INVITATION FOR BID
SOLICITATION NUMBER: DTFH6816B00010
SOLICITATION TYPE: TOTAL SMALL BUSINESS SET-ASIDE
PROJECT NUMBER: AZ FTNP SAGU 12(1)
PROJECT NAME: KINNEY ROAD REHABILITATION
BID OPENING DATE:
See Page A-1, Block 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges
On Federal Highway Projects, FP-14 English Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY
ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: www.cflhd.gov/construction/construction e-mail: CFLContracts@dot.gov
PROJECT AZ FLAP SAGU 12(1)
LOCATION SAGUARO NATIONAL PARK
COUNTY PIMA COUNTY
STATE ARIZONA
LENGTH SCHEDULE A: 2.8 MILES
OPTIONS V AND W: 0.03 MILES EACH
OPTION X: 0.07 MILES
OPTION Y: 0.12 MILES
TABLE OF CONTENTS
Notice to Bidders ................................................................................................................... A-i
Solicitation, Offer, and Award .............................................................................................. A-1
Basis for Award & Bid Schedule Instructions ..................................................................... A-4
Bid Schedule ........................................................................................................................ A-6
Solicitation Provisions ...........................................................................................................B-1
Contract Clauses ....................................................................................................................C-1
Davis Bacon Wage Determination ........................................................................................ D-1
Division 100 ........................................................................................................................... E-4 Division 150 ......................................................................................................................... E-22 Division 200 ......................................................................................................................... E-35 Division 300 ......................................................................................................................... E-39 Division 400 ......................................................................................................................... E-41 Division 500 ................................................................................................................. see FP-14 Division 600 ......................................................................................................................... E-44 Division 700 ......................................................................................................................... E-50
Appendix Appendix A ......................................................................................................... 404/401 Permit Appendix B……………………………………………………………………………Fire Plan
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
THIS SOLICITATION HAS BEEN SET-ASIDE FOR SMALL BUSINESS
CONCERNS. BIDS RECEIVED FROM FIRMS OTHER THAN
CERTIFIED SMALL BUSINESSES WILL NOT BE CONSIDERED.
• In order to submit an offer on a Small Business Concern (SBC) Set-aside, the SBC, together with its affiliates, must be small under the size standard corresponding to the NAICS code assigned to the contract, 237310.
• A firm must be a qualified SBC both at the time of its initial offer and at the time of award in order to be eligible for a SBC contract.
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Block 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2.
• Bid Schedule including Buy American Act & Hazardous Materials.
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2.
• Completed VETS 4212, Page A-ii; Bidders’ Information, Pages B-3 through B-6; Reps and Certs, Page B-7 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-8 and B-9.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 US Customary Units (FP-14).
The FP-14 was utilized for the design of this project. Hard copies of the FP-14 will not be provided to bidders. The FP-14 is available electronically at http://flh.fhwa.dot.gov/resources/pse/standard/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785- 2520 or email bob.rosenblatt@e-arc.com. No hard copies of the FP-14 will be provided to the awarded Prime Contractor.
http://www.fbo.gov/ http://flh.fhwa.dot.gov/resources/pse/standard/ mailto:bob.rosenblatt@e-arc.com
A-ii
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103(c). Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certification. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM).
Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets 4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
• My firm had a qualifying Federal Contract in 2015 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2015 and is therefore exempt from the reporting requirements
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
The Contractor is fully responsible to verify that all data is correct when an offer is submitted.
Failure to properly update your data may cause the offer to be rejected.
https://www.acquisition.gov/far/ http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm http://osdbuweb.dot.gov/
A-iii
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON MAY 24, 2016
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-336
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. Post Award Information.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of mailto:CFLContracts@dot.gov http://www.fbo.gov/ http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm http://web.sba.gov/subnet/
A-iv
Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.ccr.gov
Insurance requirements - See Subsection 107.05 of the FP-14.
http://www.ccr.gov/
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6816B00010
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
04/29/2016
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
AZ FTNP SAGU 12(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
ATTN: Agnes Rysz
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
CONSTRUCTION OF CA BLM 1840(1), BUTTE CREEK BRIDGE, IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. * Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. Denver local time on 06/03/2016 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(d)
X
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 BACK (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
15 U.S.C. 637( ) 41 U.S.C. 253(c)(5)
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed.
This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
A-3
Item 9: FOR GENERAL INFORMATION: Call 720-963-3090 or e-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by facsimile to 720-963-3360.
FOR PHYSICAL DATA: The following data is available electronically at www.fbo.gov :
• Hydraulic Report
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the
FP-14.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE
AMENDMENTS BY THE DESIGNATED DATE AND HOUR SPECIFIED IN
THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov and/or http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-14.
ESTIMATED PRICE: The price range of project work is between $2,000,000 and $3,000,000.
mailto:CFLContracts@dot.gov mailto:CFLContracts@dot.gov http://www.fbo.gov/ http://www.fbo.gov/ http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: Before preparing the bid, carefully read the Solicitation Provisions.
This Bid Proposal is comprised of one schedule and four options, as follows:
Schedule A – Kinney Road Rehabilitation, Pulverizing, Hot Asphalt, Concrete Paving, Option V and W – Access Road Rehabilitation, Pulverizing, Hot Asphalt, Concrete Paving, Parking Improvements and Drainage
Option X and Y - Access Road Rehabilitation, Pulverizing, Hot Asphalt, Concrete Paving, Parking Improvements and Drainage
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government.
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the line provided at the end of each Schedule/Option and the summary page at the end of the bid schedule.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Evaluation Factors for Award
To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A and Options V, W, X and Y. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A.
Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 120 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).
A-5
GOVERNMENT LABORATORY
Pay Item 15401-0000, Contractor Testing Bidders must provide prices on two alternative Contractor Testing pay items in two different places in each schedule’s bid tab.
On Page A-6 in Schedule A (and subsequently in Option V, W, X and Y) bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory. As part of Schedule A and Options V, W, X and Y, the price for this alternative item will be included in the "Schedule A/V/W/X/Y Total" lines on Pages A-10, A-12, A-13, A-15 and A-17 of the Bid Schedule and, therefore, included in the evaluation for award.
Bidders must also provide a stand-alone price for Schedule A (page A-10), Option V (page A-12), Option W (page A-13), Option X (page A-15) and Option Y (page A-17) for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
B I D S C H E D U L E Schedule A
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15206-0000
Line A0040 0.300 MILE $ $
15210-3000
Line A0060 2.700 MILE $ $
15215-1000
Line A0080 1 EACH $ $
15215-3000
Line A0100 4 EACH $ $
15215-7000
Line A0120 6 EACH $ $
15216-2000
Line A0140 0.500 MILE $ $
15301-0000
Line A0160 ALL LPSM $
15401-0000
Line A0180 ALL LPSM $
15501-0000
Line A0200 ALL LPSM $
15705-1400
Line A0220 880 LNFT $ $
15706-1100
Line A0240 5 EACH $ $
15706-1900
Line A0260 100 EACH $ $
15802-0000
Line A0280 ALL LPSM $
20206-0000
Line A0300 2,600 SQYD $ $
20301-1200
Line A0320 1 EACH $ $
20301-1900
Line A0340 10 EACH $ $
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
SOIL EROSION CONTROL, LOG DAM
WATERING FOR DUST CONTROL
SELECTIVE CLEARING AND GRUBBING
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, INLET PROTECTION TYPE A
REMOVAL OF HEADWALL
REMOVAL OF PIPE CULVERT
A-6
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
20301-2300
Line A0360 50 EACH $ $
20301-2400
Line A0380 25 EACH $ $
20301-3400
Line A0400 18 EACH $ $
20401-0000
Line A0420 1,200 CUYD $ $
20430-1000
Line A0440 550 LNFT $ $
20441-0000
Line A0460 175 CUYD $ $
20443-0000
Line A0480 40 LNFT $ $
21101-1000
Line A0500 1,300 SQYD $ $
25101-2200
Line A0520 1,050 CUYD $ $
25101-2300
Line A0540 400 CUYD $ $
25110-2300
Line A0560 20 CUYD $ $
25125-0000
Line A0580 10 EACH $ $
30201-2000
Line A0600 550 CUYD $ $
30202-2000
Line A0620 120 TON $ $
30402-5300
Line A0640 38,000 SQYD $ $
40105-3000
Line A0660 60 TON $ $
40301-0100
Line A0680 6,100 TON $ $
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ANTISTRIP ADDITIVE, TYPE 3
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
ROADWAY EXCAVATION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
GROUTED RIPRAP, METHOD B, CLASS 3
BOULDER
ROADWAY AGGREGATE, METHOD 2 (recycled pulverized asphalt)
SHOULDER, EXCAVATION
WASTE
BERMS
REMOVAL OF SIGN/MARKER
ASPHALT CONCRETE PAVEMENT, TYPE 1
A-7
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
41101-1000
Line A0700 45 TON $ $
41105-0000
Line A0720 55 TON $ $
41201-0000
Line A0740 16 TON $ $
41801-1000
Line A0760 15 SQYD $ $
41801-2000
Line A0780 180 SQYD $ $
50101-0600
Line A0800 125 SQYD $ $
50101-0800
Line A0820 1,150 SQYD $ $
55401-1000
Line A0840 8,400 LB $ $
60101-0000
Line A0860 110 CUYD $ $
60103-1920
Line A0880 1 EACH $ $
60201-0800
Line A0900 45 LNFT $ $
60201-1400
Line A0920 90 LNFT $ $
60202-0400
Line A0940 25 LNFT $ $
60202-1200
Line A0960 85 LNFT $ $
60210-0800
Line A0980 2 EACH $ $
60211-0800
Line A1000 3 EACH $ $
60704-0000
Line A1020 10 EACH $ $
TACK COAT
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
REINFORCING STEEL
PRIME COAT, METHOD 1
BLOTTER
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
CLEANING CULVERT IN PLACE
CONCRETE
CONCRETE, HEADWALL FOR 24-INCH EQUIVALENT DIAMETER PIPE CULVERT
24-INCH PIPE CULVERT
60-INCH PIPE CULVERT
24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
72-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
A-8
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
60901-1000
Line A1040 195 LNFT $ $
60901-1300
Line A1060 200 LNFT $ $
60915-1000
Line A1080 15 EACH $ $
61505-1000
Line A1100 1 EACH $ $
61801-0000
Line A1120 1,000 LNFT $ $
62201-0100
Line A1140 20 HOUR $ $
62201-0550
Line A1160 20 HOUR $ $
62201-0850
Line A1180 20 HOUR $ $
62201-3000
Line A1200 30 HOUR $ $
62302-1100
Line A1220 40 HOUR $ $
62405-0300
Line A1240 260 SQYD $ $
63301-0000
Line A1260 25 EACH $ $
63308-2000
Line A1280 55 EACH $ $
63308-3000
Line A1300 10 EACH $ $
63401-0300
Line A1320 60,600 LNFT $ $
63401-0400
Line A1340 100 LNFT $ $
63502-0600
Line A1360 4 EACH $ $
CURB, CONCRETE, 12-INCH DEPTH
CURB, CONCRETE, 15-INCH DEPTH
WHEELSTOP, CONCRETE
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
SIGN SYSTEM
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
PAVEMENT MARKINGS, TYPE B, SOLID
ACCESSIBILITY RAMP, CONCRETE
CONCRETE BARRIER
DUMP TRUCK, 6 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
HYDRAULIC EXCAVATOR
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
A-9
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
63502-1050
Line A1380 120 EACH $ $
63502-1300
Line A1400 120 EACH $ $
63502-2000
Line A1420 2 EACH $ $
63504-1000
Line A1440 275 SQFT $ $
63505-1000
Line A1460 12.0 MILE $ $
63506-0500
Line A1480 2,300 HOUR $ $
63507-0600
Line A1500 50 DAY $ $
63602-6000
Line A1520 1 EACH $ $
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
A-10
Submitted by:_______________________ Schedule A Total:_____________________
Schedule A Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-5 of this Solicitation for an explanation of how to bid this item.
Option V
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line V0020 ALL LPSM $
15210-3000
Line V0040 0.200 MILE $ $
15215-7000
Line V0060 1 EACH $ $
15301-0000
Line V0080 ALL LPSM $
15401-0000
Line V0100 ALL LPSM $
15501-0000
Line V0120 ALL LPSM $
15701-0000
Line V0140 ALL LPSM $
15802-0000
Line V0160 ALL LPSM $
20301-2400
Line V0180 2 EACH $ $
30202-2000
Line V0200 20 TON $ $
30402-5300
Line V0220 5,300 SQYD $ $
40105-3000
Line V0240 10 TON $ $
40301-0100
Line V0260 900 TON $ $
41101-1000
Line V0280 7 TON $ $
41105-0000
Line V0300 8 TON $ $
41201-0000
Line V0320 3 TON $ $
50101-2600
Line V0340 100 SQYD $ $
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, PARKING AREA
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ASPHALT CONCRETE PAVEMENT, TYPE 1
PRIME COAT, METHOD 1
BLOTTER
SOIL EROSION CONTROL
WATERING FOR DUST CONTROL
REMOVAL OF SIGN
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ANTISTRIP ADDITIVE, TYPE 3
TACK COAT
MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH
A-11
Option V
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
60405-0000
Line V0360 2 EACH $ $
63301-0000
Line V0380 2 EACH $ $
63401-0300
Line V0400 2,600 LNFT $ $
63405-0050
Line V0420 9 EACH $ $
63406-0000
Line V0440 2 EACH $ $
63502-1050
Line V0460 20 EACH $ $
63502-1300
Line V0480 20 EACH $ $
63506-0500
Line V0500 16 HOUR $ $
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, FLAGGER
RAISED PAVEMENT MARKER
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, DRUM
MANHOLE ADJUSTMENT
A-12
Submitted by:_______________________ Option V Total: _____________________
Option V Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________
Option W
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line W0020 ALL LPSM $
15210-3000
Line W0040 0.200 MILE $ $
15215-7000
Line W0060 1 EACH $ $
15301-0000
Line W0080 ALL LPSM $
15401-0000
Line W0100 ALL LPSM $
15501-0000
Line W0120 ALL LPSM $
15701-0000
Line W0140 ALL LPSM $
15802-0000
Line W0160 ALL LPSM $
20301-2400
Line W0180 2 EACH $ $
40901-2000
Line W0200 5,250 SQYD $ $
41401-2000
Line W0220 2,650 LNFT $ $
63301-0000
Line W0240 2 EACH $ $
63401-0300
Line W0260 2,600 LNFT $ $
63405-0050
Line W0280 9 EACH $ $
63406-0000
Line W0300 2 EACH $ $
63502-1050
Line W0320 20 EACH $ $
63502-1300
Line W0340 20 EACH $ $
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, PARKING AREA
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
RAISED PAVEMENT MARKER
SOIL EROSION CONTROL
WATERING FOR DUST CONTROL
REMOVAL OF SIGN
MICRO SURFACING, TYPE 2
CRACKS, CLEANING AND SEALING
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, DRUM
A-13
Option W Total: _____________________
*See Page A-5 of this Solicitation for an explanation of
Submitted by:_______________________ Option W Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ how to bid this item.
Option X
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line X0020 ALL LPSM $
15210-3000
Line X0040 0.200 MILE $ $
15215-7000
Line X0060 2 EACH $ $
15301-0000
Line X0080 ALL LPSM $
15401-0000
Line X0100 ALL LPSM $
15501-0000
Line X0120 ALL LPSM $
15701-0000
Line X0140 ALL LPSM $
15802-0000
Line X0160 ALL LPSM $
20301-2400
Line X0180 1 EACH $ $
20301-3400
Line X0200 12 EACH $ $
30402-5300
Line X0220 1,900 SQYD $ $
40105-3000
Line X0240 4 TON $ $
40301-0100
Line X0260 350 TON $ $
40901-2000
Line X0280 550 SQYD $ $
41101-1000
Line X0300 3 TON $ $
41105-0000
Line X0320 3 TON $ $
41201-0000
Line X0340 1 TON $ $
BLOTTER
TACK COAT
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, PARKING AREA
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ASPHALT CONCRETE PAVEMENT, TYPE 1
MICRO SURFACING, TYPE 2
PRIME COAT, METHOD 1
SOIL EROSION CONTROL
WATERING FOR DUST CONTROL
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ANTISTRIP ADDITIVE, TYPE 3
A-14
Option X
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
41401-2000
Line X0360 420 LNFT $ $
60405-0000
Line X0380 2 EACH $ $
60915-1000
Line X0400 12 EACH $ $
63301-0000
Line X0420 1 EACH $ $
63401-0300
Line X0440 1,100 LNFT $ $
63405-0050
Line X0460 1 EACH $ $
63406-0000
Line X0480 2 EACH $ $
63502-1050
Line X0500 25 EACH $ $
63505-1000
Line X0520 1.0 MILE $ $
63506-0500
Line X0540 70 HOUR $ $
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
RAISED PAVEMENT MARKER
CRACKS, CLEANING AND SEALING
MANHOLE ADJUSTMENT
WHEELSTOP, CONCRETE
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
A-15
Submitted by:_______________________ Option X Total: _____________________
Option X Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________
Option Y
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line Y0020 ALL LPSM $
15210-3000
Line Y0040 0.300 MILE $ $
15215-7000
Line Y0060 2 EACH $ $
15301-0000
Line Y0080 ALL LPSM $
15401-0000
Line Y0100 ALL LPSM $
15501-0000
Line Y0120 ALL LPSM $
15701-0000
Line Y0140 ALL LPSM $
15802-0000
Line Y0160 ALL LPSM $
20301-3400
Line Y0180 12 EACH $ $
30402-5300
Line Y0200 1,600 SQYD $ $
40105-3000
Line Y0220 4 TON $ $
40301-0100
Line Y0240 300 TON $ $
40901-2000
Line Y0260 3,450 SQYD $ $
41101-1000
Line Y0280 3 TON $ $
41105-0000
Line Y0300 2 TON $ $
41201-0000
Line Y0320 1 TON $ $
41401-2000
Line Y0340 1,580 LNFT $ $
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, PARKING AREA
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
MICRO SURFACING, TYPE 2
PRIME COAT, METHOD 1
BLOTTER
SOIL EROSION CONTROL
WATERING FOR DUST CONTROL
REMOVAL OF WHEELSTOP
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ANTISTRIP ADDITIVE, TYPE 3
ASPHALT CONCRETE PAVEMENT, TYPE 1
TACK COAT
CRACKS, CLEANING AND SEALING
A-16
Option Y
Project No: AZ FTNP SAGU 12(1)
Name: Kinney Road
Item No. Quantity Unit Unit Price Amount
60405-0000
Line Y0360 2 EACH $ $
60915-1000
Line Y0380 12 EACH $ $
63401-0300
Line Y0400 500 LNFT $ $
63405-0050
Line Y0420 1 EACH $ $
63406-0000
Line Y0440 3 EACH $ $
63502-1050
Line Y0460 35 EACH $ $
63505-1000
Line Y0480 1.0 MILE $ $
63506-0500
Line Y0500 70 HOUR $ $
WHEELSTOP, CONCRETE
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, FLAGGER
RAISED PAVEMENT MARKER
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
MANHOLE ADJUSTMENT
A-17
Submitted by:_______________________ Option Y Total: _____________________
Option Y Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-5 of this Solicitation for an explanation of how to bid this item.
Bid Schedule Summary
Bid Total
Schedule A- Base (A-10)_________________________________________ Schedule V - Option (A-12) ______________________________________ Schedule W- Option (A-13) ______________________________________ Schedule X - Option (A-15) ______________________________________ Schedule Y - Option (A-17) ______________________________________
TOTAL A+V+W+X+Y: _________________________________
A-18
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subpart 25.1 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-19
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse) DATE BOND EXECUTED (Must not be later than bid opening date) OMB NO. 9000-0045
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT OF
BID PRICE
AMOUNT NOT TO EXCEED BID DATE INVITATION NO.
DTFH68-16-B-00010
20 PERCENT MILLION(S) THOUSAND(S) HUNDRED(S) CENTS FOR (Construction, Supplies or Services) CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of
us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty
(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
(Seal)
3.
(Seal) Corporate
Seal NAMES(S) &
TITLE(S)
(Typed)
1. 2. 3.
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
1.
(Seal)
2.
(Seal)
NAME(S)
(Typed)
1. 2.
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY A
SIGNATURE(S)
1. 2.
Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
B-2
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”
STANDARD FORM 24 (Rev. 10-98) BACK
CORPORATE SURETY(IES) (Continued)
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY B SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY C SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY D SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY E SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY F SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY G SIGNATURE(S)
1. 2. Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
1. 2.
B-3
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BIDDER'S QUALIFICATIONS
INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.
If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.
1. Name and address of business:
Name DUNS Number (See FAR Provision 52.204-6)*
Street Home Office Congressional District (Insert District #) *
City State Zip Code Email Address
* Necessary for Government reporting purposes only County
To obtain a Dun & Street number, call 800-333-0505.
Telephone Number (Include Area Code)
Fax Number (Include Area Code)
2. a. Type of organization (check appropriate box):
If a Foreign entity:
Individual Non-profit organization Corporation
Partnership Joint Venture Registered in:
b. Size and type of Business Concern (check appropriate boxes):
Large Business Concern Small Disadvantaged Business Concern Emerging Small Business
Small Business Concern Women-Owned Small Business SBA 8(a) Certified
HUB Zone Business Concern Veteran Owned Business Concern Service-Disabled Veteran-Owned Business Concern
Individual Non-profit organization Corporation
Partnership Joint Venture Incorporated in:
B-4
3. If a joint venture or general partnership:
a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.
Principal
Business Name
Street
City State Zip Code
b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.
Sponsoring Partner Other Partner
Street Street
City State Zip Code City State Zip Code
4. Date organization established: _______________________
5. Name of succeeded business, if any: _________________________________________________________
6. How many years have you been in business as:
a. General contractor years.
b. Subcontractor years.
7. a. Furnish the following information concerning the owner, partners, officers and directors:
Name Percent of Business Owned
Years of Business Experience (Include Individuals who have signatory / obligating authority on behalf of the agency) Title Contracting Other
b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:
- Present position, responsibility, and length of employment.
- Amount and type of construction experience.
- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.
- Formal education and training, professional or technical registrations or licenses.
B-5
8. a. Contracts in force. (Attach additional sheets if necessary)
Project Name and Contract Numbers
Owner's Name, Address, and Contact Name and Telephone #
Scope of Work Performed Contract Amount Estimated Completion Date
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.
9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)
B-6
Project Name and Contract Numbers
Owner's Name, Address, Contact Name and Telephone #
Scope of Work Performed
Original and Final Contract Amounts
Original and Final Completion Dates
Names of On-site Project Manager and Superintendent
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet
B-7
Solicitation Provisions
52.203-98, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation (DEVIATION 2015-02)
(a) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), Government agencies are not permitted to use funds appropriated (or otherwise made available) under that or any other Act for contracts with an entity that requires employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .