Amendment_A005.pdf

PDF 3 MB Posted

Attached to
CO FLAP 209(1), Cottonwood Pass
Solicitation number
DTFH6816B00021
Issued by

About this file

Amendment A005 adds Option Y, Utility Work, to the project. It also clarifies that no extra time will be given for either Option X or Option Y.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

E-14

CO FLAP 209(1)

Cottonwood Pass Road

Add the following:

A Notice to Proceed must be issued before commencement of any work. The contract completion date is September 31, 2018. Option X and Option Y are considered concurrent work and no additional time will be given if these options are exercised.

Subgrade Incentive.

(a) An incentive of $40,000/mile will be awarded for completion of finished subgrade and placement of aggregate base course80

(b) during the first season of construction prior to Thanksgiving Day, November 23, 2017.

Measurement will be to the nearest 1/10th mile. In order to obtain the incentive the following must occur:

1. Acceptance of completed subgrade work according to Subsection 204.13.

2. Acceptance of completed permanent soil erosion control to finished slopes according to Sections 624 and 625.

3. Acceptance of placed aggregate base at a minimum 3” thickness meeting the material quality requirements and gradations of Section 301.

(c) No subgrade incentive payments will be made for work completed in the second season of construction.

(d) Extensions to the incentive time will not be authorized for any reason.

108.02 Subcontracting. Delete the third paragraph and substitute the following:

Within 14 days of subcontract award, submit a completed SF 1413 and 1413S. Complete Part I for each Subcontractor, and include Part II when the Subcontractor performs on-site work.

Complete other forms that may be required by the Government to show the work subcontracted and the total dollar amount of the subcontract. Submit the above required information for each Subcontractor at lower tiers.

108.04 Failure to Complete Work on Time.

Add the following:

108.06 Weather Delays.

(a) Definitions.

(1) Reasonably Predictable Weather Days. Estimated weather day(s) where critical activities cannot be performed in any month, within contract weather or temperature limitations, or due to weather related soil conditions. Calculate Reasonably Predictable Weather Days according to Subsection 108.06 (b).

Jeremiah.Rogers Typewritten Text Amendment A005 12/9/2016

DESCRIPTIONSHEET

INDEX TO SHEETS

U1

U3

U1 TITLE SHEET

U2

SUMMARY OF QUANTITIES

TYPICAL SECTIONS & TABULATION OF QUANTITIES

D E P

A R T

M

E

NT

OF TRANSPO

R T

A T I O

N

U N

IT

E

D STATES OF

AME

R I C

A

PLANS PREPARED BY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DENVER, COLORADO

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

SPECIAL 636-A PULLBOXU4-U5

Amendment 005

OPTION Y

COTTONWOOD PASS ROAD

CO FLAP 209(1)

STATE PROJECT

A

M N C

O R o a d w a y C

A D

D S h e e ts O p ti o n

Y

A m e n d m e n t-

U ti li ti e s T

T L

C O

O p ti o n

Y .d g n

U s e r S ta c y .D ic c ic c o

NUMBER

SHEET

CO

COTTONWOOD PASS ROAD

CO FLAP 209(1)

Hinge point

1:4

2%2%

NO SCALE

(variable)

Fill slope

1:4

WIDENING ON CURVES

(ft)

Radius

(ft)

Widening

Over 400

300 to 400

200 to 300 3

200 & under 4

U2

Hinge point

1:4

2% Cu t s lop e

(v ar iab le)

2%

18" Typ.

NOTE: (See Table below) Varies with Curve Widening 16.5' Typ.

(variable)

Fill slope

1:4

(See Table below) Varies with Curve Widening 16.5' Typ.

18" Typ.

18" Typ.

40" min. 2.

40" min. 2.

CONDUIT INSTALLATION IN EMBANKMENT

TYPICAL SECTION

CONDUIT INSTALLATION IN GRADED DITCH

TYPICAL SECTION

INSTALLATION OF PULLBOX

TYPICAL SECTION

OPTION Y

TABULATION OF QUANTITIES

TYPICAL SECTIONS &

32-1/2"

2" Conduit with mule tape

2" Conduit with mule tape

Install brown carsonite marker at every fourth pullbox.

Do not splice conduit or muletape between pullboxes. Provide a seamless run between pullboxes.

conduit as necessary to provide a 12" buffer between the top of the 2" conduit and the bottom of the culvert.

When a 40" minimum depth can not be achieved due to culvert installation, increase the depth of

18" from edge of aggregate base.

Install 2" dia. conduit with mule tape on the right hand side of the roadway, at a minimum depth of 40" and

4.

3.

2.

1.

* Pullbox locations must be approved by CO and Gunnison County prior to installation.

installation. See Special 636-A for details.

from the CO and Gunnison County prior to locations. Obtain approval of pullbox locations See Table on this sheet for approximate roadway at a maximum spacing of 3000ft.

Install Pullboxes on the right side of the

STATE PROJECT

A

M N C

O R o a d w a y C

A D

D S h e e ts O p ti o n

Y

A m e n d m e n t-

U ti li ti e s T y p S e c

O p ti o n

Y .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r S ta c y .D ic c ic c o

NUMBER

SHEET

CO

COTTONWOOD PASS ROAD

CO FLAP 209(1)

Sheet

U2 ALLOWANCE Bid Schedule

Y0020 15101-0000 MOBILIZATION LPSM ALL

Y0040 15214-0000 SURVEY AND STAKING,

MISCELLANEOUS LPSM ALL

Y0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL

Y0100 62102-0000 MARKER EACH 7

Y0120 62301-0000 GENERAL LABOR HOUR 80

Y0140 63610-0000 CONDUIT LNFT 64,945 3,255 68,200

Y0160 63621-1000 UTILITY BOX, PULLBOX EACH 24 2 26

SUMMARY OF QUANTITIES - Option Y

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

7- D ec -2

:2

A M

N

C O

\2

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es \O pt io nY _C en tu ry Li nk C on du it\

[C O

-F

LA

P-

9( 1)

-O pt

Y_ Fi na lE st im at e.

xl sx

]S he et

STATE PROJECT

U3FLAP 209(1)CO

SHEET

NUMBERAmendment A005

U4

PULLBOX

636-A

Sheet 1 of 2

Subsection 703.12 with material according to

Backfill within the pullbox

Pullbox

PULLBOX TYPICAL SECTION

Mule tape

2" Conduit with

34Approx. Weight (lbs)

1,800Breaking Strength (lbs)

5/8"Width

3,000Length (ft)

WhiteColor

PolyesterFiber

WovenConstruction included in the cost of pay item 63610-0000 CONDUIT.

6. Install Mule Tape or an approved equal. Installation of Mule Tape is

ASTM D-3485, NEMA TC-7, UL 651, UL 1990, Bellcore GR-356 the following specifications: ASTM F-2160, ASTM D-3035, ASTM D-2239,

5. All Smoothwall conduit dimensions meets or exceeds one or more of minimm wall thickness.

minimum resin tensile strength of 3,000 psi, the average OD and

4. "Safe Working Load" is calculated using 20% safety factor with the over tighter bends.

3. During cable placement, large sweeping bends are recommended

Unsupported Bend Radius 20 times the OD

Supported Bend Radius 10 times the OD,1/2" through 2-1/2"

Bend Radius

2. Install duraline SDR-9 2" conduit or approved equal.

is included in the cost of pay item 63621-1000 UTILITY BOX, PULLBOX.

1. Install newbasis pullbox or an approved equal. Backfill material

Notes:

STATE PROJECT

A

M N C

O R o a d w a y C

A D

D S h e e ts O p ti o n

Y

A m e n d m e n t-

U ti li ti e s S

P L P u ll b o x .d

U.S. DEPARTMENT OF TRANSPORTATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

SPECIAL

U.S. CUSTOMARY SPECIAL

U s e r S ta c y .D ic c ic c o

NUMBER

SHEET

CO

COTTONWOOD PASS ROAD

CO FLAP 209(1)

PULLBOX

Sheet 2 of 2

636-A

U5

1. Install newbasis pullbox or approved equal.

Notes:

STATE PROJECT

A

M N C

O R o a d w a y C

A D

D S h e e ts O p ti o n

Y

A m e n d m e n t-

U ti li ti e s S

P L P u ll b o x .d

U.S. DEPARTMENT OF TRANSPORTATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

SPECIAL

U.S. CUSTOMARY SPECIAL

U s e r S ta c y .D ic c ic c o

NUMBER

SHEET

CO

COTTONWOOD PASS ROAD

CO FLAP 209(1)

Full Appendix B.pdf
APPENDIX B.pdf
subcontractingplan
Amendment00003_Nov18-2016-SurveyCntrl-Sheets_A4-1_to_A4-4.pdf
A001.pdf
A002.pdf
A003.pdf
A004.pdf
A005.pdf
A006.pdf
A007.pdf
A008.pdf
A009.pdf
Untitled
Untitled
Untitled
Text1:
Text2:
0: 1
1: 7
Text3:
0: A005
1: 12/9/2016
2:
0:
1: CO FLAP 209(1), Cottonwood
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JEREMIAH ROGERS

1:

1:
0:
Text6:
0: DTFH68-16-B-00021
1: 11/7/2016
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Yes
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0*
Text11:
0:
1:
Text12: * See Item 14 Below
Text13: PLANS

Add new pages U1 through U5, Option Y, to the Plans. This option adds fiber optic conduit installation to the contract.

INVITATION FOR BID- E PAGES

Replace E-14 with new E-14. No additional time will be given if either, or both, of the options are awarded.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .