HYDRAULIC REPORT
SAGUARO NATIONAL PARK
KINNEY ROAD
AZ FTNP SAGU 12(1)
June 2015
Prepared By:
Laura Girard
Hydraulic Engineering
Central Federal Lands Highway Division ii
TABLE OF CONTENTS
Introduction
Background and Objectives
Design Criteria
Hydrologic Analysis
Hydraulic Analysis
Riprap
Summary
References
APPENDIX A
APPENDIX B ................................................................................................ Error! Bookmark not defined.
LIST OF TABLES
Table 1. Computed Rational Method peak discharges for DA ≤ 160 acres Table 2. Culvert design parameters Table 3. Culvert design elevations Table 4. Summary of Culvert Outlet Protection Riprap Attributes
LIST OF FIGURES
Figure 1. Saguaro National Park location map Figure 2. Saguaro West, Tucson Mountain District Figure 3. Saguaro West, Tucson Mountain District and Kinney Road aerial view Figure 4. Drainage area at Station 206+75, 58 acres Figure 5. Drainage area at Station 228+05, 52 acres Figure 6. Profile plot of 2x60” embedded culverts at Sta. 206+75 Figure 7. Profile plot of 81”x59” embedded pipe arch culvert at Sta. 228+05 Figure 8. Culvert summary table for Sta. 206+75 Figure 9. Culvert summary table for Sta. 228+05
INTRODUCTION
Saguaro National Park is located in southern Arizona in the Sonoran Desert and is divided into two districts, one to the east and one to the west of Tucson. This project is located in the southeast corner of the western
Tucson Mountain District, see Figures 1-3.
Figure 1. Saguaro National Park location map.
Figure 2. Saguaro West, Tucson Mountain District.
Figure 3. Saguaro West, Tucson Mountain District and Kinney Road aerial view.
This report provides a summary of the hydrologic and hydraulic analyses and recommendations of various drainage features on Kinney Road.
BACKGROUND AND OBJECTIVES
Multiple culverts are reported to have inadequate capacity to pass flows, often clogging with sediment and debris causing the roadway to overtop. In several culvert locations, overtopping has resulted in erosion on the downstream embankment slopes and channel. Additionally, roadway ditches are overflowing causing runoff to cross over the roadway and depositing sediment in. Low water crossings have been proposed at these locations.
DESIGN CRITERIA
Project Design Standards for culverts for a low standard road (ADT < 1500), based on the CFLHD PDDM
Capacity and Stability Design: 25-year flood
Headwater o New: Water Surface Elevation (WSEL) ≤ bottom of aggregate base layer o Existing: WSEL ≤ shoulder hinge point
Headwater/Diameter (HW/D) ratio for culverts 48” or smaller: HW/D ≤ 1.5
Headwater/Diameter (HW/D) ratio for culverts larger than 48”: HW/D ≤ 1.2
WSEL limited by unacceptable hazards to property
Minimum Size: 24” for cross-road culverts
Stream Crossings: Match streambed
Cover: Refer to FLH Standard Drawing 602-1 for the minimum and maximum cover on pipes
Kinney Road
HYDROLOGIC ANALYSIS
The Watershed Modeling System (WMS), version 9.1 was used to delineate the drainage basin for 2 culvert locations. Figures 6 and 7 show the drainage areas for culvert Sta. 206+75 and 228+05, respectively. At Sta.
228+05 there are two obvious drainage paths encompassed by the watershed delineation. For design, the flow determined by the watershed delineation was split and the template developed for Station 228+05 will be applied identically at Station 230+03. For the purposes of this report, only Sta. 228+05 will be discussed.
Figure 4. Drainage area at Station 206+75, 58 acres.
Figure 5. Drainage area at Station 228+05, 52 acres.
Peak discharge estimates were computed using NOAA Atlas 14 for the Arizona region and the ADOT Rational
Method for the basins up to 160 acres.
The Rational Method equation is
Q = CiA where:
Q = discharge (cfs)
C = runoff coefficient i = average rainfall intensity (in/hr)
A = drainage area (acres)
The time of concentration (Tc) is used to find the rainfall intensity values for the Rational Method calculation.
ADOT’s equation for finding the Tc is:
Tc = 11.4 L 0.5 Kb 0.52 S-0.31 i-0.38 where:
L = length of longest flow path, (mi)
Kb = watershed resistance coefficient
S = slope of longest flow path (ft/mi) i = average rainfall intensity (in/hr) for duration equal to Tc
The results from the ADOT Rational Method analysis for the 25-year peak flows for drainage areas less than
160 acres are summarized below in Table 1.
Table 1. Computed Rational Method peak discharges for DA ≤ 160 acres
Culvert Number Culvert Station Drainage Basin
Area (acres)
25-yr Peak
Discharge
(cfs)
1 206+75 58 151
2 228+05 26* 84
*Note: This is half the delineated drainage area, see earlier discussion for more information.
HYDRAULIC ANALYSIS
Kinney Road is a low volume road; culverts were sized for the 25-yr flood event. The CFL PDDM requires that all culverts larger than 48” have a headwater to diameter ratio (HW/D) of 1.2 or less. However, upstream aggradation and pipe clogging has been a continual issue along Kinney Road, to ensure no backwater formed, which would allow aggradation, the HW/D ratio threshold was set at less than 1. Culvert design parameters are presented below in Table 3. Figures 6 and 6 shows the profile plot of the culvert at Stations
206+75 and 228+05, respectively, while Figures 8 and 9 show the results of the culvert analysis for Stations
206+75 and 228+05, respectively from HY8.
Table 2. Culvert design parameters.
Culvert
Station
25-yr
Peak
Discharge
(cfs)
Pipe
Dimensions
Length
(ft) Slope
Headwater
Elevation
(ft)
Depth (ft) HW/D
206+75 151 81”x59”
Pipe Arch 40 11.7% 2630.10 2.88 0.96
228+05 84
2x60”
Circular, CMP
42.1 6.9% 2576.91 2.51 0.84
Figure 6. Profile plot of 2x60” embedded culverts at Sta. 206+75.
Figure 7. Profile plot of 81”x59” embedded pipe arch culvert at Sta. 228+05.
Figure 8. Culvert summary table for Sta. 206+75.
Figure 9. Culvert summary table for Sta. 228+05.
As Request by the Park, all culverts designs facilitate a natural substrate bottom for terrestrial wildlife passage. To ensure sufficient depth of channel bottom material settles in the pipe, embedded circular pipes are recommended to have 40% embedment depth for circular pipes and 20% for pipe arches. Channel invert elevation and slopes were assumed the same as existing. Design elevations for the culverts are presented in
Table 3.
Table 3. Culvert design elevations.
Station
Pipe
Dimensions
Inlet
Elevation
(ft)
Outlet
Elevation
(ft)
Embedment depth (ft)
Tailwater
Channel Invert
Elevation (ft)
206+75 81”x59”
Pipe Arch
2625.3 2620.73 23 2622.65
228+05 2x60” CMP 2572.4 2569.5 24 2571.5
RIPRAP
Riprap should be placed bat each culvert site at the outlet between the wingwalls to help prevent scour issues. Riprap elevation at the outlet will be at the bottom of the pipe and will extend at this elevation to the end of the wingwalls. After crossing the line of the wingwalls, the riprap will be brought up until it matches the existing channel elevation and extend until the distance presented in Table 4 is achieved. Table 4 contains the riprap apron design parameters. The FHWA HEC 14 Appendix C riprap calculations were used for analysis of the riprap.
Table 4. Summary of Culvert Outlet Protection Riprap Attributes.
Station
Culvert Size CFL Riprap
Class
Depth of
Riprap (ft)
Length of Riprap Apron
(ft)
206+75 81”x59” Pipe
Arch
II 2.6 40
228+05 2x60” CMP II 2.6 27
SUMMARY
It is recommended to install at Sta. 206+75 an 81”x59” pipe arch, embedded 24 inches, with Class II riprap conforming to the attributes in Table 5 at the outlet and concrete headwall and wingwalls. The recommendation at Sta. 228+05 include 2x60” circular CMP embedded 23 inches with Class II riprap conforming to the attributes in Table 5 at the outlet and concrete headwall and wingwalls
REFERENCES
Arizona Department of Transportation” Highway Drainage Design Manual” Volume 2 Hydrology, Second
Edition, 2014.
Aquaveo (2014) Watershed Modeling System v9.1 (www.aquaveo.com).
Federal Highway Administration (2008) “Project Development and Design Manual” Federal Lands Highway
Division. US Department of Transportation. Chap 7.
Federal Highway Administration HEC 14, “Hydraulic Design of Energy Dissipators for Culverts and Channels”
Third Edition, (2006).
Federal Highway Administration (2012) HY-8 7.3.
Equations for Estimating Magnitude and Frequency of Floods for Ungaged Sites, 1993, USGS WRIR 94-4002.
http://www.aquaveo.com/
APPENDIX A
HY8 ANALYSES
HY-8 Culvert Analysis Report
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 83.9 cfs
Design Flow: 83.9 cfs
Maximum Flow: 99.7 cfs
Table 1 - Summary of Culvert Flows at Crossing: 228+05 Embedded Pipe Arch
Headwater Elevation
(ft) Total Discharge (cfs) 81x59 Discharge (cfs) Roadway Discharge
(cfs) Iterations
2630.10 83.90 83.90 0.00 1
2630.15 85.48 85.48 0.00 1
2630.20 87.06 87.06 0.00 1
2630.26 88.64 88.64 0.00 1
2630.31 90.22 90.22 0.00 1
2630.37 91.80 91.80 0.00 1
2630.42 93.38 93.38 0.00 1
2630.47 94.96 94.96 0.00 1
2630.53 96.54 96.54 0.00 1
2630.58 98.12 98.12 0.00 1
2630.64 99.70 99.70 0.00 1
2639.30 248.43 248.43 0.00 Overtopping
Rating Curve Plot for Crossing: 228+05 Embedded Pipe Arch
Table 2 - Culvert Summary Table: 81x59
Total Discharge
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
83.90 83.90 2630.10 2.879 0.0* 1-S2n 0.934 1.691 1.008 0.474 11.763 5.544
85.48 85.48 2630.15 2.933 0.0* 1-S2n 0.946 1.711 1.062 0.480 11.413 5.583
87.06 87.06 2630.20 2.987 0.0* 1-S2n 0.959 1.731 1.074 0.485 11.509 5.620
88.64 88.64 2630.26 3.042 0.0* 5-S2n 0.971 1.757 1.093 0.490 11.527 5.659
90.22 90.22 2630.31 3.096 0.0* 5-S2n 0.983 1.777 1.100 0.495 11.658 5.696
91.80 91.80 2630.37 3.150 0.0* 5-S2n 0.996 1.797 1.107 0.500 11.799 5.734
93.38 93.38 2630.42 3.204 0.0* 5-S2n 1.008 1.817 1.067 0.506 12.414 5.768
94.96 94.96 2630.47 3.258 0.0* 5-S2n 1.021 1.837 1.087 0.511 12.409 5.804
96.54 96.54 2630.53 3.312 0.0* 5-S2n 1.033 1.856 1.159 0.515 11.916 5.841
98.12 98.12 2630.58 3.366 0.0* 5-S2n 1.046 1.875 1.171 0.521 11.994 5.876
99.70 99.70 2630.64 3.421 0.0* 5-S2n 1.058 1.893 1.192 0.525 11.994 5.911
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 2627.22 ft, Outlet Elevation (invert): 2622.65 ft
Culvert Length: 39.27 ft, Culvert Slope: 0.1172
Culvert Performance Curve Plot: 81x59
Water Surface Profile Plot for Culvert: 81x59
Site Data - 81x59
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 2625.30 ft
Outlet Station: 39.00 ft
Outlet Elevation: 2620.73 ft
Number of Barrels: 1
Culvert Data Summary - 81x59
Barrel Shape: Pipe Arch
Barrel Span: 81.00 in
Barrel Rise: 59.00 in
Barrel Material: Steel or Aluminum
Embedment: 23.00 in
Barrel Manning's n: 0.0280 (top and sides)
Manning's n: 0.0350 (bottom)
Culvert Type: Straight
Inlet Configuration: Square Edge with Headwall
Inlet Depression: NONE
Table 3 - Downstream Channel Rating Curve (Crossing: 228+05 Embedded Pipe
Arch)
Tailwater Channel Data - 228+05 Embedded Pipe Arch
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 30.00 ft
Side Slope (H:V): 4.00 (_:1)
Channel Slope: 0.0500
Channel Manning's n: 0.0350
Channel Invert Elevation: 2622.65 ft
Roadway Data for Crossing: 228+05 Embedded Pipe Arch
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 100.00 ft
Crest Elevation: 2639.30 ft
Roadway Surface: Paved
Roadway Top Width: 27.00 ft
Flow (cfs) Water Surface
Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
83.90 2623.12 0.47 5.54 1.48 1.46
85.48 2623.13 0.48 5.58 1.50 1.46
87.06 2623.14 0.49 5.62 1.51 1.46
88.64 2623.14 0.49 5.66 1.53 1.47
90.22 2623.15 0.50 5.70 1.55 1.47
91.80 2623.15 0.50 5.73 1.56 1.47
93.38 2623.16 0.51 5.77 1.58 1.47
94.96 2623.16 0.51 5.80 1.59 1.48
96.54 2623.17 0.52 5.84 1.61 1.48
98.12 2623.17 0.52 5.88 1.62 1.48
99.70 2623.18 0.53 5.91 1.64 1.48
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 107.4 cfs
Design Flow: 150.7 cfs
Maximum Flow: 185 cfs
Table 4 - Summary of Culvert Flows at Crossing: 206+75 CMP
Headwater Elevation
(ft) Total Discharge (cfs) 2x60” Discharge (cfs) Roadway Discharge
(cfs) Iterations
2576.35 107.40 107.40 0.00 1
2576.46 115.16 115.16 0.00 1
2576.56 122.92 122.92 0.00 1
2576.66 130.68 130.68 0.00 1
2576.76 138.44 138.44 0.00 1
2576.85 146.20 146.20 0.00 1
2576.91 150.70 150.70 0.00 1
2577.05 161.72 161.72 0.00 1
2577.15 169.48 169.48 0.00 1
2577.25 177.24 177.24 0.00 1
2577.35 185.00 185.00 0.00 1
2578.50 268.13 268.13 0.00 Overtopping
Rating Curve Plot for Crossing: 206+75 CMP
Table 5 - Culvert Summary Table: 2x60"
Total Discharge
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
107.40 107.40 2576.35 1.955 0.0* 1-S2n 1.006 1.517 1.121 0.477 8.837 7.166
115.16 115.16 2576.46 2.057 0.0* 1-S2n 1.058 1.584 1.145 0.497 9.294 7.358
122.92 122.92 2576.56 2.158 0.0* 1-S2n 1.108 1.653 1.237 0.517 9.219 7.540
130.68 130.68 2576.66 2.257 0.073 1-S2n 1.158 1.718 1.272 0.536 9.538 7.718
138.44 138.44 2576.76 2.356 0.294 1-S2n 1.207 1.785 1.339 0.554 9.618 7.887
146.20 146.20 2576.85 2.454 0.516 1-S2n 1.256 1.845 1.388 0.573 9.815 8.049
150.70 150.70 2576.91 2.511 0.648 1-S2n 1.285 1.879 1.417 0.583 9.940 8.140
161.72 161.72 2577.05 2.650 0.984 1-S2n 1.355 1.961 1.473 0.608 10.293 8.358
169.48 169.48 2577.15 2.748 1.234 1-S2n 1.405 2.023 1.535 0.625 10.391 8.504
177.24 177.24 2577.25 2.846 1.488 1-S2n 1.456 2.079 1.627 0.642 10.299 8.648
185.00 185.00 2577.35 2.946 1.749 1-S2n 1.506 2.133 1.646 0.659 10.641 8.786
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 2574.40 ft, Outlet Elevation (invert): 2571.50 ft
Culvert Length: 42.10 ft, Culvert Slope: 0.0690
Culvert Performance Curve Plot: 2x60”
Water Surface Profile Plot for Culvert: 2x60”
Site Data - 2x60”
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 2572.40 ft
Outlet Station: 42.00 ft
Outlet Elevation: 2569.50 ft
Number of Barrels: 2
Culvert Data Summary - 2x60”
Barrel Shape: Circular
Barrel Diameter: 5.00 ft
Barrel Material: Corrugated Aluminum
Embedment: 24.00 in
Barrel Manning's n: 0.0310 (top and sides)
Manning's n: 0.0350 (bottom)
Culvert Type: Straight
Inlet Configuration: Beveled Edge
Inlet Depression: NONE
Table 6 - Downstream Channel Rating Curve (Crossing: 206+75 CMP)
Tailwater Channel Data - 206+75 CMP
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 30.00 ft
Side Slope (H:V): 3.00 (_:1)
Channel Slope: 0.0600
Channel Manning's n: 0.0300
Channel Invert Elevation: 2571.50 ft
Roadway Data for Crossing: 206+75 CMP
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 200.00 ft
Crest Elevation: 2578.50 ft
Roadway Surface: Paved
Roadway Top Width: 28.00 ft
Flow (cfs) Water Surface
Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
107.40 2571.98 0.48 7.17 1.79 1.87
115.16 2572.00 0.50 7.36 1.86 1.88
122.92 2572.02 0.52 7.54 1.93 1.89
130.68 2572.04 0.54 7.72 2.01 1.90
138.44 2572.05 0.55 7.89 2.08 1.91
146.20 2572.07 0.57 8.05 2.14 1.92
150.70 2572.08 0.58 8.14 2.18 1.93
161.72 2572.11 0.61 8.36 2.28 1.94
169.48 2572.13 0.63 8.50 2.34 1.95
177.24 2572.14 0.64 8.65 2.40 1.96
185.00 2572.16 0.66 8.79 2.47 1.97