MT SWEETGRASS 210(1), Main Boulder River Road Improvements
Base Schedule
Earthwork Data Listing For
1949+25 to 1963+00
File: c:\myfiles\pw_production\d0236274\95% PIH_EW_1949+25-1963+00.log 6/23/2016, 5:46:27 PM
699 699 beg sta = 1949+25.00 R 1 1 700 700 end sta = 1963+00.00 R 1
0 0 701 END_OF_FILE
COMPUTING EARTHWORKS FOR BASELINE = MLPIH_E
COMPUTING EARTHWORKS FOR JOB = 210
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
1949+25.00 RDWYEXC
Excavation 10.89 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.81 0 0 1.00 0 0
TOPSOIL
Excavation 2.12 0 0 0.00 0 Subsoil Exc 3.06 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 0 0 0.00 0 0
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 0 0
1949+50.00 RDWYEXC
Excavation 65.02 35 35 1.00 35 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.58 3 3 1.00 32 3
TOPSOIL
Excavation 6.63 5 0 0.00 5 Subsoil Exc 0.55 2 0 0.00 2 Fill 0.00 0 0 0.00 32 0 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.68 6 0 0.00 32 6
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 32 7
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 32 0
1949+75.00 RDWYEXC
Excavation 37.63 47 47 1.00 82 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.73 2 2 1.00 77 5
TOPSOIL
Excavation 4.62 5 0 0.00 10 Subsoil Exc 1.27 1 0 0.00 3 Fill 0.00 0 0 0.00 77 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 77 12
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 77 14
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 77 0
1950+00.00 RDWYEXC
Excavation 24.80 29 29 1.00 111 Subsoil Exc 0.00 0 0 1.00 0
Page: 3
Fill 27.59 15 15 1.00 91 20
TOPSOIL
Excavation 3.89 4 0 0.00 14 Subsoil Exc 3.28 2 0 0.00 5 Fill 0.00 0 0 0.00 91 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 91 18
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 91 21
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 91 0
1950+25.00 RDWYEXC
Excavation 12.09 17 17 1.00 128 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.85 42 42 1.00 66 62
TOPSOIL
Excavation 2.91 3 0 0.00 17 Subsoil Exc 5.13 4 0 0.00 9 Fill 0.00 0 0 0.00 66 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 66 24
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 66 28
SHOULDERBACKFILL
Page: 4
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 66 0
1950+50.00 RDWYEXC
Excavation 6.06 8 8 1.00 136 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.05 77 77 1.00 -3 139
TOPSOIL
Excavation 3.17 3 0 0.00 20 Subsoil Exc 5.89 5 0 0.00 14 Fill 0.00 0 0 0.00 -3 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -3 30
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -3 35
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -3 0
1950+75.00 RDWYEXC
Excavation 0.00 3 3 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 137.68 111 111 1.00 -111 250
TOPSOIL
Excavation 0.00 1 0 0.00 21 Subsoil Exc 6.48 6 0 0.00 20 Fill 0.00 0 0 0.00 -111 0 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 5
Subsoil Exc 0.00 0 0 0.00 0 Fill 7.01 6 0 0.00 -111 36
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.37 8 0 0.00 -111 43
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -111 0
1951+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 174.23 144 144 1.00 -255 394
TOPSOIL
Excavation 0.00 0 0 0.00 21 Subsoil Exc 8.19 7 0 0.00 27 Fill 0.00 0 0 0.00 -255 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.19 7 0 0.00 -255 43
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.58 8 0 0.00 -255 51
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -255 0
1951+25.00 RDWYEXC
Excavation 0.00 0 0 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 165.87 157 157 1.00 -412 551
Page: 6
TOPSOIL
Excavation 0.00 0 0 0.00 21 Subsoil Exc 8.23 8 0 0.00 35 Fill 0.00 0 0 0.00 -412 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.57 8 0 0.00 -412 51
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 9 0 0.00 -412 60
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -412 0
1951+42.77 RDWYEXC
Excavation 0.00 0 0 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 156.52 106 106 1.00 -518 657
TOPSOIL
Excavation 0.00 0 0 0.00 21 Subsoil Exc 9.30 6 0 0.00 41 Fill 0.00 0 0 0.00 -518 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.65 6 0 0.00 -518 57
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.03 7 0 0.00 -518 67
SHOULDERBACKFILL
Page: 7
Fill 0.46 0 0 0.00 -518 0
1951+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 134.33 39 39 1.00 -557 696
TOPSOIL
Excavation 0.00 0 0 0.00 21 Subsoil Exc 7.09 2 0 0.00 43 Fill 0.00 0 0 0.00 -557 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.57 2 0 0.00 -557 59
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 3 0 0.00 -557 70
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -557 0
1951+75.00 RDWYEXC
Excavation 8.57 4 4 1.00 143 Subsoil Exc 0.00 0 0 1.00 0 Fill 115.44 116 116 1.00 -669 812
TOPSOIL
Excavation 3.52 2 0 0.00 23 Subsoil Exc 6.35 6 0 0.00 49 Fill 0.00 0 0 0.00 -669 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 8
Fill 8.57 8 0 0.00 -669 67
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 9 0 0.00 -669 79
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -669 0
1952+00.00 RDWYEXC
Excavation 16.26 11 11 1.00 154 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.06 101 101 1.00 -759 913
TOPSOIL
Excavation 3.24 3 0 0.00 26 Subsoil Exc 5.74 6 0 0.00 55 Fill 0.00 0 0 0.00 -759 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.56 8 0 0.00 -759 75
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.94 9 0 0.00 -759 88
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -759 0
1952+25.00 RDWYEXC
Excavation 11.97 13 13 1.00 167 Subsoil Exc 0.00 0 0 1.00 0 Fill 105.11 96 96 1.00 -842 1009
Page: 9
Excavation 2.98 3 0 0.00 29 Subsoil Exc 6.99 6 0 0.00 61 Fill 0.00 0 0 0.00 -842 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.55 8 0 0.00 -842 83
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.91 9 0 0.00 -842 97
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -842 0
1952+50.00 RDWYEXC
Excavation 15.98 13 13 1.00 180 Subsoil Exc 0.00 0 0 1.00 0 Fill 97.76 94 94 1.00 -923 1103
TOPSOIL
Excavation 3.36 3 0 0.00 32 Subsoil Exc 6.39 6 0 0.00 67 Fill 0.00 0 0 0.00 -923 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.54 8 0 0.00 -923 91
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.88 9 0 0.00 -923 106
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Page: 10
Fill 0.45 0 0 0.00 -923 0
1952+75.00 RDWYEXC
Excavation 0.00 7 7 1.00 187 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.68 85 85 1.00 -1001 1188
TOPSOIL
Excavation 0.00 2 0 0.00 34 Subsoil Exc 5.59 6 0 0.00 73 Fill 0.00 0 0 0.00 -1001 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.52 8 0 0.00 -1001 99
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -1001 115
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 -1001 0
1953+00.00 RDWYEXC
Excavation 7.33 3 3 1.00 190 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.28 71 71 1.00 -1069 1259
TOPSOIL
Excavation 2.32 1 0 0.00 35 Subsoil Exc 4.48 5 0 0.00 78 Fill 0.00 0 0 0.00 -1069 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.51 8 0 0.00 -1069 107
Page: 11
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.85 9 0 0.00 -1069 124
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 -1069 0
1953+25.00 RDWYEXC
Excavation 18.04 12 12 1.00 202 Subsoil Exc 0.00 0 0 1.00 0 Fill 42.74 51 51 1.00 -1108 1310
TOPSOIL
Excavation 3.56 3 0 0.00 38 Subsoil Exc 2.76 3 0 0.00 81 Fill 0.00 0 0 0.00 -1108 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.50 8 0 0.00 -1108 115
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.84 9 0 0.00 -1108 133
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1108 0
1953+50.00 RDWYEXC
Excavation 49.26 31 31 1.00 233 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.19 30 30 1.00 -1107 1340
TOPSOIL
Excavation 5.11 4 0 0.00 42
Page: 12
Subsoil Exc 2.34 2 0 0.00 83 Fill 0.00 0 0 0.00 -1107 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.49 8 0 0.00 -1107 123
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.84 9 0 0.00 -1107 142
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1107 0
1953+75.00 RDWYEXC
Excavation 93.24 66 66 1.00 299 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.17 11 11 1.00 -1052 1351
TOPSOIL
Excavation 6.30 5 0 0.00 47 Subsoil Exc 0.56 1 0 0.00 84 Fill 0.00 0 0 0.00 -1052 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 8 0 0.00 -1052 131
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.85 9 0 0.00 -1052 151
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1052 0
Page: 13
1954+00.00 RDWYEXC
Excavation 152.15 114 114 1.00 413 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.15 1 1 1.00 -939 1352
TOPSOIL
Excavation 9.48 7 0 0.00 54 Subsoil Exc 0.15 0 0 0.00 84 Fill 0.00 0 0 0.00 -939 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 8 0 0.00 -939 139
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -939 160
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -939 0
1954+25.00 RDWYEXC
Excavation 103.34 119 119 1.00 532 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.40 0 0 1.00 -820 1352
TOPSOIL
Excavation 7.01 7 0 0.00 61 Subsoil Exc 0.23 0 0 0.00 84 Fill 0.00 0 0 0.00 -820 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 8 0 0.00 -820 147
Page: 14
Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -820 169
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -820 0
1954+50.00 RDWYEXC
Excavation 47.83 70 70 1.00 602 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.13 3 3 1.00 -753 1355
TOPSOIL
Excavation 4.47 5 0 0.00 66 Subsoil Exc 1.34 1 0 0.00 85 Fill 0.00 0 0 0.00 -753 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.91 8 0 0.00 -753 155
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.28 9 0 0.00 -753 178
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -753 0
1954+75.00 RDWYEXC
Excavation 28.51 35 35 1.00 637 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.22 13 13 1.00 -731 1368
TOPSOIL
Excavation 3.17 3 0 0.00 69 Subsoil Exc 1.82 1 0 0.00 86
Page: 15
Fill 0.00 0 0 0.00 -731 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 7 0 0.00 -731 162
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 8 0 0.00 -731 186
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -731 0
1955+00.00 RDWYEXC
Excavation 2.66 14 14 1.00 651 Subsoil Exc 0.00 0 0 1.00 0 Fill 38.72 28 28 1.00 -745 1396
TOPSOIL
Excavation 1.37 2 0 0.00 71 Subsoil Exc 2.34 2 0 0.00 88 Fill 0.00 0 0 0.00 -745 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -745 168
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -745 193
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -745 0
Page: 16
1955+25.00 RDWYEXC
Excavation 0.00 1 1 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.85 46 46 1.00 -790 1442
TOPSOIL
Excavation 0.04 1 0 0.00 72 Subsoil Exc 3.47 3 0 0.00 91 Fill 0.00 0 0 0.00 -790 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -790 174
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -790 200
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -790 0
1955+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.34 72 72 1.00 -862 1514
TOPSOIL
Excavation 0.00 0 0 0.00 72 Subsoil Exc 6.20 4 0 0.00 95 Fill 0.00 0 0 0.00 -862 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -862 180
LAYER2
Page: 17
Fill 8.02 7 0 0.00 -862 207
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -862 0
1955+75.00 RDWYEXC
Excavation 0.00 0 0 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 108.18 94 94 1.00 -956 1608
TOPSOIL
Excavation 0.00 0 0 0.00 72 Subsoil Exc 6.35 6 0 0.00 101 Fill 0.00 0 0 0.00 -956 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -956 186
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -956 214
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -956 0
1956+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 112.53 102 102 1.00 -1058 1710
TOPSOIL
Excavation 0.00 0 0 0.00 72 Subsoil Exc 7.00 6 0 0.00 107 Fill 0.00 0 0 0.00 -1058 0
Page: 18
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -1058 192
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -1058 221
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1058 0
1956+25.00 RDWYEXC
Excavation 0.00 0 0 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 118.30 107 107 1.00 -1165 1817
TOPSOIL
Excavation 0.00 0 0 0.00 72 Subsoil Exc 7.93 7 0 0.00 114 Fill 0.00 0 0 0.00 -1165 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -1165 198
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -1165 228
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1165 0
1956+50.00 RDWYEXC
Page: 19
Excavation 0.00 0 0 1.00 652 Subsoil Exc 0.00 0 0 1.00 0 Fill 80.12 92 92 1.00 -1257 1909
TOPSOIL
Excavation 0.00 0 0 0.00 72 Subsoil Exc 5.47 6 0 0.00 120 Fill 0.00 0 0 0.00 -1257 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -1257 204
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -1257 235
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1257 0
1956+75.00 RDWYEXC
Excavation 5.27 2 2 1.00 654 Subsoil Exc 0.00 0 0 1.00 0 Fill 41.19 56 56 1.00 -1311 1965
TOPSOIL
Excavation 1.85 1 0 0.00 73 Subsoil Exc 3.71 4 0 0.00 124 Fill 0.00 0 0 0.00 -1311 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -1311 210
LAYER2
Excavation 0.00 0 0 0.00 0
Page: 20
Fill 8.02 7 0 0.00 -1311 242
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1311 0
1957+00.00 RDWYEXC
Excavation 20.49 12 12 1.00 666 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.11 23 23 1.00 -1322 1988
TOPSOIL
Excavation 3.37 2 0 0.00 75 Subsoil Exc 2.90 3 0 0.00 127 Fill 0.00 0 0 0.00 -1322 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 -1322 216
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.02 7 0 0.00 -1322 249
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1322 0
1957+25.00 RDWYEXC
Excavation 53.10 34 34 1.00 700 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.59 5 5 1.00 -1293 1993
TOPSOIL
Excavation 6.96 5 0 0.00 80 Subsoil Exc 1.01 2 0 0.00 129 Fill 0.00 0 0 0.00 -1293 0 Mass ordinate for TOPSOIL = 0
Page: 21
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.29 6 0 0.00 -1293 222
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.65 8 0 0.00 -1293 257
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1293 0
1957+50.00 RDWYEXC
Excavation 79.55 61 61 1.00 761 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.19 1 1 1.00 -1233 1994
TOPSOIL
Excavation 8.95 7 0 0.00 87 Subsoil Exc 0.19 1 0 0.00 130 Fill 0.00 0 0 0.00 -1233 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 7 0 0.00 -1233 229
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -1233 266
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1233 0
1957+75.00 RDWYEXC
Excavation 48.44 60 60 1.00 821
Page: 22
Fill 6.06 3 3 1.00 -1176 1997
TOPSOIL
Excavation 6.43 7 0 0.00 94 Subsoil Exc 2.38 1 0 0.00 131 Fill 0.00 0 0 0.00 -1176 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 8 0 0.00 -1176 237
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -1176 275
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1176 0
1958+00.00 RDWYEXC
Excavation 18.15 31 31 1.00 852 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.44 17 17 1.00 -1162 2014
TOPSOIL
Excavation 4.01 5 0 0.00 99 Subsoil Exc 4.41 3 0 0.00 134 Fill 0.00 0 0 0.00 -1162 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.47 8 0 0.00 -1162 245
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.86 9 0 0.00 -1162 284
Page: 23
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1162 0
1958+25.00 RDWYEXC
Excavation 0.69 9 9 1.00 861 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.71 46 46 1.00 -1199 2060
TOPSOIL
Excavation 1.23 2 0 0.00 101 Subsoil Exc 4.85 4 0 0.00 138 Fill 0.00 0 0 0.00 -1199 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.59 8 0 0.00 -1199 253
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 9 0 0.00 -1199 293
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1199 0
1958+29.43 RDWYEXC
Excavation 1.65 0 0 1.00 861 Subsoil Exc 0.00 0 0 1.00 0 Fill 66.08 11 11 1.00 -1210 2071
TOPSOIL
Excavation 0.00 0 0 0.00 101 Subsoil Exc 0.00 0 0 0.00 138 Fill 0.00 0 0 0.00 -1210 0 Mass ordinate for TOPSOIL = 0
Page: 24
Subsoil Exc 0.00 0 0 0.00 0 Fill 8.61 1 0 0.00 -1210 254
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.97 2 0 0.00 -1210 295
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1210 0
1958+50.00 RDWYEXC
Excavation 0.00 1 1 1.00 862 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.98 56 56 1.00 -1265 2127
TOPSOIL
Excavation 0.28 0 0 0.00 101 Subsoil Exc 7.48 3 0 0.00 141 Fill 0.00 0 0 0.00 -1265 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.71 7 0 0.00 -1265 261
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.06 8 0 0.00 -1265 303
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1265 0
1958+75.00 RDWYEXC
Excavation 0.34 0 0 1.00 862
Page: 25
Fill 80.58 74 74 1.00 -1339 2201
TOPSOIL
Excavation 0.67 0 0 0.00 101 Subsoil Exc 7.50 7 0 0.00 148 Fill 0.00 0 0 0.00 -1339 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.83 8 0 0.00 -1339 269
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.17 9 0 0.00 -1339 312
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1339 0
1959+00.00 RDWYEXC
Excavation 7.99 4 4 1.00 866 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.27 68 68 1.00 -1403 2269
TOPSOIL
Excavation 1.89 1 0 0.00 102 Subsoil Exc 5.97 6 0 0.00 154 Fill 0.00 0 0 0.00 -1403 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.95 8 0 0.00 -1403 277
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.29 9 0 0.00 -1403 321
Page: 26
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 -1403 0
1959+25.00 RDWYEXC
Excavation 0.31 4 4 1.00 870 Subsoil Exc 0.00 0 0 1.00 0 Fill 46.95 53 53 1.00 -1452 2322
TOPSOIL
Excavation 0.60 1 0 0.00 103 Subsoil Exc 5.69 5 0 0.00 159 Fill 0.00 0 0 0.00 -1452 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.08 8 0 0.00 -1452 285
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.41 10 0 0.00 -1452 331
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 -1452 0
1959+50.00 RDWYEXC
Excavation 1.40 1 1 1.00 871 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.29 35 35 1.00 -1486 2357
TOPSOIL
Excavation 1.16 1 0 0.00 104 Subsoil Exc 5.27 5 0 0.00 164 Fill 0.00 0 0 0.00 -1486 0 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 27
Fill 9.20 8 0 0.00 -1486 293
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.54 10 0 0.00 -1486 341
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1486 0
1959+75.00 RDWYEXC
Excavation 10.66 5 5 1.00 876 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.70 17 17 1.00 -1498 2374
TOPSOIL
Excavation 5.30 3 0 0.00 107 Subsoil Exc 2.46 4 0 0.00 168 Fill 0.00 0 0 0.00 -1498 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.32 9 0 0.00 -1498 302
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.67 10 0 0.00 -1498 351
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1498 0
1960+00.00 RDWYEXC
Excavation 50.96 29 29 1.00 905 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 4 4 1.00 -1473 2378
Page: 28
Excavation 8.97 7 0 0.00 114 Subsoil Exc 0.17 1 0 0.00 169 Fill 0.00 0 0 0.00 -1473 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.44 9 0 0.00 -1473 311
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.81 10 0 0.00 -1473 361
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1473 0
1960+25.00 RDWYEXC
Excavation 63.62 53 53 1.00 958 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.19 0 0 1.00 -1420 2378
TOPSOIL
Excavation 4.79 7 0 0.00 121 Subsoil Exc 0.19 0 0 0.00 169 Fill 0.00 0 0 0.00 -1420 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.56 9 0 0.00 -1420 320
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.96 10 0 0.00 -1420 371
SHOULDERBACKFILL
Page: 29
Fill 0.47 0 0 0.00 -1420 0
1960+34.86 RDWYEXC
Excavation 75.72 26 26 1.00 984 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -1394 2378
TOPSOIL
Excavation 0.00 1 0 0.00 122 Subsoil Exc 0.00 0 0 0.00 169 Fill 0.00 0 0 0.00 -1394 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 4 0 0.00 -1394 324
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.02 4 0 0.00 -1394 375
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.47 0 0 0.00 -1394 0
1960+50.00 RDWYEXC
Excavation 78.35 43 43 1.00 1027 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.34 0 0 1.00 -1351 2378
TOPSOIL
Excavation 9.30 3 0 0.00 125 Subsoil Exc 0.34 0 0 0.00 169 Fill 0.00 0 0 0.00 -1351 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 30
Fill 9.63 5 0 0.00 -1351 329
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.05 6 0 0.00 -1351 381
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.47 0 0 0.00 -1351 0
1960+75.00 RDWYEXC
Excavation 35.14 53 53 1.00 1080 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.22 1 1 1.00 -1299 2379
TOPSOIL
Excavation 7.97 8 0 0.00 133 Subsoil Exc 1.15 1 0 0.00 170 Fill 0.00 0 0 0.00 -1299 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.63 9 0 0.00 -1299 338
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.05 10 0 0.00 -1299 391
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.47 0 0 0.00 -1299 0
1961+00.00 RDWYEXC
Excavation 0.00 16 16 1.00 1096 Subsoil Exc 0.00 0 0 1.00 0 Fill 33.22 16 16 1.00 -1299 2395
Page: 31
Excavation 0.00 3 0 0.00 136 Subsoil Exc 6.68 4 0 0.00 174 Fill 0.00 0 0 0.00 -1299 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.63 9 0 0.00 -1299 347
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.05 10 0 0.00 -1299 401
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.47 0 0 0.00 -1299 0
1961+25.00 RDWYEXC
Excavation 0.00 0 0 1.00 1096 Subsoil Exc 0.00 0 0 1.00 0 Fill 99.83 62 62 1.00 -1361 2457
TOPSOIL
Excavation 0.00 0 0 0.00 136 Subsoil Exc 8.15 7 0 0.00 181 Fill 0.00 0 0 0.00 -1361 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.48 9 0 0.00 -1361 356
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.88 10 0 0.00 -1361 411
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Page: 32
Fill 0.47 0 0 0.00 -1361 0
1961+32.40 RDWYEXC
Excavation 4.06 1 1 1.00 1097 Subsoil Exc 0.00 0 0 1.00 0 Fill 99.62 27 27 1.00 -1387 2484
TOPSOIL
Excavation 2.09 0 0 0.00 136 Subsoil Exc 9.43 2 0 0.00 183 Fill 0.00 0 0 0.00 -1387 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.45 3 0 0.00 -1387 359
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.83 3 0 0.00 -1387 414
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1387 0
1961+50.00 RDWYEXC
Excavation 3.98 3 3 1.00 1100 Subsoil Exc 0.00 0 0 1.00 0 Fill 57.38 51 51 1.00 -1435 2535
TOPSOIL
Excavation 2.14 1 0 0.00 137 Subsoil Exc 7.71 6 0 0.00 189 Fill 0.00 0 0 0.00 -1435 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.93 6 0 0.00 -1435 365
Page: 33
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.30 7 0 0.00 -1435 421
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 -1435 0
1961+73.84 RDWYEXC
Excavation 5.26 4 4 1.00 1104 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.10 33 33 1.00 -1464 2568
TOPSOIL
Excavation 0.00 1 0 0.00 138 Subsoil Exc 0.00 3 0 0.00 192 Fill 0.00 0 0 0.00 -1464 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.41 8 0 0.00 -1464 373
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.76 9 0 0.00 -1464 430
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1464 0
1961+81.73 RDWYEXC
Excavation 6.51 2 2 1.00 1106 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.37 4 4 1.00 -1466 2572
LAYER1
Page: 34
Fill 8.24 2 0 0.00 -1466 375
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.58 3 0 0.00 -1466 433
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1466 0
1962+00.00 RDWYEXC
Excavation 9.25 6 6 1.00 1112 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.05 5 5 1.00 -1465 2577
TOPSOIL
Excavation 2.26 1 0 0.00 139 Subsoil Exc 3.13 1 0 0.00 193 Fill 0.00 0 0 0.00 -1465 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.84 5 0 0.00 -1465 380
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.17 6 0 0.00 -1465 439
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 -1465 0
1962+25.00 RDWYEXC
Excavation 12.93 10 10 1.00 1122 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.38 3 3 1.00 -1458 2580
Page: 35
Excavation 3.01 2 0 0.00 141 Subsoil Exc 1.68 2 0 0.00 195 Fill 0.00 0 0 0.00 -1458 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.39 7 0 0.00 -1458 387
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.72 8 0 0.00 -1458 447
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1458 0
1962+50.00 RDWYEXC
Excavation 11.67 12 12 1.00 1134 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.22 3 3 1.00 -1449 2583
TOPSOIL
Excavation 2.80 3 0 0.00 144 Subsoil Exc 1.61 2 0 0.00 197 Fill 0.00 0 0 0.00 -1449 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.32 7 0 0.00 -1449 394
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.67 8 0 0.00 -1449 455
SHOULDERBACKFILL
Page: 36
Fill 0.45 0 0 0.00 -1449 0
1962+75.00 RDWYEXC
Excavation 11.00 10 10 1.00 1144 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.30 3 3 1.00 -1442 2586
TOPSOIL
Excavation 2.38 3 0 0.00 147 Subsoil Exc 1.85 2 0 0.00 199 Fill 0.00 0 0 0.00 -1442 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.25 7 0 0.00 -1442 401
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.60 8 0 0.00 -1442 463
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1442 0
1963+00.00 RDWYEXC
Excavation 10.21 10 10 1.00 1154 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.69 3 3 1.00 -1435 2589
TOPSOIL
Excavation 0.82 2 0 0.00 149 Subsoil Exc 1.70 2 0 0.00 201 Fill 0.00 0 0 0.00 -1435 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 37
Fill 7.18 7 0 0.00 -1435 408
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.54 8 0 0.00 -1435 471
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 -1435 0
Page: 38
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 1154 1154 1.00 Subsoil Exc 0 0 1.00 Fill 2589 2589 1.00
TOPSOIL
Excavation 149 0 0.00 Subsoil Exc 201 0 0.00 Fill 0 0 0.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 408 0 0.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 471 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00
Page: 39
S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
RDWYEXC
Excavation 1154 1154 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 2589 2589 0 0 1.00
TOPSOIL
Excavation 149 0 0 0 0.00 Subsoil Exc 201 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER1
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 408 0 0 0 0.00
LAYER2
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 471 0 0 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
Page: 40