Conceptual_site_plans_Artisan_and_Rye.pdf
PDF 2 MB Posted
- Solicitation number
- 2502-02
- Issued by
- Manatee County, Florida
About this file
This document is a set of conceptual site plans and renderings for Artisan Lakes Elementary and Rye Ranch Elementary School prototypes, prepared for the School District of Manatee County, Florida. The project involves Construction Management at Risk services for two new elementary schools, each designed to accommodate 982 student stations. The prototype design, originally developed by Harvard Jolly, Inc. for Collier County Public Schools' Bear Creek Elementary, will be adapted to serve the specific needs of the Manatee County School District. The schools are planned as two-story facilities, with Bear Creek Elementary serving as the reference model, featuring 122,469 gross square feet and 954 student stations. Key design milestones include site plan approval by October 1, 2023, construction documents released for bidding by December 20, 2023, and bid reception by March 3, 2023, with construction for Bear Creek Elementary scheduled to start on May 9, 2024.
The site plans reveal detailed layouts for both schools, emphasizing safety and functionality with features such as a single point of entry administration area, enhanced hurricane protection, and adherence to the 2023 8th Edition building code. The conceptual renderings showcase modern architectural designs with curved entry areas, extensive glazing, and integrated landscape elements like palm trees and carefully planned circulation routes. Both schools are designed in the wind-borne debris region with wind resistance specifications of 100 MPH per ICC-500 standards. The sites include comprehensive infrastructure such as car and bus loops, play areas for different age groups, optional pre-K wings, central energy plants, and designated parking areas. The flexible prototype design allows for adaptations based on individual school district standards and specific site requirements.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAME OF PROJECT
Bear Creek Elementary School (CCPS Elementary School L)
LOCATION OF PROJECT (SITE ADDRESS)
2320 Moulder Dr Naples, FL 34120
NUMBER OF STORIES | GROSS SQUARE FEET | NUMBER OF STUDENT STATIONS
2-story 122,469 GSF | 954 Student Stations
DATE OF DESIGN NOTICE TO PROCEED
July 28, 2023
DATE OF KEY MILESTONES DURING THE DESIGN PHASE INCLUDING 100%
CONSTRUCTION DOCUMENTS.
Site Plan Approval 100% CD's released for Bidding Bids Received
October 1, 2023 December 20, 2023 March 3, 2023
DATE CONSTRUCTION STARTED AND FINISHED
Bear Creek Elementary May 9, 2024.
Previous four schools were completed in 2013.
ENHANCED HURRICANE PROTECTION AREA (EHPA) : Yes
WIND-BORNE DEBRIS REGION
Per ICC-500 (9 LB 2x4) 100MPH
BUILDING CODE EDITION DESIGNED AND PERMITTED UNDER
2023 8th Edition
PROTOTYPE INFORMATION
BEAR CREEK ES SITE PLAN
2’
-0
447’-0”
ARTISAN LAKES - CONCEPTUAL SITE PLAN
SCHOOL ENTRANCE
1. ADMINISTRATION -
SINGLE POINT OF ENTRY
2. MEDIA
3. 2 STORY CLASSROOM
BUILDING
4. KITCHEN & DINING
5. OPTIONAL PRE-K WING
6. COVERED PLAY
7. CENTRAL ENERGY PLANT
8. K-2 PLAY
9. 3-5 PLAY
10. CAR LOOP
11. BUS LOOP & SERVICE
DRIVE
RYE RANCH - CONCEPTUAL SITE PLAN
SCHOOL ENTRANCE
1. ADMINISTRATION - SINGLE
POINT OF ENTRY
2. MEDIA
3. 2 STORY CLASSROOM
BUILDING
11 4. KITCHEN & DINING
6 7
5. OPTIONAL PRE-K WING
6. COVERED PLAY
7. CENTRAL ENERGY PLANT
1 8. K-2 PLAY
4 3
9. 3-5 PLAY
10. CAR LOOP
11. BUS LOOP & SERVICE
DRIVE
12. ACCESS TO ADJACENT
PARK
RYE RANCH - CONCEPTUAL RENDERING - BIRDSEYE
RYE RANCH - CONCEPTUAL RENDERING - ENTRY
RYE RANCH - CONCEPTUAL RENDERING - OVERALL
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
File details come from the government source that posted it. Updated .