FA301618B0005_SOW_Appendix_B1.pdf
PDF 13 MB Posted
- Attached to
- REPAVE MALABANG TRAIL-FA301618B0005 Federal contract opportunity
- Solicitation number
- CYBR11023
About this file
FA301618B0005 SOW APPENDIX B1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COSA_Item_520_Hydromulching.pdf | ||
| FA301618B0005_0004.pdf | ||
| Site_Visit_Q-A40-41.pdf | ||
| Site_Visit_Q-A_38-39.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Sign-In.pdf | ||
| Site_Visit_Q-A.docx | DOCX document | |
| FA301618B0005_02.pdf | ||
| FA301618B0005_01.pdf | ||
| FA301618B0005_SOW_Appendix_B3.pdf | ||
| FA301618B0005_SOW_Appendix_B2.pdf | ||
| FA301618B0005_Attachment_6_Unescorted_Access_Request.pdf | ||
| FA301618B0005_Attachment_3_Project_Map.pdf | ||
| FA301618B0005_SOW_Appendix_A.pdf | ||
| FA301618B0005_Attachment_5_Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| FA301618B0005_Attachment_1_Statement_of_Work.pdf | ||
| FA301618B0005_Attachment_SOW_Apendix_D.pdf | ||
| FA301618B0005.docx.pdf | ||
| FA301618B0005_SOW_Appendix_C.pdf | ||
| FA301618B0005_Attachment_4_Wage_Determination.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA
B
A pp en di x B
R eq ui re d Co ns tru ct io n Sp ec ifi ca tio ns (C
O
SA
City of San Antonio Standard Specifications for Construction 2
ITEM
101 PREPARING RIGHT-OF-WAY
101.1. DESCRIPTION: Prepare the right of way and designated easements for construction operations by removing and disposing of all obstructions when removal of such obstructions is not specifically shown on the plans to be paid by other Items.
101.2. MATERIALS:
A. Obstructions. Obstructions shall be considered to include, but not limited to, remains of houses not completely removed by others, foundations, floor slabs, concrete, brick, lumber, plaster, cisterns, septic tanks, basements, abandoned utility pipes or conduits, equipment or other foundations, fences, retaining walls, outhouses, shacks, and all other debris as well as buried concrete slabs, curbs, gutters, driveways, and sidewalks.
This item shall also include the removal of trees, stumps, bushes, shrubs, brush, roots, vegetation, logs, rubbish, paved parking areas, miscellaneous stone, brick, drainage structures, manholes, inlets, abandoned railroad tracks, scrap iron and all debris, whether above or below ground, except live utility facilities.
It is the intent of this specification to provide for the removal and disposal of all obstructions to the new construction together with other objectionable materials not specifically provided for elsewhere by the plans and specifications.
B. Explosives. This item shall not govern for the demolition of buildings by the use of explosives. Such demolition work shall be governed by the use of a special specification controlling the work.
C. Fences. Unless shown otherwise on the plans, all fences along the right-of-way which are damaged or removed temporarily by the Contractor shall be replaced by the Contractor to an equal or better condition at no additional cost to the City.
D. Hazardous Materials. If the Contractor encounters hazardous substances, industrial waste, other environmental pollutants, underground storage tanks, or conditions conducive to environmental damage, Contractor shall immediately stop work in the area affected and report the condition to the Owner's representative in writing. Contractor shall not be responsible for or required to conduct any investigation, site monitoring, containment, cleanup, removal, restoration or other remedial work of any kind or nature (the "remedial work") under any applicable level, state or federal law, regulation or ordinance, or any judicial order. If the Contractor agrees in writing to commence and/or prosecute some or all of the remedial work, all costs and expenses, to include any extension of the contract time, of such remedial work shall be paid by Owner to Contractor as additional compensation.
101.3. EQUIPMENT: Provide applicable equipment to conduct work as described in this specification or as specified on the plans.
101.4. CONSTRUCTION: Protect designated features on the right of way and prune trees and shrubs as directed. Do not park equipment, service equipment, store materials, or disturb the root area under the branches of trees designated for preservation. When shown on the plans, treat cuts on trees with an approved tree wound dressing within 20 min. of making a pruning cut or otherwise
June 2008 Item IOI Preparing Right-Of-Way
City of San Antonio Standard Specifications for Construction 3 causing damage to the tree. Follow all local and state regulations when burning. If burning of brush is approved, pile and burn at approved locations. When working in state or national forests or parks, coordinate work with state and federal authorities. Testing, removal, and disposal of hazardous materials will be in accordance with 101.2.D, "Hazardous Materials."
Clear areas shown on the plans of all obstructions, except those landscape features that are to be preserved. Such obstructions include but are not limited to those identified in 101.2.A, "Obstructions" and other items as specified on the plans. Remove vegetation and other landscape features not designated for preservation. Removal of live utility facilities is not included in this Item. Remove culverts, storm sewers, manholes, and inlets in proper sequence to maintain traffic and drainage.
Unless otherwise indicated on the plans, all underground obstructions shall be removed to the following depths:
• In areas receiving embankment, remove obstructions not designated for preservation to 2 ft.
below natural ground.
• In areas to be excavated, remove obstructions to 2 ft. below the excavation level.
• In all other areas, remove obstructions to 1 ft. below natural ground.
When allowed by the plans or directed, cut trees and stumps off to ground level.
Holes remaining after removal of all obstructions, objectionable materials, vegetation, etc. shall be backfilled and tamped and the entire area bladed, to prevent ponding of water and to positive provide drainage. Backfill materials deemed unacceptable by the Engineer shall be removed and replaced at no additional cost to the City. In areas that are to be immediately excavated, backfilling and blading may be eliminated if approved by the Engineer. Areas to be used as borrow sites and material sources shall have all obstructions, objectionable materials, vegetation, etc., removed to the complete extent necessary to prevent such objectionable matter from becoming mixed with the material to be used in the construction.
Where a conduit is shown to be replaced, it shall be removed in its entirety and all connections to the existing conduit shall be extended to the new line. Where an existing conduit is to be cut and plugged, the line shall be cut back not less that 2 feet and a plug of concrete not less that 2 feet long shall be poured and held in the end of the pipe or the plug may be accomplished by using a precast stopper grouted into place.
Material to be removed will be designated as "salvageable" or "non-salvageable" on the plans prior to bidding by the Contractor. All "salvageable" material will remain the property of the City and will be stored at the site as directed by the Engineer. All "non-salvageable" materials and debris removed shall become the property of the Contractor and shall be removed from the site and shall be disposed of properly and in accordance with local, state, and federal requirements.
All asphaltic material shall be deposited of or recycled at a facility authorized to accept the asphalt for such purposes.
Dispose of wells in accordance with TxDOT Item 103, "Disposal of Wells."
101.5. MEASUREMENT: "Preparing Right-of-Way" for new construction will be measured by the lump sum.
June 2008 Item 101 Preparing Right-Of-Way
City of San Antonio Standard Specifications for Construction 4
101.6. PAYMENT: This item will be paid for at the contract lump sum price bid for "Preparing Right of-Way," which price shall be full compensation for work herein specified, including the furnishing of all materials, equipment, tools, labor, and incidentals necessary to complete the work. The lump sum price will be pro-rated based on the number of phases in the project. A phase will be eligible for payment when street excavation is completed for that phase.
101.7. BID ITEM:
Item IOI.I - Preparing Right-of-Way- lump sum
June 2008 Item 101 Preparing Right-Of-Way
City of San Antonio Standard Specifications for Construction 18
107 EMBANKMENT
107.1. DESCRIPTION: Furnish, place, and compact materials for construction of roadways, embankments, levees, dikes, or any designated section of the roadway where additional material is required.
107.2. MATERIALS: Furnish approved material capable of forming a stable embankment from required excavation in the areas shown on the plans or from sources outside the right of way.
Provide material meeting the requirements of Type B unless one or more of the following types is shown on the plans or directed by the Engineer:
A. Type A. Granular material that is free from vegetation or other objectionable material and meets the requirements of Table I.
Property
Liquid limit Plasticity index (Pl) Bar linear shrinkage
Table 1 T R estme: equ1rements
TxDOT Standard
Laboratory Test
Procedure
Tex-104-E Tex-106-E Tex-107-E
Specification
Limit
:S 45
:S 15
�2
The Linear Shrinkage test only needs to be performed as indicated in TxDOT standard laboratory test procedure Tex-104-E.
B. Type B. Materials such as rock, loam, clay, or other approved materials.
C. Type C. Material meeting the specification requirements shown on the plans.
D. Type D. Material from required excavation areas shown on the plans.
Retaining wall backfill material must meet the requirements of the pertinent retaining wall Items.
107.3. EQUIPMENT: Provide applicable equipment to conduct work as described in this specification or as specified on the plans.
107.4. CONSTRUCTION: When offsite sources are used, the Contractor must comply with all Federal, State, County, City, and local laws, ordinances, and regulations pertaining to the work included in this item and demonstrate to the City that all applicable permits, contracts, or other legal documentation are in place prior to use of the offsite borrow source. To allow for required testing, notify the Engineer before opening a material source. Complete preparation of the right of way, in accordance with Item 10 I, "Preparing Right of Way," for areas to receive embankment.
Backfill tree-stump holes or other minor excavations with approved material and tamp. Restore the ground surface, including any material disked loose or washed out, to its original slope.
Compact the ground surface by sprinkling in accordance with TxDOT Item 204, "Sprinkling" and by rolling using equipment complying with Item 210, "Rolling," when directed.
June 2008 Item I 07 Embankment
City of San Antonio Standard Specifications for Construction 19
Scarify and loosen the unpaved surface areas, except rock, to a depth of at least 6-inches, unless otherwise shown on the plans. Bench slopes before placing material. Begin placement of material at the toe of slopes. Do not place trees, stumps, roots, vegetation, or other objectionable material in the embankment. Simultaneously recompact scarified material with the placed embankment material. Do not exceed the layer depth specified in Section 107.3.D, "Compaction Methods."
Construct embankments to the grade and sections shown on the plans. Construct the embankment in layers approximately parallel to the finished grade for the full width of the individual roadway cross sections, unless otherwise shown on the plans. Ensure that each section of the embankment conforms to the detailed sections or slopes. Maintain the finished section, density, and grade until the project is accepted.
A. Earth Embankments. Earth embankment is mainly composed of material other than rock.
Construct embankments in successive layers, evenly distributing materials in lengths suited for sprinkling and rolling.
Obtain approval to incorporate rock and broken concrete produced by the construction project in the lower layers of the embankment. When the size of approved rock or broken concrete exceeds the layer thickness requirements in Section 107.3.D, "Compaction Methods," place the rock and concrete outside the limits of the completed roadbed. Cut and remove all exposed reinforcing steel from the broken concrete.
Move the material dumped in piles or windrows by blading or by similar methods and incorporate it into uniform layers. Featheredge or mix abutting layers of dissimilar material for at least I 00-feet to ensure there are no abrupt changes in the material. Break down clods or lumps of material and mix embankment until a uniform material is attained.
Apply water free of industrial wastes and other objectionable matter to achieve the uniform moisture content specified for compaction.
When ordinary compaction is specified, roll and sprinkle each embankment layer in accordance with Section 107.3.D.1, "Ordinary Compaction." When density control is specified, compact the layer to the required density in accordance with Section 107.3.D.2, "Density Control." When rock and broken concrete are allowed in lower layers of earth embankments, proof-roll these layers as directed where density testing is not possible, m accordance with TxDOT Item 216, "Proof Rolling" to ensure proper compaction.
B. Rock Embankments. Rock embankment is mainly composed of rock. Construct rock embankments in successive layers for the full width of the roadway cross-section with a depth of 18-inches or less. Increase the layer depth for large rock sizes as approved. Do not exceed a depth of 2Yi feet in any case. Fill voids created by the large stone matrix with smaller stones during the placement and filling operations.
June 2008
Ensure the depth of the embankment layer is greater than the maximum dimension of any rock. Do not place rock greater than 2 feet in its maximum dimension, unless otherwise approved. Construct the final layer with graded material so that the density and uniformity is in accordance with Section 107.3.D, "Compaction Methods." Break up exposed oversized material as approved.
When ordinary compaction is specified, roll and sprinkle each embankment layer in accordance with Section 107.3.D.1, "Ordinary Compaction." When density control is specified, compact each layer to the required density in accordance with Section 107.3.D.2, Item 107 Embankment
City of San Antonio Standard Specifications for Construction 20
"Density Control." When directed, proof-roll each rock layer where density testing is not possible, in accordance with TxDOT Item 216, "Proof Rolling" to ensure proper compaction.
C. Embankments Adjacent to Culverts and Bridges. Compact embankments adjacent to culverts and bridges in accordance with Item 106, "Box Culvert Excavation and Backfilling."
D. Compaction Methods. Begin rolling longitudinally at the sides and proceed toward the center, overlapping on successive trips by at least Yi the width of the roller. On super elevated curves, begin rolling at the lower side and progress toward the high side. Alternate roller trips to attain slightly different lengths. Compact embankments in accordance with one of the following methods as shown on the plans:
June 2008
1. Ordinary Compaction. Use approved rolling equipment complying with Item 210, "Rolling," to compact each layer. The plans or the Engineer may require specific equipment. Do not allow the loose depth of any layer to exceed 12 inches, unless otherwise approved. Before and during rolling operations, bring each layer to the moisture content directed. Compact each layer until there is no evidence of further consolidation. Maintain a level layer to ensure uniform compaction. If the required stability or finish is lost for any reason, recompact and refinish the subgrade at no additional expense to the City.
2. Density Control. Compact each layer to the required density using equipment complying with Item 210, "Rolling." Determine the maximum lift thickness based on the ability of the compacting operation and equipment to meet the required density. Do not exceed layer thickness of 12 inches loose material, unless otherwise approved. Maintain a level layer to ensure uniform compaction.
The Engineer will use TxDOT standard laboratory test procedure Tex-114-E to determine the maximum dry density (D.) and optimum moisture content (W0p1). Meet the requirements for field density and moisture content in Table 2, unless otherwise shown on the plans.
Table 2 Field Density Control Requirements
Description Density Moisture Content
Tex-115-E
PI< 15 ~ 98% D.
15 < PI '.S 35 ~ 98% D. and< 102% D. ~Wont
PI> 35 ~ 95% D. and< 100% D. ~Wont
Each layer is subject to testing by the Engineer for density and moisture content. During compaction, the moisture content of the soil should not exceed the value shown on the moisture-density curve, above optimum, required to achieve:
• 98% dry density for soils with a Pl greater than 15 but less than or equal to 35 or
• 95% dry density for soils with PI greater than 35.
When required, remove small areas of the layer to allow for density tests. Replace the removed material and recompact at no additional expense to the City. Proof-roll in accordance with TxDOT Item 216, "Proof Rolling," when shown on the plans or as directed. Correct soft spots as directed.
Item I 07 Embankment
City of San Antonio Standard Specifications for Construction 21
E. Maintenance of Moisture and Reworking. Maintain the density and moisture content once all requirements in Table 2 are met. For soils with a PI greater than 15, maintain the moisture content no lower than 4 percentage points below optimum. Rework the material to obtain the specified compaction when the material loses the required stability, density, moisture, or finish. Alter the compaction methods and procedures on subsequent work to obtain specified density as directed.
F. Acceptance Criteria.
1. Grade Tolerances.
a. Staged Construction. Grade to within 0.1-foot in the cross-section and 0.1-foot in 16-feet measured longitudinally.
b. Turnkey Construction. Grade to within Y2-inch in the cross-section and Yi-inch in 16-feet measured longitudinally.
2. Gradation Tolerances. When gradation requirements are shown on the plans, material is acceptable when not more than l of the 5 most recent gradation tests is outside the specified limits on any individual sieve by more than 5 percentage points.
3. Density Tolerances. Compaction work is acceptable when not more than 1 of the 5 most recent density tests is outside the specified density limits, and no test is outside the limits by more than 3 lb. per cubic foot.
4. Plasticity Tolerances. Material is acceptable when not more than 1 of the 5 most recent Pl tests is outside the specified limit by no more than 2 points.
107.5. MEASUREMENT: Embankment will be measured by the cubic yard. Measurement will be further defined for payment as follows :
A. Final. The cubic yard will be measured in its final pos1t1on using the average end area method. The volume is computed between the original ground surface or the surface upon which the embankment is to be constructed and the lines, grades, and slopes of the embankment. In areas of salvaged topsoil, payment for embankment will be made in accordance with TxDOT Item 160, "Topsoil." Shrinkage or swell factors will not be considered in determining the calculated quantities.
B. Original. The cubic yard will be measured in its original and natural position using the average end area method.
C. Vehicle. The cubic yard will be measured in vehicles at the point of delivery.
When measured by the cubic yard in its final position, this is a plans quantity measurement Item.
The quantity to be paid is the quantity shown in the proposal, unless modified by Change Order.
Additional measurements or calculations will be made if adjustments of quantities are required.
Shrinkage or swell factors are the Contractor's responsibility. When shown on the plans, factors are for informational purposes only.
Measurement of retaining wall backfill in embankment areas is paid for as embankment, unless otherwise shown on plans. Limits of measurement for embankment in retaining wall areas are shown on the plans.
June 2008 Item I 07 Embankment
City of San Antonio Standard Specifications for Construction 22
107.6. PAYMENT: The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for "Embankment (Final)," "Embankment (Original)," or "Embankment (Vehicle)," of the compaction method and type specified. This price is full compensation for furnishing embankment; hauling; placing, compacting, finishing, and reworking; disposal of waste material;
and equipment, labor, tools, and incidentals.
When proof rolling is directed, it will be paid for in accordance with TxDOT Item 216, "Proof Rolling."
All sprinkling and rolling, except proof rolling, will not be paid for directly, but will be considered subsidiary to this Item, unless otherwise shown on the plans.
Where subgrade is constructed under this contract, correction of soft spots in the subgrade will be at the Contractor's expense. Where subgrade is not constructed under this contract, correction of soft spots in the subgrade will be paid in accordance through the Change Order process.
107.7. BID ITEM:
Item 107.1 - Embankment (Final) - per cubic yard
Item 107.2 - Embankment (Original) - per cubic yard
Item 107.3 - Embankment (Vehicle) - per cubic yard
June 2008 Item 107 Embankment
City of San Antonio Standard Specifications for Construction 34
DIVISION II - BASE & SURFACE COURSES
ITEM
200 FLEXIBLE BASE
200.1. DESCRIPTION: Construct a base course for swfacing, pavement, or other base courses composed of crushed stone, and constructed as herein specified in one or more courses in conformance with the typical sections shown on the plans and to the lines and grades as established by the Engineer.
200.2. MATERIALS: Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of the proposed material sources and of changes to material sources. The Engineer may sample and test project materials at any time before compaction throughout the duration of the project to assure specification compliance. Use the TxDOT standard laboratory test procedure Tex- I 00-E for material definitions.
A. Aggregate. Furnish aggregate of the type and grade shown on the plans and conforming to the requirements of Table 1. Each source must meet Table 1 requirements for liquid limit, plasticity index, and wet ball mill for the grade specified. Do not use additives such as but not limited to lime, cement, or fly ash to modify aggregates to meet the requirements of Table 1, unless shown on the plans.
June 2008
Table I A l!"l!"ree:a e a ena t M t . IR t equiremen s
Property Test Method Grade 1 Grade 2 Grade 3 Grade 4 Master gradation sieve size (% retained)
2-'h in. - 0 0
I-'!. in. 0 0-10 0- IO As shown Y, in. Tex-110-E 10-35 - - on the plans :Y, in. 30-50 - - No. 4 45- 65 45- 75 45- 75
No. 40 70-85 60-85 50-85
Liquid limit,% max.2 Tex-104-E 35 40 40 As shown on the plans
Plasticity index, max.2 10 12 12 As shown
Tex-106-E on the clans Plasticity index, min.2 As shown on the plans
Wet ball mill , % max.3 40 45 - Wet ball mill ,% max. Tex-116-E As shown increase passing the 20 20 - on the plans No. 40 sieve' I TxDOT standard laboratory test procedures 2 Determme plastic mdex m accordance with Tex-!07-E (linear shrinkage) when liquid hm1t is unattainable as defined in Tex- I 04-E.
3. ASTM C13 I (Grad A), Los Angeles Abrasion, can be used in lieu of the wet ball mill procedure The maximum abrasion allowed to the crushed stone is forty (40) when subjected to the Los Angeles Abrasion test
1. Material Tolerances. The Engineer may accept material if no more than 1 of the 5 most recent gradation tests has an individual sieve outside the specified limits of the gradation.
Item 200 Flexible Base
City of San Antonio Standard Specifications for Construction 35
June 2008
When target grading is required by the plans, no single failing test may exceed the master grading by more than 5 percentage points on sieves No. 4 and larger or 3 percentage points on sieves smaller than No. 4 sieve.
The Engineer may accept material if no more than 1 of the 5 most recent plasticity index tests is outside the specified limit. No single failing test may exceed the allowable limit by more than 2 points.
2. Material Types. Do not use fillers or binders unless approved by the Engineer. Furnish the type specified on the plans in accordance with the following.
a. Type A. Crushed stone produced and graded from oversize quarried aggregate that originates from a single, naturally occurring source. Do not use gravel or multiple sources.
b. Type B. Crushed or uncrushed gravel. Blending of2 or more sources is allowed. Use of this material must have written approval by the City Engineer prior to selection for bidding or construction.
c. Type C. Crushed gravel with a minimum of 60% of the particles retained on a No. 4 sieve with 2 or more crushed faces as determined by TxDOT's standard laboratory test procedure Tex-460-A, Part I. Blending of 2 or more sources is allowed.
d. Type D. Type A material or crushed concrete. Crushed concrete containing gravel will be considered Type D material. Crushed concrete must meet the requirements in Section 200.2.A.3.b, "Recycled Material (Including Crushed Concrete) Requirements," and be managed in a way to provide for uniform quality. The Engineer may require separate dedicated stockpiles in order to verify compliance.
e. Type E. As shown on the plans.
3. Recycled Material. Recycled asphalt pavement (RAP) and other recycled materials may be used when shown on the plans. Request approval to blend 2 or more sources of recycled materials.
a. Limits on Percentage. When RAP is allowed, do not exceed 20% RAP by weight unless otherwise shown on the plans. The percentage limitations for other recycled materials will be as shown on the plans.
b. Recycled Material (Including Crushed Concrete) Requirements.
(1) Contractor Furnished Recycled Materials. When the Contractor furnishes the recycled materials, including crushed concrete, the final product will be subject to the requirements of Table 1 for the grade specified. Certify compliance with TxDOT's DMS-11000, "Evaluating and Using Nonhazardous Recyclable Materials Guidelines," for Contractor furnished recycled materials. In addition, recycled materials must be free from reinforcing steel and other objectionable material and have at most 1.5% deleterious material when tested in accordance with TxDOT's standard laboratory test procedure Tex-413-A. For RAP, do not exceed a maximum percent loss from decantation of 5.0% when tested in accordance with TxDOT's standard laboratory test procedure Tex-406-A. Test RAP without removing the asphalt.
City of San Antonio Standard Specifications for Construction 36
(2) City Furnished Required Recycled Materials. When the City furnishes and requires the use of recycled materials, unless otherwise shown on the plans:
• City required recycled material will not be subject to the requirements in Table 1,
• Contractor furnished materials are subject to the requirements in Table I and this Item,
• the final product, blended, will be subject to the requirements in Table 1, and
• for final product, unblended (100% City furnished required recycled material), the liquid limit, plasticity index, wet ball mill, classification, and compressive strength is waived.
Crush City-furnished RAP so that 100% passes the 2 inch sieve. The Contractor is responsible for uniformly blending to meet the percentage required.
(3) City Furnished and Allowed Recycled Materials. When the City furnishes and allows the use of recycled materials or allows the Contractor to furnish recycled materials, the final blended product is subject to the requirements of Table 1 and the plans.
c. Recycled Material Sources. City-owned recycled material is available to the Contractor only when shown on the plans. Return unused City-owned recycled materials to the City stockpile location designated by the Engineer unless otherwise shown on the plans.
The use of Contractor-owned recycled materials is allowed when shown on the plans.
Contractor-owned surplus recycled materials remain the property of the Contractor.
Remove Contractor-owned recycled materials from the project and dispose of them in accordance with federal, state, and local regulations before project acceptance. Do not intermingle Contractor-owned recycled material with City-owned recycled material unless approved by the Engineer.
B. Water. Furnish water free of industrial wastes and other objectionable matter.
C. Material Sources. Only commercial sources may be used unless otherwise allowed by the City and shown on the plans.
200.3. EQUIPMENT: Provide machinery, tools, and equipment necessary for proper execution of the work. Provide rollers in accordance with Item 210, "Rolling." Provide proof rollers in accordance with TxDOT Item 216, "Proof Rolling," when required.
200.4. CONSTRUCTION: Construct each layer uniformly, free of loose or segregated areas, and with the required density and moisture content. Provide a smooth surface that conforms to the typical sections, lines, and grades shown on the plans or as directed.
Stockpile base material temporarily at an approved location before delivery to the roadway.
Build stockpiles in layers no greater than 2 feet thick. Stockpiles must have a total height between 10 and 16 feet unless otherwise shown on the plans. After construction and acceptance of the
June 2008 Item 200 Flexible Base
City of San Antonio Standard Specifications for Construction 37 stockpile, loading from the stockpile for delivery is allowed. Load by making successive vertical cuts through the entire depth of the stockpile.
Do not add or remove material from temporary stockpiles that require sampling and testing before delivery unless otherwise approved. Charges for additional sampling and testing required as a result of adding or removing material will be deducted from the Contractor's estimates.
Haul approved flexible base in clean trucks. Deliver the required quantity to each 100 foot station or designated stockpile site as shown on the plans. Prepare stockpile sites as directed. When delivery is to the 100 foot station, manipulate in accordance with the applicable Items.
A. Preparation of Subgrade or Existing Base. Remove or scarify existing asphalt concrete pavement in accordance with Item 104, "Street Excavation," when shown on the plans or as directed. Shape the subgrade or existing base to conform to the typical sections shown on the plans or as directed.
When new base is required to be mixed with existing base, deliver, place, and spread the new flexible base in the required amount per station. Manipulate and thoroughly mix the new base with existing material to provide a uniform mixture to the specified depth before shaping.
When shown on the plans or directed, proof roll the roadbed in accordance with TxDOT Item 216, "Proof Rolling," before pulverizing or scarifying. Correct soft spots as directed.
B. Placing. Spread and shape flexible base into a uniform layer with an approved spreader the same day as delivered unless otherwise approved. Construct layers to the thickness shown on the plans. Maximum lift thickness shall be 10 inches of loose material. Maintain the shape of the course. Control dust by sprinkling, as directed. Correct or replace segregated areas as directed, at no additional expense to the City.
Place successive base courses and finish courses using the same construction methods required for the first course.
C. Compaction. Compact in courses not to exceed 8 inches compacted depth using density control unless otherwise shown on the plans. Multiple lifts are permitted when shown on the plans or approved. Bring each layer to the moisture content directed. When necessary, sprinkle the material in accordance with TxDOT Item 204, "Sprinkling."
June 2008
Begin rolling longitudinally at the sides and proceed towards the center, overlapping on successive trips by at least Y2 the width of the roller unit. On superelevated curves, begin rolling at the low side and progress toward the high side. Offset alternate trips of the roller.
Operate rollers at a speed between 2 and 6 mph as directed.
Rework, recompact, and refinish material that fails to meet or that loses required moisture, density, stability, or finish before the next course is placed or the project is accepted.
Continue work until specification requirements are met. Perform the work at no additional expense to the City.
1. Ordinary Compaction. Roll with approved compaction equipment as directed. Correct irregularities, depressions, and weak spots immediately by scarifying the areas affected, adding or removing approved material as required, reshaping, and recompacting.
City of San Antonio Standard Specifications for Construction 38
2. Density Control. Compact to at least 95% of the maximum density determined by TxDOT' s standard laboratory test procedure Tex-113-E unless otherwise shown on the plans. Determine the moisture content of the material at the beginning and during compaction in accordance with TxDOT's standard laboratory test procedure Tex-103-E.
The Engineer will determine roadway density of completed sections in accordance with TxDOT' s standard laboratory test procedure Tex-115-E. The Engineer may accept the section if no more than I of the 5 most recent density tests is below the specified density and the failing test is no more than 3 pounds per cubic foot below the specified density.
D. Finishing. After completing compaction, clip, skin, or tight-blade the surface with a maintainer or subgrade trimmer to a depth of approximately '/4 inch. Remove loosened material and dispose of it at an approved location. Seal the clipped surface immediately by rolling with a pneumatic tire roller until a smooth surface is attained. Add small increments of water as needed during rolling. Shape and maintain the course and surface in conformity with the typical sections, lines, and grades as shown on the plans or as directed.
In areas where surfacing is to be placed, correct grade deviations greater than '/4 inch in 16 feet measured longitudinally or greater than '/4 inch over the entire width of the cross-section.
Correct by loosening, adding, or removing material. Reshape and recompact in accordance with Section 200.4.C, "Compaction."
E. Curing. Cure the finished section until the moisture content is at least 3 percentage points below and above optimum or as directed before applying the next successive course or prime coat.
200.5. MEASUREMENT: Flexible base will be measured by the square yard method per thickness shown in the proposal.
Measurement by the square yard is a plans quantity measurement. The quantity to be paid for is the quantity shown in the proposal unless modified by the Engineer. Additional measurements or calculations will be made if adjustments of quantities are required.
Measurement is further defined for payment by the square yard of surface area in the completed and accepted final position. The surface area of the base course is based on the width of flexible base as shown on the plans.
200.6. PAYMENT: The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for the types of work shown below. No additional payment will be made for thi'ckness or width exceeding that shown on the typical section or provided on the plans for square yard measurement.
Sprinkling and rolling will not be paid for directly but will be subsidiary to this Item unless otherwise shown on the plans.
Where subgrade is constructed under this Contract (Subgrade Treatment), correction of soft spots in the subgrade will be at the Contractor's expense. Where subgrade is not constructed under this project, correction of soft spots in the subgrade will be paid in accordance with pertinent Items.
Payment will be made for the type and grade specified. For .square yard measurement, a depth will be specified. This price is full compensation for furnishing materials, temporary stockpiling, assistance provided in stockpile sampling and operations to level stockpiles for measurement, City of San Antonio Standard Specifications for Construction 39 loading, hauling, delivery of materials, spreading, blading, mixing, shaping, placing, compacting, reworking, finishing, correcting locations where thickness is deficient, curing, furnishing scales and labor for weighing and measuring, and equipment, labor, tools, and incidentals.
200.7. BID ITEM:
Item 200.1 - per square yard per_ inches compacted depth
City of San Antonio Standard Specifications for Construction 46
202 PRIME COAT
202.1. DESCRIPTION: This item shall govern for the application of asphaltic material on the completed base course and/or other areas in accordance with this specification and as directed by the Engineer. Apply blotter material as required.
202.2. MATERIALS: Provide materials in accordance with the following requirements:
A. Bituminous. Unless the type and grade are shown on the plans, utilize an MC-30 or AE-P asphalt cement in accordance with Item 300, "Asphalts, Oils, and Emulsions" of the Standard Specifications of the Texas Department of Transportation for prime coat. Where Emulsified Asphalts are used, the amount of emulsified asphalt as a percentage by volume of the total mixture shall be within the limits shown on the plans, or shall be of a percentage as directed by the Engineer.
B. Blotter. Unless otherwise shown on the plans or approved, use either base course sweepings obtained from cleaning the base or sand as blotter materials.
202.3. EQUIPMENT: Provide applicable equipment in accordance with this specification or as specified on the plans.
A. Distributor. Furnish a distributor that will apply the asphalt material uniformly at the specified rate or as directed.
1. Transverse Variance Rate. When a transverse variance rate is shown on the plans, confirm that the nozzles outside the wheel paths will output a predetermined percentage more of asphalt material by volume than the nozzles over the wheel paths.
2. Calibration.
a. Transverse Distribution. Furnish a distributor test report, no more than 1 year old, documenting that the variation in output for individual nozzles of the same size does not exceed 10% when tested at the greatest shot width in accordance with Tex-922- K, "Calibrating Asphalt Distribution Equipment," Part III.
Include the following documentation on the test report:
• the serial number of the distributor,
• a method that identifies the actual nozzle set used in the test, and
• the fan width of the nozzle set at a 12 inch bar height.
When a transverse variance rate is required, perform the test using the type and grade of asphalt material to be used on the project. The Engineer may verify the transverse rate and distribution at any time. If verification does not meet the requirements, correct deficiencies and furnish a new test report.
B. Tank Volume. Furnish a volumetric calibration and strap stick for the distributor tank in accordance with Tex-922-K, "Calibrating Asphalt Distribution Equipment," Part I.
June 2008 Item 202 Prime Coat
City of San Antonio Standard Specifications for Construction 47
Calibrate the distributor within the previous 3 years of the date first used on the project. The Engineer may verify calibration accuracy in accordance with Tex-922-K, "Calibrating Asphalt Distribution Equipment," Part II.
C. Computerized Distributor. When paying for asphalt material by weight, the Engineer may allow use of the computerized distributor display to verify application rates. Verify application rate accuracy at a frequency acceptable to the Engineer.
D. Broom. Furnish rotary, self-propelled brooms.
E. Rollers. Rollers provided shall meet the requirements for their type as shown in Item 210, "Rollers."
F. Asphalt Storage and Handling Equipment. When the plans or the Engineer allows storage tanks, furnish a thermometer in each tank to indicate the asphalt temperature continuously.
Keep equipment clean and free of leaks. Keep asphalt material free of contamination.
G. Digital Measuring Instrument. Furnish a vehicle with a calibrated digital-measuring instrument accurate to ±6 ft. per mile.
202.4. CONSTRUCTION:
A. General. Apply the mixture when the air temperature is 60°F and above, or above 50°F and rising. Measure the air temperature in the shade away from artificial heat. The Engineer will determine when weather conditions are suitable for application.
Do not permit traffic, hauling, or placement of subsequent courses over freshly constructed prime coats. Maintain the primed surface until placement of subsequent courses or acceptance of the work.
B. Surface Preparation. Prepare the surface by sweeping or other approved methods. When directed, before applying bituminous material, lightly sprinkle the surface with water to control dust and ensure absorption.
C. Application.
June 2008
1. Bituminous. The Engineer will select the application temperature within the limits recommended in Item 300, "Asphalts, Oils, and Emulsions." Apply material within 15°F of the selected temperature.
Unless otherwise shown on the plans, prime coat shall be applied at a rate not to exceed
0.20 gallon per square yard of surface. The prime coat shall be applied evenly and smoothly, under a pressure necessary for proper distribution.
When emulsified asphalts are used as prime coat, agitate the water and emulsified asphalt to produce a uniform blend. Evenly distribute, at the rate specified, to locations shown on the plans or as directed. Regulate the percentage of emulsified asphalt in the mixture and distribute successive applications to achieve the specified rate, if necessary.
During the application of prime coat, care shall be taken to prevent splattering of adjacent pavement, curb and gutters or structures. When directed, roll the freshly applied prime coat with a pneumatic-tire roller to ensure penetration.
Item 202 Prime Coat
City of San Antonio Standard Specifications for Construction 48
2. Blotter. Spread blotter material before allowing traffic to use a primed surface. When "Prime Coat and Blotter" is shown on the plans as a bid item, apply blotter material to primed surface at the rate shown in the plans or as directed. When "Prime Coat" is shown on the plans as a bid item, apply blotter to spot locations or as directed to accommodate traffic movement through the work area. Remove blotter material before placing the surface. Dispose of blotter material according to applicable state and federal requirements.
202.5. MEASUREMENT: The asphaltic material for prime coat will be measured at the point of delivery on the project in gallons at the applied temperature. The quantity to be paid for shall be the number of gallons of asphaltic material used, as directed, in the accepted prime coat to the pay limits as shown on the plans. When emulsions are used, only that percentage of emulsified asphalt as a percentage by volume of the total mixture shall be paid for by the gallon of asphaltic material used in the accepted prime coat. Water used will not be measured for payment.
202.6. PAYMENT: The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for "Prime Coat" or "Prime Coat and Blotter" of the type and grade of bituminous material specified. This price is full compensation for cleaning and sprinkling the area to be primed; materials, including blotter material; and rolling, equipment, labor, tools, and incidentals.
202.7. BID ITEM:
Item 202.1 - Prime Coat - per gallon
Item 202.2 - Prime Coat and Blotter - per gallon
June 2008 Item 202 Prime Coat
City of San Antonio Standard Specifications for Construction 49
203 TACK COAT
203.1. DESCRIPTION: Apply asphaltic material on the completed base course after the prime coat has sufficiently cured, existing pavement, bituminous surface, or in the case of a bridge, on the prepared floor slab in accordance with these specifications and/or as directed by the Engineer.
203.2. MATERIALS: The asphaltic material used for Tack Coat shall meet the requirements for "Asphalt Cement", "Cut-Back Asphalt" or "Emulsified Asphalt" in Item No. 300, "Asphalts, Oils and Emulsions" of the Texas Department of Transportation Standard Specifications. The asphaltic material used for Tack Coat shall be the type or grade shown in the referring specification, or on the plans, or as directed/approved by the Engineer.
203.3. EQUIPMENT: Provide equipment that conforms to the requirements of Item 202, "Prime Coat," Part 3, "Equipment."
203.4. CONSTRUCTION: Before the tack coat is applied, the surface shall be cleaned thoroughly with a vacuum sweeper to the satisfaction of the Engineer. The asphaltic material shall be applied on the clean surface by an approved type of self-propelled pressure distributor evenly and smoothly under a pressure necessary for proper distribution.
The tack coat shall be applied at the rate specified by the referring specification or on the plans.
Unless otherwise stated or allowed by the Engineer the application rate shall not exceed 0.10 gallon per square yard of surface.
Where the pavement mixture will adhere to the surface on which it is to be placed without the use of a tack coat, the tack coat may be eliminated by the Engineer. All contact surfaces of curbs and structures and all joints shall be painted with a thin uniform coat of the asphaltic material used for tack coat. During the application of tack coat, care shall be taken to prevent splattering of adjacent pavement, curb and gutters or structures.
203.5. MEASUREMENT: The asphaltic material for tack coat will be measured at point of delivery on the project in gallons at the applied temperature. The quantity to be paid for shall be the number of gallons of asphaltic material used, as directed, in the accepted tack coat. Water used with Emulsions will not be measured for payment.
203.6. PAYMENT: The work performed and materials furnished as prescribed by this item will be paid for at the contract unit price bid per gallon for "Tack Coat" which price shall be full compensation for cleaning the surface, for furnishing, heating, hauling and distributing the tack coat as specified; for all freight involved; and for all manipulations, labor, tools, equipment, and incidentals necessary to complete the work.
203.7. BID ITEM:
Item 203.1 - Tack Coat - per gallon
June 2008 Item 203 Tack Coat
City of San Antonio Standard Specifications for Construction 55
205 HOT MIX ASPHALTIC CONCRETE PAVEMENT
205.1. DESCRIPTION: Construct a leveling-up course, a surface course or any combination of these courses as shown on the plans, each to be composed of a compacted mixture of mineral aggregate and asphaltic material. The pavement shall be constructed on the newly constructed subgrade or base course, existing pavement, bituminous surface or in the case of bridges, on the prepared floor slab, as herein specified and in accordance with the details shown on the plans.
205.2. MATERIALS: Materials used in Hot Mix Asphaltic Concrete Pavement shall meet the requirements as set forth herein. If shown on ti)e plans, materials may also meet the requirements as described in Item 340, "Dense-Graded Hot-Mix Asphalt (Method)" or Item 341, "Dense Graded Hot-Mix Asphalt (QC/QA)" of the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges.
Unless otherwise shown on the plans, provide aggregates that meet the aggregate quality requirements of TxDOT's Bituminous Rated Source Quality Catalog (BRSQC). Unapproved sources may be used if accepted by the Engineer and approved prior to use.
Furnish aggregates from sources that conform to the requirements shown in Table 1 herein, and as specified in this Section, unless otherwise shown on the plans. Provide aggregate stockpiles that meet the definition in this Section for either a coarse aggregate or fine aggregate. When reclaimed asphalt pavement (RAP) is used, provide RAP stockpiles in accordance with this Section. Aggregate from RAP is not required to meet Table 1 requirements unless otherwise shown on the plans.
Document all test results on a mixture design report and submit to the Engineer for approval. The Engineer may perform tests on independent or split samples to verify Contractor mix design results. Stockpile aggregates for each source and type separately. Determine aggregate gradations for mixture design and production testing based on the washed sieve analysis given in TxDOT standard laboratory test procedure Tex-200-F, Part II. Do not add material to an approved stockpile from other sources, unless otherwise approved by the Engineer.
Unless otherwise shown on the plans, reclaimed asphalt pavement (RAP) may be used in asphalt pavement maintenance or rehabilitation applications and shall be limited to a maximum of 20% RAP for surface or wearing courses and 30% RAP for courses below the surface or wearing course. Higher percentages of RAP may be used if requested in writing and approved by the Engineer prior to use.
A. Coarse Aggregate. Coarse aggregate stockpiles must have no more than 20% passing the #8 sieve. Provide aggregates with a surface aggregate classification (SAC) as shown below:
June 2008
Street Classification Primary and Secondary Arterials Collector and Local Type B Streets Local Type A Street With Bus Traffic Local Type A Street Without Bus Traffic
Minimum Surface Aggregate Classification A B B C
Item 205 Hot Mix Asphaltic Concrete Pavement
City of San Antonio Standard Specifications for Construction 56
SAC requirements apply only to aggregates used on the surface of travel lanes, unless otherwise shown on the plans. Blending aggregates to meet SAC criteria is allowable. Class B aggregate meeting all other requirements in Table 1 may be blended with a Class A aggregate in order to meet requirements for Class A materials. When blending Class A and B aggregates to meet a Class A requirement, ensure that at least 50% by weight of the material retained on the No. 4 sieve comes from the Class A aggregate source. Blend by volume if the bulk specific gravities of the Class A and B aggregates differ by more than 0.300. When blending, do not use Class C or D aggregates. For blending purposes, coarse aggregate from RAP will be considered as Class B aggregate.
B. Reclaimed Asphalt Pavement (RAP). RAP is defined as a salvaged, pulverized, broken or crushed asphalt pavement. The RAP to be used in the mix shall be crushed or broken to the extent that 100% will pass the two inch sieve.
The stockpiled RAP shall not be contaminated by dirt or other objectionable materials.
Unless otherwise shown on the plans, stockpiled, crushed RAP…