T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 22,370,648.00$ -14.1% 19,222,846.00$ Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 1,936,525.00$ 1,936,525.00$ 1,650,000.00$
15215-1000 Line A0040 11 EACH 600.00$ 6,600.00$ 33,000.00$
15215-3000 Line A0060 164 EACH 600.00$ 98,400.00$ 200,080.00$
15215-7000 Line A0080 1 EACH 3,000.00$ 3,000.00$ 12,000.00$
15225-0000 Line A0100 12.530 MILE 13,000.00$ 162,890.00$ 213,010.00$
15236-2000 Line A0120 25.060 MILE 7,400.00$ 185,444.00$ 25,060.00$
15301-0000 Line A0140 ALL LPSM 589,300.00$ 589,300.00$ 200,000.00$
15401-0000 Line A0160 ALL LPSM 200,000.00$ 200,000.00$ 150,000.00$
15501-0000 Line A0180 ALL LPSM 70,000.00$ 70,000.00$ 20,000.00$
15705-0100 Line A0200 46,300 LNFT 3.00$ 138,900.00$ 277,800.00$
15705-1400 Line A0220 49,000 LNFT 6.00$ 294,000.00$ 245,000.00$
15706-0200 Line A0240 300 EACH 250.00$ 75,000.00$ 150,000.00$
15706-1000 Line A0260 185 EACH 300.00$ 55,500.00$ 55,500.00$
Engineer's Estimate
300.00$
500.00$
5.00$
6.00$
20,000.00$
150,000.00$
200,000.00$
1,000.00$
17,000.00$
1,220.00$
Kirkland Construction
3,000.00$
1,650,000.00$
MOBILIZATION
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
SURVEY CONTROL, GRADE FINISHING
SOIL EROSION CONTROL, INLET PROTECTION
SURVEY AND STAKING, PARKING AREA
12,000.00$
12/21/2016 Page 1 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Kirkland Construction
15706-1600 Line A0280 2 EACH 2,000.00$ 4,000.00$ 5,000.00$
15802-0000 Line A0300 ALL LPSM 100,000.00$ 100,000.00$ 100,000.00$
20101-0000 Line A0320 132.0 ACRE 4,000.00$ 528,000.00$ 1,122,000.00$
20301-0600 Line A0340 1 EACH 2,000.00$ 2,000.00$ 3,000.00$
20301-1100 Line A0360 1 EACH 200.00$ 200.00$ 700.00$
20301-2400 Line A0380 30 EACH 100.00$ 3,000.00$ 6,000.00$
20302-0700 Line A0400 80 LNFT 2.00$ 160.00$ 1,200.00$
20315-0000 Line A0420 115 LNFT 5.00$ 575.00$ 3,450.00$
20401-0000 Line A0440 324,400 CUYD 15.00$ 4,866,000.00$ 3,892,800.00$
20402-0000 Line A0460 6,700 CUYD 40.00$ 268,000.00$ 201,000.00$
20441-0000 Line A0480 14,600 CUYD 10.00$ 146,000.00$ 58,400.00$
21101-1000 Line A0500 52,400 SQYD 7.50$ 393,000.00$ 262,000.00$
25101-2200 Line A0520 2,200 CUYD 150.00$ 330,000.00$ 220,000.00$ 100.00$
5.00$
4.00$
30.00$
12.00$
30.00$
15.00$
200.00$
700.00$
3,000.00$
8,500.00$
100,000.00$
2,500.00$
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF SIGN
REMOVAL OF FENCE
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
12/21/2016 Page 2 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Kirkland Construction
25101-2300 Line A0540 100 CUYD 200.00$ 20,000.00$ 35,000.00$
25125-0000 Line A0560 200 EACH 275.00$ 55,000.00$ 100,000.00$
25205-1000 Line A0580 3,420 CUYD 150.00$ 513,000.00$ 342,000.00$
30103-0000 Line A0600 33,630 CUYD 56.30$ 1,893,369.00$ 1,681,500.00$
40101-5600 Line A0620 42,620 TON 115.00$ 4,901,300.00$ 4,091,520.00$
40105-3000 Line A0640 426 TON 230.00$ 97,980.00$ 75,828.00$
40601-0000 Line A0660 82 TON 475.00$ 38,950.00$ 60,270.00$
41102-1000 Line A0680 195,700 SQYD 1.00$ 195,700.00$ 136,990.00$
41105-0000 Line A0700 270 TON 45.00$ 12,150.00$ 14,850.00$
41201-0000 Line A0720 84 TON 1,000.00$ 84,000.00$ 61,740.00$
60201-0800 Line A0740 8,500 LNFT 120.00$ 1,020,000.00$ 1,190,000.00$
60201-1000 Line A0760 290 LNFT 130.00$ 37,700.00$ 72,500.00$
60210-0800 Line A0780 320 EACH 400.00$ 128,000.00$ 160,000.00$ 500.00$
250.00$
140.00$
735.00$
55.00$
0.70$
735.00$
178.00$
96.00$
50.00$
100.00$
500.00$
350.00$
PLACED RIPRAP, METHOD B, CLASS 3
BOULDER
ROCK BUTTRESS, MECHANICALLY-PLACED
AGGREGATE BASE
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
12/21/2016 Page 3 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Kirkland Construction
60210-1000 Line A0800 8 EACH 800.00$ 6,400.00$ 5,600.00$
60501-0000 Line A0820 11,700 LNFT 50.00$ 585,000.00$ 327,600.00$
61901-0000 Line A0840 200 LNFT 50.00$ 10,000.00$ 10,000.00$
61901-0900 Line A0860 80 LNFT 7.00$ 560.00$ 1,200.00$
61902-0000 Line A0880 1 EACH 14,000.00$ 14,000.00$ 3,000.00$
61902-0000 Line A0900 2 EACH 14,000.00$ 28,000.00$ 5,000.00$
61902-1400 Line A0920 1 EACH 1,000.00$ 1,000.00$ 2,500.00$
61903-0900 Line A0940 1 EACH 22,000.00$ 22,000.00$ 35,000.00$
62201-0250 Line A0960 200 HOUR 130.00$ 26,000.00$ 23,000.00$
62201-0550 Line A0980 200 HOUR 120.00$ 24,000.00$ 24,000.00$
62201-0950 Line A1000 200 HOUR 160.00$ 32,000.00$ 28,000.00$
62201-2850 Line A1020 200 HOUR 150.00$ 30,000.00$ 30,000.00$
62201-3350 Line A1040 200 HOUR 200.00$ 40,000.00$ 36,000.00$ 180.00$
150.00$
140.00$
120.00$
115.00$
35,000.00$
2,500.00$
2,500.00$
3,000.00$
15.00$
50.00$
28.00$
700.00$
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
FENCE, BARBED WIRE, 4 STRAND
GATE (ROAD CLOSURE)
GATE(TEMPORARY ROAD CLOSED)
GATE, METAL, 16 FEET WIDTH
CATTLE GUARD, 28 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
END SECTION FOR 36-INCH PIPE CULVERT
STANDARD UNDERDRAIN SYSTEM
FENCE (BUCK AND POLE)
12/21/2016 Page 4 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Kirkland Construction
62202-1000 Line A1060 ALL LPSM 60,000.00$ 60,000.00$ 25,000.00$
62301-0000 Line A1080 300 HOUR 50.00$ 15,000.00$ 13,500.00$
62302-0100 Line A1100 50 HOUR 300.00$ 15,000.00$ 13,500.00$
62302-1000 Line A1120 200 HOUR 130.00$ 26,000.00$ 40,000.00$
62302-1100 Line A1140 200 HOUR 180.00$ 36,000.00$ 40,000.00$
62406-0200 Line A1160 85.0 ACRE 5,550.00$ 471,750.00$ 425,000.00$
62510-2000 Line A1180 85.0 ACRE 1,400.00$ 119,000.00$ 170,000.00$
62515-2000 Line A1200 51.0 ACRE 1,650.00$ 84,150.00$ 102,000.00$
62515-3000 Line A1220 34.0 ACRE 5,000.00$ 170,000.00$ 136,000.00$
63301-0000 Line A1240 115 EACH 800.00$ 92,000.00$ 69,000.00$
63301-0000 Line A1260 2 EACH 5,000.00$ 10,000.00$ 6,000.00$
63308-2000 Line A1280 348 EACH 95.00$ 33,060.00$ 20,880.00$
63308-3000 Line A1300 4 EACH 95.00$ 380.00$ 440.00$
4,000.00$
2,000.00$
2,000.00$
5,000.00$
200.00$
200.00$
270.00$
45.00$
25,000.00$
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
SIGN SYSTEM
SIGN SYSTEM(FLASHING BEACON)
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
600.00$
60.00$
3,000.00$
110.00$
12/21/2016 Page 5 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Kirkland Construction
63309-0100 Line A1320 90 EACH 25.00$ 2,250.00$ 1,980.00$
63309-1100 Line A1340 75 EACH 45.00$ 3,375.00$ 5,250.00$
63316-1000 Line A1360 30 EACH 300.00$ 9,000.00$ 13,500.00$
63402-0300 Line A1380 88.3 MILE 600.00$ 52,980.00$ 147,019.50$
63402-0400 Line A1400 12.9 MILE 600.00$ 7,740.00$ 21,478.50$
63502-0600 Line A1420 10 EACH 700.00$ 7,000.00$ 3,000.00$
63502-0900 Line A1440 200 EACH 12.00$ 2,400.00$ 4,000.00$
63502-1300 Line A1460 100 EACH 70.00$ 7,000.00$ 7,000.00$
63502-2000 Line A1480 3 EACH 30,000.00$ 90,000.00$ 45,000.00$
63504-1000 Line A1500 400 SQFT 15.00$ 6,000.00$ 6,000.00$
63506-0500 Line A1520 6,400 HOUR 45.00$ 288,000.00$ 32,000.00$
63601-6000 Line A1540 ALL LPSM 18,000.00$ 18,000.00$ 10,000.00$
64706-1000 Line A1560 5,130 SQYD 92.00$ 471,960.00$ 205,200.00$
DELINEATOR, TYPE 1
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
MITIGATION, WETLANDS MITIGATION
DELINEATOR, TYPE SNOW POLE, 8 FEET
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH
22.00$
450.00$
70.00$
1,665.00$
1,665.00$
20.00$
300.00$
15,000.00$
70.00$
5.00$
15.00$
40.00$
10,000.00$
12/21/2016 Page 6 of 30
Schedule A Total of Bid Items:
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15215-1000 Line A0040 11 EACH
15215-3000 Line A0060 164 EACH
15215-7000 Line A0080 1 EACH
15225-0000 Line A0100 12.530 MILE
15236-2000 Line A0120 25.060 MILE
15301-0000 Line A0140 ALL LPSM
15401-0000 Line A0160 ALL LPSM
15501-0000 Line A0180 ALL LPSM
15705-0100 Line A0200 46,300 LNFT
15705-1400 Line A0220 49,000 LNFT
15706-0200 Line A0240 300 EACH
15706-1000 Line A0260 185 EACH
MOBILIZATION
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY CONTROL, GRADE FINISHING
SOIL EROSION CONTROL, INLET PROTECTION
SURVEY AND STAKING, PARKING AREA
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
1,850,000.00$ 1,900,000.00$
14,300.00$ 16,500.00$
82,000.00$ 164,000.00$
4,150.00$ 5,500.00$
95,854.50$ 125,300.00$
107,758.00$ 112,770.00$
446,000.00$ 1,500,000.00$
437,000.00$ 560,000.00$
44,000.00$ 100,000.00$
169,458.00$ 53,245.00$
100,940.00$ 107,800.00$
8,280.00$ 30,000.00$
18,870.00$ 18,500.00$ 102.00$ 100.00$
27.60$ 100.00$
2.06$ 2.20$
3.66$ 1.15$
44,000.00$ 100,000.00$
437,000.00$ 560,000.00$
446,000.00$ 1,500,000.00$
4,300.00$ 4,500.00$
7,650.00$ 10,000.00$
1,300.00$ 1,500.00$
500.00$ 1,000.00$
A&S Construction Co. SEMA Construction, Inc.
1,850,000.00$ 1,900,000.00$
4,150.00$ 5,500.00$
12/21/2016 Page 7 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15706-1600 Line A0280 2 EACH
15802-0000 Line A0300 ALL LPSM
20101-0000 Line A0320 132.0 ACRE
20301-0600 Line A0340 1 EACH
20301-1100 Line A0360 1 EACH
20301-2400 Line A0380 30 EACH
20302-0700 Line A0400 80 LNFT
20315-0000 Line A0420 115 LNFT
20401-0000 Line A0440 324,400 CUYD
20402-0000 Line A0460 6,700 CUYD
20441-0000 Line A0480 14,600 CUYD
21101-1000 Line A0500 52,400 SQYD
25101-2200 Line A0520 2,200 CUYD
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF SIGN
REMOVAL OF FENCE
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
A&S Construction Co. SEMA Construction, Inc.
6,600.00$ 3,000.00$
150,000.00$ 520,000.00$
462,000.00$ 1,346,400.00$
2,462.00$ 3,000.00$
262.00$ 200.00$
3,150.00$ 3,600.00$
640.00$ 800.00$
1,035.00$ 1,150.00$
1,946,400.00$ 2,530,320.00$
177,550.00$ 134,000.00$
73,000.00$ 109,500.00$
209,600.00$ 115,280.00$
264,000.00$ 220,000.00$ 120.00$ 100.00$
4.00$ 2.20$
5.00$ 7.50$
26.50$ 20.00$
6.00$ 7.80$
9.00$ 10.00$
8.00$ 10.00$
105.00$ 120.00$
262.00$ 200.00$
2,462.00$ 3,000.00$
3,500.00$ 10,200.00$
150,000.00$ 520,000.00$
3,300.00$ 1,500.00$
12/21/2016 Page 8 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
25101-2300 Line A0540 100 CUYD
25125-0000 Line A0560 200 EACH
25205-1000 Line A0580 3,420 CUYD
30103-0000 Line A0600 33,630 CUYD
40101-5600 Line A0620 42,620 TON
40105-3000 Line A0640 426 TON
40601-0000 Line A0660 82 TON
41102-1000 Line A0680 195,700 SQYD
41105-0000 Line A0700 270 TON
41201-0000 Line A0720 84 TON
60201-0800 Line A0740 8,500 LNFT
60201-1000 Line A0760 290 LNFT
60210-0800 Line A0780 320 EACH
PLACED RIPRAP, METHOD B, CLASS 3
BOULDER
ROCK BUTTRESS, MECHANICALLY-PLACED
AGGREGATE BASE
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INC
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
A&S Construction Co. SEMA Construction, Inc.
14,200.00$ 10,000.00$
45,200.00$ 27,000.00$
513,000.00$ 239,400.00$
1,715,130.00$ 975,270.00$
4,091,520.00$ 4,262,000.00$
111,612.00$ 85,200.00$
81,836.00$ 35,260.00$
156,560.00$ 107,635.00$
24,840.00$ 20,250.00$
61,320.00$ 218,400.00$
1,360,000.00$ 1,062,500.00$
46,400.00$ 44,950.00$
91,200.00$ 81,600.00$ 285.00$ 255.00$
160.00$ 155.00$
160.00$ 125.00$
730.00$ 2,600.00$
92.00$ 75.00$
0.80$ 0.55$
998.00$ 430.00$
262.00$ 200.00$
96.00$ 100.00$
51.00$ 29.00$
150.00$ 70.00$
226.00$ 135.00$
142.00$ 100.00$
12/21/2016 Page 9 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
60210-1000 Line A0800 8 EACH
60501-0000 Line A0820 11,700 LNFT
61901-0000 Line A0840 200 LNFT
61901-0900 Line A0860 80 LNFT
61902-0000 Line A0880 1 EACH
61902-0000 Line A0900 2 EACH
61902-1400 Line A0920 1 EACH
61903-0900 Line A0940 1 EACH
62201-0250 Line A0960 200 HOUR
62201-0550 Line A0980 200 HOUR
62201-0950 Line A1000 200 HOUR
62201-2850 Line A1020 200 HOUR
62201-3350 Line A1040 200 HOUR
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
FENCE, BARBED WIRE, 4 STRAND
GATE (ROAD CLOSURE)
GATE(TEMPORARY ROAD CLOSED)
GATE, METAL, 16 FEET WIDTH
CATTLE GUARD, 28 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
END SECTION FOR 36-INCH PIPE CULVERT
STANDARD UNDERDRAIN SYSTEM
FENCE (BUCK AND POLE)
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
A&S Construction Co. SEMA Construction, Inc.
3,880.00$ 4,000.00$
877,500.00$ 292,500.00$
6,400.00$ 10,000.00$
640.00$ 2,000.00$
7,600.00$ 15,000.00$
12,800.00$ 4,000.00$
2,500.00$ 2,500.00$
38,500.00$ 35,000.00$
24,000.00$ 23,000.00$
30,000.00$ 34,000.00$
40,000.00$ 24,000.00$
31,000.00$ 32,000.00$
49,600.00$ 34,000.00$ 248.00$ 170.00$
155.00$ 160.00$
200.00$ 120.00$
150.00$ 170.00$
120.00$ 115.00$
38,500.00$ 35,000.00$
2,500.00$ 2,500.00$
6,400.00$ 2,000.00$
7,600.00$ 15,000.00$
8.00$ 25.00$
32.00$ 50.00$
75.00$ 25.00$
485.00$ 500.00$
12/21/2016 Page 10 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1060 ALL LPSM
62301-0000 Line A1080 300 HOUR
62302-0100 Line A1100 50 HOUR
62302-1000 Line A1120 200 HOUR
62302-1100 Line A1140 200 HOUR
62406-0200 Line A1160 85.0 ACRE
62510-2000 Line A1180 85.0 ACRE
62515-2000 Line A1200 51.0 ACRE
62515-3000 Line A1220 34.0 ACRE
63301-0000 Line A1240 115 EACH
63301-0000 Line A1260 2 EACH
63308-2000 Line A1280 348 EACH
63308-3000 Line A1300 4 EACH
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
MULCHING, HYDRAULIC METHOD, BONDED FIBE
SIGN SYSTEM
SIGN SYSTEM(FLASHING BEACON)
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
A&S Construction Co. SEMA Construction, Inc.
89,000.00$ 50,000.00$
24,300.00$ 13,500.00$
19,650.00$ 12,500.00$
31,000.00$ 28,000.00$
31,000.00$ 28,000.00$
340,000.00$ 807,500.00$
97,750.00$ 144,500.00$
64,260.00$ 41,310.00$
107,100.00$ 85,000.00$
51,750.00$ 62,100.00$
5,900.00$ 6,000.00$
22,620.00$ 17,400.00$
440.00$ 400.00$
3,150.00$ 2,500.00$
1,260.00$ 810.00$
1,150.00$ 1,700.00$
4,000.00$ 9,500.00$
155.00$ 140.00$
155.00$ 140.00$
393.00$ 250.00$
81.00$ 45.00$
89,000.00$ 50,000.00$
450.00$ 540.00$
65.00$ 50.00$
2,950.00$ 3,000.00$
110.00$ 100.00$
12/21/2016 Page 11 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
63309-0100 Line A1320 90 EACH
63309-1100 Line A1340 75 EACH
63316-1000 Line A1360 30 EACH
63402-0300 Line A1380 88.3 MILE
63402-0400 Line A1400 12.9 MILE
63502-0600 Line A1420 10 EACH
63502-0900 Line A1440 200 EACH
63502-1300 Line A1460 100 EACH
63502-2000 Line A1480 3 EACH
63504-1000 Line A1500 400 SQFT
63506-0500 Line A1520 6,400 HOUR
63601-6000 Line A1540 ALL LPSM
64706-1000 Line A1560 5,130 SQYD
DELINEATOR, TYPE 1
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR SY
MITIGATION, WETLANDS MITIGATION
DELINEATOR, TYPE SNOW POLE, 8 FEET
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28
-21.5% 17,562,823.50$ -14.0% 19,245,410.00$
Unit Price Amount Unit Price Amount
A&S Construction Co. SEMA Construction, Inc.
2,340.00$ 1,710.00$
5,400.00$ 7,500.00$
4,500.00$ 12,900.00$
132,450.00$ 114,790.00$
19,350.00$ 16,770.00$
3,000.00$ 2,500.00$
1,200.00$ 2,000.00$
2,400.00$ 3,000.00$
27,000.00$ 22,500.00$
4,800.00$ 8,000.00$
185,600.00$ 160,000.00$
23,566.00$ 30,000.00$
153,900.00$ 205,200.00$
26.00$ 19.00$
150.00$ 430.00$
72.00$ 100.00$
1,500.00$ 1,300.00$
1,500.00$ 1,300.00$
6.00$ 10.00$
300.00$ 250.00$
9,000.00$ 7,500.00$
24.00$ 30.00$
29.00$ 25.00$
12.00$ 20.00$
30.00$ 40.00$
23,566.00$ 30,000.00$
12/21/2016 Page 12 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15215-1000 Line A0040 11 EACH
15215-3000 Line A0060 164 EACH
15215-7000 Line A0080 1 EACH
15225-0000 Line A0100 12.530 MILE
15236-2000 Line A0120 25.060 MILE
15301-0000 Line A0140 ALL LPSM
15401-0000 Line A0160 ALL LPSM
15501-0000 Line A0180 ALL LPSM
15705-0100 Line A0200 46,300 LNFT
15705-1400 Line A0220 49,000 LNFT
15706-0200 Line A0240 300 EACH
15706-1000 Line A0260 185 EACH
MOBILIZATION
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY CONTROL, GRADE FINISHING
SOIL EROSION CONTROL, INLET PROTECTION
SURVEY AND STAKING, PARKING AREA
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
2,100,000.00$ 2,012,600.00$
11,000.00$ 8,580.00$
147,600.00$ 101,680.00$
4,500.00$ 3,450.00$
90,216.00$ 77,686.00$
298,214.00$ 370,888.00$
300,000.00$ 965,000.00$
130,000.00$ 85,000.00$
40,000.00$ 24,000.00$
53,245.00$ 115,750.00$
117,600.00$ 235,200.00$
18,000.00$ 72,000.00$
12,025.00$ 53,650.00$ 65.00$ 290.00$
60.00$ 240.00$
2.40$ 4.80$
1.15$ 2.50$
40,000.00$ 24,000.00$
130,000.00$ 85,000.00$
300,000.00$ 965,000.00$
11,900.00$ 14,800.00$
7,200.00$ 6,200.00$
2,012,600.00$
1,000.00$ 780.00$
900.00$ 620.00$
American Civil Constructors, LLC Kelley Trucking, Inc.
2,100,000.00$
4,500.00$ 3,450.00$
12/21/2016 Page 13 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15706-1600 Line A0280 2 EACH
15802-0000 Line A0300 ALL LPSM
20101-0000 Line A0320 132.0 ACRE
20301-0600 Line A0340 1 EACH
20301-1100 Line A0360 1 EACH
20301-2400 Line A0380 30 EACH
20302-0700 Line A0400 80 LNFT
20315-0000 Line A0420 115 LNFT
20401-0000 Line A0440 324,400 CUYD
20402-0000 Line A0460 6,700 CUYD
20441-0000 Line A0480 14,600 CUYD
21101-1000 Line A0500 52,400 SQYD
25101-2200 Line A0520 2,200 CUYD
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF SIGN
REMOVAL OF FENCE
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
American Civil Constructors, LLC Kelley Trucking, Inc.
4,000.00$ 11,000.00$
100,000.00$ 157,000.00$
409,200.00$ 475,200.00$
1,500.00$ 2,900.00$
500.00$ 750.00$
2,250.00$ 4,200.00$
240.00$ 1,440.00$
345.00$ 2,116.00$
6,569,100.00$ 3,033,140.00$
147,400.00$ 203,345.00$
160,600.00$ 90,520.00$
262,000.00$ 196,500.00$
132,000.00$ 132,000.00$ 60.00$ 60.00$
5.00$ 3.75$
11.00$ 6.20$
22.00$ 30.35$
20.25$ 9.35$
3.00$ 18.40$
3.00$ 18.00$
75.00$ 140.00$
500.00$ 750.00$
1,500.00$ 2,900.00$
3,100.00$ 3,600.00$
100,000.00$ 157,000.00$
2,000.00$ 5,500.00$
12/21/2016 Page 14 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
25101-2300 Line A0540 100 CUYD
25125-0000 Line A0560 200 EACH
25205-1000 Line A0580 3,420 CUYD
30103-0000 Line A0600 33,630 CUYD
40101-5600 Line A0620 42,620 TON
40105-3000 Line A0640 426 TON
40601-0000 Line A0660 82 TON
41102-1000 Line A0680 195,700 SQYD
41105-0000 Line A0700 270 TON
41201-0000 Line A0720 84 TON
60201-0800 Line A0740 8,500 LNFT
60201-1000 Line A0760 290 LNFT
60210-0800 Line A0780 320 EACH
PLACED RIPRAP, METHOD B, CLASS 3
BOULDER
ROCK BUTTRESS, MECHANICALLY-PLACED
AGGREGATE BASE
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INC
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
American Civil Constructors, LLC Kelley Trucking, Inc.
6,000.00$ 10,000.00$
29,000.00$ 40,000.00$
324,900.00$ 239,400.00$
1,143,420.00$ 1,177,050.00$
4,943,920.00$ 4,965,230.00$
89,460.00$ 110,760.00$
87,330.00$ 41,000.00$
117,420.00$ 117,420.00$
21,870.00$ 23,490.00$
75,600.00$ 252,000.00$
1,275,000.00$ 2,069,750.00$
63,800.00$ 98,600.00$
128,000.00$ 272,000.00$ 400.00$ 850.00$
220.00$ 340.00$
150.00$ 243.50$
900.00$ 3,000.00$
81.00$ 87.00$
0.60$ 0.60$
1,065.00$ 500.00$
210.00$ 260.00$
116.00$ 116.50$
34.00$ 35.00$
95.00$ 70.00$
145.00$ 200.00$
60.00$ 100.00$
12/21/2016 Page 15 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
60210-1000 Line A0800 8 EACH
60501-0000 Line A0820 11,700 LNFT
61901-0000 Line A0840 200 LNFT
61901-0900 Line A0860 80 LNFT
61902-0000 Line A0880 1 EACH
61902-0000 Line A0900 2 EACH
61902-1400 Line A0920 1 EACH
61903-0900 Line A0940 1 EACH
62201-0250 Line A0960 200 HOUR
62201-0550 Line A0980 200 HOUR
62201-0950 Line A1000 200 HOUR
62201-2850 Line A1020 200 HOUR
62201-3350 Line A1040 200 HOUR
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
FENCE, BARBED WIRE, 4 STRAND
GATE (ROAD CLOSURE)
GATE(TEMPORARY ROAD CLOSED)
GATE, METAL, 16 FEET WIDTH
CATTLE GUARD, 28 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
END SECTION FOR 36-INCH PIPE CULVERT
STANDARD UNDERDRAIN SYSTEM
FENCE (BUCK AND POLE)
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
American Civil Constructors, LLC Kelley Trucking, Inc.
6,080.00$ 8,000.00$
795,600.00$ 304,200.00$
2,200.00$ 12,000.00$
640.00$ 3,200.00$
13,600.00$ 17,500.00$
27,200.00$ 4,800.00$
5,700.00$ 2,900.00$
25,500.00$ 26,000.00$
18,400.00$ 35,000.00$
17,000.00$ 35,000.00$
24,000.00$ 32,000.00$
26,000.00$ 32,000.00$
35,000.00$ 48,000.00$ 175.00$ 240.00$
130.00$ 160.00$
120.00$ 160.00$
85.00$ 175.00$
92.00$ 175.00$
25,500.00$ 26,000.00$
5,700.00$ 2,900.00$
13,600.00$ 2,400.00$
13,600.00$ 17,500.00$
8.00$ 40.00$
11.00$ 60.00$
68.00$ 26.00$
760.00$ 1,000.00$
12/21/2016 Page 16 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1060 ALL LPSM
62301-0000 Line A1080 300 HOUR
62302-0100 Line A1100 50 HOUR
62302-1000 Line A1120 200 HOUR
62302-1100 Line A1140 200 HOUR
62406-0200 Line A1160 85.0 ACRE
62510-2000 Line A1180 85.0 ACRE
62515-2000 Line A1200 51.0 ACRE
62515-3000 Line A1220 34.0 ACRE
63301-0000 Line A1240 115 EACH
63301-0000 Line A1260 2 EACH
63308-2000 Line A1280 348 EACH
63308-3000 Line A1300 4 EACH
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
MULCHING, HYDRAULIC METHOD, BONDED FIBE
SIGN SYSTEM
SIGN SYSTEM(FLASHING BEACON)
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
American Civil Constructors, LLC Kelley Trucking, Inc.
177,000.00$ 75,000.00$
7,800.00$ 23,400.00$
22,500.00$ 10,500.00$
33,000.00$ 56,000.00$
33,000.00$ 31,000.00$
365,500.00$ 352,750.00$
93,500.00$ 161,500.00$
63,750.00$ 45,900.00$
110,500.00$ 95,200.00$
52,900.00$ 71,875.00$
6,100.00$ 6,600.00$
23,664.00$ 20,184.00$
448.00$ 480.00$
3,250.00$ 2,800.00$
1,250.00$ 900.00$
1,100.00$ 1,900.00$
4,300.00$ 4,150.00$
165.00$ 155.00$
165.00$ 280.00$
450.00$ 210.00$
26.00$ 78.00$
177,000.00$ 75,000.00$
460.00$ 625.00$
68.00$ 58.00$
3,050.00$ 3,300.00$
112.00$ 120.00$
12/21/2016 Page 17 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
63309-0100 Line A1320 90 EACH
63309-1100 Line A1340 75 EACH
63316-1000 Line A1360 30 EACH
63402-0300 Line A1380 88.3 MILE
63402-0400 Line A1400 12.9 MILE
63502-0600 Line A1420 10 EACH
63502-0900 Line A1440 200 EACH
63502-1300 Line A1460 100 EACH
63502-2000 Line A1480 3 EACH
63504-1000 Line A1500 400 SQFT
63506-0500 Line A1520 6,400 HOUR
63601-6000 Line A1540 ALL LPSM
64706-1000 Line A1560 5,130 SQYD
DELINEATOR, TYPE 1
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR SY
MITIGATION, WETLANDS MITIGATION
DELINEATOR, TYPE SNOW POLE, 8 FEET
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28
-1.3% 22,087,472.00$ -10.0% 20,126,309.00$
Unit Price Amount Unit Price Amount
American Civil Constructors, LLC Kelley Trucking, Inc.
2,430.00$ 2,700.00$
5,625.00$ 9,000.00$
4,500.00$ 15,000.00$
128,035.00$ 207,505.00$
18,705.00$ 23,220.00$
2,300.00$ 1,750.00$
5,600.00$ 460.00$
6,000.00$ 2,900.00$
17,400.00$ 24,000.00$
9,200.00$ 16,000.00$
217,600.00$ 169,600.00$
20,000.00$ 19,000.00$
246,240.00$ 271,890.00$
27.00$ 30.00$
150.00$ 500.00$
75.00$ 120.00$
1,450.00$ 1,800.00$
1,450.00$ 2,350.00$
28.00$ 2.30$
230.00$ 175.00$
5,800.00$ 8,000.00$
60.00$ 29.00$
34.00$ 26.50$
23.00$ 40.00$
48.00$ 53.00$
20,000.00$ 19,000.00$
12/21/2016 Page 18 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15215-1000 Line A0040 11 EACH
15215-3000 Line A0060 164 EACH
15215-7000 Line A0080 1 EACH
15225-0000 Line A0100 12.530 MILE
15236-2000 Line A0120 25.060 MILE
15301-0000 Line A0140 ALL LPSM
15401-0000 Line A0160 ALL LPSM
15501-0000 Line A0180 ALL LPSM
15705-0100 Line A0200 46,300 LNFT
15705-1400 Line A0220 49,000 LNFT
15706-0200 Line A0240 300 EACH
15706-1000 Line A0260 185 EACH
MOBILIZATION
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY CONTROL, GRADE FINISHING
SOIL EROSION CONTROL, INLET PROTECTION
SURVEY AND STAKING, PARKING AREA
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
1,788,072.00$ 1,987,000.00$
7,909.00$ 7,700.00$
94,300.00$ 91,840.00$
3,200.00$ 3,100.00$
72,047.50$ 70,168.00$
120,037.40$ 117,782.00$
500,000.00$ 450,000.00$
460,000.00$ 325,000.00$
85,000.00$ 33,000.00$
60,190.00$ 185,200.00$
88,200.00$ 147,000.00$
21,450.00$ 45,000.00$
16,742.50$ 18,500.00$ 90.50$ 100.00$
71.50$ 150.00$
1.80$ 3.00$
1.30$ 4.00$
85,000.00$ 33,000.00$
460,000.00$ 325,000.00$
500,000.00$ 450,000.00$
4,790.00$ 4,700.00$
5,750.00$ 5,600.00$
1,788,072.00$ 1,987,000.00$
719.00$ 700.00$
575.00$ 560.00$
Oftedal Construction SWP Contracting & Paving
3,200.00$ 3,100.00$
12/21/2016 Page 19 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15706-1600 Line A0280 2 EACH
15802-0000 Line A0300 ALL LPSM
20101-0000 Line A0320 132.0 ACRE
20301-0600 Line A0340 1 EACH
20301-1100 Line A0360 1 EACH
20301-2400 Line A0380 30 EACH
20302-0700 Line A0400 80 LNFT
20315-0000 Line A0420 115 LNFT
20401-0000 Line A0440 324,400 CUYD
20402-0000 Line A0460 6,700 CUYD
20441-0000 Line A0480 14,600 CUYD
21101-1000 Line A0500 52,400 SQYD
25101-2200 Line A0520 2,200 CUYD
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF SIGN
REMOVAL OF FENCE
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
Oftedal Construction SWP Contracting & Paving
5,460.00$ 5,000.00$
130,000.00$ 310,000.00$
765,600.00$ 831,600.00$
1,680.00$ 1,700.00$
451.00$ 1,500.00$
3,840.00$ 1,200.00$
448.00$ 1,040.00$
356.50$ 115.00$
2,270,800.00$ 3,892,800.00$
167,500.00$ 80,400.00$
84,534.00$ 29,200.00$
151,960.00$ 222,700.00$
78,100.00$ 176,000.00$ 35.50$ 80.00$
2.90$ 4.25$
5.79$ 2.00$
25.00$ 12.00$
7.00$ 12.00$
3.10$ 1.00$
5.60$ 13.00$
128.00$ 40.00$
451.00$ 1,500.00$
1,680.00$ 1,700.00$
5,800.00$ 6,300.00$
130,000.00$ 310,000.00$
2,730.00$ 2,500.00$
12/21/2016 Page 20 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
25101-2300 Line A0540 100 CUYD
25125-0000 Line A0560 200 EACH
25205-1000 Line A0580 3,420 CUYD
30103-0000 Line A0600 33,630 CUYD
40101-5600 Line A0620 42,620 TON
40105-3000 Line A0640 426 TON
40601-0000 Line A0660 82 TON
41102-1000 Line A0680 195,700 SQYD
41105-0000 Line A0700 270 TON
41201-0000 Line A0720 84 TON
60201-0800 Line A0740 8,500 LNFT
60201-1000 Line A0760 290 LNFT
60210-0800 Line A0780 320 EACH
PLACED RIPRAP, METHOD B, CLASS 3
BOULDER
ROCK BUTTRESS, MECHANICALLY-PLACED
AGGREGATE BASE
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INC
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
Oftedal Construction SWP Contracting & Paving
4,300.00$ 8,500.00$
27,600.00$ 22,000.00$
299,250.00$ 256,500.00$
1,748,760.00$ 1,748,760.00$
4,688,200.00$ 4,475,100.00$
84,348.00$ 89,460.00$
82,000.00$ 36,490.00$
103,721.00$ 127,205.00$
20,655.00$ 21,600.00$
71,652.00$ 235,200.00$
1,360,000.00$ 1,105,000.00$
58,580.00$ 55,100.00$
82,240.00$ 128,000.00$ 257.00$ 400.00$
202.00$ 190.00$
160.00$ 130.00$
853.00$ 2,800.00$
76.50$ 80.00$
0.53$ 0.65$
1,000.00$ 445.00$
198.00$ 210.00$
110.00$ 105.00$
52.00$ 52.00$
87.50$ 75.00$
138.00$ 110.00$
43.00$ 85.00$
12/21/2016 Page 21 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
60210-1000 Line A0800 8 EACH
60501-0000 Line A0820 11,700 LNFT
61901-0000 Line A0840 200 LNFT
61901-0900 Line A0860 80 LNFT
61902-0000 Line A0880 1 EACH
61902-0000 Line A0900 2 EACH
61902-1400 Line A0920 1 EACH
61903-0900 Line A0940 1 EACH
62201-0250 Line A0960 200 HOUR
62201-0550 Line A0980 200 HOUR
62201-0950 Line A1000 200 HOUR
62201-2850 Line A1020 200 HOUR
62201-3350 Line A1040 200 HOUR
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
FENCE, BARBED WIRE, 4 STRAND
GATE (ROAD CLOSURE)
GATE(TEMPORARY ROAD CLOSED)
GATE, METAL, 16 FEET WIDTH
CATTLE GUARD, 28 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
END SECTION FOR 36-INCH PIPE CULVERT
STANDARD UNDERDRAIN SYSTEM
FENCE (BUCK AND POLE)
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
Oftedal Construction SWP Contracting & Paving
5,288.00$ 4,400.00$
789,750.00$ 643,500.00$
10,400.00$ 7,600.00$
840.00$ 3,120.00$
7,310.00$ 8,000.00$
5,220.00$ 6,000.00$
783.00$ 950.00$
23,000.00$ 20,000.00$
24,800.00$ 17,000.00$
19,700.00$ 14,000.00$
25,400.00$ 18,000.00$
28,000.00$ 21,000.00$
30,000.00$ 22,000.00$ 150.00$ 110.00$
140.00$ 105.00$
127.00$ 90.00$
98.50$ 70.00$
124.00$ 85.00$
23,000.00$ 20,000.00$
783.00$ 950.00$
2,610.00$ 3,000.00$
7,310.00$ 8,000.00$
10.50$ 39.00$
52.00$ 38.00$
67.50$ 55.00$
661.00$ 550.00$
12/21/2016 Page 22 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1060 ALL LPSM
62301-0000 Line A1080 300 HOUR
62302-0100 Line A1100 50 HOUR
62302-1000 Line A1120 200 HOUR
62302-1100 Line A1140 200 HOUR
62406-0200 Line A1160 85.0 ACRE
62510-2000 Line A1180 85.0 ACRE
62515-2000 Line A1200 51.0 ACRE
62515-3000 Line A1220 34.0 ACRE
63301-0000 Line A1240 115 EACH
63301-0000 Line A1260 2 EACH
63308-2000 Line A1280 348 EACH
63308-3000 Line A1300 4 EACH
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
MULCHING, HYDRAULIC METHOD, BONDED FIBE
SIGN SYSTEM
SIGN SYSTEM(FLASHING BEACON)
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
Oftedal Construction SWP Contracting & Paving
160,000.00$ 80,000.00$
14,700.00$ 11,100.00$
8,950.00$ 7,750.00$
14,600.00$ 25,000.00$
28,800.00$ 28,000.00$
238,850.00$ 108,375.00$
119,000.00$ 114,750.00$
56,100.00$ 71,400.00$
120,360.00$ 108,800.00$
65,550.00$ 106,950.00$
6,080.00$ 11,400.00$
18,270.00$ 36,540.00$
412.00$ 540.00$
3,540.00$ 3,200.00$
1,100.00$ 1,400.00$
1,400.00$ 1,350.00$
2,810.00$ 1,275.00$
144.00$ 140.00$
73.00$ 125.00$
179.00$ 155.00$
49.00$ 37.00$
160,000.00$ 80,000.00$
570.00$ 930.00$
52.50$ 105.00$
3,040.00$ 5,700.00$
103.00$ 135.00$
12/21/2016 Page 23 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
63309-0100 Line A1320 90 EACH
63309-1100 Line A1340 75 EACH
63316-1000 Line A1360 30 EACH
63402-0300 Line A1380 88.3 MILE
63402-0400 Line A1400 12.9 MILE
63502-0600 Line A1420 10 EACH
63502-0900 Line A1440 200 EACH
63502-1300 Line A1460 100 EACH
63502-2000 Line A1480 3 EACH
63504-1000 Line A1500 400 SQFT
63506-0500 Line A1520 6,400 HOUR
63601-6000 Line A1540 ALL LPSM
64706-1000 Line A1560 5,130 SQYD
DELINEATOR, TYPE 1
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR SY
MITIGATION, WETLANDS MITIGATION
DELINEATOR, TYPE SNOW POLE, 8 FEET
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28
-18.8% 18,165,111.50$ -12.6% 19,547,790.00$
Unit Price Amount Unit Price Amount
Oftedal Construction SWP Contracting & Paving
1,800.00$ 3,330.00$
8,025.00$ 6,000.00$
13,590.00$ 10,050.00$
145,959.90$ 185,430.00$
21,323.70$ 21,285.00$
1,600.00$ 2,750.00$
420.00$ 4,000.00$
2,650.00$ 8,500.00$
21,720.00$ 66,000.00$
15,000.00$ 8,000.00$
156,736.00$ 192,000.00$
150,000.00$ 11,000.00$
194,940.00$ 189,810.00$
20.00$ 37.00$
453.00$ 335.00$
107.00$ 80.00$
1,653.00$ 1,650.00$
1,653.00$ 2,100.00$
2.10$ 20.00$
160.00$ 275.00$
7,240.00$ 22,000.00$
26.50$ 85.00$
24.49$ 30.00$
37.50$ 20.00$
38.00$ 37.00$
150,000.00$ 11,000.00$
12/21/2016 Page 24 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15215-1000 Line A0040 11 EACH
15215-3000 Line A0060 164 EACH
15215-7000 Line A0080 1 EACH
15225-0000 Line A0100 12.530 MILE
15236-2000 Line A0120 25.060 MILE
15301-0000 Line A0140 ALL LPSM
15401-0000 Line A0160 ALL LPSM
15501-0000 Line A0180 ALL LPSM
15705-0100 Line A0200 46,300 LNFT
15705-1400 Line A0220 49,000 LNFT
15706-0200 Line A0240 300 EACH
15706-1000 Line A0260 185 EACH
MOBILIZATION
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY CONTROL, GRADE FINISHING
SOIL EROSION CONTROL, INLET PROTECTION
SURVEY AND STAKING, PARKING AREA
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
1,098,000.00$ 3,840,000.00$
7,425.00$ 8,250.00$
88,560.00$ 159,900.00$
3,000.00$ 3,200.00$
67,662.00$ 72,674.00$
112,770.00$ 120,288.00$
140,000.00$ 225,000.00$
240,000.00$ 256,000.00$
15,000.00$ 28,000.00$
69,450.00$ 55,560.00$
110,250.00$ 112,700.00$
18,000.00$ 27,000.00$
16,650.00$ 19,425.00$ 90.00$ 105.00$
60.00$ 90.00$
2.25$ 2.30$
1.50$ 1.20$
15,000.00$ 28,000.00$
3,200.00$
240,000.00$ 256,000.00$
140,000.00$ 225,000.00$
4,500.00$ 4,800.00$
5,400.00$ 5,800.00$
1,098,000.00$ 3,840,000.00$
675.00$ 750.00$
540.00$ 975.00$
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
3,000.00$
12/21/2016 Page 25 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15706-1600 Line A0280 2 EACH
15802-0000 Line A0300 ALL LPSM
20101-0000 Line A0320 132.0 ACRE
20301-0600 Line A0340 1 EACH
20301-1100 Line A0360 1 EACH
20301-2400 Line A0380 30 EACH
20302-0700 Line A0400 80 LNFT
20315-0000 Line A0420 115 LNFT
20401-0000 Line A0440 324,400 CUYD
20402-0000 Line A0460 6,700 CUYD
20441-0000 Line A0480 14,600 CUYD
21101-1000 Line A0500 52,400 SQYD
25101-2200 Line A0520 2,200 CUYD
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF SIGN
REMOVAL OF FENCE
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
2,082.00$ 5,600.00$
825,000.00$ 235,000.00$
660,000.00$ 369,600.00$
500.00$ 1,900.00$
420.00$ 600.00$
3,750.00$ 1,020.00$
480.00$ 800.00$
115.00$ 230.00$
3,244,000.00$ 1,784,200.00$
73,700.00$ 201,000.00$
21,900.00$ 51,100.00$
209,600.00$ 222,700.00$
165,000.00$ 286,000.00$ 75.00$ 130.00$
4.00$ 4.25$
1.50$ 3.50$
11.00$ 30.00$
10.00$ 5.50$
1.00$ 2.00$
6.00$ 10.00$
125.00$ 34.00$
420.00$ 600.00$
500.00$ 1,900.00$
5,000.00$ 2,800.00$
825,000.00$ 235,000.00$
1,041.00$ 2,800.00$
12/21/2016 Page 26 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
25101-2300 Line A0540 100 CUYD
25125-0000 Line A0560 200 EACH
25205-1000 Line A0580 3,420 CUYD
30103-0000 Line A0600 33,630 CUYD
40101-5600 Line A0620 42,620 TON
40105-3000 Line A0640 426 TON
40601-0000 Line A0660 82 TON
41102-1000 Line A0680 195,700 SQYD
41105-0000 Line A0700 270 TON
41201-0000 Line A0720 84 TON
60201-0800 Line A0740 8,500 LNFT
60201-1000 Line A0760 290 LNFT
60210-0800 Line A0780 320 EACH
PLACED RIPRAP, METHOD B, CLASS 3
BOULDER
ROCK BUTTRESS, MECHANICALLY-PLACED
AGGREGATE BASE
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INC
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
7,000.00$ 14,000.00$
20,000.00$ 28,000.00$
239,400.00$ 444,600.00$
1,681,500.00$ 1,614,240.00$
4,475,100.00$ 3,580,080.00$
89,034.00$ 78,810.00$
36,490.00$ 28,700.00$
117,420.00$ 156,560.00$
21,600.00$ 11,340.00$
228,480.00$ 56,700.00$
1,020,000.00$ 1,190,000.00$
56,550.00$ 72,500.00$
128,000.00$ 94,400.00$ 400.00$ 295.00$
195.00$ 250.00$
120.00$ 140.00$
2,720.00$ 675.00$
80.00$ 42.00$
0.60$ 0.80$
445.00$ 350.00$
209.00$ 185.00$
105.00$ 84.00$
50.00$ 48.00$
70.00$ 130.00$
100.00$ 140.00$
70.00$ 140.00$
12/21/2016 Page 27 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
60210-1000 Line A0800 8 EACH
60501-0000 Line A0820 11,700 LNFT
61901-0000 Line A0840 200 LNFT
61901-0900 Line A0860 80 LNFT
61902-0000 Line A0880 1 EACH
61902-0000 Line A0900 2 EACH
61902-1400 Line A0920 1 EACH
61903-0900 Line A0940 1 EACH
62201-0250 Line A0960 200 HOUR
62201-0550 Line A0980 200 HOUR
62201-0950 Line A1000 200 HOUR
62201-2850 Line A1020 200 HOUR
62201-3350 Line A1040 200 HOUR
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
FENCE, BARBED WIRE, 4 STRAND
GATE (ROAD CLOSURE)
GATE(TEMPORARY ROAD CLOSED)
GATE, METAL, 16 FEET WIDTH
CATTLE GUARD, 28 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
END SECTION FOR 36-INCH PIPE CULVERT
STANDARD UNDERDRAIN SYSTEM
FENCE (BUCK AND POLE)
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
5,600.00$ 5,080.00$
608,400.00$ 386,100.00$
7,200.00$ 10,000.00$
2,960.00$ 800.00$
7,800.00$ 15,200.00$
5,600.00$ 4,200.00$
900.00$ 3,400.00$
20,000.00$ 23,500.00$
16,000.00$ 17,000.00$
13,000.00$ 16,000.00$
17,000.00$ 21,000.00$
20,000.00$ 20,000.00$
21,000.00$ 22,000.00$ 105.00$ 110.00$
100.00$ 100.00$
85.00$ 105.00$
65.00$ 80.00$
80.00$ 85.00$
20,000.00$ 23,500.00$
900.00$ 3,400.00$
2,800.00$ 2,100.00$
7,800.00$ 15,200.00$
37.00$ 10.00$
36.00$ 50.00$
52.00$ 33.00$
700.00$ 635.00$
12/21/2016 Page 28 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1060 ALL LPSM
62301-0000 Line A1080 300 HOUR
62302-0100 Line A1100 50 HOUR
62302-1000 Line A1120 200 HOUR
62302-1100 Line A1140 200 HOUR
62406-0200 Line A1160 85.0 ACRE
62510-2000 Line A1180 85.0 ACRE
62515-2000 Line A1200 51.0 ACRE
62515-3000 Line A1220 34.0 ACRE
63301-0000 Line A1240 115 EACH
63301-0000 Line A1260 2 EACH
63308-2000 Line A1280 348 EACH
63308-3000 Line A1300 4 EACH
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
MULCHING, HYDRAULIC METHOD, BONDED FIBE
SIGN SYSTEM
SIGN SYSTEM(FLASHING BEACON)
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
79,000.00$ 115,000.00$
10,500.00$ 9,900.00$
7,500.00$ 6,250.00$
24,000.00$ 26,000.00$
27,000.00$ 27,000.00$
102,000.00$ 297,500.00$
110,500.00$ 144,500.00$
71,400.00$ 42,075.00$
105,400.00$ 85,000.00$
103,500.00$ 46,000.00$
11,000.00$ 5,200.00$
34,800.00$ 19,488.00$
520.00$ 380.00$
3,100.00$ 2,500.00$
1,400.00$ 825.00$
1,300.00$ 1,700.00$
1,200.00$ 3,500.00$
135.00$ 135.00$
120.00$ 130.00$
150.00$ 125.00$
35.00$ 33.00$
79,000.00$ 115,000.00$
900.00$ 400.00$
100.00$ 56.00$
5,500.00$ 2,600.00$
130.00$ 95.00$
12/21/2016 Page 29 of 30
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
63309-0100 Line A1320 90 EACH
63309-1100 Line A1340 75 EACH
63316-1000 Line A1360 30 EACH
63402-0300 Line A1380 88.3 MILE
63402-0400 Line A1400 12.9 MILE
63502-0600 Line A1420 10 EACH
63502-0900 Line A1440 200 EACH
63502-1300 Line A1460 100 EACH
63502-2000 Line A1480 3 EACH
63504-1000 Line A1500 400 SQFT
63506-0500 Line A1520 6,400 HOUR
63601-6000 Line A1540 ALL LPSM
64706-1000 Line A1560 5,130 SQYD
DELINEATOR, TYPE 1
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR SY
MITIGATION, WETLANDS MITIGATION
DELINEATOR, TYPE SNOW POLE, 8 FEET
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28
-22.4% 17,353,444.00$ -22.8% 17,276,497.00$
Unit Price Amount Unit Price Amount
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
3,150.00$ 2,070.00$
5,625.00$ 4,800.00$
9,750.00$ 4,050.00$
178,807.50$ 70,640.00$
20,188.50$ 5,547.00$
1,550.00$ 2,500.00$
400.00$ 1,000.00$
2,600.00$ 2,000.00$
21,300.00$ 24,000.00$
14,800.00$ 4,000.00$
153,600.00$ 160,000.00$
10,525.00$ 26,000.00$
184,680.00$ 143,640.00$
35.00$ 23.00$
325.00$ 135.00$
75.00$ 64.00$
1,565.00$ 430.00$
2,025.00$ 800.00$
2.00$ 5.00$
155.00$ 250.00$
7,100.00$ 8,000.00$
26.00$ 20.00$
24.00$ 25.00$
37.00$ 10.00$
36.00$ 28.00$
10,525.00$ 26,000.00$
12/21/2016 Page 30 of 30
Option X Total of Bid Items: 53,005.00$ -1.1% 52,400.00$
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 4,800.00$ 4,800.00$ 5,000.00$
15217-1000 Line X0040 8 HOUR 150.00$ 1,200.00$ 1,120.00$
15301-0000 Line X0060 ALL LPSM 1,700.00$ 1,700.00$ 2,000.00$
15401-0000 Line X0080 ALL LPSM 600.00$ 600.00$ 1,000.00$
15705-0100 Line X0100 85 LNFT 3.00$ 255.00$ 510.00$
61501-0100 Line X0120 10 SQYD 75.00$ 750.00$ 2,000.00$
62301-0000 Line X0140 8 HOUR 50.00$ 400.00$ 360.00$
63301-0000 Line X0160 1 EACH 800.00$ 800.00$ 410.00$
64603-1000 Line X0180 1 EACH 42,500.00$ 42,500.00$ 40,000.00$
CONTRACTOR TESTING
1,000.00$
MOBILIZATION
SURVEY AND STAKING, MISCELLANEOUS
CONTRACTOR QUALITY CONTROL
GENERAL LABOR
SIGN SYSTEM
FIXTURE, VAULT TOILET
SOIL EROSION CONTROL, SILT FENCE
SIDEWALK, CONCRETE
Kirkland Construction
140.00$
5,000.00$
6.00$
2,000.00$
410.00$
45.00$
200.00$
40,000.00$
Engineer's Estimate
12/21/2016 Page 1 of 5
Option X Total of Bid Items:
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15217-1000 Line X0040 8 HOUR
15301-0000 Line X0060 ALL LPSM
15401-0000 Line X0080 ALL LPSM
15705-0100 Line X0100 85 LNFT
61501-0100 Line X0120 10 SQYD
62301-0000 Line X0140 8 HOUR
63301-0000 Line X0160 1 EACH
64603-1000 Line X0180 1 EACH
CONTRACTOR TESTING
MOBILIZATION
SURVEY AND STAKING, MISCELLANEOUS
CONTRACTOR QUALITY CONTROL
GENERAL LABOR
SIGN SYSTEM
FIXTURE, VAULT TOILET
SOIL EROSION CONTROL, SILT FENCE
SIDEWALK, CONCRETE
107.5% 109,984.00$ 28.5% 68,132.00$
Unit Price Amount Unit Price Amount
20,000.00$ 500.00$
10,000.00$ 1,120.00$
15,000.00$ 1,000.00$
14,000.00$ 500.00$
306.00$ 102.00$
3,930.00$ 4,000.00$
648.00$ 360.00$
1,100.00$ 550.00$
45,000.00$ 60,000.00$
14,000.00$ 500.00$
20,000.00$ 500.00$
A&S Construction Co. SEMA Construction, Inc.
3.60$ 1.20$
1,250.00$ 140.00$
15,000.00$ 1,000.00$
1,100.00$ 550.00$
81.00$ 45.00$
393.00$ 400.00$
45,000.00$ 60,000.00$
12/21/2016 Page 2 of 5
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15217-1000 Line X0040 8 HOUR
15301-0000 Line X0060 ALL LPSM
15401-0000 Line X0080 ALL LPSM
15705-0100 Line X0100 85 LNFT
61501-0100 Line X0120 10 SQYD
62301-0000 Line X0140 8 HOUR
63301-0000 Line X0160 1 EACH
64603-1000 Line X0180 1 EACH
CONTRACTOR TESTING
MOBILIZATION
SURVEY AND STAKING, MISCELLANEOUS
CONTRACTOR QUALITY CONTROL
GENERAL LABOR
SIGN SYSTEM
FIXTURE, VAULT TOILET
SOIL EROSION CONTROL, SILT FENCE
SIDEWALK, CONCRETE
34.5% 71,300.00$ 69.0% 89,574.00$
Unit Price Amount Unit Price Amount
1,260.00$ 575.00$
1,480.00$ 1,280.00$
915.00$ 2,600.00$
600.00$ 1,900.00$
170.00$ 170.00$
1,200.00$ 6,800.00$
200.00$ 624.00$
475.00$ 625.00$
65,000.00$ 75,000.00$
600.00$ 1,900.00$
1,260.00$
American Civil Constructors, LLC Kelly Trucking, Inc.
2.00$ 2.00$
575.00$
185.00$ 160.00$
915.00$ 2,600.00$
475.00$ 625.00$
25.00$ 78.00$
120.00$ 680.00$
65,000.00$ 75,000.00$
12/21/2016 Page 3 of 5
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15217-1000 Line X0040 8 HOUR
15301-0000 Line X0060 ALL LPSM
15401-0000 Line X0080 ALL LPSM
15705-0100 Line X0100 85 LNFT
61501-0100 Line X0120 10 SQYD
62301-0000 Line X0140 8 HOUR
63301-0000 Line X0160 1 EACH
64603-1000 Line X0180 1 EACH
CONTRACTOR TESTING
MOBILIZATION
SURVEY AND STAKING, MISCELLANEOUS
CONTRACTOR QUALITY CONTROL
GENERAL LABOR
SIGN SYSTEM
FIXTURE, VAULT TOILET
SOIL EROSION CONTROL, SILT FENCE
SIDEWALK, CONCRETE
120.7% 116,995.50$ 57.7% 83,600.00$
Unit Price Amount Unit Price Amount
10,700.00$ 6,000.00$
1,152.00$ 1,120.00$
391.00$ 8,500.00$
391.00$ 2,000.00$
110.50$ 425.00$
3,900.00$ 2,350.00$
392.00$ 280.00$
559.00$ 925.00$
99,400.00$ 62,000.00$
391.00$ 2,000.00$
8,500.00$
Oftedal Construction SWP Contracting & Paving
1.30$ 5.00$
10,700.00$ 6,000.00$
144.00$ 140.00$
391.00$
559.00$ 925.00$
49.00$ 35.00$
390.00$ 235.00$
99,400.00$ 62,000.00$
12/21/2016 Page 4 of 5
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15217-1000 Line X0040 8 HOUR
15301-0000 Line X0060 ALL LPSM
15401-0000 Line X0080 ALL LPSM
15705-0100 Line X0100 85 LNFT
61501-0100 Line X0120 10 SQYD
62301-0000 Line X0140 8 HOUR
63301-0000 Line X0160 1 EACH
64603-1000 Line X0180 1 EACH
CONTRACTOR TESTING
MOBILIZATION
SURVEY AND STAKING, MISCELLANEOUS
CONTRACTOR QUALITY CONTROL
GENERAL LABOR
SIGN SYSTEM
FIXTURE, VAULT TOILET
SOIL EROSION CONTROL, SILT FENCE
SIDEWALK, CONCRETE
37.0% 72,637.50$ 48.1% 78,476.00$
Unit Price Amount Unit Price Amount
6,000.00$ 6,400.00$
1,080.00$ 1,160.00$
1,000.00$ 4,300.00$
1,000.00$ 2,200.00$
127.50$ 102.00$
2,250.00$ 4,650.00$
280.00$ 264.00$
900.00$ 400.00$
60,000.00$ 59,000.00$
1,000.00$
1,000.00$ 4,300.00$
Flatiron Constructors, Inc. Oldcastle SW Group, Inc.
1.50$ 1.20$
6,000.00$ 6,400.00$
135.00$ 145.00$
2,200.00$
900.00$ 400.00$
35.00$ 33.00$
225.00$ 465.00$
60,000.00$ 59,000.00$
12/21/2016 Page 5 of 5
Option Y Total of Bid Items: 1,594,400.00$ -76.0% 381,960.00$
Project No: CO FLAP 209(1)
Project Name: COTTONWOOD PASS ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line Y0020 ALL LPSM 145,000.00$ 145,000.00$ 2,000.00$
15214-0000 Line Y0040 ALL LPSM 12,000.00$ 12,000.00$…