Site_Visit_Q-A.docx
DOCX document 22 KB Posted
- Attached to
- REPAVE MALABANG TRAIL-FA301618B0005 Federal contract opportunity
- Solicitation number
- CYBR11023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COSA_Item_520_Hydromulching.pdf | ||
| FA301618B0005_0004.pdf | ||
| Site_Visit_Q-A40-41.pdf | ||
| Site_Visit_Q-A_38-39.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Sign-In.pdf | ||
| FA301618B0005_01.pdf | ||
| FA301618B0005_02.pdf | ||
| FA301618B0005_SOW_Appendix_B3.pdf | ||
| FA301618B0005_SOW_Appendix_B2.pdf | ||
| FA301618B0005_SOW_Appendix_B1.pdf | ||
| FA301618B0005_SOW_Appendix_C.pdf | ||
| FA301618B0005_Attachment_4_Wage_Determination.pdf | ||
| FA301618B0005_Attachment_6_Unescorted_Access_Request.pdf | ||
| FA301618B0005_Attachment_3_Project_Map.pdf | ||
| FA301618B0005_SOW_Appendix_A.pdf | ||
| FA301618B0005_Attachment_5_Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| FA301618B0005_Attachment_1_Statement_of_Work.pdf | ||
| FA301618B0005_Attachment_SOW_Apendix_D.pdf | ||
| FA301618B0005.docx.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A Session Repair Malabang Trail
FA301618B0005; CYRB11023
1. Will there be a minimum street width in narrow areas for asphalt, if so what is the width?
The minimum width of the existing roadway is 14-feet.
2. Will there be a requirement to restripe road if the width is under TxDot lanes requirements?
The Government desires white edge line striping regardless of road width. Roadway width of 18 feet or greater should have a yellow dashed centerline and double solid yellow line on curves.
3. What are the existing widths of the road?
The Govt has determined that the roadway widths are: 14-ft, 18-ft, 22-ft, and 27-ft.
4. Is the 2-foot shoulder requirement already included as part of the existing road?
The 2-foot shoulder is to be added to each side of the current road width.
5. The road does not really have an existing crown, what will be the required specifications that will need to meet and whether the contractors can reuse the milling material to build up the crown.
Reuse existing millings to build up the crown: Millings shall not be used to build up the crown. In accordance with SOW para. 1.3.9 Reworking Base - The Contractor shall rework the existing base by bringing in new base material as required to meet proposed grade and 2% grade cross slope and rolling it and moisturizing it until it achieves compaction requirements and is in accordance with City of San Antonio Standard Specifications: Item 200 Flexible Base, Item 216 Proof Rolling, Item 220 Blading, Item 230 Base and Pavement Replacement.
6. Is on-site water available?
Yes. There 2 overhead water sites on Wilderness Trail, Cp Bullis.
7. Are there “Phases” on the project?
No. Not directed by the Govt. The Contractor may develop phases for Traffic Control purposes, etc. and will need to discuss with Contracting Officer prior to execution.
8. Are there “Historical Culverts” to be repaired?
No. Any culverts should be left alone by Contractor.
9. Can milling be used to create crown?
No.
10. Government wants 2 Ft Wide Shoulders in addition to the existing width of the road?
Yes.
11. If unable to add 2ft wide additional shoulders, do you repave to existing width?
Where this situation exists, Contractor shall bring it to the attention of the Contractor prior to execution.
12. Is primer acceptable for use on sub-base?
If you mean Prime Coat, No.
13. “Crown” the entire road?
Yes
14. Restore existing vegetation of damaged?
Yes.
15. Paving to meet concrete pads at a ATV crossings?
The concrete pads that cross the road periodically: Contractor shall pave up to the edge of the concrete. Tack Coat on the concrete is required. Contractor shall establish a smooth transition from the asphalt to the concrete.
16. Are you limited to how much road you can tear up?
No.
17. Are you required to start in a certain place?
No. I would recommend that Contractor mill and overlay the pavement at Combat Village up to County Rd first, so it can be used. This would help with detour because the people using the site would detour up Lewis Valley Rd to County Rd to get to that site.
18. Can milling be used or does it have to be taken off site?
Milling shall be taken off site.
(End of 18 questions)
Q & A Session Page 3 of 3 Malabang Trail Repair
File details come from the government source that posted it.