Draft T-BOSS Pricing Matrix 2024.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
Tinker Air Force Base Operations Support Service (TAFB BOSS) Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a draft pricing matrix for the Tinker Base Operating Support Services (T-BOSS) contract opportunity. The pricing matrix provides instructions and a detailed breakdown of the contract line items (CLINs) and associated pricing for the contract, which includes facility sustainment, restoration, and modernization (FSRM) operations and maintenance, facility operations, predictability-based maintenance, pavement clearance, and materials management services. The pricing matrix covers the transition period, basic periods, option periods, and a six-month extension, with applicable quality performance indicators (QPIs) and weighting factors. The total evaluated price (TEP) is calculated based on the proposed unit prices. The related federal contract opportunity is for a contract to provide operations management services for facilities, infrastructure, and central plant operations at Tinker Air Force Base in Midwest City, Oklahoma, under the NAICS code 561210 - Engineering Services.

View the file

Other files for this federal contract opportunity

Other files attached to Tinker Air Force Base Operations Support Service (TAFB BOSS), newest first.
File Type Posted
TBOSS_RFI_Matrix_10312024_GOV Responses.xlsx XLSX spreadsheet
OK20240026WD_Heavy.pdf PDF
MOA Industrial Process Technician.pdf PDF
Draft FA813725R0004 29102024.pdf PDF
OK20240049WD_Building.pdf PDF
Wage Determination OK20240026 10_04_2024.pdf PDF
Wage Determination OK20240049 10_04_2024.pdf PDF
E1_CBA Teamsters.pdf PDF
SCA 2015-5315 Rev 24 07222024.pdf PDF
OK20240015WD_Highway.pdf PDF
OK20240049WD_Building.pdf PDF
OK20240026WD_Heavy.pdf PDF
E3_RTL_ASO_CBA IAMAW.pdf PDF
E4_SSI CBA IAMAW.pdf PDF
E2_Amentum CBA IAMAW.pdf PDF
Draft FA813725R0004 18102024.pdf PDF
E5_FAR 22.1010 Notice.pdf PDF
Draft FA813725R0004.pdf PDF
Draft Exhibit A CDRLS _DATA Requirements.pdf PDF
Draft_PWS Operations Management.pdf PDF
Draft Appendix C_Historical Information.pdf PDF
DCAA Accounting System Requirements Pre Awards.pdf PDF
DRAFT Appendix A_Operations Management.pdf PDF
Draft Appendix B_GPS.pdf PDF
DRAFT BOS Evaluation Factors for Award.pdf PDF
DRAFT T BOSS Instructions to Bidders.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

T-BOSS
Instructions for Pricing Matrix
1Offerors shall input the proposed unit prices into the "PRICING MATRIX" worksheet in ALL yellow highlighted cells. Offerors shall input their company name in Cell B3.
2All dollar amounts shall be rounded to the nearest cent.
3The extended price will be automatically calculated by multiplying the proposed unit price by the evaluation quantity
4A subtotal price will be automatically calculated at the bottom of each contract period/year.
5The Total Evaluated Price (TEP) will automatically calculate.
6The Pricing Matrix automatically applies the Option period 3 unit prices to the six-month extension unit prices as applicable.
7The Government has provided plug numbers for the Cost Reimbursable CLINs (CLINs X015-X018) in the Pricing Matrix. The plug numbers provided include costs only and are based on historical data. The total plug number for each CR CLIN will be included in the TEP, but do not guarantee that amount will be utilized during contract execution. The TEP is for evaluation purposes only.

Calculation Methodology

T-BOSS
Calculation Methodology

QPI IAW PWS Paragraph 6(c), In this FFP contract, except for transition (CLIN 0020), 8% of all FFP CLINs will be held "at risk" for satisfactory performance. In general, each FFP CLIN will be reduced by 8%, as detailed in the Pricing Matrix. Prior to award and exercise of options IAW FAR 52.217-9, the Government will determine the LoS funding level for applicable CLIN. Then, the Government will modify the CLINs to reflect the adjusted unit and QPI prices from the pricing matrix.

QPI CLIN: Total proposed price is multiplied by 8% (Ex. CLIN X002) Primary CLIN: Total proposed price is multiplied by 92% (Ex. CLIN X001) See table below for calculation methodology.

Weighting CLINs X001-X006 includes a weighting, based on the Level of Service (LoS), applied to the total proposed price. See table below for weighting calculation.

LoS 1 is weighted 20% (CLINs X001-X002) LoS 2 is weighted 75% (CLINs X003-X004) LoS 3 is weighted 5% (CLINs X005-X006)

CLINDescriptionCalculation MethodologyWeightingExample - Amounts are notional.
X001Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 1Proposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%.Total price reduced by QPI is multiplied by 20%.Proposed monthly price: $1,000

Quantity: 12 months Total Price: $1,000 x 12 = $12,000 Total Price less QPI: $12,000 x 92% = $11,040 Weighting: $11,040 x 20% = $2,208 CLIN total for evaluation purposes only = $2,208 X002 FSRM Quality Performance Indicator (QPI) Level 1 The total proposed price for CLIN X001 is multiplied by the QPI of 8%. Total price less QPI is multiplied by 20% Total Price for CLIN X001: $12,000 Total Price multiplied by QPI: $12,000 x 8% = $960 Weighting: $960 x 20% = $192 CLIN total for evaluation purposes only = $192 X003 Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 2 Proposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%. Total price reduced by QPI is multiplied by 75%. Proposed monthly price: $1,000 Quantity: 12 months Total Price: $1,000 x 12 = $12,000 Total Price less QPI: $12,000 x 92% = $11,040 Weighting: $8,280 x 75% = $8,280 CLIN total for evaluation purposes only = $8,280 X004 FSRM Quality Performance Indicator (QPI) Level 2 The total proposed price for CLIN X003 is multiplied by the QPI of 8%. Total price less QPI is multiplied by 75% Total Price for CLIN X001: $12,000 Total Price multiplied by QPI: $12,000 x 8% = $960 Weighting: $960 x 75% = $720 CLIN total for evaluation purposes only = $720 X005 Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 3 Proposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%. Total price reduced by QPI is multiplied by 5%. Proposed monthly price: $1,000 Quantity: 12 months Total Price: $1,000 x 12 = $12,000 Total Price less QPI: $12,000 x 92% = $11,040 Weighting: $8,280 x 5% = $552 CLIN total for evaluation purposes only = $552 X006 FSRM Quality Performance Indicator (QPI) Level 3 The total proposed price for CLIN X005 is multiplied by the QPI of 8%. Total price less QPI is multiplied by 5% Total Price for CLIN X001: $12,000 Total Price multiplied by QPI: $12,000 x 8% = $960 Weighting: $960 x 5% = $48 CLIN total for evaluation purposes only = $48

X007Facility Operations (FO) Requirements and Optimization, Demand Maintenance / Customer Service, Plant Operations, Facility Operations, Facility Projects, Work Request Work Group/Work Request Review Board, Planning, Building Automation Energy Analysis, Material ManagementProposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%.
X008FO Labor QPIThe total proposed price for CLIN X007 is multiplied by the QPI of 8%.
X009Predictability Based Maintenance Program (PdM) (CSAG)Proposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%.
X010Predictability Based Maintenance Program (PdM) (CSAG) QPIThe total proposed price for CLIN X009 is multiplied by the QPI of 8%.
X011CSAG Pavements ClearanceProposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%.
X012CSAG Pavements Clearance (QPI)The total proposed price for CLIN X011 is multiplied by the QPI of 8%.
X013Material Management - FOProposed monthly unit price multiplied by monthly quantity per each basic period, each option period, and the six-month extension. The total price is multiplied by 92%.
X014Material Management - FO QPIThe total proposed price for CLIN X013 is multiplied by the QPI of 8%.
X015Contractor Acquired Parts (Materials) - FO (Cost Reimbursement)Government Plug Number
X016Contractor Acquired Parts (Materials) - SRM (Cost Reimbursement)Government Plug Number
X017Contractor Acquired Parts (Materials) - CSAG (Cost Reimbursement)Government Plug Number
X018Equipment Rental and Supplemental Services (Cost Reimbursement)Government Plug Number
X019Data Items - Not EvaluatedNSP - Not Evaluated
0020Transition InProposed monthly unit price multiplied by three months.
Total Evaluated Price (TEP)The sum of all total CLIN prices for the Transition Period, all Basic Periods, all Option Periods, and the six-month Extension.
The TEP is for evaluation purposes only and does not indicate the total contract award amount.
Only the proposed unit prices will be incorporated into the contract.

PRICING MATRIX

Tinker Base Operating Support Services

T-BOSS

DRAFTPRICING MATRIX T-BOSS 16 OCT 24
Offeror:Insert Offeror Name
CLINs 000XCLINs 000XCLINs 000XCLINs 100XCLINs 100XCLINs 100XCLINs 100X
Transition In
(3 months)Basic Period 1
(9 months)Basic Period 2
(12 months)Basic Period 3
(12 months)Option Period 1
(12 months)Option Period 2
(12 months)Option Period 3
(12 months)6 Mo Extension

(6 months)

CLINDescriptionContract
TypeUnit of IssueQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceTotal Evaluated PriceCLIN
X001Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 1FFPMO20% weighting applied. See calculation methodology for example20%9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X001
X002FSRM Quality Performance Indicator (QPI) Level 1FFPMO20% weighting applied. See calculation methodology for example20%QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X002
X003Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 2FFPMO75% weighting applied. See calculation methodology for example75%9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X003
X004FSRM Quality Performance Indicator (QPI) Level 2FFPMO75% weighting applied. See calculation methodology for example75%QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X004
X005Facility Sustainment Restoration Modernization (FSRM) Operations and Maintenance, Preventative Maintenance, Enhancement Work, and Scheduled/Unscheduled corrective maintenance - Level 3FFPMO5% weighting applied. See calculation methodology for example5%9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X005
X006FSRM Quality Performance Indicator (QPI) Level 3FFPMO5% weighting applied. See calculation methodology for example5%QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X006
X007Facility Operations (FO) Requirements and Optimization, Demand Maintenance / Customer Service, Plant Operations, Facility Operations, Facility Projects, Work Request Work Group/Work Request Review Board, Planning, Building Automation Energy Analysis, Material ManagementFFPMO9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X007
X008FO Labor QPIFFPMOQPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X008
X009Predictability Based Maintenance Program (PdM) (CSAG)FFPMO9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X009
X010Predictability Based Maintenance Program (PdM) (CSAG) QPIFFPMOQPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X010
X011CSAG Pavements ClearanceFFPMO9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X011
X012CSAG Pavements Clearance (QPI)FFPMOQPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X012
X013Material Management - FOFFPMO9$ - 012$ - 012$ - 012$ - 012$ - 012$ - 06$ - 0$ - 0$ - 0X013
X014Material Management - FO QPIFFPMOQPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0QPI 8%$ - 0$ - 0X014
X015Contractor Acquired Parts (Materials) - FO (Cost Reimbursement)CRMO$ 525,000.00$ 714,000.00$ 728,280.00$ 742,845.60$ 757,702.51$ 772,856.56$ 386,428.28$ 4,627,112.95X015
X016Contractor Acquired Parts (Materials) - SRM (Cost Reimbursement)CRMO$ 4,500,000.00$ 6,120,000.00$ 6,242,400.00$ 6,367,248.00$ 6,494,592.96$ 6,624,484.82$ 3,312,242.41$ 39,660,968.19X016
X017Contractor Acquired Parts (Materials) - CSAG (Cost Reimbursement)CRMO$ 4,500,000.00$ 6,120,000.00$ 6,242,400.00$ 6,367,248.00$ 6,494,592.96$ 6,624,484.82$ 3,312,242.41$ 39,660,968.19X017
X018Equipment Rental and Supplemental Services (Cost Reimbursement)CRMO$ 1,725,000.00$ 2,346,000.00$ 2,392,920.00$ 2,440,778.40$ 2,489,593.97$ 2,539,385.85$ 1,269,692.92$ 15,203,371.14X018
X019Data Items - Not EvaluatedNSPMOX019
0020Transition InFFPMO3$ 5,000.00$ 15,000.00$ 15,000.000020
$ 99,167,420.47TEP
TransitionBP 1BP 2BP 3OP 1OP 2OP 36-Mo ExtTotal Evaluated Price (TEP)
$ 15,000.00$ 11,250,000.00$ 15,300,000.00$ 15,606,000.00$ 15,918,120.00$ 16,236,482.40$ 16,561,212.05$ 8,280,606.02$ 99,167,420.47cross check

Note: The X reference for the CLINs in Column A will become the number of the applicable basic period or option period as labeled in Row 5. For example, CLIN X001 will be 0001 for all Basic Periods, and 1001 for all Option Periods.

T-BOSS

&A Source Selection Information See FAR 2.101 & 3.104 &P

File details come from the government source that posted it. Updated .