indicate seeding and mulching) 13 ACRES 3 ACRES 633 Permanent Traffic Control (traffic control devices) 200 SF 635 Temporary Traffic Control – Flagger 2500 HRS 300 HRS 635 Temporary Traffic Control – Supervisor 180 DAYS 647 Environmental Mitigation (use pay item description) Rock Weir 32 EA 647 Environmental Mitigation (use pay item description) Sediment Retention Sill 40 EA 647 Environmental Mitigation (use pay item description) Fish Passage Boulder 30 EA 647 Environmental Mitigation (use pay item description) Streambed Material 500 CY 650 Temporary Diversions 2000 LF