Text version

MT SWEETGRASS 210(1), Main Boulder River Road Improvements

Earthwork Data Listing

For

MT SWEETGRASS 210(1)

MAIN BOULDER RIVER ROAD

IMPROVEMENTS

BASE SCHEDULE AND OPTION A

MT SWEETGRASS 210(1), Main Boulder River Road Improvements

Base Schedule

Earthwork Data Listing For

1664+75 to 1665+00

File: c:\myfiles\pw_production\d0236274\95% PIH_EW_1644+75-1665+00_A2.log 6/23/2016, 4:16:27 PM

1 698 698 beg sta = 1644+75.00 R 1 1 699 699 end sta = 1665+00.00 R 1

0 0 700 END_OF_FILE

COMPUTING EARTHWORKS FOR BASELINE = MLPIH_A

COMPUTING EARTHWORKS FOR JOB = 210

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

1644+75.00 RDWYEXC

Excavation 16.20 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.17 0 0 1.00 0 0

TOPSOIL

Excavation 4.11 0 0 0.00 0 Subsoil Exc 1.16 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 0 0 0.00 0 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.18 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.50 0 0 0.00 0 0

1645+00.00 RDWYEXC

Excavation 47.14 30 30 1.00 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.91 1 1 1.00 29 1

TOPSOIL

Excavation 8.12 6 0 0.00 6 Subsoil Exc 0.77 1 0 0.00 1 Fill 0.00 0 0 0.00 29 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.67 6 0 0.00 29 6

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.18 8 0 0.00 29 8

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.51 0 0 0.00 29 0

1645+25.00 RDWYEXC

Excavation 33.13 37 37 1.00 67 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.71 2 2 1.00 64 3

TOPSOIL

Excavation 3.65 6 0 0.00 12 Subsoil Exc 1.69 1 0 0.00 2 Fill 0.00 0 0 0.00 64 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.98 6 0 0.00 64 12

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.49 8 0 0.00 64 16

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.50 0 0 0.00 64 0

1645+50.00 RDWYEXC

Excavation 33.13 31 31 1.00 98 Subsoil Exc 0.00 0 0 1.00 0

Page: 3

Fill 2.88 3 3 1.00 92 6

TOPSOIL

Excavation 3.78 3 0 0.00 15 Subsoil Exc 1.67 2 0 0.00 4 Fill 0.00 0 0 0.00 92 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.30 7 0 0.00 92 19

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.76 8 0 0.00 92 24

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.49 0 0 0.00 92 0

1645+75.00 RDWYEXC

Excavation 65.68 46 46 1.00 144 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.39 2 2 1.00 136 8

TOPSOIL

Excavation 5.70 4 0 0.00 19 Subsoil Exc 1.17 1 0 0.00 5 Fill 0.00 0 0 0.00 136 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 7 0 0.00 136 26

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 8 0 0.00 136 32

SHOULDERBACKFILL

Page: 4

Subsoil Exc 0.00 0 0 0.00 0 Fill 0.48 0 0 0.00 136 0

1646+00.00 RDWYEXC

Excavation 75.57 66 66 1.00 210 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.72 1 1 1.00 201 9

TOPSOIL

Excavation 6.64 5 0 0.00 24 Subsoil Exc 0.63 1 0 0.00 6 Fill 0.00 0 0 0.00 201 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.93 7 0 0.00 201 33

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.32 9 0 0.00 201 41

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 201 0

1646+25.00 RDWYEXC

Excavation 71.92 68 68 1.00 278 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 269 9

TOPSOIL

Excavation 2.00 4 0 0.00 28 Subsoil Exc 0.17 0 0 0.00 6 Fill 0.00 0 0 0.00 269 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 5

Subsoil Exc 0.00 0 0 0.00 0 Fill 8.24 7 0 0.00 269 40

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.60 9 0 0.00 269 50

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 269 0

1646+37.50 RDWYEXC

Excavation 91.74 38 38 1.00 316 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.15 0 0 1.00 307 9

TOPSOIL

Excavation 2.31 1 0 0.00 29 Subsoil Exc 0.15 0 0 0.00 6 Fill 0.00 0 0 0.00 307 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.37 4 0 0.00 307 44

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.73 4 0 0.00 307 54

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 307 0

1646+50.00 RDWYEXC

Excavation 122.19 50 50 1.00 366 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 357 9

Page: 6

TOPSOIL

Excavation 3.02 1 0 0.00 30 Subsoil Exc 0.17 0 0 0.00 6 Fill 0.00 0 0 0.00 357 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.37 4 0 0.00 357 48

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.73 5 0 0.00 357 59

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 357 0

1646+75.00 RDWYEXC

Excavation 225.03 161 161 1.00 527 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.07 0 0 1.00 518 9

TOPSOIL

Excavation 8.29 5 0 0.00 35 Subsoil Exc 0.07 0 0 0.00 6 Fill 0.00 0 0 0.00 518 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.37 8 0 0.00 518 56

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.73 9 0 0.00 518 68

SHOULDERBACKFILL

Page: 7

Fill 0.45 0 0 0.00 518 0

1647+00.00 RDWYEXC

Excavation 315.95 250 250 1.00 777 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 768 9

TOPSOIL

Excavation 9.66 8 0 0.00 43 Subsoil Exc 0.08 0 0 0.00 6 Fill 0.00 0 0 0.00 768 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.37 8 0 0.00 768 64

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.73 9 0 0.00 768 77

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 768 0

1647+25.00 RDWYEXC

Excavation 362.68 314 314 1.00 1091 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.07 0 0 1.00 1082 9

TOPSOIL

Excavation 10.90 10 0 0.00 53 Subsoil Exc 0.07 0 0 0.00 6 Fill 0.00 0 0 0.00 1082 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 8

Fill 8.45 8 0 0.00 1082 72

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.81 9 0 0.00 1082 86

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 1082 0

1647+50.00 RDWYEXC

Excavation 497.03 398 398 1.00 1489 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.11 0 0 1.00 1480 9

TOPSOIL

Excavation 12.49 11 0 0.00 64 Subsoil Exc 0.11 0 0 0.00 6 Fill 0.00 0 0 0.00 1480 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.52 8 0 0.00 1480 80

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.87 9 0 0.00 1480 95

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 1480 0

1647+75.00 RDWYEXC

Excavation 690.76 550 550 1.00 2039 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.11 0 0 1.00 2030 9

Page: 9

Excavation 15.29 13 0 0.00 77 Subsoil Exc 0.11 0 0 0.00 6 Fill 0.00 0 0 0.00 2030 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.59 8 0 0.00 2030 88

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.71 10 0 0.00 2030 105

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.16 1 0 0.00 2030 1

1648+00.00 RDWYEXC

Excavation 704.80 646 646 1.00 2685 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 2676 9

TOPSOIL

Excavation 17.12 15 0 0.00 92 Subsoil Exc 0.08 0 0 0.00 6 Fill 0.00 0 0 0.00 2676 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.66 8 0 0.00 2676 96

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.40 12 0 0.00 2676 117

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Page: 10

Fill 3.80 3 0 0.00 2676 4

1648+25.00 RDWYEXC

Excavation 845.66 718 718 1.00 3403 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 3394 9

TOPSOIL

Excavation 17.99 16 0 0.00 108 Subsoil Exc 0.08 0 0 0.00 6 Fill 0.00 0 0 0.00 3394 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.73 8 0 0.00 3394 104

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.45 12 0 0.00 3394 129

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.80 4 0 0.00 3394 8

1648+50.00 RDWYEXC

Excavation 983.36 847 847 1.00 4250 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.09 0 0 1.00 4241 9

TOPSOIL

Excavation 18.98 17 0 0.00 125 Subsoil Exc 0.09 0 0 0.00 6 Fill 0.00 0 0 0.00 4241 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.80 8 0 0.00 4241 112

Page: 11

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.50 12 0 0.00 4241 141

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.79 4 0 0.00 4241 12

1648+75.00 RDWYEXC

Excavation 928.23 885 885 1.00 5135 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 5126 9

TOPSOIL

Excavation 18.97 18 0 0.00 143 Subsoil Exc 0.08 0 0 0.00 6 Fill 0.00 0 0 0.00 5126 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.87 8 0 0.00 5126 120

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.55 13 0 0.00 5126 154

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.78 4 0 0.00 5126 16

1649+00.00 RDWYEXC

Excavation 931.38 861 861 1.00 5996 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 5987 9

TOPSOIL

Excavation 18.63 17 0 0.00 160

Page: 12

Subsoil Exc 0.08 0 0 0.00 6 Fill 0.00 0 0 0.00 5987 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.94 8 0 0.00 5987 128

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.93 12 0 0.00 5987 166

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.10 3 0 0.00 5987 19

1649+25.00 RDWYEXC

Excavation 939.72 866 866 1.00 6862 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.11 0 0 1.00 6853 9

TOPSOIL

Excavation 17.83 17 0 0.00 177 Subsoil Exc 0.11 0 0 0.00 6 Fill 0.00 0 0 0.00 6853 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 6853 136

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.32 10 0 0.00 6853 176

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 1 0 0.00 6853 20

Page: 13

1649+50.00 RDWYEXC

Excavation 733.42 774 774 1.00 7636 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.12 0 0 1.00 7627 9

TOPSOIL

Excavation 17.94 17 0 0.00 194 Subsoil Exc 0.12 0 0 0.00 6 Fill 0.00 0 0 0.00 7627 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 7627 144

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.37 10 0 0.00 7627 186

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.46 0 0 0.00 7627 20

1649+75.00 RDWYEXC

Excavation 644.19 638 638 1.00 8274 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 8265 9

TOPSOIL

Excavation 14.94 15 0 0.00 209 Subsoil Exc 0.17 0 0 0.00 6 Fill 0.00 0 0 0.00 8265 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 8265 152

Page: 14

Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 10 0 0.00 8265 196

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.43 1 0 0.00 8265 21

1650+00.00 RDWYEXC

Excavation 711.83 628 628 1.00 8902 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.09 0 0 1.00 8893 9

TOPSOIL

Excavation 17.19 15 0 0.00 224 Subsoil Exc 0.09 0 0 0.00 6 Fill 0.00 0 0 0.00 8893 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 8893 160

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.10 12 0 0.00 8893 208

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.14 3 0 0.00 8893 24

1650+25.00 RDWYEXC

Excavation 450.90 538 538 1.00 9440 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.10 0 0 1.00 9431 9

TOPSOIL

Excavation 11.07 13 0 0.00 237 Subsoil Exc 0.10 0 0 0.00 6

Page: 15

Fill 0.00 0 0 0.00 9431 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 9431 168

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.83 13 0 0.00 9431 221

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.17 4 0 0.00 9431 28

1650+36.50 RDWYEXC

Excavation 391.17 179 179 1.00 9619 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.04 0 0 1.00 9610 9

TOPSOIL

Excavation 13.00 5 0 0.00 242 Subsoil Exc 0.04 0 0 0.00 6 Fill 0.00 0 0 0.00 9610 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 4 0 0.00 9610 172

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.05 6 0 0.00 9610 227

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.40 2 0 0.00 9610 30

Page: 16

1650+50.00 RDWYEXC

Excavation 313.70 176 176 1.00 9795 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.10 0 0 1.00 9786 9

TOPSOIL

Excavation 16.38 7 0 0.00 249 Subsoil Exc 0.10 0 0 0.00 6 Fill 0.00 0 0 0.00 9786 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.31 5 0 0.00 9786 177

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.32 7 0 0.00 9786 234

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.67 2 0 0.00 9786 32

1650+59.55 RDWYEXC

Excavation 276.10 104 104 1.00 9899 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.20 0 0 1.00 9890 9

TOPSOIL

Excavation 19.61 6 0 0.00 255 Subsoil Exc 0.20 0 0 0.00 6 Fill 0.00 0 0 0.00 9890 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.31 3 0 0.00 9890 180

LAYER2

Page: 17

Fill 11.92 4 0 0.00 9890 238

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.28 1 0 0.00 9890 33

1650+61.05 RDWYEXC

Excavation 251.37 14 14 1.00 9913 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.20 0 0 1.00 9904 9

TOPSOIL

Excavation 18.61 1 0 0.00 256 Subsoil Exc 0.20 0 0 0.00 6 Fill 0.00 0 0 0.00 9904 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.31 1 0 0.00 9904 181

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.29 1 0 0.00 9904 239

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.64 0 0 0.00 9904 33

SKIP STATION RANGE = 1650+67.35 to 1652+13.35

1650+67.35 RDWYEXC

Excavation 185.17 51 51 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.97 0 0 1.00 9955 9

TOPSOIL

Excavation 15.99 4 0 0.00 260 Subsoil Exc 0.97 0 0 0.00 6

Page: 18

Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 2 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 3 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

1650+71.05 RDWYEXC

Excavation 148.48 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.20 0 0 1.00 9955 9

TOPSOIL

Excavation 10.36 0 0 0.00 260 Subsoil Exc 2.80 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

Page: 19

1650+72.15 RDWYEXC

Excavation 138.08 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.21 0 0 1.00 9955 9

TOPSOIL

Excavation 10.11 0 0 0.00 260 Subsoil Exc 2.18 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

1650+75.00 RDWYEXC

Excavation 104.03 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 14.39 0 0 1.00 9955 9

TOPSOIL

Excavation 8.98 0 0 0.00 260 Subsoil Exc 2.89 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Page: 20

Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1650+76.05 RDWYEXC

Excavation 95.07 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.53 0 0 1.00 9955 9

TOPSOIL

Excavation 8.53 0 0 0.00 260 Subsoil Exc 3.31 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1650+77.35 RDWYEXC

Excavation 84.39 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.95 0 0 1.00 9955 9

TOPSOIL

Excavation 8.00 0 0 0.00 260 Subsoil Exc 3.79 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0

Page: 21

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1650+83.65 RDWYEXC

Excavation 35.31 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 94.60 0 0 1.00 9955 9

TOPSOIL

Excavation 5.03 0 0 0.00 260 Subsoil Exc 6.60 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1650+88.65 RDWYEXC

Page: 22

Excavation 5.16 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 167.51 0 0 1.00 9955 9

TOPSOIL

Excavation 2.85 0 0 0.00 260 Subsoil Exc 8.60 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 339.48 0 0 1.00 9955 9

TOPSOIL

Excavation 0.00 0 0 0.00 260 Subsoil Exc 8.15 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 23

Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+25.00 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 520.02 0 0 1.00 9955 9

TOPSOIL

Excavation 0.00 0 0 0.00 260 Subsoil Exc 0.00 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 538.89 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

Page: 24

Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+75.00 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 390.98 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+92.05 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 195.69 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

Page: 25

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1651+97.05 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 141.47 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1652+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 115.84 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Page: 26

Fill 0.68 0 0 0.00 9955 33

1652+03.35 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.42 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1652+04.65 RDWYEXC

Excavation 0.00 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 84.32 0 0 1.00 9955 9

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.63 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 0 0 0.00 9955 33

1652+08.55 RDWYEXC

Page: 27

Excavation 2.59 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.59 0 0 1.00 9955 9

TOPSOIL

Excavation 1.20 0 0 0.00 260 Subsoil Exc 8.96 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

1652+09.65 RDWYEXC

Excavation 2.09 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.34 0 0 1.00 9955 9

TOPSOIL

Excavation 1.23 0 0 0.00 260 Subsoil Exc 0.00 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 28

Fill 11.20 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

1652+13.35 RDWYEXC

Excavation 25.94 0 0 1.00 9964 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.38 0 0 1.00 9955 9

TOPSOIL

Excavation 1.88 0 0 0.00 260 Subsoil Exc 9.18 0 0 0.00 6 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.61 0 0 0.00 9955 183

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 0 0 0.00 9955 242

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.25 0 0 0.00 9955 33

1652+20.36 RDWYEXC

Excavation 26.65 7 7 1.00 9971 Subsoil Exc 0.00 0 0 1.00 0 Fill 51.72 16 16 1.00 9946 25

TOPSOIL

Excavation 1.87 0 0 0.00 260 Subsoil Exc 8.38 2 0 0.00 8 Fill 0.00 0 0 0.00 9946 0 Mass ordinate for TOPSOIL = 0

Page: 29

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.31 2 0 0.00 9946 185

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.46 3 0 0.00 9946 245

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.81 0 0 0.00 9946 33

1652+22.26 RDWYEXC

Excavation 30.56 2 2 1.00 9973 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.10 4 4 1.00 9944 29

TOPSOIL

Excavation 1.84 0 0 0.00 260 Subsoil Exc 8.23 1 0 0.00 9 Fill 0.00 0 0 0.00 9944 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.30 1 0 0.00 9944 186

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 1 0 0.00 9944 246

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.47 0 0 0.00 9944 33

1652+25.00 RDWYEXC

Excavation 31.28 3 3 1.00 9976

Page: 30

Fill 42.86 5 5 1.00 9942 34

TOPSOIL

Excavation 1.83 0 0 0.00 260 Subsoil Exc 8.34 1 0 0.00 10 Fill 0.00 0 0 0.00 9942 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.30 1 0 0.00 9942 187

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.23 1 0 0.00 9942 247

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.58 0 0 0.00 9942 33

1652+44.25 RDWYEXC

Excavation 49.80 29 29 1.00 10005 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.67 16 16 1.00 9955 50

TOPSOIL

Excavation 0.00 0 0 0.00 260 Subsoil Exc 0.00 3 0 0.00 13 Fill 0.00 0 0 0.00 9955 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 7 0 0.00 9955 194

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.83 9 0 0.00 9955 256

Page: 31

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.17 2 0 0.00 9955 35

1652+50.00 RDWYEXC

Excavation 49.28 11 11 1.00 10016 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.13 0 0 1.00 9966 50

TOPSOIL

Excavation 9.17 1 0 0.00 261 Subsoil Exc 0.13 0 0 0.00 13 Fill 0.00 0 0 0.00 9966 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 2 0 0.00 9966 196

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.21 3 0 0.00 9966 259

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.56 1 0 0.00 9966 36

1652+57.00 RDWYEXC

Excavation 60.91 14 14 1.00 10030 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.07 0 0 1.00 9980 50

TOPSOIL

Excavation 5.91 2 0 0.00 263 Subsoil Exc 0.07 0 0 0.00 13 Fill 0.00 0 0 0.00 9980 0 Mass ordinate for TOPSOIL = 0

Page: 32

Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 2 0 0.00 9980 198

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.43 4 0 0.00 9980 263

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.77 1 0 0.00 9980 37

1652+66.83 RDWYEXC

Excavation 58.73 22 22 1.00 10052 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 10002 50

TOPSOIL

Excavation 3.50 2 0 0.00 265 Subsoil Exc 0.17 0 0 0.00 13 Fill 0.00 0 0 0.00 10002 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 3 0 0.00 10002 201

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.76 5 0 0.00 10002 268

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.79 2 0 0.00 10002 39

1652+75.00 RDWYEXC

Excavation 47.59 16 16 1.00 10068

Page: 33

Fill 1.71 0 0 1.00 10018 50

TOPSOIL

Excavation 5.62 1 0 0.00 266 Subsoil Exc 1.71 0 0 0.00 13 Fill 0.00 0 0 0.00 10018 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 3 0 0.00 10018 204

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.30 4 0 0.00 10018 272

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.33 1 0 0.00 10018 40

1653+00.00 RDWYEXC

Excavation 22.36 32 32 1.00 10100 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 1 1 1.00 10049 51

TOPSOIL

Excavation 5.08 5 0 0.00 271 Subsoil Exc 0.41 1 0 0.00 14 Fill 0.00 0 0 0.00 10049 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 8 0 0.00 10049 212

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.97 12 0 0.00 10049 284

Page: 34

Subsoil Exc 0.00 0 0 0.00 0 Fill 2.10 3 0 0.00 10049 43

1653+25.00 RDWYEXC

Excavation 7.25 14 14 1.00 10114 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.97 2 2 1.00 10061 53

TOPSOIL

Excavation 2.23 4 0 0.00 275 Subsoil Exc 0.94 1 0 0.00 15 Fill 0.00 0 0 0.00 10061 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.05 8 0 0.00 10061 220

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.40 10 0 0.00 10061 294

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 1 0 0.00 10061 44

1653+50.00 RDWYEXC

Excavation 4.99 6 6 1.00 10120 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.00 9 9 1.00 10058 62

TOPSOIL

Excavation 2.41 2 0 0.00 277 Subsoil Exc 2.04 1 0 0.00 16 Fill 0.00 0 0 0.00 10058 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 35

Fill 9.15 8 0 0.00 10058 228

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.50 10 0 0.00 10058 304

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10058 44

1653+75.00 RDWYEXC

Excavation 3.88 4 4 1.00 10124 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.74 20 20 1.00 10042 82

TOPSOIL

Excavation 2.33 2 0 0.00 279 Subsoil Exc 3.23 2 0 0.00 18 Fill 0.00 0 0 0.00 10042 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.25 9 0 0.00 10042 237

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.59 10 0 0.00 10042 314

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10042 44

1654+00.00 RDWYEXC

Excavation 10.42 6 6 1.00 10130 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.67 27 27 1.00 10021 109

Page: 36

Excavation 3.60 2 0 0.00 281 Subsoil Exc 2.69 3 0 0.00 21 Fill 0.00 0 0 0.00 10021 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.35 9 0 0.00 10021 246

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.69 10 0 0.00 10021 324

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.44 0 0 0.00 10021 44

1654+25.00 RDWYEXC

Excavation 26.19 17 17 1.00 10147 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.40 24 24 1.00 10014 133

TOPSOIL

Excavation 5.15 4 0 0.00 285 Subsoil Exc 1.94 2 0 0.00 23 Fill 0.00 0 0 0.00 10014 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.46 9 0 0.00 10014 255

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.79 10 0 0.00 10014 334

SHOULDERBACKFILL

Page: 37

Fill 0.44 0 0 0.00 10014 44

1654+50.00 RDWYEXC

Excavation 33.02 27 27 1.00 10174 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.49 20 20 1.00 10021 153

TOPSOIL

Excavation 5.68 5 0 0.00 290 Subsoil Exc 2.30 2 0 0.00 25 Fill 0.00 0 0 0.00 10021 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.56 9 0 0.00 10021 264

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.89 10 0 0.00 10021 344

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10021 44

1654+75.00 RDWYEXC

Excavation 35.35 32 32 1.00 10206 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.67 21 21 1.00 10032 174

TOPSOIL

Excavation 5.96 5 0 0.00 295 Subsoil Exc 2.47 2 0 0.00 27 Fill 0.00 0 0 0.00 10032 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 38

Fill 9.66 9 0 0.00 10032 273

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.00 10 0 0.00 10032 354

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10032 44

1654+91.87 RDWYEXC

Excavation 36.86 23 23 1.00 10229 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.07 15 15 1.00 10040 189

TOPSOIL

Excavation 6.04 3 0 0.00 298 Subsoil Exc 2.34 2 0 0.00 29 Fill 0.00 0 0 0.00 10040 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.72 6 0 0.00 10040 279

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.07 7 0 0.00 10040 361

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10040 44

1655+00.00 RDWYEXC

Excavation 37.37 11 11 1.00 10240 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.91 7 7 1.00 10044 196

Page: 39

Excavation 6.02 2 0 0.00 300 Subsoil Exc 2.16 1 0 0.00 30 Fill 0.00 0 0 0.00 10044 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.76 3 0 0.00 10044 282

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.11 3 0 0.00 10044 364

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.45 0 0 0.00 10044 44

1655+25.00 RDWYEXC

Excavation 39.42 36 36 1.00 10276 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.56 21 21 1.00 10059 217

TOPSOIL

Excavation 5.99 5 0 0.00 305 Subsoil Exc 2.29 2 0 0.00 32 Fill 0.00 0 0 0.00 10059 0 Mass ordinate for

This is the start of the file's text. The full file is on GovTribe.