CN-730000-P0144-A5.pdf
PDF 3 MB Posted
- Contract number
- P0144
- Issued by
- Florida
About this file
This document is a contract amendment between the Florida Department of Revenue and The Sanborn Map Company, specifically Amendment No. 5 for Task Order #5 under Contract #P0144. The contract involves the Florida County Digital Orthophotography Program (FCDOP) and focuses on digital orthoimagery services for nine counties: Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee, and Taylor, known as Project Area 1.
The amendment increases the contract value by $498,212.00, bringing the total contract value to $1,201,900.73, subject to fund availability. The project involves acquiring 6-inch resolution digital orthoimagery using multispectral aerial photography, with specific technical requirements including collection during the October 1, 2021 to March 15, 2022 flight season, establishing ground control points, developing a digital elevation model (DEM), and delivering uncompressed 4-band TIFF images. The pricing is set at $71.50 per square mile for approximately 6,968 square miles, with deliverables to be completed by May 31, 2022, and the contract effective from October 15, 2021 to June 30, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-730000-P0144-A1.pdf | ||
| CN-730000-P0117-A3.pdf | ||
| CN-730000-P0144-A4.pdf | ||
| CN-730000-P0144-A7.pdf | ||
| CN-730000-P0144-A8.pdf | ||
| CN-730000-P0144.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-730000-P0144-A2.pdf | ||
| CN-730000-P0144-A6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Amendment as revised 9/21/2021 1
Contract # P0144 AMENDMENT No.: 5
Task Order #5
THIS AMENDMENT, entered into between the State of Florida, Department of Revenue hereafter referred to as the “Department” and, The Sanborn Map Company, hereafter referred to as the “contractor”, amends Contract # P0144. This Amendment 5 / Task Order 5 cancels and replaces in its entirety, Amendment 4 - Task Order 4.
In accordance with Section III, E and Section II, A of the Contract, the parties mutually agree that:
Task Order 5 is incorporated into this amendment to provide the funding for Task Order 5. This Task Order provides for aerial digital orthoimagery for Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee and Taylor counties, known as Project Area 1.
This contract amendment 5 increases the amount of the contract by $498,212.00. The value of the amended contract shall not to exceed $1,201,900.73, subject to the availability of funds.
All provisions not in conflict with this amendment are still in effect and are to be performed at the level and criteria specified in the contract.
The provisions of Chapter 287, Florida Statutes, are incorporated herein by reference.
This amendment shall begin on October 15, 2021 or the last date signed, whichever is later, and end on June 30, 2022.
This amendment is hereby made a part of the Contract # P0144.
IN WITNESS WHEREOF, the parties hereto have caused these nine (9) pages amendment to be executed by their officials thereunto duly authorized.
CONTRACTOR: DEPARTMENT OF REVENUE
Sanborn Map Company, Inc. STATE OF FLORIDA
SIGNED BY: SIGNED BY:
Authorized Signature NAME: NAME: Shannon C. Segers
TITLE: TITLE: Director, Office Financial Management
DATE: DATE:
FOR THE DEPARTMENT:
APPROVED AS TO FORM AND LEGAL CONTENT
OFFICE OF THE GENERAL COUNSEL
SIGNED BY: _______________________
Date: _______________________
Not valid until signed and dated by both parties
DocuSign Envelope ID: 7E0745AF-7F07-4F84-82DF-D802FE930C83
10/7/2021 | 10:59 AM EDT
10/11/2021 | 10:55 AM PDT
John Copple
CEO
10/11/2021 | 2:33 PM EDT
FEID Email:
Task Order Number :
PROJECT TITLE:
Task Order Term/Due Date
Contractor Name:
Contractor Contact: Phone: Email:
Task Description/Statement of Work: (Attach additional sheets if needed)
Deliverables:
Fixed Price Task Order:
Funding Source:
Invoicing & Financial Consequences: Or Refer to contract page # and paragraph where invoicing and financial consequences are stated
Phone:
Email:
Phone:
Email:
Phone:
FLORIDA DEPARTMENT OF REVENUE
for the Department:
Contract Manager:
Signature and Date:
Project Manager
Signature and Date:
Email:
Florida Department of Revenue
TASK ORDER ASSIGNMENT
Contract #
For the Contractor:
Signature of Contractor Representative and Date
This Task Order issued against Master Contract # Shown. Above-all terms and conditions remain unchanged.
Program
(Naming Convention: TO(01,02,03 etc) then FY) v2 10-2018.pd Contract Task Order Template
PurchasingManager
Signature and Date:
Email:
P0144 PTO
TO05 FY21/22
FY 2021/2022 Digital Orthophotography: Orthophoto Project Area 1
All final deliverables must be received within one hundred twenty (120) calendar days from the successful collection of aerial imagery or no later than June 1, 2022
The Sanborn Map Company Inc. F 133980333 - 002 ksapeta@sanborn.com
Ms. Krysia Sapeta (321) 613-2809 ksapeta@sanborn.com
FY 2021/2022 DIGITAL ORTHOPHOTOGRAPHY
Project Area 1 (Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee and Taylor) Provide Orthophotography as called for within the attached Scope of Work. Project area is approximately 6,968 square miles at the cost of $71.50 per square mile- total cost of this effort is $498,212.00.
Payment will made to the vendor upon final approval and acceptance of deliverables and a proper invoice
All deliverables will meet the requirements as stated in Request for Qualifications # 17/18-18 and contract P0144.
$498,212.00
ORG CODE 73310308251 - EO 01
Invoicing: refer to Contract P0144, page 1, section 1.C., page 6, Section Q, and page 9, Section B.
Financial Consequences: refer to Contract P0144, page 8, section Y.
Faith Ballard
Charles Russell
Ed Valla
850-617-8910
Faith.Ballard@floridarevenue.com
850-617-8867
Charles.Russell@floridarevenue.com
850-717-7567
Edwin.Valla@floridarevenue.com
John R. Copple / President-CEO jcopple@sanborn.com
DocuSign Envelope ID: 7E0745AF-7F07-4F84-82DF-D802FE930C83
10/6/2021 | 3:56 PM EDT
10/6/2021 | 4:10 PM EDT
10/7/2021 | 10:49 AM EDT
10/11/2021 | 10:55 AM PDT
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 1 of 7
September 29, 2021
Faith Ballard, FCCM Operations & Management Consultant, Contract Manager Property Tax Oversight (PTO) | Resource Management Florida Department of Revenue
(850) 617-8910 Faith.Ballard@floridarevenue.com
Re: FY 2021/2022 Digital Orthophotography: Orthophoto Project Area 1
Dear Ms. Ballard:
On behalf of The Sanborn Map Company, Inc. (Sanborn), it is my pleasure to provide you with this letter of interest to the Florida Department of Revenue (FDOR) for the FY 2021/2022 Digital Orthophotography: Project Area 1 (Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee and Taylor) under the Florida County Digital Orthophotography Program (FCDOP).
It has been Sanborn’s privilege to provide mapping services to FDOR since 2006 for digital orthoimagery development, and we are grateful for the opportunity to work with FDOR again. Sanborn is thoroughly familiar with FDOR specifications and your mapping needs, and our history of developing digital orthophotography for you offers a good model for guaranteed quality work and our commitment to schedule.
Project Area
The project area to be mapped consists of 7,770 5000 by 5000-foot tiles (cells) (approximately 6,968 square miles), as defined in the Group1_21_22.shp file issued by the
FDOR.
Time and Budget Requirements
We understand the mission-critical nature of this project, and the need to produce quality orthoimagery on time, on budget, and to your specifications. We are committed to acquire the imagery as soon as given notice to proceed, with completion of aerial imagery prior to January 30, 2022, and completion of all product deliveries no later than June 1, 2022. We have traditionally met or accelerated the previous project schedules. An overview of the schedule is provided on the following page.
mailto:Faith.Ballard@floridarevenue.com
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 2 of 7
Proposed Schedule Deliverable/Task Delivery Method Estimated Delivery
Date* Contract Executed Email ~October 15, 2021 Project Kick-off Meeting Web-based ~October 22, 2021 Imagery Acquisition Completed (weather permitting, flight window October 1 – January 30) Status report January 30, 2022
(complete) AT and Update or Development of New DEM Completed Status report February 28, 2022 Deliver Digital Copy of the Orthophotography Survey Report FTP/final drive NLT May 31, 2022 Deliver Four Band (RGBN) Orthophotography Image Tiles (GeoTIFF) Hard drive NLT May 31, 2022 Deliver Metadata XML File for Each Image Tile Hard drive NLT May 31, 2022 Deliver Final Surface Model Used to Rectify Photography Hard drive NLT May 31, 2022 Deliver Digital Files (Esri Shapefile format) Used for Survey Report Map Hard drive NLT May 31, 2022 Deliver Image Seamline Feature Class (Esri Shapefile format) Hard drive NLT May 31, 2022
* Final schedule dependent on contract execution and acquisition completion
Proximity to Project Location
At this time of year, we strategically move the required acquisition resources to the southern states of Florida, Georgia and South Carolina, to stay within close proximity of the projects scheduled for acquisition during the late fall/early winter. Sanborn owns and operates 11 aircraft and four (4) UltraCam Eagle imagery sensors, which provides assurance that the critical acquisition phase will be completed efficiently and on schedule.
Mr. Gary Eaton, Florida PSM No. LS0006319, will oversee the mapping from our Charlotte, North Carolina, office.
The orthophoto production will also be performed in our Charlotte office with additional resource production support from our Colorado Springs, Colorado, office.
Current and Projected Workload
Sanborn’s earned value management (EVM) environment, in addition to multiple supplementary tracking systems, enables integrated management of the entire project lifecycle. This project management and production tool is used to develop and track all project resources and the schedule throughout the life of the project, from design and proposal development, to implementation, and change management. Project schedules and resource allocations are modeled in the EVM as early as the proposal stage, then developed and maintained over the entire life of the project. For FDOR’s program, as the collection and processing moves through the timeframes, updates to the EVM allow Sanborn to reallocate resources if necessary and to direct additional assets to cover equipment failures, weather problems or changes in the capacity plan as a result of changes in the collection activity.
The graphs on the following pages illustrate our EVM resource analyses. The graphs show significant capacity for airborne imagery acquisition, airborne GPS/IMU processing, image processing (pre-rectification), aerotriangulation, compilation/GIS (DEM ingest and update), and imagery (post processing orthorectification). Based upon this analysis, Sanborn has plenty of capacity to take on the proposed scope of work.
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 3 of 7
Ja n-
Fe b-
M ar
-2
Ap r-
M ay
-2
Ju n-
Ju l-2
Au g-
Se p-
O ct
-2
No v-
De c-
Ho ur s Capacity Analysis: Acquisi�on/Survey
Total Capacity
Expected Workload
Ja n-
Fe b-
M ar
-2
A pr
-2
M ay
-2
Ju n-
Ju l-2
A ug
-2
Se p-
O ct
-2
No v-
De c-
Ho ur s
Capacity Analysis: Aerial Triangula�on (AT)
Total Capacity
Expected Workload
Ja n-
Fe b-
M ar
-2
A pr
-2
M ay
-2
Ju n-
Ju l-2
A ug
-2
Se p-
O ct
-2
No v-
De c-
Ho ur s
CapacityAnalysis: GPS IMU Processing
Total Capacity
Expected Workload
Ja n-
Fe b-
M ar
-2
A pr
-2
M ay
-2
Ju n-
Ju l-2
A ug
-2
Se p-
O ct
-2
No v-
De c-
Ho ur s
Capacity Analysis: Image Processing
Total Capacity
Expected Workload
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 4 of 7
Our current workload throughout all phases is as follows:
Ja n-
Fe b-
M ar
-2
A pr
-2
M ay
-2
Ju n-
Ju l-2
A ug
-2
Se p-
O ct
-2
No v-
De c-
Ho ur s Capacity Analysis: Compila�on/GIS
Total Capacity
Expected Workload
Ja n-
Fe b-
M ar
-2
A pr
-2
M ay
-2
Ju n-
Ju l-2
A ug
-2
Se p-
O ct
-2
No v-
De c-
Ho ur s
Capacity Analysis: Imaging
Total Capacity
Expected Workload
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 5 of 7
Scope of Work
All surveying and mapping work performed will meet the Standards of Practice Chapter 5J-17, F.A.C., pursuant to Chapter 472, Florida Statutes. Sanborn is committed to meet or exceed all quality and accuracy requirements as detailed in the Request for Proposal (RFP). The proposed project will include the following items and components:
Acquisition of new imagery using a digital aerial camera capable of collecting multispectral imagery in natural color (RGB bands) and near infrared (IR band N), with a resolution of 6-inches Collection of ABGPS/IMU-controlled vertical color imagery for this project will be performed by Sanborn with the advanced UltraCam Eagle digital aerial camera system with 3rd generation architecture. The fixed frame design and photogrammetric based engineering provides accuracy that will meet the required FDOR imagery specifications. All images will be obtained under cloud free conditions and will be free of obscuring haze, smoke or other atmospheric conditions. All images will be collected with a sun angle no less than 30 degrees. Imagery will be acquired at a density in the “high-rise” urban areas such that all road networks are clearly visible and that buildings show no signs of excessive tilt or lean
Acquisition of data during the specified flight season, from October 1, 2021, through March 15, 2022. Sanborn is committed to acquire the imagery prior to January 30, 2022, weather permitting
Establishment of new photo control points or recovery of a network of ground control as needed to support the Orthophoto mapping. A minimum of sixty-two (62) ground control points will be used and one-hundred-one (101) checkpoints evenly distributed throughout the project area1, for a total of one-hundred and sixty
(163) survey points Sanborn will utilize existing ground control on this project to the fullest extent possible, and augment it with new, photo-identifiable or targeted ground control points where needed. Using the ground control survey information, camera calibration information and Airborne GPS/Inertial Measurement Unit (AGPS/IMU) data acquired during the aerial flight, a Fully Analytical Aerial Triangulation (FAAT) solution will be completed, establishing the accuracy standards set by FDOR for updating or generating a new terrain model as needed, and creation of the orthoimagery
Unless otherwise approved, all Airborne GNSS/INS trajectory corrections will be directly referenced to the Florida Permanent Reference Network (FPRN)
Update and delivery of the existing lidar DEM, or development of a new DEM. Sanborn will ensure that the DEM used for the orthorectification will be up-to-date and accurate in order to support the 6-inch (1”=100’) resolution accuracy specification
Production of 6-inch Orthorectified image tiles, with four bands, consisting of 8-bits per band natural color (RGB) and near infrared (NIR)
Delivery of original source imagery as uncompressed 4-band TIFF images (RGBN) at the native bit-depth of the Eagle sensor
Development and delivery of a Seamline Feature Class Supplemental documentation, reports, and deliverables created as a part of the production process, as outlined in the RFP, including a survey report, signed and sealed by a Professional Surveyor Mapper (PSM), boresight calibration files, and metadata compliant with the Federal Geographic Data Committee's (FGDC) Content Standard for Digital Geospatial Metadata for each GeoTIFF image file and the DEM (which documents the source, enhancements made, and density of the DEMs utilized for the orthoimage production)
Data consistency and quality is of critical concern for every project. All Sanborn offices are ISO 9001:2015-certified and adhere to an established Quality Management System (QMS), ensuring a production workflow that produces exceptional quality. This is accomplished through rigorous quality testing of the interim dataset at all phases of the production process, and closed loop feedback communications with production staff to ensure our staff meet customer expectations and understand the FDOR’s specifications. Sanborn places an emphasis on problem prevention rather than dependence on detection after occurrence. Sanborn management will exercise tight control over the project, and coordinate our efforts with those of FDOR’s management and staff to ensure that this project is completed on time, to specification, and within budget
Quote-Budgetary Estimate Letter Template v5; 02/19/2021 Page 7 of 7
Appendix
The draft flight map and ground control design is provided below. Sanborn will utilize existing ground control on this project to the fullest extent possible, and augment it with new, ground control points where needed. The final ground control dataset will contain 62 ground control points and 101 checkpoints for a total of 163 ground control points evenly distributed over both counties.
| P0144_CH_A5_TO5(10.06.21).pdf |
| Blank Page |
| P0144_CH_A5FDOR proposal letter_updated_signed.pdf |
| FDOR proposal letter_BM_KS_mlm_KS_MLM_printed_Updated_KS_MLM_new.template_printed |
| FDOR proposal letter_signature |
File details come from the government source that posted it. Updated .