Amendment_A005.pdf
PDF 3 MB Posted
- Attached to
- CO FLAP 209(1), Cottonwood Pass
- Solicitation number
- DTFH6816B00021
About this file
Amendment A005 adds Option Y, Utility Work, to the project. It also clarifies that no extra time will be given for either Option X or Option Y.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
E-14
CO FLAP 209(1)
Cottonwood Pass Road
Add the following:
A Notice to Proceed must be issued before commencement of any work. The contract completion date is September 31, 2018. Option X and Option Y are considered concurrent work and no additional time will be given if these options are exercised.
Subgrade Incentive.
(a) An incentive of $40,000/mile will be awarded for completion of finished subgrade and placement of aggregate base course80
(b) during the first season of construction prior to Thanksgiving Day, November 23, 2017.
Measurement will be to the nearest 1/10th mile. In order to obtain the incentive the following must occur:
1. Acceptance of completed subgrade work according to Subsection 204.13.
2. Acceptance of completed permanent soil erosion control to finished slopes according to Sections 624 and 625.
3. Acceptance of placed aggregate base at a minimum 3” thickness meeting the material quality requirements and gradations of Section 301.
(c) No subgrade incentive payments will be made for work completed in the second season of construction.
(d) Extensions to the incentive time will not be authorized for any reason.
108.02 Subcontracting. Delete the third paragraph and substitute the following:
Within 14 days of subcontract award, submit a completed SF 1413 and 1413S. Complete Part I for each Subcontractor, and include Part II when the Subcontractor performs on-site work.
Complete other forms that may be required by the Government to show the work subcontracted and the total dollar amount of the subcontract. Submit the above required information for each Subcontractor at lower tiers.
108.04 Failure to Complete Work on Time.
Add the following:
108.06 Weather Delays.
(a) Definitions.
(1) Reasonably Predictable Weather Days. Estimated weather day(s) where critical activities cannot be performed in any month, within contract weather or temperature limitations, or due to weather related soil conditions. Calculate Reasonably Predictable Weather Days according to Subsection 108.06 (b).
Jeremiah.Rogers Typewritten Text Amendment A005 12/9/2016
DESCRIPTIONSHEET
INDEX TO SHEETS
U1
U3
U1 TITLE SHEET
U2
SUMMARY OF QUANTITIES
TYPICAL SECTIONS & TABULATION OF QUANTITIES
D E P
A R T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DENVER, COLORADO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SPECIAL 636-A PULLBOXU4-U5
Amendment 005
OPTION Y
COTTONWOOD PASS ROAD
CO FLAP 209(1)
STATE PROJECT
A
M N C
O R o a d w a y C
A D
D S h e e ts O p ti o n
Y
A m e n d m e n t-
U ti li ti e s T
T L
C O
O p ti o n
Y .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CO
COTTONWOOD PASS ROAD
CO FLAP 209(1)
Hinge point
1:4
2%2%
NO SCALE
(variable)
Fill slope
1:4
WIDENING ON CURVES
(ft)
Radius
(ft)
Widening
Over 400
300 to 400
200 to 300 3
200 & under 4
U2
Hinge point
1:4
2% Cu t s lop e
(v ar iab le)
2%
18" Typ.
NOTE: (See Table below) Varies with Curve Widening 16.5' Typ.
(variable)
Fill slope
1:4
(See Table below) Varies with Curve Widening 16.5' Typ.
18" Typ.
18" Typ.
40" min. 2.
40" min. 2.
CONDUIT INSTALLATION IN EMBANKMENT
TYPICAL SECTION
CONDUIT INSTALLATION IN GRADED DITCH
TYPICAL SECTION
INSTALLATION OF PULLBOX
TYPICAL SECTION
OPTION Y
TABULATION OF QUANTITIES
TYPICAL SECTIONS &
32-1/2"
2" Conduit with mule tape
2" Conduit with mule tape
Install brown carsonite marker at every fourth pullbox.
Do not splice conduit or muletape between pullboxes. Provide a seamless run between pullboxes.
conduit as necessary to provide a 12" buffer between the top of the 2" conduit and the bottom of the culvert.
When a 40" minimum depth can not be achieved due to culvert installation, increase the depth of
18" from edge of aggregate base.
Install 2" dia. conduit with mule tape on the right hand side of the roadway, at a minimum depth of 40" and
4.
3.
2.
1.
* Pullbox locations must be approved by CO and Gunnison County prior to installation.
installation. See Special 636-A for details.
from the CO and Gunnison County prior to locations. Obtain approval of pullbox locations See Table on this sheet for approximate roadway at a maximum spacing of 3000ft.
Install Pullboxes on the right side of the
STATE PROJECT
A
M N C
O R o a d w a y C
A D
D S h e e ts O p ti o n
Y
A m e n d m e n t-
U ti li ti e s T y p S e c
O p ti o n
Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CO
COTTONWOOD PASS ROAD
CO FLAP 209(1)
Sheet
U2 ALLOWANCE Bid Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15214-0000 SURVEY AND STAKING,
MISCELLANEOUS LPSM ALL
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0100 62102-0000 MARKER EACH 7
Y0120 62301-0000 GENERAL LABOR HOUR 80
Y0140 63610-0000 CONDUIT LNFT 64,945 3,255 68,200
Y0160 63621-1000 UTILITY BOX, PULLBOX EACH 24 2 26
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- D ec -2
:2
A M
N
C O
\2
(1
R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \O pt io nY _C en tu ry Li nk C on du it\
[C O
-F
LA
P-
9( 1)
-O pt
Y_ Fi na lE st im at e.
xl sx
]S he et
STATE PROJECT
U3FLAP 209(1)CO
SHEET
NUMBERAmendment A005
U4
PULLBOX
636-A
Sheet 1 of 2
Subsection 703.12 with material according to
Backfill within the pullbox
Pullbox
PULLBOX TYPICAL SECTION
Mule tape
2" Conduit with
34Approx. Weight (lbs)
1,800Breaking Strength (lbs)
5/8"Width
3,000Length (ft)
WhiteColor
PolyesterFiber
WovenConstruction included in the cost of pay item 63610-0000 CONDUIT.
6. Install Mule Tape or an approved equal. Installation of Mule Tape is
ASTM D-3485, NEMA TC-7, UL 651, UL 1990, Bellcore GR-356 the following specifications: ASTM F-2160, ASTM D-3035, ASTM D-2239,
5. All Smoothwall conduit dimensions meets or exceeds one or more of minimm wall thickness.
minimum resin tensile strength of 3,000 psi, the average OD and
4. "Safe Working Load" is calculated using 20% safety factor with the over tighter bends.
3. During cable placement, large sweeping bends are recommended
Unsupported Bend Radius 20 times the OD
Supported Bend Radius 10 times the OD,1/2" through 2-1/2"
Bend Radius
2. Install duraline SDR-9 2" conduit or approved equal.
is included in the cost of pay item 63621-1000 UTILITY BOX, PULLBOX.
1. Install newbasis pullbox or an approved equal. Backfill material
Notes:
STATE PROJECT
A
M N C
O R o a d w a y C
A D
D S h e e ts O p ti o n
Y
A m e n d m e n t-
U ti li ti e s S
P L P u ll b o x .d
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CO
COTTONWOOD PASS ROAD
CO FLAP 209(1)
PULLBOX
Sheet 2 of 2
636-A
U5
1. Install newbasis pullbox or approved equal.
Notes:
STATE PROJECT
A
M N C
O R o a d w a y C
A D
D S h e e ts O p ti o n
Y
A m e n d m e n t-
U ti li ti e s S
P L P u ll b o x .d
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CO
COTTONWOOD PASS ROAD
CO FLAP 209(1)
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Amendment00003_Nov18-2016-SurveyCntrl-Sheets_A4-1_to_A4-4.pdf |
| A001.pdf |
| A002.pdf |
| A003.pdf |
| A004.pdf |
| A005.pdf |
| A006.pdf |
| A007.pdf |
| A008.pdf |
| A009.pdf |
| Untitled |
| Untitled |
| Untitled |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 7 |
| Text3: |
| 0: A005 |
| 1: 12/9/2016 |
| 2: |
| 0: |
| 1: CO FLAP 209(1), Cottonwood |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-16-B-00021 |
| 1: 11/7/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: PLANS |
Add new pages U1 through U5, Option Y, to the Plans. This option adds fiber optic conduit installation to the contract.
INVITATION FOR BID- E PAGES
Replace E-14 with new E-14. No additional time will be given if either, or both, of the options are awarded.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .