140R2022B0002_Amendment_0002_0002.pdf
PDF 21 MB Posted
- Attached to
- Truckee Canal - Lining and Check Structures Federal contract opportunity
- Solicitation number
- 140R2022B0002
About this file
This solicitation is for a construction project to line a section of the Truckee Canal with concrete over a geomembrane barrier and repair/replace two check structures and conduct general repairs to supporting site structures. The Department of the Interior Bureau of Reclamation is seeking these services with a total estimated value of $5-10 million. The solicitation number is 140R2022B0002 and responses are due by April 15th, 2022. Award is expected to be made by June 1st, 2022 to the responsible bidder whose bid conforms to all material terms and is the lowest priced technically acceptable offer.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2022B0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
140R2022B000205/24/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/16/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. Title: Truckee Canal - Canal Lining STA. 650+00 to 838+00 and, Bango Check Modification and Fernley Check Replacement
B. Purpose: The purpose of this amendment is to clarify some ambiguity in a section of the specifications and supporting drawings.
C. Description: This amendment revises and replaces the following named specification sections and drawings:
1. Section 31 23 39 - Disposal of Excavated Materials is replaced with 31 23 39 - Disposal of Excavated Materials - REV - 1.
2. Section 52 00 00 - Drawings is replaced with 52 00 00 - Drawings - REV - 1
3. Drawing 29-D-60116 is replaced with 29-D-60116-REV-1
4. Drawing 29-D-60201 is replaced with 29-D-60201-REV-1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erik M. Danger
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement Truckee Division Newlands Project, Nevada Specifications No.
Disposal of Excavated Materials
31 23 39 - 1
SECTION 31 23 39
DISPOSAL OF EXCAVATED MATERIALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include cost of disposal of excavated materials in prices offered in Price
Schedules for Excavation for Canal Lining and Excavation for Roads and Structures.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 DISPOSAL OF EXCAVATED MATERIALS
A. Waste material from required excavation which is not suitable or required for backfill, embankment, or topsoil.
B. Deposit waste excavated material in waste banks on rights-of-way controlled by the Government.
C. Wasted excavated materials shall be placed in the Contractor's Use Area #10, as shown on drawings, or as determined by the COR.
D. Do not place waste material in wetlands or within 12 feet of drainage channels.
E. Place waste banks so they will not:
1. Impede or alter natural flow of streams or cross drainage.
2. Interfere with operation of the canal.
3. Restrict accessibility of completed structures.
4. Detract from appearance of completed project.
F. Do not waste material by dumping from top of slope.
G. Grade waste banks to reasonably even and uniform surfaces that blend with natural terrain.
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
Disposal of Excavated Materials
31 23 39 - 2
1. Minimum slope: 2 percent.
2. Maximum slope: 3H:1V.
H. Leave surface in a condition that will facilitate natural revegetation.
END OF SECTION
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
Drawings
52 00 00 - 1
SECTION 52 00 00
DRAWINGS
PART 1 GENERAL
1.01 DISCREPANCIES, ERRORS, OR OMISSIONS
A. Inform the CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction.
B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.
1.02 PROJECT CONDITIONS
A. Where there are differences as determined by the Government between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.03 INFORMATION DRAWINGS
A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.
These drawings do not show work to be performed under this contract.
B. If there are differences as determined by the Government between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.04 STANDARD DRAWINGS
A. Standard drawings may show details which are not a part of work under this contract.
Disregard details shown on these drawings which are not applicable to work under this contract.
1.05 COPIES OF DRAWINGS
A. One set of full-size (22 inches by 34 inches) drawings, except standard drawings, will be furnished to the Contractor.
B. Upon request, additional half-size (11 inches by 17 inches) copies of standard drawings will be furnished to the Contractor.
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 2
1.06 LIST OF DRAWINGS
A. Drawings listed in Table 52 00 00A - List of Drawings are made a part of Section C - Description/Specifications.
1.07 DRAWING NUMBERS IN NUMERICAL ORDER
A. Specification drawings are listed in numerical order in Table 52 00 00B - Drawings in Numerical Order.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
General:
1 29-D-60116- REV-1 Vicinity Map, Notes, and Key
2 29-D-60201- REV-1 Staging Areas – Contractor Use Areas
3 29-D-60166 Bango Check Structire Site Plan and Typical Access Road Sections – Plan and Sections
4 29-D-60167 Bango Check Structure Site Plan and Typical Access Road Sections – Plan and Profile
Demolition:
5 29-D-60168 Bango Check Structure Demolition – Plan and Section
Civil:
6 29-D-60119 Plan and Profile - Sta. 650+00 To Sta. 660+00
7 29-D-60120 Plan and Profile - Sta. 660+00 To Sta. 670+00
8 29-D-60121 Plan and Profile - Sta. 670+00 To Sta. 680+00
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
9 29-D-60122 Plan and Profile - Sta. 680+00 To Sta. 690+0
10 29-D-60123 Plan and Profile - Sta. 690+00 To Sta. 700+00
11 29-D-60124 Plan and Profile - Sta. 700+00 To Sta. 708+00
12 29-D-60125 Plan and Profile - Sta. 708+00 To Sta. 718+00
13 29-D-60126 Plan and Profile - Sta. 718+00 To Sta. 728+00
14 29-D-60127 Plan and Profile - Sta. 728+00 To Sta. 738+00
15 29-D-60128 Plan and Profile - Sta. 738+00 To Sta. 743+00
16 29-D-60129 Plan and Profile - Sta. 743+00 To Sta. 753+00
17 29-D-60130 Plan and Profile - Sta. 753+00 To Sta. 763+00
18 29-D-60131 Plan and Profile - Sta. 763+00 To Sta. 773+00
19 29-D-60132 Plan and Profile - Sta. 773+00 To Sta. 783+00
20 29-D-60133 Plan and Profile - Sta. 783+00 To Sta. 793+00
21 29-D-60134 Plan and Profile - Sta. 793+00 To Sta. 803+00
22 29-D-60135 Plan and Profile - Sta. 803+00 To Sta. 813+00
23 29-D-60139 Plan and Profile - Sta. 813+00 To Sta. 823+00
24 29-D-60140 Plan and Profile - Sta. 823+00 To Sta. 833+00
25 29-D-60141 Plan and Profile - Sta. 833+00 To Sta. 838+00
26 29-D-60161 Turnout Structures and Others – Typical Sections and Details
27 29-D-60162 Canal Hydraulic Properties - Typical Sections and Details
28 29-D-60163 Typical Canal Tables and Joint Details – Elevations, Excavation, and Joints
29 29-D-60164 Typical Riprap Section – Partial Plan, Typical Section, and Detail
30 29-D-60165 Pour Point 8 Hardening – Plan and Section
Structural:
31 29-D-60002 Existing Conditions and Demolition Plan
32 29-D-60199 Site – 3D Isometric
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 4
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
33 29-D-60006 Site Grading – Plan and Sections
34 29-D-60014 Design Criteria, General Notes, and Symbols
35 29-D-60015 General Arrangement – Plan – Operating Deck – El. “C”
36 29-D-60016 General Arrangement – Transverse Section
37 29-D-60017 General Arrangement – Logitudinal – Section and Details
38 29-D-60169 Corbel Concrete Outline – Plan and Section
39 29-D-60170 Corbel Reinforcement – Section And Details
40 29-D-60171 Bango Check Structure Conceptual Radial Gates - Installation - Layout
41 29-D-60172 Bango Check Structure Conceptual Radial Gates - Gate Details
42 29-D-60018 Architectural - Partial Site Plan
43 29-D-60173 Control Building - Architectural - Plans, Notes, Legend, Abbreviations, And Code Summary
44 29-D-60174 Control Building - Architectural - Elevations And Section
45 29-D-60175 Control Building - Architectural - Details And Schedules
46 29-D-60176 Control Building - Structural Design Data - General
47 29-D-60177 Control Building - Concrete Outline And Reinforcement Design
- Floor Plan
48 29-D-60178 Control Building - Concrete Outline And Reinforcement Design
- Sections And Detail
49 29-D-60179 Control Building - Concrete Outline And Reinforcement Design
- Roof Plan, Sections and Detail
50 29-D-60180 Control Building - Masonry Design - Floor Plan And Typical Details
51 29-D-60181 Control Building - Masonry Design – Sections
52 29-D-60023 Outline and Reinforcmenet Design – Plan – Operating Deck – El “C”
53 29-D-60024 Outline and Reinforcmenet Design – Sections and Details – Sheet 1 of 3
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 5
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
54 29-D-60025 Outline and Reinforcement Design – Sections and Details – Sheet 2 of 3
55 29-D-60026 Outline and Reinforcement Design – Sheet 3 of 3
Mechanical:
56 29-D-60182 Bulkhead Gate – Installation – List of Parts
57 29-D-60183 Bulkhead Gate – Details – Parts - Sections
58 29-D-60184 Bulkhead Gate – Sections and Views
59 29-D-60185 Bulkhead Gate – Parts
60 29-D-60192 Radial Gate Hoist - Installation
61 29-D-60193 Radial Gate – Galvanic Anode – Cathodic Protection System
62 29-D-60207 Fernley Check Structure Conceptual Radial Gates – Installation
- Layout
63 29-D-60208 Fernley Check Structure Conceptual Radial Gates – Gate Details
64 20-D-60032 Bulkhead Gate Guides and Seats – Plan – Installation – Sections
– Sheet 1 of 2
65 20-D-60033 Bulkhead Gate Guides and Seats – Parts – Sections – Sheet 2 of 2
66 20-D-60034 Bulkhead Gates – Installation – Assembly – List of Parts – Sheet 1 of 3
67 20-D-60035 Bulkhead Gates – Bulkhead Gate – Details – Sections – Sheet 2 of 3
68 20-D-60036 Bulkhead Gates – Parts – Details – Sections – Sheet 3 of 3
Metalwork:
69 29-D-60194 Miscellaneous Metalwork – Bango Check Structure Guardrail – Plan and Sections
70 29-D-60195 Miscellaneous Metalwork - Safety Ladder – Sections and Details
71 29-D-60196 Miscellaneous Metalwork – Bango Check Structure Guardrail – Sections and Details
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 6
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
72 29-D-60197 Miscellaneous Metalwork – Typical Safety Safety Cable Installation – Plan, Section, and Details
73 29-D-60198 Miscellaneous Metalwork- Installation List – Safety Ladders and Safety Cable Locations
74 29-D-60011 Miscellaneous Metalwork – Access Walkways – Plans and Sections
75 29-D-60012 Miscellaneous Metalwork – Walkways Along Pier – Plans, Sections, and Details
76 29-D-60013 Miscellaneous Metalwork – Partial Plan – Sections and Details
77 29-D-60028 Miscellaneous Metalwork – Stairs and Walkways - Plan
78 29-D-60029 Miscellaneous Metalwork – Pipe Guardrails - Sections
79 29-D-60030 Miscellaneous Metalwork – Pipe Guardrails – Sections and Details
80 29-D-60031 Miscellaneous Metalwork – Stairs and Gate with Overhangs – Plan, Sections, and Details
Electrical:
81 29-D-60187 Fernley Check Structure – Plan View – Site
82 29-D-60188 Fernley Electrical Installation – Singe Line Diagram
83 29-D-60189 Bango Check Structure – Plan View – Site
84 29-D-60190 Bango Electrical Installation - Single Line Diagram
Information Drawings:
85 29-OA-235-82 Newland Project – Truckee Canal Bango Check – Sheet 1 of 2
86 29-OA-235-83 Newland Project – Truckee Canal Bango Check – Sheet 2 of 2
87 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 1 of 6
88 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 2 of 6
89 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 3 of 6
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 7
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
90 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 4 of 6
91 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 5 of 6
92 616-8 Truckee Canal Takeout Structure with ADS Pipe Cast In Place – Sheet 6 of 6
93 1659 Main Lower Truckee Canal – Cross Sections of Canal
94 C-35 Figure B-01 – Biologic and Human Resources – September 2020
95 C-36 Figure B-02 – Biologic and Human Resources – September 2020
96 C-37 Figure B-03 – Biologic and Human Resources – September 2020
97 C-38 Figure B-04 – Biologic and Human Resources – September 2020
98 C-39 Figure B-05 – Biologic and Human Resources – September 2020
99 C-40 Figure B-06 – Biologic and Human Resources – September 2020
100 C-41 Figure B-07 – Biologic and Human Resources – September 2020
101 C-42 Figure B-08 – Biologic and Human Resources – September 2020
102 C-43 Figure B-09 – Biologic and Human Resources – September 2020
103 C-44 Figure B-10 – Biologic and Human Resources – September 2020
104 C-45 Figure B-11 – Biologic and Human Resources – September 2020
105 C-46 Figure B-12 – Biologic and Human Resources – September 2020
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 8
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
106 C-47 Figure B-13 – Biologic and Human Resources – September 2020
107 C-48 Figure B-14 – Biologic and Human Resources – September 2020
108 C-49 Figure B-15 – Biologic and Human Resources – September 2020
109 C-50 Figure B-16 – Biologic and Human Resources – September 2020
110 C-51 Figure B-17 – Biologic and Human Resources – September 2020
111 C-52 Figure B-18 – Biologic and Human Resources – September 2020
112 C-53 Figure B-19 – Biologic and Human Resources – September 2020
113 C-54 Figure B-20 – Biologic and Human Resources – September 2020
114 C-55 Figure B-21 – Biologic and Human Resources – September 2020
115 C-56 Figure B-22 – Biologic and Human Resources – September 2020
Standard Drawings:
116 40-D-5599 Standard Design - Small Equipment Foundations
117 40-D-7016 Chain Link Fence – Chain Link Fencing Requirements – Soil Installation
118 40-D-7102 Standard and Typical Designs – Government Drawing Format – Drawing Border, Sample Title Block, and Signature Lines
119 40-D-60003 General Notes For Concrete Outline And Reinforcement – Sheet
120 40-D-60004 Minimum Requirements For Detailing Reinforcement – Sheet
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 9
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
121 104-D-757 Pumping Plant – Electrical Installations – Designations and Symbols
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 10
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
29-D-
29-D-60002 31
29-D-60006 33
29-D-60011 74
29-D-60012 75
29-D-60013 76
29-D-60014 34
29-D-60015 35
29-D-60016 36
29-D-60017 37
29-D-60018 42
29-D-60023 52
29-D-60024 53
29-D-60025 54
29-D-60026 55
29-D-60028 77
29-D-60029 78
29-D-60030 79
29-D-60031 80
29-D-60032 64
29-D-60033 65
29-D-60034 66
29-D-60035 67
29-D-60036 68
29-D-60116-REV-1 1
29-D-60201-REV-1 2
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 11
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
29-D-60119 6
29-D-60120 7
29-D-60121 8
29-D-60122 9
29-D-60123 10
29-D-60124 11
29-D-60125 12
29-D-60126 13
29-D-60127 14
29-D-60128 15
29-D-60129 16
29-D-60130 17
29-D-60131 18
29-D-60132 19
29-D-60133 20
29-D-60134 21
29-D-60135 22
29-D-60139 23
29-D-60140 24
29-D-60141 25
29-D-60161 26
29-D-60162 27
29-D-60163 28
29-D-60164 29
29-D-60165 30
29-D-60166 3
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 12
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
29-D-60167 4
29-D-60168 5
29-D-60169 38
29-D-60170 39
29-D-60171 40
29-D-60172 41
29-D-60173 43
29-D-60174 44
29-D-60175 45
29-D-60176 46
29-D-60177 47
29-D-60178 48
29-D-60179 49
29-D-60180 50
29-D-60181 51
29-D-60182 56
29-D-60183 57
29-D-60184 58
29-D-60185 59
29-D-60187 81
29-D-60188 82
29-D-60189 83
29-D-60190 84
26-D-60192 60
26-D-60193 61
29-D-60194 69
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 13
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
29-D-60195 70
29-D-60196 71
29-D-60197 72
29-D-60198 73
29-D-60199 32
29-D-60201 2
29-D-60207 62
29-D-60208 63
29-OA-235-
29-OA-235-82 85
29-OA-235-83 86
616-8
616-8 Sheet 1 of 6 87
616-8 Sheet 2 of 6 88
616-8 Sheet 3 of 6 89
616-8 Sheet 4 of 6 90
616-8 Sheet 5 of 6 91
616-8 Sheet 6 of 6 92
1659 93
C-
C-35 94
C-36 95
C-37 96
C-38 97
C-39 98
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 14
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
C-40 99
C-41 100
C-42 101
C-43 102
C-44 103
C-45 104
C-46 105
C-47 106
C-48 107
C-49 108
C-50 109
C-51 110
C-52 111
C-53 112
C-54 113
C-55 114
C-56 115
40-D-
40-D-5599 116
40-D-7016 117
40-D-7102 118
40-D-60003 119
40-D-60004 120
104-D-
104-D-757 121
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 15
END OF SECTION
Truckee Canal - Canal Lining Sta. 650+00 to 838+00 – Bango Ck Modification and Fernley Ck Replacement
52 00 00 - 16
This page intentionally left blank.
NevadaNevada
CALIFORNIA
IDAHOOREGON
ARIZONA
UTAH
NEVADA
End of concrete lining 838+00.00
Start of concrete lining 650+00.00
Start of Truckee Canal 10+00.00
End Truckee Canal 1652+03.67
Survey Control Point TC-2
Survey Control Point TC-5/Fernley Check
Survey Control Point TC-T13
Survey Control Point TC-6/7 at Anderson Check
Survey Control Point TC-9
Survey Control Point TC-T10 at Allendale Check
Survey Control Point TC-1
SURVEY CONTROL POINTS
TABLE
Point Name
TC-1
TC-T10 at Allendale Check
TC-2
TC-5/Fernley Check
TC-T13
TC-6/7 at Anderson Check
TC-9
Station
554+00.00
618+00.00
644+00.00
706+22.00
805+70.00
861+00.00
984+26.00
Northing
14894632.06
14882370.14
14888052.96
14886696.86
14881973.58
14883052.61
14882373.83
Easting
2426945.94
2471288.85
2432699.82
2437813.51
2445745.22
2451113.79
2463048.98
Elevation
4197.01
4191.02
4197.99
4196.21
4194.60
4194.60
4192.19
LOCATION MAP
Project location
Lyon County
0' 30000'15000'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
DOUGLAS RICHARDS
MATT GEMPERLINE
MICHELLE NORRIS
Lorberau, Jeremy M P.E.
Norris, Michelle L P.E.
Civil Engineer
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
3.
1S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D -6
-R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
D A R
IC
H A R D
S
N
EW
LA
N
D S P
R O
JE
C T
TR
U
C K
EE
D
IV
IS
IO
N
TR
U
C K
EE
C A N
A L
C H
EC
K S
TR
U
C
TU
R
ES
A N
D C
A N
A L
LI
N
IN
G
TITLE SHEET
VICINITY MAP, NOTES
AND KEY MAP
DENVER, CO
29-D-60116
2022-02-25
Project location
SITE MAP
0' 6000'3000'
GENERAL NOTES
1. Canal areas not in concrete-lined zones are earthen-lined.
2. Stations are approximate and may vary as directed by COR. Local stationing varies from design stationing shown on drawings.
3. Contractor to field locate all utilities prior to work, including location, depth, diameter, minimum clearances, and other relevant details.
4. Coordinates shown are based on Nevada State Plane Coordinate System
West Zone, US Survey Feet. Horizontal Datum: NAD83, Vertical Datum:
NAVD 1988.
5. CAUTION: Call Nevada One Call 811 before you dig.
6. The survey control point basis of elevation is USC&GS Benchmark D 441.
Published elevation is 4,169.16 feet.
7. Construction limits shall be 100.0' Typ., unless otherwise noted or directed by COR.
8. Special excavation required within 25.0' of utilities, see Specifications.
ABBREVIATIONS
Cl. - Center line CPT - Cone penetrometer test CR - County road D/S - Downstream El. - Elevation FT - Feet Min. - Minimum OH - Overhead OL - Observation well PC - Point of curvature PI - Point of intersection PP8 - Pour point 8 PT - Point of tangency RTE - Route SPT - Standard penetration test t - Thickness TD - Total depth or target depth TP - Test pit Typ. - Typical U/S - Upstream WSEL - Water surface evelation
W
G
S
Cl. canal Construction limits Natural gas pipeline Overhead powerline Sewerline Overhead line Waterline AT&T line
LINETYPES
Truckee River
Lahontan reservior
Fernley
Truckee Canal
F
FLOW
LEGEND
Q - Flow rate B - Invert width Dn - Normal water depth FB - Bank freeboard FL - Lining freeboard S - Invert slope n - Manning's roughness factor V - Velocity R - Hydraulic radius CFS - Cubic feet per second
Derby Dam
Bango check structure
Contractor use area #1
Contractor use area #2
Contractor use area #3
Contractor use area #4
Contractor use area #5
Contractor use area #6
Contractor use area #7
Contractor use area #8
Contractor use area #9
KEY MAP
Not to scale
SURVEY CONTROL POINTS
Truckee Canal
Contractor use area #10
RE
V
NO 1
-0
5-
D
N or ri s, M ic he lle
L P
.E
A D
D
IT
IO
N
O F
C O
N
TR
A C
TO
R U
S E
A R
EA
A N
D P
O
IN
T
TA
B
LE
F O
R T
H
IS
A R
EA
R el ea se d
AutoCAD SHX Text
ALWAYS THINK
AutoCAD SHX Text
SAFETY
Contractor Use Area #01 Point #
Northing
14885971.91
14885966.83
14885267.34
14885174.80
14885003.79
14884948.04
14885851.04
Easting
2438911.77
2438623.56
2438678.34
2438726.66
2438899.49
2439108.48
2439100.04
Contractor Use Area #02 Point #
Northing
14882703.50
14882912.87
14882839.85
14882821.60
14882625.62
14882613.58
14882612.50
14882627.98
14882673.24
14882716.82
14882728.53
14882715.87
Easting
2451389.77
2451137.74
2451139.99
2451193.62
2451205.61
2451248.47
2451308.20
2451339.92
2451366.84
2451419.39
2451478.90
2452052.37
Contractor Use Area #03 Point #
Northing
14882879.79
14882601.54
14882577.21
14882917.26
14882903.06
Easting
2459123.83
2459125.02
2460469.78
2460467.80
2459249.70
Contractor Use Area #04 Point #
Northing
14882332.05
14882131.50
14881710.03
14881961.63
Easting
2471003.34
2470847.84
2471580.34
2471723.15
Contractor Use Area #05 Point #
Northing
14881282.63
14880192.43
14880197.91
14881181.76
Easting
2474116.57
2474100.24
2475800.21
2475782.88
Contractor Use Area #06 Point #
Northing
14868486.73
14868505.91
14867554.94
14867513.04
14867827.76
Easting
2485123.83
2484378.03
2484362.27
2485675.29
2485680.42
Contractor Use Area #07 Point #
Northing
14868479.85
14868472.14
14868131.85
Easting
2485391.44
2485690.91
2485685.37
Contractor Use Area #08 Point #
Northing
14866613.09
14866608.80
14866636.66
14867407.24
14867179.60
14867009.65
14866675.55
Easting
2486349.24
2486679.52
2486702.10
2486035.60
2485800.16
2485907.60
2486260.53
Contractor Use Area #09 Point #
Northing
14867532.85
14867482.33
14867225.21
14867126.05
14867411.25
14867513.88
14867554.18
14867578.35
Easting
2486535.22
2486536.11
2486668.67
2486534.89
2486294.01
2486414.25
2486406.80
2486440.07
Contractor Use Area #10 Point #
Northing
14879201.90
14879170.25
14879264.51
14879233.55
14879336.39
14879060.94
14878882.77
14878910.95
14878937.23
14878767.84
14878754.73
14878711.66
14878880.51
14879022.42
Easting
2474187.46
2474354.76
2474772.84
2474932.84
2475028.54
2475130.81
2474954.08
2474783.07
2474743.91
2474415.48
2474283.41
2474090.72
2474062.94
2474104.68
6+
0+
4+
728+00
0+
4+
8+
2+
205 206
4+
8+
00 95 2+
6+
304305
00401
00 11
+00
+00
+00
+00
+00
903 904
119120
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
3.
1S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D -6
-R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
D A R
IC
H A R D
S
N
EW
LA
N
D S P
R O
JE
C T
TR
U
C K
EE
D
IV
IS
IO
N
TR
U
C K
EE
C A N
A L
C H
EC
K S
TR
U
C
TU
R
ES
A N
D C
A N
A L
LI
N
IN
G
STAGING AREAS
CONTRACTOR USE
AREAS
DENVER, CO
29-D-60201
2022-04-01
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
DOUGLAS RICHARDS
MATT GEMPERLINE
MICHELLE NORRIS
Lorberau, Jeremy M P.E.
Norris, Michelle L P.E.
Civil Engineer
0 400'200'
CONTRACTOR USE AREA #1
0 400'200'
CONTRACTOR USE AREA #10
0 400'200'
Contractor Use Area #3
0 400'200'
CONTRACTOR USE AREA #4
0 600'300'
CONTRACTOR USE AREA #5
0 400'200'
CONTRACTOR USE AREA #8 AND #9
0 400'200'
CONTRACTOR USE AREA #6 AND #7 CONTRACTOR USE AREA TABLES
R
EV
N O 1
-0 5-
D
N or ri s, M ic he lle
L P
.E
A D
D
ED
C O
N
TR
A C
TO
R U
S E
A R
EA
IN
C
LU
D
ED
P O
IN
T
TA
B
LE
Note: For Contractor Use Area #10, polygon follows the alignment of an existing road. Reclamation to flag boundary before construction. Approximately 9 acres available.
R el ea se d
| SF 30 Draft Amend 0002 |
| 31 23 39 - Disposal of Excavated Materials - REV - 1 |
| 52 00 00 - Drawings - REV - 1 |
| 29-D-60116-REV-1 |
| Sheets and Views |
| 22 x 34 |
| 29-D-60201-REV-1 |
| Sheets and Views |
| 22 x 34 |
| 29-D-60116 ShtNo Rev1: 1 |
| 29-D-60201 ShtNo Rev1: 2 |
File details come from the government source that posted it. Updated .