Drawings_Geology_and_Logs_G1-G190_11x17_96-190.pdf
PDF 26 MB Posted
- Attached to
- Truckee Canal - Lining and Check Structures Federal contract opportunity
- Solicitation number
- 140R2022B0002
About this file
This document outlines a federal contract opportunity for canal repair work. The solicitation seeks bids to line a section of the Truckee Canal in concrete over a geomembrane barrier and repair or replace two check structures. Additional work includes general repairs to supporting site structures. The contracting agency is the Department of the Interior Bureau of Reclamation. The solicitation number is 140R2022B0002 and bids are due by the date specified in the related solicitation document. The scope of work involves canal lining, check structure replacement or repair, and ancillary site work.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0*
23*
78/0.5 *
59/1.0
SPT TEST SAMPLE NOTES:
12.5 to 12.7 ft. rods sank 0.2 ft. into seating interval.
15.0 to 15.3 ft. rods sank 0.3 ft. into seating interval.
17.5 to 18.9 ft. rods sank 1.4 ft. through seating and SPT interval. The SPT test was cancelled and the hole cleaned to
19.0 ft.
22.5 to 22.7 ft. rods sank 0.2 ft. into seating interval.
26.0 to 26.5 ft. SPT reached refusal at 78 blows in the 1/2 foot seating interval, and the rest of the SPT test was cancelled.
For SPT testing, below the water table (12.0 ft.) water was added up to the collar of the auger rods to keep sand from running in.
SPT EQUIPMENT:
SPT data was collected using a 140 pound Automatic Mobile Hammer run at 39 to 45 blows per minute with a throw of 30 inches.
REASON FOR HOLE TERMINATION:
The hole was terminated upon successful completion of investigation to about 30 ft.
and to SPT refusal.
HOLE COMPLETION:
The hole was back filled with drill cuttings from 30.0 ft. to the ground surface.
DEPTH TO WATER:
Hole Water Date Depth Depth Elev.
4/19/00 12.0 12.5 4,201.2
NP
3.9
7.0
NP
NP
NP
NP
70.2
45.0
24.2
81.4
79.2
45.1
38.9
11.8
28.6
37.4
26.5
22.0
12.1
10.0 s(ML) to
SM
(GW-GM)s
14.8
52.0
75.8
18.6
10.2
13.2
9.4
Laboratory Data Intervals:
24.0 to 24.8 ft.
26.0 to 26.5 ft.
28.5 to 30.0 ft.
The auger bit refused to cut and a pilot bit had to be used from 24.8 to 26.0 ft. and from
26.5 to 28.5 ft. These two intervals are interpreted as containing predominantly gravel and cobbles.
Note: 0.0 to 15.0 ft. interpreted as Fill, with river alluvium from 15.0 to 30.0 ft. However, the Fill/ alluvium contact is not clear, and Fill may extend deeper than 15.0 ft.
(SM)g s(ML)
(ML)s
SM
SP-SM
(SM)g
(GW-GM)s
BOTTOM OF HOLE
NP
26.6
31.5
NP
NP
NP
NP
4195.7
4188.6
4183.2
Qal
14.8
52.0
75.8
18.6
10.2
13.2
9.4
15.0
3.0
0.0
0.0
10.5
41.7
51.7
NR
NR
FAPB
FAPB
NOTES
D E
P T
H
AND DATE MEASURED: 12.0 (4201.2) 4/19/00
B L
O W
S
.5
F T
S
A N
D
SHEET 2 OF 2
STATE: Nevada
HOLE LOGGED BY: M. McCulla
C
O R
E R
E C
O V
E R
Y
STATION AND OFFSET: NA
LABORATORY DATA
G
R A
V E
L
V
IS
U A
L C
L A
S S
IF
IC
A T
IO
N
GEOLOGIC LOG OF DRILL HOLE NO. SPT-00-7
TOTAL DEPTH: 30.0
L
IQ
U
ID
L
IM
IT
COORDINATES: N 14,884,591.0 E 2,381,853.0
L A
B O
R A
T O
R Y
C L
A S
S
IF
IC
A
T
IO
N
PROJECT: Washoe Project
DEPTH TO BEDROCK: NE
CLASSIFICATION AND
PHYSICAL CONDITION
G E
O L
O G
IC
U
N
IT
S
Y M
B O
L
DRILL HOLE SPT-00-7SHEET 2 OF 2
S P
T (B
L O
W S
F
T
P L
A S
T
IC
IT
Y
IN
D
E X
F
IN
E
S
M O
IS
T
U R
E C
O N
T E
N T
REVIEWED BY: J. Sturm
GROUND ELEVATION: 4213.2
E L
E V
A T
IO
N
FEATURE: Fish Conveyance
BEGUN: 4/18/00 FINISHED: 4/19/00
LOCATION: Left Bank of Canal at Fish Bypass Pipe Area.
DEPTH AND ELEVATION OF WATER LEVEL
ANGLE FROM HORIZONTAL: 90 AZIMUTH:
COMMENTS:
* See SPT Test Sample Notes
SPT Refusal is shown by the following example:
44/0.2 = refusal after 44 blows penetrated only 2 tenths of a foot.
NP = Nonplastic NA = Data not available NE = Not Encountered NR = No Recovery FADC = Flight Auger Dry Core FAPB = Flight Auger Pilot Bit SPT = Standard Penetration Test EMB = Embankment
D E
R B
Y
S P
T
D E
R B
Y .G
P J
D E
R B
Y .G
D T
/2
/0
:2
:4
A M
Specifications No. 20-C0911
G96
G97
G98
G99
G100
G101
G102
G103
G104
G105
G106
G107
G108
G109
G110
G111
G112
G113
G114
G115
G116
G117
G118
G119
G120
G121
G122
G123
G124
G125
G126
G127
G128
G129
G130
G131
G132
G133
G134
G135
G136
G137
G138
G139
G140
G141
G142
G143
G144
G145
G146
G147
G148 pe ci fi ca ti on s
N o.
0-
C
G149 ci fi ca ti on s
N o.
0-
C
G150 ci fi ca ti on s
N o.
0-
C
G151 ci fi ca ti on s
N o.
0-
C
G152 ci fi ca ti on s
N o.
0-
C
G153 ci fi ca ti on s
N o.
0-
C
11G154 ci fi ca ti on s
N o.
0-
C
G155 ci fi ca ti on s
N o.
0-
C
G156 ci fi ca ti on s
N o.
0-
C
G157 ci fi ca ti on s
N o.
0-
C
G158 ci fi ca ti on s
N o.
0-
C
11G159 ci fi ca ti on s
N o.
0-
C
G160 ci fi ca ti on s
N o.
0-
C
11G161 ci fi ca ti on s
N o.
0-
C
G162 ci fi ca ti on s
N o.
0-
C
11G163 ci fi ca ti on s
N o.
0-
C
G164 ci fi ca ti on s
N o.
0-
C
G165 ci fi ca ti on s
N o.
0-
C
G166 ci fi ca ti on s
N o.
0-
C
G167 ci fi ca ti on s
N o.
0-
C
11G168 ci fi ca ti on s
N o.
0-
C
G169 ci fi ca ti on s
N o.
0-
C
G170 ci fi ca ti on s
N o.
0-
C
G171 ci fi ca ti on s
N o.
0-
C
G172 ci fi ca ti on s
N o.
0-
C
G173 ci fi ca ti on s
N o.
0-
C
G174 ci fi ca ti on s
N o.
0-
C
G175 ci fi ca ti on s
N o.
0-
C
G176 ci fi ca ti on s
N o.
0-
C
G177 ci fi ca ti on s
N o.
0-
C
G178 ci fi ca ti on s
N o.
0-
C
G179 ci fi ca ti on s
N o.
0-
C
G180 ci fi ca ti on s
N o.
0-
C
G181 ci fi ca ti on s
N o.
0-
C
G182 ci fi ca ti on s
N o.
0-
C
G183 ci fi ca ti on s
N o.
0-
C
G184 ci fi ca ti on s
N o.
0-
C
G185 ci fi ca ti on s
N o.
0-
C
11G186 ci fi ca ti on s
N o.
0-
C
G187 ci fi ca ti on s
N o.
0-
C
11G188 ci fi ca ti on s
N o.
0-
C
G189 ci fi ca ti on s
N o.
0-
C
G190
File details come from the government source that posted it. Updated .