AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 11/18/2016 N/A MT SWEETGRASS 210(1), Main Boulder River Road Improvements

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-16-B-00024

9B. DATED (SEE ITEM 11)

11/04/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT SWEETGRASS 210(1), Main Boulder River Road Improvements

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 11-18-16 MT SWEETGRASS 210(1) Solicitation No. DTFH70-16-B-00024 Main Boulder River Road Improvements

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision G-7 713.12 Fiber Rolls and Socks Adds to subsection

PLANS

Plan sheet #F.5 Revises sheet

ENCLOSURES

Pages:

G-6 through G-8

Plan Sheets:

F.5

G-6 DIVISION 700

Special Contract Requirements Project: MT SWEETGRASS 210(1) Main Boulder River Road Improvements

Section 713. — ROADSIDE IMPROVEMENT MATERIAL

05/20/16– FP-14

713.04 Seed. Add the following:

Furnish a mixture consisting of the following kinds of seed with the corresponding percentages by weight of “live seed”:

Slender wheatgrass (Elymus trachycaulus ssp. trachycaulus) 15%

Bluebunch wheatgrass (Pseudoroegneria spicata) 10%

Bluebunch wheatgrass (Pseudoroegneria spicata) 10%

Big bluegrass (Poa secunda spp. Ampla) 10%

Canada Wildrye 7%

Sandberg bluegrass 8%

Thickspike wheatgrass (Elymus lanceolatus) 12%

Tufted hairgrass ( Descampisa caespitiosa) 3%

Mountain brome (Bromus marginatus) 15%

Idaho fescue 10%

Determine the amount of “live seed” in a container by the following formula:

Net weight of seed in container multiplied by the purity percentage multiplied by the germination percentage. (If seed is 85 percent pure and tests 90 percent germination, then a 100 pound container would contain 76.5 pounds of “live seed”).

Seed must be certified noxious weed seed free from the current “Western States Noxious Weeds List.” Lot must be tested by a certified seed laboratory.

713.06 Plant Material. Add following:

(f) Bank Willow Pole Plantings. Use healthy, straight, and live tree-type willows at least 1 year old. Stakes for planting must be 1 to 3 inches in diameter. Cuttings must be fresh and kept moist after they have been harvested. Do not cut to length, trim, or prune stakes until the same day they will be installed.

(g) Emergent Willow Pole Plantings. Use healthy, straight, and live shrub-type willows at least 1 year old. Stakes for planting must be 0.75 to 3 inches in diameter. Cuttings must be fresh and kept moist after they have been harvested. Do not cut to length, trim, or prune stakes until the same day they will be installed.

(h) Cottonwood Pole Plantings. Use healthy, straight, and live cottonwoods at least 1 year old. Harvest plants and stakes during dormant season. Stakes for planting must be 1 to 3 inches in diameter. Cuttings must be fresh and kept moist after they have been harvested.

Do not cut to length, trim, or prune stakes until the same day they will be installed.

713.12 Fiber Rolls and Socks. Amend as follows:

Revised by Amendment A001

G-7 DIVISION 700

Project: MT SWEETGRASS 210(1) Main Boulder River Road Improvements

713.12 Fiber Rolls and Socks. Amend as follows:

(a) Excelsior fiber rolls. Add following:

Conform to the following:

(1) Diameter 12 inches min.

(2) Mass 3 pounds per foot min

(b) Straw fiber rolls. Add following:

Conform to the following:

(1) Diameter 9 inches min.

(2) Netting strand thickness 0.030 inches

(3) Netting knot thickness 0.055 inches

(4) Mass of netting 0.315 to 0.385 ounces per foot

Add following:

Furnish a product that is 100% biodegradable.

G-8 DIVISION 700

Project: MT SWEETGRASS 210(1) Main Boulder River Road Improvements

Reserved

NO SCALE

Spacing Slope

STAKES REQUIRED

1:1

1:2

1:3

1:4 or flatter for each roll

Stakes required

FIBER ROLL SPACING

Fiber roll length

Fl ow

T o e o f fi ll s lo p e

ELEVATION

PLAN

disturbed areas

Runoff from

INSTALLATION BEYOND TOE OF SLOPE

INSTALLATION ALONG SLOPES

FIBER ROLL STAKING DETAIL

PROPERLY STAKED AND ENTRENCHED FIBER ROLL

Existing ground (typ.)

Fiber roll

Flow direction

Slope

Direction of runof f from distur bed area s sp ac in g ch ar t

S ee F ib er R ol l

Fiber roll ff o n ur f o n oi t c er i

D along contours

Install fiber rolls

Fiber roll

Slope

Fi ll slo pe

Direction of runoff ground

Existing soil to match ground level

Backfilled and compacted

Flow larger than fiber roll wood stakes. See Note 2.

Pay lim its

Pay lim its

SLOPE PROTECTION INSTALLATION

ALTERNATE FIBER ROLL JOINT DETAIL

FIBER ROLL LAPPING DETAIL

on uphill side of fiber roll

Place excavated material Stagger joints (typ.)

2.

1.

permanent installations. Do not crush fiber roll while staking.

roll is secure to slope. Live stakes may be used for and install fiber rolls

Step 1: Excavate trench Step 2: Backfill soil against fiber rolls

DRAFT: 7/2016

REVISED:

DETAIL APPROVED FOR USE 10/2014

WESTERN FEDERAL LANDS HIGHWAY DIVISION

FIBER ROLL

(FT)

(FT)

W157-21

2" (min.) Excavate trench 2"

1" x 1" or 1" Ø ove rlap

12" (m in.)

t o m in m in

1" x 1" Wood stake as specified in plans

3' min. or

3' (min.)

Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.

6-inches from fiber roll end angles towards the adjacent

Overlap fiber rolls 12-inch minimum. Drive stakes at

U.S. CUSTOMARY DETAIL

DETAIL

STATE PROJECT

NUMBER

SHEET

F.5

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

SWEETGRASS 210(1) MT

U S

C c m y fi le s p w p r o d u c ti o n d

W .d g n

P

M

N o v e m b e r

1 Revised by Amendment No.A001