Drawings_021-040_TruckeeCanal_Set3_11x17.pdf

PDF 22 MB Posted

Attached to
Truckee Canal - Lining and Check Structures Federal contract opportunity
Solicitation number
140R2022B0002
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document provides details on a federal contract opportunity to line a section of the Truckee Canal. The solicitation number is 140R2022B0002 and seeks to line a section of the Truckee Canal with concrete over a geomembrane barrier and repair/replace two check structures. Additional work includes general repairs to the site and supporting structures. The contracting agency is the Department of the Interior Bureau of Reclamation. The opportunity type is listed as a solicitation, though no further information is provided on response dates, award dates, pricing terms, or set asides.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

G G

G G G G G

G

GGG

G

L=321.47

=19.3119 R=953.76 T=162.27 100.0', Typ.

3+

4+

5+

6+

7+

8+

9+

0+

1+

2+

3+

PT

795+51.37 N=14881813.79 E=2444736.42

4194 4196

EL

EV

A

TI

O N

STATION

793+00 794+00 795+00 796+00 797+00 798+00 799+00 800+00 801+00 802+00 803+00

S=-0.00018

PLAN

Cl. Truckee Canal

0 100'50'

PROFILE

Note: vertical scale exaggerated 10x for clarity

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-3 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

PLAN AND PROFILE

793+00 TO 803+00

DENVER, CO

29-D-60134

2022-02-26

Construction limits, Typ.

M

AT

CH

L

IN

E

M A

TC

H L

IN

E

3+

Existing canal invertFinished canal invert

Southwest gas utility

FLOW

El. "C", see Note 1 El. "C", see Note 1Minimum top of lining

NOTES

1. See TABLES on (60163) for elevations "C" (required minimum top of lining), elevations "D" (canal invert), and minimum required joint spacing. Elevations vary uniformly between points shown.

El. "D", see Note 1 El. "D", see Note 1

Excavation type B

Re le as ed

Specifications No. 20-C0911

TC-t13 805+72.00 Existing takeout structure

4+

5+

6+

7+

8+

9+

0+

1+

2+

100.0', Typ.

EL

EV

A

TI

O N

STATION

803+00 804+00 805+00 806+00 807+00 808+00 809+00 810+00 811+00 812+00 813+00

S=-0.00018

TC

-t

5+

.0

In ve rt E l.=

.0

PLAN

Cl. Truckee Canal

0 100'50'

PROFILE

Note: Vertical scale exaggerated 10x for clarity

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-3 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

PLAN AND PROFILE

803+00 TO 813+00

DENVER, CO

29-D-60135

2022-02-26

Construction limits, Typ.

M A

TC

H L

M A

TC

H L

Existing canal invert Finished canal invert

FLOW

El. "D", see Note 1

El. "C", see Note 1

El. "D", see Note 1

El. "C", see Note 1Minimum top of lining

NOTES

1. See TABLES on (60163) for elevations "C" (required minimum top of lining), elevations "D" (canal invert), and minimum required spacing joints. Elevations vary uniformly between points shown.

2. For existing turnout structure details, see (60161).

3. Riprap extends approximately 72.0' at structure location, see

For Information Only drawing 616-8.

Excavation type B

Remove and salvage existing riprap, see Note 3

Re le as ed

100.0', Typ.

PC

822+47.25 N=14882142.53 E=2447412.18

L=91.62

=8.9916 R=583.79 T=45.90

4+

5+

6+

7+

8+

9+

0+

1+

2+

3+

N82° 59' 45.25"E 2695.90'

STATION

813+00 814+00 815+00 816+00 817+00 818+00 819+00 820+00 821+00 822+00 823+00

S=-0.00018

PLAN

Cl. Truckee Canal

Existing canal invert

0 100'50'

PROFILE

Note: vertical scale exaggerated 10x for clarity

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-3 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

PLAN AND PROFILE

813+00 TO 823+00

DENVER, CO

29-D-60139

2022-02-26

Construction limits, Typ.

M A

TC

H L

Finished canal invert

M

AT

C H

L

NOTES

1. See TABLES on (60163) for elevations "C" (required minimum top of lining), elevations "D" (canal invert), and minimum required joint spacing. Elevations vary uniformly between points shown.

FLOW

Excavation type B

El. "D", see Note 1

El. "C", see Note 1

El. "D", see Note 1

El. "C", see Note 1 Minimum top of lining

Re le as ed

4+

5+

6+

7+

8+

9+

0+

1+

2+

100.0', Typ.

PT

823+38.77 N=14882160.74 E=2447501.77

N74° 00' 15.35"E 2900.04'

STATION

23+00 824+00 825+00 826+00 827+00 828+00 829+00 830+00 831+00 832+00 833+00

S=-0.00018

PLAN

Cl. Truckee Canal

0 100'50'

PROFILE

Note: vertical scale exaggerated 10x for clarity

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-3 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

PLAN AND PROFILE

823+00 TO 833+00

DENVER, CO

29-D-60140

2022-02-28

Construction limits, Typ.

M A

TC

H L

M A

TC

H L

FLOW

Excavation type B

Existing canal invert

Finished canal invert

El. "D", see Note 1

El. "C", see Note 1

El. "D", see Note 1

El. "C", see Note 1 Minimum top of lining

NOTES

1. See TABLES on (60163) for elevations "C" (required minimum top of liner), elevation "D" (canal invert), and minimum required joint spacing. Elevations vary uniformly between points shown.

Re le as ed

4+

5+

6+

7+

8+

End of concrete lining 838+00.00 N=14,882,563.41 E=2,448,906.43

100.0', Typ.

EL

EV

A

TI

O N

STATION

833+00 834+00 835+00 836+00 837+00 838+00

S=-0.00018

PLAN

Cl. Truckee Canal

Existing canal invert

0 100'50'

PROFILE

Note: vertical scale exaggerated 10x for clarity

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-3 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

PLAN AND PROFILE

833+00 TO 838+00

DENVER, CO

29-D-60141

2022-02-28

Construction limits, Typ. AT&T overhead line, see Note 4

M

A

TC

H L

NOTES

1. See TABLES on (60163) for elevations "C" (required minimum top of liner), elevation "D" (canal invert), and minimum required joint spacing. Elevations vary uniformly between points shown.

2. For riprap lined transition, see (60164).

FLOW

Excavation type B

Finished canal invert

El. "C", see Note 1

El. "D", see Note 1

Minimum top of lining

Riprap lined transition (not shown for clarity), see Note 2

El. "C", see Note 1

El. "D", see Note 1

Re le as ed

Existing turnout, see

TURNOUT LOCATION TABLE

Turnout pipe

Existing turnout, see Note 2 Connection, see Detail 1

Stock water delivery pipe

Existing top of bank, El. varies

Spread footing, see Note 2

Existing turnout, see Note 2

A

Cl. turnout structure

Spread footing, see Note 2

FLOW

Cl. of pipes, Typ.

Existing structure wall

Batten bars and anchor bolts, Typ.

Retrofit waterstop

Install retrofit waterstop, anchor bolts, and batten bars in accordance with manufacturer's recommendations

Top of concrete lining

Geomembrane composite

Varies

Tapered wall, see Note 4

6" M in

Canal embankment

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

0s C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

TURNOUT STRUCTURES

AND OTHERS

TYPICAL SECTIONS AND

DETAILS

DENVER, CO

29-D-60161

2022-02-25

1. Furnish retrofit waterstop at all concrete canal lining and turnout/takeout structure connections in accordance with Specifications.

2. See For Information Only drawings for existing turnout/takeout structure details.

3. Use Detail 1 at all locations where canal lining is adjacent to turnout structures, bridge abutments, piers, and new Fernley Check structure. See Detail 6 (60164) for connection to original Fernley Check structure.

4. Taper thickened concrete to match lining thickness 18" from structure wall.

A Not to ScaleNOT TO SCALE

TAKEOUTS LOCATION TABLE

DESIGNATION DRAWING CURRENT STATION

TC-t11 (60119) 651+50.00

TC-t12 (60128) 739+06.00

TC-t13 (60135) 805+70.00

1 NOT TO SCALE

NOTES

TURNOUT LOCATION TABLE

DESIGNATION DRAWING CURRENT STATION

TC3 SW (60121) 679+00.00

TC4 (60123) 694+50.00

TC5 (60124) 706+22.00

Re le as ed

Concrete lining

Geomembrane composite, Typ.

Existing ground, slope varies

Anchor trench, Typ., see Detail 2

12.0' Min.

B

WSEL

ss

8"

Cl.

FB

Slope 2:1 to match existing grade

O&M road

Slope varies

FL

Excavation type A or B, see Note 2

D n

H

Geomembrane composite liner bedding, see Note 3

Compacted embankment fill

HYDRAULIC PROPERTIES TABLE

Station Q (CFS) B (FT) Dn (FT) H (FT) FL (FT) FB (FT) S (FT/FT) n V (FT/s) R (FT) ss:1

650+00 to 707+85 600* 33.00 4.53 10.00** 1.34 3.16 0.00019 0.015 2.17 4.58 2:1

707+85 to 838+00 600* 33.00 4.56 10.00** 1.34 3.16 0.00018 0.015 2.46 4.23 2:1

* Flow of 600 CFS and relevant hydraulic properties are based on completion of all Phase 1 lining, which is not included in this Contract.

** Project lining height not based on Dn + FL, determined based on other project conditions.

1.5', Min.

1.

5'

M in

8"

2'-0", Min.

2'-0", Min.

Longitudinal contraction joints 14'-0" O.C. Max., see Note 5

Control Joint, see Note 5

All details symmetric about Cl.

No joints located within hatch zone, Typ.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1s C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

CANAL HYDRAULIC

PROPERTIES

TYPICAL SECTIONS AND

DETAIL

DENVER, CO

29-D-60162

2022-02-25

NOTES

1. HYDRAULIC PROPERTIES TABLE shows properties for flow rate (600

CFS), with all Phase 1 lining complete. Due to current canal conditions and Contract work this flow exceeds current flow restrictions, which are to be followed.

2. Surface excavation and preparation varies, see EXCAVATION ZONE TABLE on (60163).

3. All dimensions for excavation are given relative to finished canal invert, see (60163).

4. For typical joint details and expansion joint locations, see (60163).

5. Transverse contraction joint spacing shall match longitudinal contraction joint spacing, unless otherwise directed by COR.

0 5' 10'

1' 2'0

Anchor trench

Concrete lining

Geomembrane composite

Compacted structural backfill

C 3' 6'0

B

Neatline

1/

2" T yp

Lo rb er au

Je re m y M

P .E

-0 4-

D

Lo rb er au

Je re m y M

P .E

C H

A N

G

ED

T

YP

TO

M

IN

O N

S

EC

TI

O

N C

Re le as ed

Elastomeric joint sealer

3/4"" chamfer

Top of concrete lining

Elastomeric joint sealer, see Specifications

3/4" Chamfer

1/2" Sponge rubber joint filler

See EXPANSION JOINT TABLE for spacing

Groove may be tooled or formed with plastic strip

Elastomeric joint sealer

Top of concrete lining

1/ of t

M in t

1/4"

NOTES

1. Excavation type A includes facing and moderate compaction only.

Excavation type B includes 6" canal geomembrane composite liner bedding, see Specifications.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

TYPICAL CANAL TABLES

AND JOINT DETAILS

ELEVATIONS,

EXCAVATION, AND

JOINTS

DENVER, CO

29-D-60163

2022-02-25

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

MATT GEMPERLINE

DOUGLAS RICHARDS

MICHELLE NORRIS

Lorberau, Jeremy M P.E.

Civil Engineer

Norris, Michelle L P.E.

Civil Engineer

EXCAVATION ZONE TABLE

Start Station End Station Excavation Type

650+00 700+00 A 700+00 838+00 B

STATION/ELEVATION TABLE

Station Elevation "C" (ft) Top of Concrete

Lining

Elevation "D" (ft) Finished Canal

Invert 650+00 4193.97 4183.97 660+00 4193.79 4183.79 670+00 4193.60 4183.60 680+00 4193.42 4183.42 690+00 4193.23 4183.23 700+00 4193.05 4183.05 708+00 4192.90 4182.90 718+00 4192.72 4182.72 728+00 4192.54 4182.54 738+00 4192.35 4182.35 743+00 4192.26 4182.26 753+00 4192.08 4182.08 763+00 4191.90 4181.90 773+00 4191.72 4181.72 783+00 4191.54 4181.54 793+00 4191.36 4181.36 803+00 4191.18 4181.18 813+00 4191.00 4181.00 823+00 4190.82 4180.82 833+00 4190.63 4180.63 838+00 4190.54 4180.54

EXPANSION JOINTS TABLE

Minimum spacing 1000 feet O.C.

Spacing at canal horizontal bends

At PC and PT for all bends over 10 degrees at centerline

PP8 spacing Joint between concrete lining and PP8 apron

DETAIL - EXPANSION JOINT

NOT TO SCALE

DETAIL - CONTRACTION JOINT

NOT TO SCALE

DETAIL - CONTROL JOINT

NOT TO SCALE

R

EV

N O

-0 4-

D

Lo rb er au

Je re m y M

P .E

R

EM

O V A L

O F

"S A W

C U

T" F

R O

M D

ET

A

IL

S

Re le as ed

V ar ie s

Riprap, Typ.

FLOW

5:1 Min., up to 10:1 from Cl.

Concrete-lined to earthen-lined shown, earthen-lined to concrete-lined transition similar but opposite hand

Transition to riprap lined section

Start transition End transition, start riprap lined section

Geomembrane composite connection, see Detail 6

Station varies, see RIPRAPTRANSITION TABLE

End riprap lining, begin earthen lining

Riprap, Typ.

V ar ie s

RIPRAP TRANSITION TABLE

Start station End station H (FT)

648+00 650+00 10.0

838+00 840+00 10.0

H

Excavated surface, see Note 3

2:1

1.0' Typ.

Cl.

Sand and gravel bedding

Match existing canal slope, Typ.

O&M road

0.

5'

T yp

Concrete lining, see (60163)

Geomembrane composite anchor trench

5.

0'

3.0'

Riprap Existing earthen-lined canal, protect in place

200.0'

1.

0'

T yp

Compacted structural backfill

Geomembrane composite, lap at bottom of trench

Sand and gravel bedding

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1s C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

D A R

IC

H A R D

S

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

TYPICAL RIPRAP

SECTION

PARTIAL PLAN, TYPICAL

SECTION, AND DETAIL

DENVER, CO

29-D-60164

2022-02-26

NOTES

1. Riprap lined canal to concrete lined canal is opposite hand of

PARTIAL PLAN - TYPICAL RIPRAP TRANSITION.

2. Excavated surface varies, see STATION/ELEVATION TABLE

(60163).

3. See Specification for riprap and riprap bedding requirements.

0 10' 20'

0 6'3'

D 0 3' 6'

PARTIAL PLAN - TYPICAL RIPRAP TRANSITION

Re le as ed

CHOU CHA Digitally signed by CHOU CHA Date: 2022.02.15 08:28:40 -07'00'

Date: 2022.02.15 08:27:26 -07'00'

Date: 2022.02.15 08:28:03 -07'00'

Gate hoist assembly

Raised position (Full Open)

Lowered position (Fully closed)

Bulkhead gate guide

Deck

Invert El. 4176.0

CL. of trunnion pin.

Same as existing location

Weir wall EL. 4183

8' -0

H ei gh t of g at e an d bo tt om o f ga te in f ul ly r ai se d po si tio n

8' -0

0' 4'2'

R 10' to inside of skinplate

8' x 8' Radial Gate Cathodic protection, see 29-D-60193

FLOW

Locate pin as shown on 29-D-60169

Faceplate assembly

Gate hoist assembly

CL. of gate No. 2

FL

O

W

CL. of gate No.3

CL. of gate No. 1

Gate hoist assembly

Gate hoist assembly

0' 4'2' 8'

Skinplate

Wear plate

8'-0" (See notes)

0' 4'2'

CL. wire rope

Flap seal

Horizontal beam

Gate hoist assembly not shown

Wire rope not shown

PLAN - GATE ARM ASSEMBLY

0' 3'2'

CL. of gate strut and pedestal anchorage

Existing pier

6"

New corbel

1'

Drain holes

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

K C O

N V

ER

S E

N

EW

LA

N

D S P

R O

JE

C T

TR

U

C K

EE

D

IV

IS

IO

N

TR

U

C K

EE

C A N

A L

C H

EC

K S

TR

U

C

TU

R

ES

A N

D C

A N

A L

LI

N

IN

G

BANGO CHECK

STRUCTURE

CONCEPTUAL RADIAL

GATES

INSTALLATION - LAYOUT

DENVER, CO

29-D-60171

2022-02-17

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

K Converse

K Converse

J Mena

McCann, Alan M P.E.

Mechanical Engineer

Stephen, Ryan D P.E.

Mechanical EngineerLIST OF DRAWINGS

BANGO CHECK STRUCTURE CONCEPTUAL RADIAL GATES

INSTALLATION - LAYOUT_________________________29-D-60171

GATE DETAILS_________________________________29-D-60172

NOTES

1. Views of gates shown are conceptual only. See specifications for requirements.

2. The pedestal anchorage is Reclamation designed. Fabricate as shown.

3. Existing structure dimensions shown on the drawings are not guaranteed to be correct.

Contractor required to perform survey prior to submitting gate design for approval.

REFERENCE DRAWINGS

CORBEL CONCRETE OUTLINE

PLAN AND SECTION_____________________________29-D-60169

CORBEL REINFORCEMENT

SECTION AND DETAILS _________________________29-D-60170

RADIAL GATE HOIST

INSTALLATION_________________________________29-D-60038

RADIAL GATE

GALVANIC ANODE CATHODIC PROTECTION SYSTEM___29-D-60193

Re le as ed

File details come from the government source that posted it. Updated .