Cost_table_- Merjent.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
Ecological Services
Contract number
395002-O24-0510574-000
Issued by
Wisconsin

About this file

This document is a contract cost worksheet and price proposal from Merjent submitted in response to RFP 510574, which appears to be a state contract vehicle for ecological and environmental services. The document contains detailed pricing structures across multiple service categories including bat and asbestos inspections for bridges, ecological assessments, rare species surveys, wetland services, and various environmental management activities. Merjent has structured their proposal with 22 different rate classifications ranging from field technicians to contract managers, with hourly rates spanning from $24.04 for Field Technician I to $93.84 for Engineer III positions.

The contract encompasses a comprehensive range of environmental services with both lump sum and hourly rate pricing structures. Bridge inspection services are priced on a tiered system, with combined bat and asbestos inspections ranging from $10,900 to $13,970 per structure depending on project size, while bat-only inspections range from $5,900 to $7,470 per structure. The proposal includes detailed cost breakdowns for ten specific project scenarios covering ecological assessments, prairie management, wetland delineation and monitoring, and large-scale functional planting projects. Merjent applies a 123.64% overhead rate and 12% profit margin to direct labor costs, with no markup on subcontractor costs or direct expenses. The total estimated annual contract value across all service categories reaches approximately $17.95 million, with the largest component being ecological services at $16.89 million and bat inspection services at $1.04 million based on projected annual demand.

View the file

Other files

File Type Posted
GEI_CostProposal_510574.xlsx XLSX spreadsheet
REL _RFP_510574_Cost_table.xlsx XLSX spreadsheet
Stantec._Cost_Proposal.xlsx XLSX spreadsheet
TRC - RFP_510574_Cost_table.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Contract Cost Worksheet--RFP 510574 Attachment 1
INSTRUCTIONS Return as Excel Spreadsheet! Do not reformat.
Fill in only those cells highlighted in blue. Cells in green are calculated.
Tab 1 Hourly Rates and CostsCell #
1. Fill in firm nameB2
2. Fill in lump sum amount for Combined Bat and Asbestos Inspection per bridge structureB7, C7, D7, E7
3. Fill in lump sum amount for Combined Bat and Asbestos Inspection per bridge structure, two person or confined spaceB8, C8, D8, E8
4. Fill in lump sum amount for Bat inspection without asbestos inspection per bridge structureB9, C9, D9, E9
5. Fill in lump sum amount for Bat inspection without asbestos inspection per bridge structure, confined spaceB10, C10, D10, E10
6. Fill in proposed overhead rateB60
7. Fill in proposed profit percentage as a whole number, field is formatted as a percentageB62
Tab 2 Classifications in TitlesCell #
1. Fit each of your current employee classifications into one of the Twenty Two contract Rate TitlesB6 through W15
2. Put no more than ten classifications into each rate category.
3. Leave unused cells blank.
Tab 3 Average Wage Rate CalcCell #
1. Enter the direct hourly wage rate (without overhead or profit) for each classification entered in Tab 2Columns D, F, H, J, L, N, P, R, T, V, Cells 8 through 29
2. Put a zero in any unused cell in column D
3. Leave all other unused cells blank
Tab 4 Staff HoursCell #
1. For each of the project scenarios (Section 4.4 Proposer Solutions), indicate the number of hours proposed for each rate title to complete the project.Columns B, G, L, and Q--Cells 8 through 29; AND Columns B, G, L, Q, V, and AA--Cells 40 through 61
2. Scenario 4.4.10 requires two cost estimates: 4.4.10 Functional Planting - Large Project, and 4.4.10A Functional Planting - Large Project Alternative Planting.
3. Put a 0 for any unused rate titles for a project.
Tab 5 Direct ExpensesCell #
1. For each of the project scenarios (Section 4.4 Proposer Solutions), indicate the direct expenses to be incurred to complete the project.Columns G through J--Cells 7 through 28 and 36 through 57;

Columns M through P--Cells 7 through 28 and 36 through 57;

Columns S through V--Cells 7 through 28 and 36 through 57;

Columns Y through AB--Cells 7 through 28 and 36 through 57;

Columns AE through AH--Cells 36 through 57;

And Columns AK through AN--Cells 36 through 57

2. Scenario 4.4.10 requires two cost estimates: 4.4.10 Functional Planting - Large Project, and 4.4.10A Functional Planting - Large Project Alternative Planting.
3. In the "Unit or Rate" columns, indicate whether the costs are incurred per "Unit" or as a "Rate"
4. Leave unused cells blank.
Tab 6 SubcontractorsCell #
1. For each of the project scenarios (Section 4.4 Proposer Solutions), indicate the subcontractor to be incurred to complete the project.Columns E through G--Cells 7 through 25 and 34 through 52;

Columns I through K--Cells 7 through 25 and 34 through 52;

Columns M through O--Cells 7 through 25 and 34 through 52;

Columns Q through S--Cells 7 through 25 and 34 through 52;

Columns U through W--Cells 34 through 52;

And Columns Y through AA--Cells 34 through 52

2. Scenario 4.4.10 requires two cost estimates: 4.4.10 Functional Planting - Large Project, and 4.4.10A Functional Planting - Large Project Alternative Planting.
3. Leave unused cells blank.
Tab 7 Cost Total
1. The firm does not input anything on this tab.
2. This tab pulls the total costs of the proposed scenarios, and uses information provided for certain rate titles, lump sums, and proposed overhead and profit rates to calculate a total cost proposal. See Section 6.1 for how scores will be assigned for cost proposals.

Tab 1 Hourly Rates and Costs

Contract Cost Package 2024
FIRM NAME:Merjent
INSTRUCTIONS: Return as Excel Spreadsheet! Do not reformat.
Fill in only those cells highlighted in blue. Cells in green are calculated.
Bat and Asbestos Inspections - Bridges Terms: Lump SumCost per single structureTwo to four structures, cost per structureFive to nine structures, cost per structureTen or more structures, cost per structure
Combined Bat and Asbestos inspection, per bridge structure (Terms:Lump Sum)$ 13,970.00$ 11,685.00$ 11,285.00$ 10,900.00
Asbestos and Bat inspection - Confined Space or Two Person project (for traffic control, water entry or other safety considerations)# Terms: Lump Sum$ 14,970.00$ 12,685.00$ 12,285.00$ 11,900.00# The determination of need for confined space entry, or two person team for traffic control, water entry, or other safety considerations will be made by the consultant.
Bat inspection of bridges without asbestos inspection (Terms: lump sum)$ 7,470.00$ 6,685.00$ 6,285.00$ 5,900.00
Bat inspection of bridges without asbestos inspection - Confined space # (Terms: lump sum)$ 7,470.00$ 6,685.00$ 6,285.00$ 5,900.00
NOTE: Structures requested at the same time in the same spreadsheet constitute a single request, number of structures for pricing is determined by number of structures in request, not number of project IDs. Prices for long, multiple-section structures such as the Hoan Bridge, Wisconsin River bridges, St Croix river bridges, and Mississippi River bridges, will be negotiated separately at the time of request.
Bat and Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Project StaffTerms: average direct hourly rate**the average direct hourly rate for each classification shall be the rate charged for the contract
Contract Manager$89.90Average Hourly Rate
Project Supervisor I$57.46Average Hourly Rate
Project Supervisor II$73.72Average Hourly Rate
Engineer I$36.07Average Hourly Rate
Engineer II$61.98Average Hourly Rate
Engineer III$93.84Average Hourly Rate
Hydrogeologist I$38.37Average Hourly Rate
Hydrogeologist II$45.05Average Hourly Rate
Hydrogeologist III$50.92Average Hourly Rate
Scientist I$25.41Average Hourly Rate
Scientist II$28.37Average Hourly Rate
Scientist III$33.21Average Hourly Rate
Field Technician I$24.04Average Hourly Rate
Field Technician II$28.37Average Hourly Rate
Field Technician III$36.32Average Hourly Rate
CADD/GIS I$49.66Average Hourly Rate
CADD/GIS II$65.43Average Hourly Rate
Accounting I$33.70Average Hourly Rate
Accounting II$47.71Average Hourly Rate
Administrative Support I$33.70Average Hourly Rate
Administrative Support II$47.71Average Hourly Rate
Asbestos Inspector$49.10Average Hourly Rate

Equipment and supplies Terms: direct expense, no markup

Subcontractor Costs Terms: actual cost, no markup

MileageTerms: current state reimbursement rate
Per mile, personal vehicle rate$0.51/mile
MealsTerms: current state reimbursement rate
Breakfast$ 10.00
Lunch$ 12.00
Dinner$ 23.00
LodgingTerms: current state reimbursement rate, excluding taxes
Per night$98.00
Per night, Milwaukee, Racine and Kenosha counties$103.00
Overhead
Proposed rate123.640%Percentage of Direct Labor
Profit Terms: percentage of labor and overhead, no profit on subcontractors or direct expenses
Proposed Rate12.000%Percentage of Direct Labor + Labor Overhead, NO PROFIT ON SUBCONTRACTORS OR DIRECT EXPENSES

Tab 2 Classifications in Titles Classifications included in average wage rate: (list each classification on a separate line, do not insert or delete rows, do not leave blank rows between classifications.)

Merjent Please fill in the actual titles of your staff. Limit 10 titles per classification

Rate Title:Contract ManagerProject Supervisor IProject Supervisor IIEngineer IEngineer IIEngineer IIIHydrogeologist IHydrogeologist IIHydrogeologist IIIScientist IScientist IIScientist IIIField Technician IField Technician IIField Technician IIICADD/GIS ICADD/GIS IIAccounting IAccounting IIAdministrative Support IAdministrative Support IIAsbestos Inspector
Classifications included in Rate Titles:EC9/RC9/NRS9.1EC5/RC5/NRS5.1EC7/RC7/NRS7.1Eng Tech I 1Eng Tech III/Eng II 1Eng V/Eng PM II 1EC3/RC3/NRS3.1EC4/RC4/NRS4.1NRT10.1EC1/RC1/NRS1.1NRT5.1EC2/RC2/NRS2.1RT3.1RT5.1RT7.1EC4/NRS4.1EC6/NRS6.1EC2EC4EC2EC4EC2
NRS9.2NRS5.2NRS7.2Eng Tech I 2Eng Tech III/Eng II 2Eng V/Eng PM II 2NRS3.2NRS4.2NRT10.2NRS1.2NRT5.2NRS2.2RT3.2RT5.2RT7.2NRS4.2NRS6.2EC3EC5EC3EC5EC3
EXAMPLE:PrincipalEC6/RC6/NRS6.1EC8/RC8/NRS8.1Eng Tech I 3Eng Tech III/Eng II 3Eng V/Eng PM II 3NRT8.1NRT9.1/RT9.1NRT10.3NRT4.1NRT6.1NRT7.1RT4.1RT6.1RT8.1EC5/NRS5.1EC7/NRS7.1EC4/NRS4.1
Rate Title: Scientist INRS6.2NRS8.2Eng Tech II/Eng I 1Eng Tech IV/Eng III/Eng PM I 1Eng VI/Eng PM III 1NRT8.2NRT9.2/RT9.2NRT4.2NRT6.2NRT7.2RT4.2RT6.2RT8.2NRS5.2NRS7.2NRS4.2
Classifications included in title: Staff scientist 1Eng Tech II/Eng I 2Eng Tech IV/Eng III/Eng PM I 2Eng VI/Eng PM III 2NRT9.3EC5/NRS5.1
ArboristEng Tech II/Eng I 3Eng Tech IV/Eng III/Eng PM I 3Eng VI/Eng PM III 3NRS5.2
Geologist 1Sr Eng Tech/Eng IV 1Sr Eng/Sr Eng PM 1EC6
Geologist 2Sr Eng Tech/Eng IV 2Sr Eng/Sr Eng PM 2EC7
Senior Project Technical 1Sr Eng Tech/Eng IV 3Sr Eng/Sr Eng PM 3
Senior Project Technical 2

Tab 3 Average Wage Rate Calc

MerjentFill in only those cells highlighted in blue. Cells in green are calculated.Do not alter or change the formulas.
Enter the hourly rate for each classification shown
Example:Average Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6
Scientist$17.52Staff Scientist 1$ 12.35Staff Scientist 2$ 13.50Staff Scientist 3$ 14.75Geologist 1$ 17.50Geologist 2$ 23.50Senior Project Technical$ 23.50
TitleAverage Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6Classification 7Hourly Rate 7Classification 8Hourly Rate 8Classification 9Hourly Rate 9Classification 10Hourly Rate 10
Contract Manager$89.90EC9/RC9/NRS9.1$ 84.93NRS9.2$ 86.58Principal$ 98.200000000
Project Supervisor I$57.46EC5/RC5/NRS5.1$ 52.04NRS5.2$ 55.49EC6/RC6/NRS6.1$ 58.93NRS6.2$ 63.38000000
Project Supervisor II$73.72EC7/RC7/NRS7.1$ 67.84NRS7.2$ 71.56EC8/RC8/NRS8.1$ 75.27NRS8.2$ 80.22000000
Engineer I$36.07Eng Tech I 1$ 29.09Eng Tech I 2$ 31.26Eng Tech I 3$ 33.43Eng Tech II/Eng I 1$ 38.38Eng Tech II/Eng I 2$ 40.88Eng Tech II/Eng I 3$ 43.380000
Engineer II$61.98Eng Tech III/Eng II 1$ 48.28Eng Tech III/Eng II 2$ 50.76Eng Tech III/Eng II 3$ 53.23Eng Tech IV/Eng III/Eng PM I 1$ 58.19Eng Tech IV/Eng III/Eng PM I 2$ 62.02Eng Tech IV/Eng III/Eng PM I 3$ 65.86Sr Eng Tech/Eng IV 1$ 70.81Sr Eng Tech/Eng IV 2$ 73.16Sr Eng Tech/Eng IV 3$ 75.520
Engineer III$93.84Eng V/Eng PM II 1$ 80.47Eng V/Eng PM II 2$ 82.94Eng V/Eng PM II 3$ 85.42Eng VI/Eng PM III 1$ 90.37Eng VI/Eng PM III 2$ 93.47Eng VI/Eng PM III 3$ 96.56Sr Eng/Sr Eng PM 1$ 101.51Sr Eng/Sr Eng PM 2$ 105.10Sr Eng/Sr Eng PM 3$ 108.690
Hydrogeologist I$38.37EC3/RC3/NRS3.1$ 36.50NRS3.2$ 39.94NRT8.1$ 37.48NRT8.2$ 39.55000000
Hydrogeologist II$45.05EC4/RC4/NRS4.1$ 43.38NRS4.2$ 47.71NRT9.1/RT9.1$ 42.65NRT9.2/RT9.2$ 44.72NRT9.3$ 46.7900000
Hydrogeologist III$50.92NRT10.1$ 48.85NRT10.2$ 50.92NRT10.3$ 52.990000000
Scientist I$25.41EC1/RC1/NRS1.1$ 24.02NRS1.2$ 27.46NRT4.1$ 24.56NRT4.2$ 25.59000000
Scientist II$28.37NRT5.1$ 26.62NRT5.2$ 27.92NRT6.1$ 28.95NRT6.2$ 29.98000000
Scientist III$33.21EC2/RC2/NRS2.1$ 30.90NRS2.2$ 33.70NRT7.1$ 33.09NRT7.2$ 35.15000000
Field Technician I$24.04RT3.1$ 22.49RT3.2$ 23.52RT4.1$ 24.56RT4.2$ 25.59000000
Field Technician II$28.37RT5.1$ 26.62RT5.2$ 27.92RT6.1$ 28.95RT6.2$ 29.98000000
Field Technician III$36.32RT7.1$ 33.09RT7.2$ 35.15RT8.1$ 37.48RT8.2$ 39.55000000
CADD/GIS I$49.66EC4/NRS4.1$ 43.38NRS4.2$ 47.71EC5/NRS5.1$ 52.04NRS5.2$ 55.49000000
CADD/GIS II$65.43EC6/NRS6.1$ 58.93NRS6.2$ 63.38EC7/NRS7.1$ 67.84NRS7.2$ 71.56000000
Accounting I$33.70EC2$ 30.90EC3$ 36.5000000000
Accounting II$47.71EC4$ 43.38EC5$ 52.0400000000
Administrative Support I$33.70EC2$ 30.90EC3$ 36.5000000000
Administrative Support II$47.71EC4$ 43.38EC5$ 52.0400000000
Asbestos Inspector$49.10EC2$ 30.90EC3$ 36.50EC4/NRS4.1$ 43.38NRS4.2$ 47.71EC5/NRS5.1$ 52.04NRS5.2$ 55.49EC6$ 58.93EC7$ 67.8400

Tab 4 Staff Hours

For each Proposer Solution (Section 4.4) enter the number of hours per Rate Title. Total Direct Expenses and Subcontractors will be entered on subsequent tabs.
Fill in only those cells highlighted in blue. Cells in green are calculated.
There are 10 scenarios to provide Staff Hours information for: 4.4.2, 4.4.3, 4.4.4, 4.4.5, 4.4.6, 4.4.7, 4.4.8, 4.4.9, 4.4.10, and 4.4.10A
4.4.2 ESA Biological assessment4.4.3 Rare Species Survey4.4.4 Roadside remnant prairie and invasive species management4.4.5 Roadside facilities tree management and planting
ClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal Cost
Contract Manager3$ 89.90$ 269.71Contract Manager1$ 89.90$ 89.90Contract Manager3$ 89.90$ 269.71Contract Manager4$ 89.90$ 359.61
Project Supervisor I167$ 57.46$ 9,595.97Project Supervisor I30$ 57.46$ 1,723.83Project Supervisor I21$ 57.46$ 1,206.68Project Supervisor I24$ 57.46$ 1,379.06
Project Supervisor II85$ 73.72$ 6,266.32Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0
Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0
Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0
Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0
Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0
Hydrogeologist II$ 45.05$ - 0Hydrogeologist II12$ 45.05$ 540.60Hydrogeologist II$ 45.05$ - 0Hydrogeologist II$ 45.05$ - 0
Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0
Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0
Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0
Scientist III$ 33.21$ - 0Scientist III$ 33.21$ - 0Scientist III19$ 33.21$ 630.99Scientist III46$ 33.21$ 1,527.65
Field Technician I$ 24.04$ - 0Field Technician I$ 24.04$ - 0Field Technician I148$ 24.04$ 3,557.92Field Technician I184$ 24.04$ 4,423.36
Field Technician II$ 28.37$ - 0Field Technician II$ 28.37$ - 0Field Technician II68$ 28.37$ 1,928.99Field Technician II176$ 28.37$ 4,992.68
Field Technician III$ 36.32$ - 0Field Technician III$ 36.32$ - 0Field Technician III12$ 36.32$ 435.81Field Technician III56$ 36.32$ 2,033.78
CADD/GIS I15$ 49.66$ 744.83CADD/GIS I6$ 49.66$ 297.93CADD/GIS I7$ 49.66$ 347.59CADD/GIS I4$ 49.66$ 198.62
CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0
Accounting I$ 33.70$ - 0Accounting I$ 33.70$ - 0Accounting I1$ 33.70$ 33.70Accounting I2$ 33.70$ 67.40
Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0
Administrative Support I$ 33.70$ - 0Administrative Support I3$ 33.70$ 101.10Administrative Support I$ 33.70$ - 0Administrative Support I$ 33.70$ - 0
Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0
Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0
Direct Expenses$ - 0Direct Expenses$ 151.00Direct Expenses$ 4,200.00Direct Expenses$ 27,350.00
Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0
Overhead$ 20,866.51Overhead$ 3,404.25Overhead$ 10,399.83Overhead$ 18,523.95
Profit$ 4,529.20Profit$ 738.91Profit$ 2,257.35Profit$ 4,020.73
Total Cost 4.4.2$ 42,272.54Total Cost 4.4.3$ 7,047.52Total Cost 4.4.4$ 25,268.56Total Cost 4.4.5$ 64,876.85
4.4.6 Roadside facilities prairie management and planting4.4.7 Wetland Delineation4.4.8 Wetland Monitoring4.4.9 Stream Features Worksheet4.4.10 Functional Planting - Large Project4.4.10A Functional Planting - Large Project Alternate Planting
ClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal CostClassificationTotal Number of HoursRateTotal Cost
Contract Manager5$ 89.90$ 449.52Contract Manager1$ 89.90$ 89.90Contract Manager8$ 89.90$ 719.23Contract Manager1$ 89.90$ 89.90Contract Manager5$ 89.90$ 449.52Contract Manager$ 89.90$ - 0
Project Supervisor I10$ 57.46$ 574.61Project Supervisor I7$ 57.46$ 402.23Project Supervisor I$ 57.46$ - 0Project Supervisor I6$ 57.46$ 344.77Project Supervisor I23$ 57.46$ 1,321.60Project Supervisor I$ 57.46$ - 0
Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0Project Supervisor II$ 73.72$ - 0
Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0Engineer I20$ 36.07$ 721.37Engineer I$ 36.07$ - 0Engineer I$ 36.07$ - 0
Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0Engineer II$ 61.98$ - 0
Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0Engineer III$ 93.84$ - 0
Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0Hydrogeologist I138$ 38.37$ 5,294.63Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0Hydrogeologist I$ 38.37$ - 0
Hydrogeologist II$ 45.05$ - 0Hydrogeologist II$ 45.05$ - 0Hydrogeologist II$ 45.05$ - 0Hydrogeologist II10$ 45.05$ 450.50Hydrogeologist II$ 45.05$ - 0Hydrogeologist II$ 45.05$ - 0
Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0Hydrogeologist III$ 50.92$ - 0
Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0Scientist I$ 25.41$ - 0
Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0Scientist II$ 28.37$ - 0
Scientist III28$ 33.21$ 929.88Scientist III72.5$ 33.21$ 2,407.71Scientist III122$ 33.21$ 4,051.60Scientist III$ 33.21$ - 0Scientist III63$ 33.21$ 2,092.22Scientist III1$ 33.21$ 33.21
Field Technician I14$ 24.04$ 336.56Field Technician I$ 24.04$ - 0Field Technician I$ 24.04$ - 0Field Technician I$ 24.04$ - 0Field Technician I720$ 24.04$ 17,308.80Field Technician I3$ 24.04$ 72.12
Field Technician II67$ 28.37$ 1,900.62Field Technician II$ 28.37$ - 0Field Technician II$ 28.37$ - 0Field Technician II$ 28.37$ - 0Field Technician II412$ 28.37$ 11,687.41Field Technician II3$ 28.37$ 85.10
Field Technician III7$ 36.32$ 254.22Field Technician III$ 36.32$ - 0Field Technician III$ 36.32$ - 0Field Technician III$ 36.32$ - 0Field Technician III148$ 36.32$ 5,374.99Field Technician III$ 36.32$ - 0
CADD/GIS I8$ 49.66$ 397.24CADD/GIS I5$ 49.66$ 248.28CADD/GIS I20$ 49.66$ 993.11CADD/GIS I5$ 49.66$ 248.28CADD/GIS I6$ 49.66$ 297.93CADD/GIS I0.5$ 49.66$ 24.83
CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0CADD/GIS II$ 65.43$ - 0
Accounting I3$ 33.70$ 101.10Accounting I$ 33.70$ - 0Accounting I$ 33.70$ - 0Accounting I$ 33.70$ - 0Accounting I2$ 33.70$ 67.40Accounting I$ 33.70$ - 0
Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0Accounting II$ 47.71$ - 0
Administrative Support I$ 33.70$ - 0Administrative Support I3$ 33.70$ 101.10Administrative Support I$ 33.70$ - 0Administrative Support I3$ 33.70$ 101.10Administrative Support I$ 33.70$ - 0Administrative Support I$ 33.70$ - 0
Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0Administrative Support II$ 47.71$ - 0
Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0Asbestos Inspector$ 49.10$ - 0
Direct Expenses$ 8,535.00Direct Expenses$ 704.50Direct Expenses$ 1,533.60Direct Expenses$ 267.50Direct Expenses$ 43,880.00Direct Expenses$ 500.00
Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0Subcontract$ - 0
Overhead$ 6,112.45Overhead$ 4,017.33Overhead$ 13,672.80Overhead$ 2,418.29Overhead$ 47,724.88Overhead$ 266.15
Profit$ 1,326.74Profit$ 871.99Profit$ 2,967.76Profit$ 524.90Profit$ 10,358.97Profit$ 57.77
Total Cost 4.4.6$ 20,917.94Total Cost 4.4.7$ 8,843.04Total Cost 4.4.8$ 29,232.72Total Cost 4.4.9$ 5,166.61Total Cost 4.4.10$ 140,563.71Total Cost 4.4.10A$ 1,039.18

Tab 5 Direct Expenses

List each direct expense item individually, include quantity and unit or rate. Do not include mileage, lodging, or per diems.
Fill in only those cells highlighted in blue. Cells in green are calculated.0
There are 10 scenarios to provide Direct Expenses information for: 4.4.2, 4.4.3, 4.4.4, 4.4.5, 4.4.6, 4.4.7, 4.4.8, 4.4.9, 4.4.10, and 4.4.10A
Example4.4.2 ESA Biological assessment4.4.3 Rare Species Survey4.4.4 Roadside remnant prairie and invasive species management4.4.5 Roadside facilities tree management and planting
ItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotal
Photo Copies250per page$ 0.15$ 37.50$ - 0Mileage100per mile$ 0.51$ 51.00Crew Truck7Per Day$ 210.00$ 1,470.00Crew Truck21Per Day$ 210.00$ 4,410.00
PID Rental4per day$ 125.00$ 500.00$ - 0BreakfastUnit$ 10.00$ - 0Enclosed Trailer4Per Day$ 60.00$ 240.00Equipment Trailer7Per Day$ 100.00$ 700.00
Sample Jars75each$ 3.45$ 258.75$ - 0LunchUnit$ 12.00$ - 0Dump Trailer1Per Day$ 60.00$ 60.00Skid Steer5Per Day$ 380.00$ 1,900.00
Test Blank4each$ 7.00$ 28.00$ - 0DinnerUnit$ 23.00$ - 0UTV4Per Day$ 170.00$ 680.00Skid Steer Auger2Per Day$ 140.00$ 280.00
Trip Blank2each$ 7.00$ 14.00$ - 0GPS2Unit$ 50.00$ 100.00UTV Skid Sprayer3Per Day$ 60.00$ 180.00Skid Steep Grapple2Per Day$ 140.00$ 280.00
Dry ice6per pound$ 5.75$ 34.50$ - 0Lodging Per Diemper night$ 98.00$ - 0Bruschcutter3Per Day$ 30.00$ 90.00Chainsaw4Per Day$ 30.00$ 120.00
Cooler2each$ 12.50$ 25.00$ - 0$ - 0Bacpack Sprayer12Per Day$ 10.00$ 120.00Misc Hand Tools14Per Day$ 40.00$ 560.00
Method Blank2each$ 7.00$ 14.00$ - 0$ - 0Misc. Hand Tools4Per Day$ 40.00$ 160.00Lift (Rental)1Cost$ 4,500.00$ 4,500.00
Postage1package$ 6.75$ 6.75$ - 0$ - 0Chipper (Rental)1Cost$ 250.00$ 250.00Chipper (Rental)1Cost$ 1,500.00$ 1,500.00
$ - 0$ - 0$ - 0Herbicide, Surfactants, Dye1Cost$ 800.00$ 800.0025x Trees1Cost$ 10,500.00$ 10,500.00
$ - 0$ - 0$ - 0Dump Fee1Cost$ 150.00$ 150.00Mulch, Stakes, Guy Strap, ECB, Seed1Cost$ 1,000.00$ 1,000.00
Total Expenses$ 918.50$ - 0$ - 0$ - 0Gator Watering Bags1Cost$ 300.00$ 300.00
$ - 0$ - 0$ - 0Misc Maintenance Materials (strap, stakes, etc)1cost$ 150.00$ 150.00
$ - 0$ - 0$ - 0Herbicides and Pesticides1Cost$ 350.00$ 350.00
$ - 0$ - 0$ - 02x Replacement Trees1Cost$ 800.00$ 800.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Expenses$ - 0Total Expenses$ 151.00Total Expenses$ 4,200.00Total Expenses$ 27,350.00
4.4.6 Roadside facilities prairie management and planting4.4.7 Wetland Delineation4.4.8 Wetland Monitoring4.4.9 Stream Features Worksheet4.4.10 Functional Planting - Large Project4.4.10A Functional Planting - Large Project Alternate Planting
ItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotalItemQuantityUnit or RateUnit CostTotal
Crew Truck5.5Per Day$ 210.00$ 1,155.00Mileage450per mile$ 0.51$ 229.50Mileage360per mile$ 0.51$ 183.60Mileage250per mile$ 0.51$ 127.50Crew Truck60Per Day$ 210.00$ 12,600.00#5 Container Oak Trees1Cost$ 450.00$ 450.00
Enclosed Trailer4Per Day$ 60.00$ 240.00Breakfast5Unit$ 10.00$ 50.00BreakfastUnit$ 10.00$ - 0Breakfast2Unit$ 10.00$ 20.00Enclosed Trailer20Per Day$ 60.00$ 1,200.00Tree Cages1Cost$ 50.00$ 50.00
Equipment Trailer0.5Per Day$ 100.00$ 50.00Lunch5Unit$ 12.00$ 60.00LunchUnit$ 12.00$ - 0Lunch2Unit$ 12.00$ 24.00Equipment Trailer19Per Day$ 100.00$ 1,900.00$ - 0
UTV4Per Day$ 170.00$ 680.00Dinner5Unit$ 23.00$ 115.00DinnerUnit$ 23.00$ - 0Dinner2Unit$ 23.00$ 46.00UTV8Per Day$ 170.00$ 1,360.00$ - 0
UTV Skid Sprayer1.5Per Day$ 60.00$ 90.00GPS5Unit$ 50.00$ 250.00GPS7Unit$ 50.00$ 350.00GPS1Unit$ 50.00$ 50.00UTV Skid Sprayer1Per Day$ 60.00$ 60.00$ - 0
UTV Pull-Behind Mower2.5Per Day$ 60.00$ 150.00Lodging Per Diemper night$ 98.00$ - 0Lodging Per Diemper night$ 98.00$ - 0Lodging Per Diemper night$ 98.00$ - 0Zero Turn Mower10Per Day$ 265.00$ 2,650.00$ - 0
Backpack Sprayer2Per Day$ 10.00$ 20.00$ - 0Data Logger10Unit$ 100.00$ 1,000.00$ - 0Skid Steer Grapple1Per Day$ 140.00$ 140.00$ - 0
0-100 HP Tractor0.5Per Day$ 480.00$ 240.00$ - 0$ - 0$ - 0Skid Steer Mower1Per Day$ 140.00$ 140.00$ - 0
8' Native No-Tll Seed Drill0.5Per Day$ 120.00$ 60.00$ - 0$ - 0$ - 0Skid Steer9Per Day$ 380.00$ 3,420.00$ - 0
WisDOT 70 Seed Mix1Cost$ 5,250.00$ 5,250.00$ - 0$ - 0$ - 0Rotary Tiller4Per Day$ 150.00$ 600.00$ - 0
Herbicide1Cost$ 600.00$ 600.00$ - 0$ - 0$ - 0Fabric Trencher3Per Day$ 200.00$ 600.00$ - 0
$ - 0$ - 0$ - 0$ - 00-100 HP Tractor7Per Day$ 480.00$ 3,360.00$ - 0
$ - 0$ - 0$ - 0$ - 0Misc Hand Tools33Per Day$ 40.00$ 1,320.00$ - 0
$ - 0$ - 0$ - 0$ - 0Backpack Sprayer18Per Day$ 10.00$ 180.00$ - 0
$ - 0$ - 0$ - 0$ - 0Forestry Mulcher Head (Rental)1Cost$ 1,200.00$ 1,200.00$ - 0
$ - 0$ - 0$ - 0$ - 0Bare Root Shrubs/Live Stakes (Install)1Cost$ 5,300.00$ 5,300.00$ - 0
$ - 0$ - 0$ - 0$ - 0Bare Root Shrubs/Live Stakes (Replants)1Cost$ 1,800.00$ 1,800.00$ - 0
$ - 0$ - 0$ - 0$ - 0Herbicide1Cost$ 550.00$ 550.00$ - 0
$ - 0$ - 0$ - 0$ - 0Weed Barrier Fabric and Staples1Cost$ 4,000.00$ 4,000.00$ - 0
$ - 0$ - 0$ - 0$ - 0Pea Gravel Mulch1Cost$ 1,200.00$ 1,200.00$ - 0
$ - 0$ - 0$ - 0$ - 0Plant Skydd1Cost$ 200.00$ 200.00$ - 0
$ - 0$ - 0$ - 0$ - 0Root Dip1Cost$ 100.00$ 100.00$ - 0
Total Expenses$ 8,535.00Total Expenses$ 704.50Total Expenses$ 1,533.60Total Expenses$ 267.50Total Expenses$ 43,880.00Total Expenses$ 500.00

Tab 6 Subcontractors

List each Subcontracted item individually, include quantity and unit or rate. Do not include mileage, lodging, or per diems.
Fill in only those cells highlighted in blue. Cells in green are calculated.0
There are 10 scenarios to provide Subcontractor information for: 4.4.2, 4.4.3, 4.4.4, 4.4.5, 4.4.6, 4.4.7, 4.4.8, 4.4.9, 4.4.10, and 4.4.10A
Example4.4.2 ESA Biological assessment4.4.3 Rare Species Survey4.4.4 Roadside remnant prairie and invasive species management4.4.5 Roadside facilities tree management and planting
SubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotal
XYZ AnalyticalLaboratory Analysis$ 1,745.00
Green Drilling175' direct push borings$ 3,550.00
FGH Researchdatabase research$ 450.00
$ 5,745.00

Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0

4.4.6 Roadside facilities prairie management and planting4.4.7 Wetland Delineation4.4.8 Wetland Monitoring4.4.9 Stream Features Worksheet4.4.10 Functional Planting - Large Project4.4.10A Functional Planting - Large Project Alternate Planting
SubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotalSubcontractorTaskTotal

Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0 Total Subcontract $ - 0

Tab 7 Cost Total

Bat inspections, per bridge structure (lump sum)Cost per single structureTwo to four structures, cost per structureFive to nine structures, cost per structureTen or more structures, cost per structure
$ 7,470.00$ 6,685.00$ 6,285.00$ 5,900.00
Bat Inspection Market Basket (based on 5 year daily request totals)59502321$ 1,043,435.00Total bat inspection cost
Program management assistance* based on estimated annual program needs
TitleHours *Average RateCostOverheadProfitTotal
Administrative Support I100$ 33.70$ 3,370.00$ 4,166.67$ 904.40$ 8,441.07
Contract Manager25$ 89.90$ 2,247.58$ 2,778.91$ 603.18$ 5,629.67
Project Supervisor I25$ 57.46$ 1,436.52$ 1,776.12$ 385.52$ 3,598.15
CADD/GIS I50$ 49.66$ 2,482.77$ 3,069.70$ 666.30$ 6,218.76
Accounting I8$ 33.70$ 269.60$ 333.33$ 72.35$ 675.29
Total Program Management Assistance Cost$ 17,668.89
Ecological ServicesCostMarket BasketExtended Cost
4.4.2 ESA Biological assessment$ 42,272.547295907.772149311
4.4.3 Rare Species Survey$ 7,047.52130916177.975663555
4.4.4 Roadside remnant prairie and invasive species management$ 25,268.561383487061.62395918
4.4.5 Roadside facilities tree management and planting$ 64,876.85191232660.23319968
4.4.6 Roadside facilities prairie management and planting$ 20,917.9417355605.034116777
4.4.7 Wetland Delineation$ 8,843.042141892410.37702624
4.4.8 Wetland Monitoring$ 29,232.72501461636.12869184
4.4.9 Stream Features Worksheet$ 5,166.61525833.0485306503
4.4.10 Functional Planting - Large Project$ 141,602.89517221747.42113984
Total Ecological Services Cost$ 16,889,039.61
FIRM Name:Merjent
Total Cost$ 17,950,143.51