CN-730000-P0144-A2.pdf
PDF 4 MB Posted
- Contract number
- P0144
- Issued by
- Florida
About this file
This document is a Task Order Assignment from the Florida Department of Revenue for the Florida County Digital Orthophotography Program (FCDOP), specifically for Project Area 1 in Baker County during Fiscal Year 2019-2020. The contract is between the Florida Department of Revenue and The Sanborn Map Company, an ISO 9001:2015-certified mapping services company. The task order is part of a broader statewide initiative to provide aerial orthophotography to support property tax assessment and mapping efforts across Florida's 67 counties.
The task order involves acquiring high-resolution digital orthophotography for approximately 648 square miles in Baker County, with imagery to be collected between October 1, 2019, and March 15, 2020, at a resolution of 6 inches. The total contract value is $56,862, priced at $87.75 per square mile. The project requires collecting multispectral imagery in natural color (RGB) and near-infrared bands using an UltraCam Eagle digital aerial camera. Deliverables include uncompressed four-band GeoTIFF image tiles, a digital elevation model, ground control point survey, metadata, and a comprehensive survey report. The contract specifies strict technical requirements for image quality, horizontal and vertical accuracy, and adherence to federal and state mapping standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-730000-P0117-A3.pdf | ||
| CN-730000-P0144-A4.pdf | ||
| CN-730000-P0144-A7.pdf | ||
| CN-730000-P0144-A8.pdf | ||
| CN-730000-P0144.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-730000-P0144-A1.pdf | ||
| CN-730000-P0144-A5.pdf | ||
| CN-730000-P0144-A6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Revenue
TASK ORDER ASSIGNMENT
Task Order Number:
Contract # Program
Naming Convention: TO(01,02,03 etc) then FY
PROJECT TITLE: Project Area 1-Baker County Aerial Orthophotography Fiscal Year 2019-2020
Task Order Term/Due Date June 1, 2020
Contractor Name· The Sanborn Map Company
Contractor Contact Name: Krysia Sapeta
FEID F133980333-002
Phone: (321)613-2809
Email:
Email:
Ksapeta@sanborn.com
Ksapeta@sanborn.com
Task Description/Statement of Work: (Attach additional sheets if needed)
Deliverables:
Fixed Price Task Order: Amount: not to exceed $
Funding Source:
Invoicing & Financial Consequences: Or Refer to contract page # and paragraph where invoicing and financial consequences are stated
FLORIDA DEPARTMENT OF REVENUE - INITIALS ONLY
for the Department:
DOR Contract Manager:
Initial and Date:
Terry L. Goodwin Phone:
Email:
850-717-6874
Terry.Goodwin@FloridaRevenue.com
DOR Project Manager: Charles Russell Phone: 850-617-8867
Initial and Date Email: Charles.Russell@FloridaRevenue.com
OFM Purchasing Manager:
Initial and Date
For the Contractor:
Zach Hoskins Phone: 850-717-7305
Email: Zachary.Hoskins@floridarevenue.com
Contractor: John R. Copple Email: jcopple@sanborn.com
Signature_____________________________________________________ Date__________
This Task Order is issued under the Master Contract Agreement Number shown above.
All terms and conditions remain unchanged v1 05-2018.pd Contract Task Order Template
Invoicing: refer to Contract P0144, page 1, section 1.C., page 6, Section Q, and page 9, Section B.
Financial Consequences: refer to Contract P0144, page 8, section Y.
All deliverables will meet the requirements as stated in Request for Qualifications # 17/18-18 and contract P0144.
Project Area 1 (Baker County) - Provide Orthophotography as called for within the attached Scope of Work. Project area is approximately 648 square miles at
$87.75 per square mile for a total of $56,862. Payment will made to the vendor upon final approval and acceptance of deliverables.
PTO P0144
TO 02 19/20
$56,862
73-31-03-08-251 EO=01 - General Revenue
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
9/23/2019 | 4:14 PM EDT
9/23/2019 | 4:21 PM EDT
9/30/2019 | 9:26 AM EDT
In Process
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
10/3/2019 | 10:13 AM EDT
mailto:Ksapeta@sanborn.com mailto:Ksapeta@sanborn.com mailto:Terry.Goodwin@FloridaRevenue.com mailto:Charles.Russell@FloridaRevenue.com mailto:Zachary.Hoskins@floridarevenue.com mailto::%20ksapatea@sanborn.com
FLORIDA DEPARTMENT OF REVENUE
Property Tax Oversight
Mapping and GIS Section
PROJECT TITLE: FY 2019/20 DIGITAL ORTHOPHOTOGRAPHY
ORTHOPHOTO PROJECT AREA: Project Area 1 (Baker)
FDOR CONTRACT NUMBER: #P
CONTRACTOR NAME:.
DOR PROJECT MANAGER: Charles Russell
CONTENTS:
1 INTRODUCTION
2 PURPOSE
3 ABBREVIATIONS / DEFINITIONS
4 ORTHOPHOTO SPECIFICATIONS
4.1 Digital Camera
4.2 Image Spatial Resolution
4.3 Horizontal and Vertical Datum
4.4 Horizontal Map Accuracy
4.5 Digital Elevation Model
4.6 Ground Control
4.7 Airborne GNSS/INS Corrections
4.8 Flight Season
4.9 Image Quality
4.10 Historical Images
5 ORTHOPHOTO DELIVERABLES
5.1 File Formats and Image Types
5.2 Geospatial Metadata
5.3 Image Seamline Feature Class
5.4 Survey Report
6 ORTHOPHOTO PROJECT SCHEDULE
7 PROJECT AREA
8 GROUND CONTROL SURVEY REQUIREMENTS
8.1 GROUND CONTROL TABLE EXAMPLE
Ms. Bridget Marcotte
The Sanborn Map Company, Inc.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
1 INTRODUCTION
The purpose of this project is to fulfill the Department of Revenue’s (Department) responsibilities of providing aid and assistance to the County Property Appraisers as specified in section 195.002(1), Florida Statutes, and to at least once every three (3) years furnish such aerial photographs and non-property ownership maps to the property appraisers as necessary to ensure that all real property within the state is listed on the roll. The Department, for its own use and for the County Property Appraiser’s use, is proposing to contract for the acquisition and delivery of digital orthophotography products. The Department intends to acquire ortho-rectified digital image data to support the development and analysis of the tax rolls for all sixty-seven (67) counties in Florida.
Since 1972, Florida Statutes have stipulated cooperation between USGS, FDOT, and the state Water Management Districts to facilitate statewide topographic mapping efforts. Currently the horizontal part of the statewide topographic map is being accomplished through the Florida County Digital Orthophotography Program (FCDOP). The FCDOP is supported by partnerships and agreements between several state, federal, and local agencies. The current FCDOP mapping efforts consist of statewide orthophotography coverage of Florida on a three (3) year cycle, with a maximum ground sample distance (GSD) resolution of 0.5 feet.
2 PURPOSE
This document defines the minimum standards for providing digital orthophotography products for inclusion into the FCDOP. All final data will be considered public record as defined by applicable Florida Statutes.
Any products created from oblique aerial imagery acquired during the Orthophotography project imagery collection are beyond the scope of this document.
All work performed must be in accordance with the Standards of Practice Chapter 5J-17, F.A.C., pursuant to Chapter 472, Florida Statutes.
3 ABBREVIATIONS / DEFINITIONS
• ASPRS - American Society for Photogrammetry & Remote Sensing
• CADD - Computer Aided Design & Drafting
• CSDGM - Content Standard for Digital Geospatial Metadata
• DEM - Digital Elevation Model
• ESRI - Environmental Systems Research Institute
• FGDC - Federal Geographic Data Committee
• FIPS - Federal Information Processing Standards
• FCDOP - Florida Digital Orthophotography Program
• GeoTIFF - Raster image file. GeoTIFF fully complies with the TIFF 6.0 specifications, and its extensions do not in any way go against the TIFF recommendations, nor do they limit the scope of raster data supported by TIFF. GeoTIFF uses a small set of reserved TIFF tags to store a broad
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982 range of georeferencing information, catering to geographic as well as projected coordinate system needs.
• GSD - Ground Sample Distance
• IMU - Inertial Measurement Unit
• LiDAR - Light Detection and Ranging
• LAS - A binary file standard supported by ASPRS for storing point location and attribute information primarily used for LiDAR data.
• NSSDA - National Standard for Spatial Data Accuracy
• Orthophoto - same as Orthophotograph
• Orthophotograph - A photographic copy, prepared from a perspective photograph, in which the displacements of images due to tilt and relief have been removed. (Source: American Congress on Surveying and Mapping and the American Society of Civil Engineers. Definitions of Surveying and Associated Terms. Library of Congress Catalogue Card Number 72-76807. Washington 1972, 1978.
• Orthophotomosaic - An assembly of orthophotographs forming a uniform-scale mosaic.
(Source: American Congress on Surveying and Mapping and the American Society of Civil Engineers. Definitions of Surveying and Associated Terms. Library of Congress Catalogue Card Number 72-76807. Washington 1972, 1978.
• Orthorectification - A special case of image resampling whereby the effects of image perspective and relief displacement are removed so that the resulting orthoimage has uniformly scaled pixels, resembling a planimetric map. (Source: American Society for Photogrammetry and Remote Sensing Manual of Photogrammetry Fifth Edition, 2004, page 963)
• Photogrammetry - The science or art of obtaining reliable measurements by photography.
(Source: American Congress on Surveying and Mapping and the American Society of Civil Engineers. Definitions of Surveying and Associated Terms. Library of Congress Catalogue Card Number 72-76807. Washington 1972, 1978.
• RMSE - Root Mean Square Error
• USft - United States Survey Feet
• USGS - United States Geological Survey
• XML - Extensible Markup Language
4 ORTHOPHOTO SPECIFICATIONS
4.1 Digital Camera
All imagery shall be collected using a digital aerial camera capable of collecting multispectral imagery in natural color (RGB) bands and near infrared band (N). The sensor must also have a documented bore-sight calibration performed within six (6) months of image acquisition.
4.2 Image Spatial Resolution
The Consultant shall deliver images that have been re-sampled to the desired resolution a.k.a. Ground Sample Distance (GSD) of 0.5 feet. The original raw imagery must have a GSD less than or equal to the desired final resolution of the orthoimagery. Orthoimagery that has been resampled to a higher resolution than the original raw imagery GSD will NOT be accepted. The allowable RMSEx and RMSEy shall be less than or equal to 1.0 feet (2 pixels) per FDOT Survey Handbook (MARCH 29, 2019), Section 25.
http://www.fdot.gov/geospatial/documentsandpubs/SurveyandMappingHandbook.pdf
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process http://www.fdot.gov/geospatial/documentsandpubs/SurveyandMappingHandbook.pdf
4.3 Horizontal and Vertical Datum
Unless otherwise requested the Orthophotography and other topographic products shall be referenced to the North American Datum of 1983 2011. The map projection referenced shall be to the appropriate Florida State Plane Coordinate System in units of U.S. Survey Feet.
Orthophotography and other topographic products shall be referenced to the North American Vertical Datum of 1988 (NAVD 88), in units of U.S. Survey Feet.
4.4 Horizontal Map Accuracy
The final horizontal map accuracy of Orthophotography products shall be determined using well defined photo identifiable check points. Computed local horizontal accuracy shall meet or exceed 2.5 feet at the 95% confidence interval as specified in the FGDC “Geospatial Positioning Accuracy Standards, Part 3:
National Standard for Spatial Data Accuracy”. A minimum of twenty-five (25) independent checkpoints within the project area will be used for verification. Check points will be distributed throughout the dataset.
4.5 Digital Elevation Model
A Digital Elevation Model adequate to support accuracy specifications identified for this project must be created to accurately orthorectify photographic imagery.
The Consultant is responsible for evaluating the accuracy of the DEMs, and when necessary shall collect additional surface information to accurately orthorectify photographic imagery.
The Consultant will submit information in the final survey report and metadata which documents the source, enhancements made, and density of the DEMs utilized for the Orthophoto mapping project.
Additionally, if LiDAR data is acquired as part of the project, the classified scan data must be provided in LAS file format as per ASPRS LAS Specification 1.4 with associated metadata.
4.6 Ground Control
A network of ground control points of sufficient number as well as horizontal and vertical accuracy, shall be established to support Orthophoto mapping. All control shall meet the requirements of the FCDOP, see 8 Ground Control Survey Requirements.
The Consultant will coordinate with Agency staff in planning ground control surveys and methodology used for all horizontal and vertical control surveys.
4.7 Airborne GNSS/INS Corrections
Unless otherwise approved, all orthophotography collection shall include differential GNSS measurements to at least four Florida Permanent Reference Network (FPRN) stations.
4.8 Flight Season
The specified flight season will be from October 1st through March 15th. To the greatest extent possible imagery should be obtained prior to January 30th. Imagery collected outside of this flight season will require written approval from contracting agency.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
4.9 Image Quality
All images will be obtained under cloud free conditions and will be free of obscuring haze, smoke or other atmospheric conditions. Radiometric and color balancing of the imagery is described in Section 5:
Orthophoto Deliverables. All images must be collected with a sun angle no less than 30. Imagery shall be acquired at a density in the “high-rise” urban areas such that all road networks are clearly visible and that buildings show no signs of excessive tilt or lean.
4.10 Historical Images
To maintain consistency between images collected during different years, historical examples of imagery shall be reviewed. If applicable color balancing should be performed that is consistent with previous FCDOP imagery.
5 ORTHOPHOTO DELIVERABLES
All deliverables will be the property of the Contracting Agency and are considered public record. Written permission from the Agency must be obtained to release data to any party prior to final publication. The Consultant will deliver Ortho-rectified four band imagery consisting 8-bits per band natural color (RGB) and near infrared (N). The Stereoscopic panchromatic images collected will not be delivered unless specifically requested by the Agency. The Consultant shall keep a copy of the original data for a period of five (5) years and must contact the Agency before destroying the data. The Consultant will document all data deliveries with an itemized transmittal letter.
5.1 File Formats and Image Types
Clarity and quality of the imagery is of the highest importance. Imagery will be delivered as uncompressed four band GeoTIFF images with valid projection header information. One GeoTIFF file per 5000 x 5000-foot tile is required.
a) Natural Color Imagery – The natural color, RGB, bands will be color balanced across the entire study area to the greatest extent possible to allow viewing of the image tiles as a visually seamless mosaic. Care should be taken during radiometric processing to avoid loss of detail in shadows and overexposure on bright surfaces such as bare ground and light-colored building roofs.
b) Color Infrared Imagery – The near infrared band will be radiometrically processed in a manner that preserves original image characteristics to the greatest extent practical. Systematic radiometric corrections to reduce sun angle and sensor variations are desired. Corrections for seasonal variations in ground cover are not to be done, however, care should be taken to ensure appropriate coloration of different vegetation types (e.g. deciduous, evergreen, etc.) is evident.
All orthoimages will be delivered according to the project tiling index (ESRI shapefile) provided to the consultant before commencement of work. The Florida Imagery Index may be found at the Department’s website http://floridarevenue.com/dor/property/gis/.
Tiles will be contiguous and non-overlapping and will be suitable for creating a seamless image mosaic that includes no data void cells or gaps. Tile naming convention is as follows:
YYYY__NNNNNN_RGBN.TIF (4Band Imagery, Required)
YYYY__NNNNNN_RGB.TIF (Natural Color Imagery if requested)
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process http://floridarevenue.com/dor/property/gis/
YYYY__NNNNNN_CIR.TIF (Color Infrared Imagery if requested)
Where:
YYYY = Ending year of the flying season that typically ends in March.
NNNNNN = Appropriate tile (cell) index number values from project tiling index provided.
The following examples represent the three-color variations of the same Orthophoto image tile that was acquired during the 2013– 2014 flying season.
2014_200001.tif (4Band Image Tile Required) 2014_200001_RGB.tif (Natural Color Image Tile if requested) 2014_200001_CIR.tif (Color Infrared Image Tile if requested)
5.2 Geospatial Metadata
A metadata file must be delivered for each GeoTIFF image file, the DEM used for Orthophoto production, and any other relevant mapping files, in XML format.
Metadata must be compliant with the Federal Geographic Data Committee's (FGDC) Content Standard for Digital Geospatial Metadata (CSDGM), https://www.fgdc.gov/metadata/csdgm/, the online link to the USGS metadata parser for CSDM validation is https://mrdata.usgs.gov/validation/ .
5.3 Image Seamline Feature Class
The Consultant will include a file “ProjectName_Seamlines” in ESRI Shape file format, containing a feature class of non-overlapping polygons with no data voids for the project area. Each polygon will delineate image capture dates and times used to seam together photographs for the production of orthophotography
The feature class should conform to project boundary, and have the following attributes:
DOF = Date of Flight EXPOSURE = Exposure filename TIMESTAMP = GNSS time in
HH:MM:SS
HEIGHT = Approximate height of aircraft at time of exposure
5.4 Survey Report
The Consultant Professional Surveyor and Mapper (PSM) will prepare a Digital Survey Report that documents all processes and is compliant with relevant Standards of Practice Chapter 5J-17, F.A.C., and shall at a minimum include the following items:
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982 https://www.fgdc.gov/metadata/csdgm/ https://mrdata.usgs.gov/validation/
➢ Project title and reference number.
➢ Name and address of corporation (certificate of authorization number).
➢ Surveyor in responsible charge (contact information).
➢ Abbreviations, definitions; data sources; etc.
➢ Final deliverable listing of files stating filename with extension and delivery date in the appendix of the survey report.
➢ Survey Date(s) are the first and last date of field measurements.
➢ Introduction, purpose, objectives.
➢ Scope of work.
➢ Reference to ground Control Survey by title, survey date, corporation, and certifying
Surveyor and Mapper.
➢ Describe all equipment, software, etc.
➢ Imaging sensor description, specifications, and any available calibration documentation.
➢ Airborne sensor trajectory/exterior orientation report.
➢ Aerial triangulation control coordinates and aerial triangulation blocks along with statistical summaries.
➢ Digital Orthophoto image acquisition dates and logs.
➢ Digital elevation model acquisition (identify source and accuracy).
➢ If Light Detection and Ranging (LiDAR) data is collected, then the following items shall be included:
1. LiDAR data acquisition dates and logs,
2. LiDAR sensor description and calibration report, and
3. LiDAR specifications and procedures.
➢ Digital orthophotography image accuracy NSSDA analysis according to the FGDC
NATIONAL STANDARD FOR SPATIAL DATA ACCURACY (FGDC-STD-007.3-1998).
➢ List the field and office personnel.
➢ Digital Survey Report will include a map overlay which will display the following items:
1. All horizontal and vertical ground control with identify which points were constrained during aerial triangulation and which points were used for check during NSSDA analysis,
2. Aerial triangulation blocks,
3. Digital orthophotography cut lines and dates associated with the strips,
4. Digital orthophotography tile limits and layout,
5. LiDAR quality control locations and accuracy (if applicable), and
6. Base map features (USGS quad, county boundaries, major roads, major hydrography / water bodies, township/range lines, basin boundaries, cities).
The Consultant will deliver a certified digital report with the following final digital media deliverables.
Final Digital Media Submittal:
➢ Digital copy of the Orthophotography Survey report.
➢ Digital copy of the Control Survey report (if separate).
➢ Four Band (RGBN) Orthophotography image tiles.
➢ Three Band (RGB and/or (CIR) - IF REQUESTED IN SCOPE.
➢ Metadata XML file for each image tile.
➢ Final surface model used to rectify photography.
➢ Classified LiDAR data files (*.LAS) if collected.
➢ Digital files (ESRI Shape file format) used for Survey Report map overlays:
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
1. All horizontal and vertical ground control with identify which points were constrained during aerial triangulation and which points were used for check during NSSDA analysis,
2. Aerial triangulation blocks,
3. Digital orthophotography cut lines and dates associated with the photographs,
4. Digital orthophotography tile limits and layout,
5. Digital orthophotography Control Point Locations, and
6. LiDAR QC accuracy locations (if applicable)
Base map features.
Final submittals will be delivered on a single portable external USB computer drive and accompanied by an itemized transmittal letter. All deliverables will become the property of the Agency. The drive shall be labeled on the outside with the following information:
o Project Title, o Purchase Order Number, o Work Order Name, o Work Order Number, o Consultant Name, and o Project Manager’s Name.
6 ORTHOPHOTO PROJECT SCHEDULE
All final deliverables must be received within one hundred twenty (120) calendar days from the successful collection of aerial imagery or no later than June 1, 2020. The Consultant will submit a proposed project schedule. The Consultant will notify the Agency when aerial images have been collected.
7 PROJECT AREA
The project area to be mapped consists of 723 tiles 5000 by 5000-foot tiles (cells) (approximately 648 square miles) defined in ATTACHMENT A – ORTHOPHOTO PROJECT AREA and in the ArcGIS Shapefile _Ortho_Project_Area delivered under separate cover. This will serve as the final uniform tiling scheme for the seamless Orthophoto mosaic and supporting data deliverables.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
8 GROUND CONTROL SURVEY REQUIREMENTS
Ground Control Requirements for Florida County Digital Orthophotography Program
Purpose:
The purpose of this document is to specify the requirements for a geodetic control survey to support 0.5-foot ground sample distance resolution county aerial orthophotography mapping. The positional accuracy required for this imagery resolution is 2.5 feet at the 95% confidence level.
1. All surveying and mapping work performed shall meet the Standards of Practice Chapter 5J-17, F.A.C., pursuant to Chapter 472, Florida Statutes.
• Global Positioning System (GPS) techniques shall be used to establish horizontal and vertical positions on targeted and/or well-defined photo identifiable points that will be used as control for aerial photogrammetric mapping. New photo control point positions shall be identified in the field by a survey mark.
• When aerial panels are used, the vertical offset from top of mark to the panel surface shall be measured and recorded.
• In rare circumstances where the photo identifiable control point cannot be occupied directly, either horizontally and/or vertically, offset distances of less than 0.5 feet from the occupied survey mark may be used. Field survey measurements of sufficient precision must be collected and recorded to allow accurate coordinate computation of the photo identifiable point from the offset mark.
2. Ground control shall be referenced to the 2011 realization of the North American Datum of 1983 a.k.a. NAD83 (2011) based on redundant ties to the Florida Permanent Reference Network (FPRN) http://www.myfloridagps.com/spiderweb/frmIndex.aspx.
3. The photogrammetric ground control network shall meet the horizontal and vertical accuracies necessary to support the required map accuracy of the orthophotography per FDOT Survey Handbook (MARCH 29, 2019), Section 14.
http://www.fdot.gov/geospatial/documentsandpubs/SurveyandMappingHandbook.pdf
4. Sufficient (minimum four) published NAVD88 benchmarks shall be included in the control network to insure accurate elevations can be computed from GNSS measurements through local network adjustment using the latest FPRN geoid model (http://www.fdot.gov/geospatial/FPRN.shtm).
5. Where conditions dictate differential leveling may be used to establish elevations on photo control points from the nearest ground control network station or published NSRS vertical station within a five (5) mile radius from the photo control point. The differential leveling procedures used shall meet or exceed Standards of Practice for vertical control accuracy.
6. With prior approval of orthophoto project surveyor, ground control points may be moved from their original proposed locations to insure safety, and if the proposed point is ambiguous or no longer exists. Such control points shall be documented as moved.
7. A field sketch with survey date, GPS satellite visibility and weather conditions at the time of GPS data collection shall be prepared for each control point site.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982 http://www.myfloridagps.com/spiderweb/frmIndex.aspx http://www.fdot.gov/geospatial/documentsandpubs/SurveyandMappingHandbook.pdf http://www.fdot.gov/geospatial/FPRN.shtm
8. Digital photo(s) shall be taken showing the exact location of the control point, preferably while the point is occupied by the GPS unit setup. Digital photo filenames shall include the control point name.
9. Submittal Items:
A. The Professional Surveyor and Mapper (PSM) will prepare a certified digital Report of
Control Survey that shall at a minimum include the following items:
• Project title and reference number,
• Name and address of corporation (certificate of authorization number),
• Surveyor in responsible charge (contact information),
• Abbreviations; data sources; etc.,
• Introduction, purpose and objective,
• Description and scope of work,
• Describe equipment, software, etc.,
• Describe the accuracy standards and specifications, procedures and methodology for establishing ground control,
• Describe and list the geodetic control (existing and newly-established), displaying the horizontal and vertical coordinates, Datum used, Geoid model and error estimates (95% confidence level),
• List the field and office personnel,
• Survey Date(s) are the first and last date of field measurements,
• Describe monumentation recovered and set, and
• Map overlay which will display the following items:
o GPS baseline network, indicate repeated measurements, o Existing horizontal and vertical geodetic control, o Newly-established photogrammetric control, and o Base map features (county boundaries, major roads, major hydrography
/ water bodies, township/range lines, cities).
B. Digital Media Submittal on CDs/DVDs shall contain:
• Digital copy of the Control Survey report,
• Existing geodetic control recovery/to-reach descriptions, sketches, field notes, photographs, etc.,
• Newly-established photogrammetric control location descriptions, sketches, field notes, photographs, etc.,
• Copies of Global Navigation Satellite System (GNSS) data logs and a listing of
GNSS occupations,
• All GNSS data observed and produced during the survey (digital format), including the raw observation data, processed baselines, loop closures and least squares adjustments (free and fixed),
• A Microsoft EXCEL spreadsheet file list of final control with datum header information along with point name, geographic (Latitude, Longitude), grid (State Plane Zone Northing and Easting), and elevation values for control points. Grid coordinates and elevations shall be in units of US survey feet. Any horizontal and vertical mark offsets measured shall be identified and applied to the aerial panel or photo identifiable feature position and/or surface. Offset measurements shall be included to verify computations. See example in CONTROL TABLE EXAMPLE, and
• Sketches and digital pictures of photo control point sites identifying measured point location and type of mark including target size and material if applicable.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
8.1 GROUND CONTROL TABLE EXAMPLE
FINAL ADJUSTED HORIZONTAL AND ORTHOMETRIC HEIGHT VALUES FOR MARION COUNTY (PD6027) POST FLIGHT PHOTO POINT
UNITS ARE US Survey Feet (USft)
HORIZONTAL DATUM IS NAD 83 (2011)
STATE PLANE ZONE IS FLORIDA WEST ZONE 0902
ORTHOMETRIC HEIGHT DATUM IS NAVD 88
ALL CONTROL STATION VALUES ARE DERIVED BY STATIC GPS OBSERVATIONS FROM PUBLISHED NGS CONTROL
GPS Control Station - Geographic GPS Control Station - USft Offset from GPS Station to Photo ID Point - USft
FINAL Photo ID Control - USft
PHOTO_ID LATITUDE LONGITUDE
ELLIP_HG
T (meters)
NORTHING EASTING
ORTHO_HG
T Offset North
Offset East
Offset Vertica l
NORTHING EASTING
ORTHO_HG
T
D510S010 29 29 44.73172 -82 24 24.26473 1.757 1876786.2
526773.9
97.18 0 0.5 0
1876786.2
526774.4
97.18
D510S011 29 28 42.07552 -82 3 20.32535 -4.497 1870232.3
638460.5
77.18 -0.5 -0.5 0
1870231.8
638460.0
77.18
D510S012 29 30 29.98811 -81 51 49.10517 10.530 1881156.8
699540.7
127.11 0 0 0
1881156.8
699540.7
127.11
D510S013 29 19 32.46883 -81 58 11.18511 -5.832 1814716.8
665798.4
72.96 0 0 0.5
1814716.8
665798.4
73.46
D510S014 29 21 52.50874 -81 44 25.40237 -16.367 1828952.7
738861.5
39.27 0 0 0
1828952.7
738861.5
39.27
D510S015 29 17 40.65095 -81 39 9.97229 -27.655 1803585.2
766847.0
2.34 0.5 0.3 0.5
1803585.7
766847.3
2.84
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
Quote-Budgetary Estimate Letter Template v3; 11/7/17 Page 1 of 7
September 18, 2019
Ms. Terry Goodwin Manager Contracts and Resource Management Florida Department of Revenue Property Tax Oversight
(850) 717-6874 Terry.Goodwin@floridarevenue.com
Re: FY 2019/20 Digital Orthophotography; Orthophoto Project Area 1 (Baker) – Pricing Revision
Dear Ms. Goodwin:
On behalf of The Sanborn Map Company, Inc. (Sanborn), it is my pleasure to provide you with this letter of interest to the Florida Department of Revenue (FDOR) for the FY 2019/20 Project Area 1, Baker County, under the Florida County Digital Orthophotography Program (FCDOP).
Sanborn, an ISO 9001:2015-certified company focused on quality, is excited about the opportunity to work with the FDOR again. It has been Sanborn’s privilege to provide mapping services to FDOR since 2006 for digital orthoimagery development. Sanborn is thoroughly familiar with FDOR specifications and your mapping needs, and our history of developing digital orthophotography for you offers a good model for guaranteed quality work and our commitment to schedule.
Project Area
The project area to be mapped consists of 723 tiles 5000 by 5000-foot tiles (cells) (approximately 648 square miles) as defined in the Baker_Tiles.shp shapefile, issued by the FDOR.
The draft flight line map with ground control layout is provided in the Appendix, at the end of this letter response.
Time and Budget Requirements
We understand the mission-critical nature of this project, and the need to produce quality orthoimagery on time, on budget, and to your specifications. We are committed to acquire the imagery as soon as given notice to proceed, with completion of aerial imagery prior to January 30, 2020, and completion of all product deliveries no later than June 1, 2020. We have traditionally met or accelerated the previous project schedules.
An overview of the schedule is provided below.
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
In Process mailto:Terry.Goodwin@floridarevenue.com
Proposed Schedule Deliverable/Task Delivery Method Estimated Delivery
Date* Contract Executed Email ~ October 15, 2019 Project Kick-off Meeting Web-based ~ October 22, 2019 Imagery Acquisition Completed (weather permitting, flight window October 30 – January 30) Status report January 30, 2020
(complete) AT and Update or Development of New DEM Completed Status report February 28, 2020 Deliver Pilot Tiles (GeoTIFF format) FTP April 15, 2020 Deliver Digital Copy of the Orthophotography Survey Report FTP/final drive NLT May 29, 2020 Deliver Four Band (RGBN) Orthophotography Image Tiles (GeoTIFF) Hard drive NLT May 29, 2020 (Optional) Delivery of Online GeoServe for FDOR and County Review Web-based As available per area Deliver Metadata XML File for Each Image Tile Hard drive NLT May 29, 2020 Deliver Final Surface Model Used to Rectify Photography Hard drive NLT May 29, 2020 Deliver Digital Files (Esri Shapefile format) Used for Survey Report Map Hard drive NLT May 29, 2020 Deliver Image Seamline Feature Class (Esri Shapefile format) Hard drive NLT May 29, 2020
* Final schedule dependent on contract execution and acquisition completion
Proximity to Project Location
At this time of year, we strategically move the required acquisition resources to the southern states of Florida, Georgia and South Carolina, to stay within close proximity of the projects scheduled for acquisition during the late fall/early winter. Sanborn owns and operates 10 aircraft and three (3) UltraCam Eagle imagery sensors, which provides assurance that the critical acquisition phase will be completed efficiently and on schedule.
Mr. Gary Eaton, Florida PSM No. LS0006319, will oversee the mapping from our Charlotte, North Carolina, office.
The orthophoto production will also be performed in our Charlotte office with additional resource production support from our Colorado Springs, Colorado, office.
Current and Projected Workload
Sanborn’s earned value management (EVM) environment, in addition to multiple supplementary tracking systems, enables integrated management of the entire project lifecycle. This project management and production tool is used to develop and track all project resources and the schedule throughout the life of the project, from design and proposal development, to implementation, and change management. Project schedules and resource allocations are modeled in the EVM as early as the proposal stage, then developed and maintained over the entire life of the project. For FDOR’s program, as the collection and processing moves through the timeframes, updates to the EVM allow Sanborn to reallocate resources if necessary and to direct additional assets to cover equipment failures, weather problems or changes in the capacity plan as a result of changes in the collection activity.
The graphs below illustrate our EVM resource analyses. The graphs show significant capacity for airborne imagery acquisition, airborne GPS/IMU processing, image processing (pre-rectification), aerotriangulation, compilation/GIS (DEM ingest and update), and imagery (post processing orthorectification). Based upon this analysis, Sanborn has plenty of capacity to take on the proposed scope of work. Our current workload throughout all phases is as follows:
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
Scope of Work
All surveying and mapping work performed will meet the Standards of Practice Chapter 5J-17, F.A.C., pursuant to Chapter 472, Florida Statutes. Sanborn is committed to meet or exceed all quality and accuracy requirements as detailed in the Request for Proposal (RFP). The proposed project will include the following items and components:
Acquisition of new imagery using a digital aerial camera capable of collecting multispectral imagery in natural color (RGB bands) and near infrared (IR band N), with a resolution of 6-inches.
Collection of ABGPS/IMU-controlled vertical color imagery for this project will be performed by Sanborn with the advanced UltraCam Eagle digital aerial camera system with 3rd generation architecture. The fixed frame design and photogrammetric based engineering provides accuracy that will meet the required FDOR imagery specifications. All images will be obtained under cloud free conditions and will be free of obscuring haze, smoke or other atmospheric conditions. All images must be collected with a sun angle no less than 30 degrees. Imagery will be acquired at a density in the “high-rise” urban areas such that all road networks are clearly visible and that buildings show no signs of excessive tilt or lean.
Acquisition of data during the specified flight season, from October 1, 2019, through March 15, 2020. Sanborn is committed to acquire the imagery prior to January 30, 2020, weather permitting
Establishment of new photo control points or recovery of a network of ground control as needed to support the Orthophoto mapping. Twenty (20) ground control points will be surveyed and twenty-five (25) checkpoints evenly distributed throughout the project area, for a total of forty-five (45) survey points.
Sanborn will utilize existing ground control on this project to the fullest extent possible, and augment it with new, photo-identifiable or targeted ground control points where needed. Using the ground control survey information, camera calibration information and Airborne GPS/Inertial Measurement Unit (AGPS/IMU) data acquired during the aerial flight, a Fully Analytical Aerial Triangulation (FAAT) solution will be completed, establishing the accuracy standards set by FDOR for updating or generating a new terrain model as needed, and creation of the orthoimagery
Unless otherwise approved, all Airborne GNSS/INS trajectory corrections will be directly referenced to the Florida Permanent Reference Network (FPRN).
Update of the existing lidar DEM, or development of a new DEM using stereo-compilation techniques.
Sanborn will ensure that the DEM used for the orthorectification will be up-to-date and accurate in order to support the 6-inch (1”=100’) resolution accuracy specification
Production of 6-inch Orthorectified image tiles, with four bands, consisting of 8-bits per band natural color (RGB) and near infrared (N)
Delivery of original source imagery as uncompressed 4-band TIFF images (RGBN) at the native bit-depth of the Eagle sensor
Development and delivery of a Seamline Feature Class Provision of an optional, no-cost web-based quality control application for FDOR. Data is served from a central data server at Sanborn to the customer-side computer and uses a mapping interface from within a standard web browser, for FDOR to review the data imagery.
Edit flags are stored in a centralized location where they are immediately available for review by others in the organization. Users are able to view available data and add digital issue points to areas which may have perceived problems or errors, which are submitted directly to a secure centralized database where they are immediately available for others to review.
Benefits of the online QC process include:
Helps reduce the time needed for review as data can be corrected incrementally with edit calls, often speeding the review schedule Provides ease and documentation for data quality review needed for monitoring and compliance Facilitates coordination between many data reviewers
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
Appendix
The draft flight map and ground control design is provided below. Using the draft flight plan, Sanborn calculates
1.4 missions (full flying days) are required with our Eagle sensor to complete the imagery acquisition. Even considering an approximate weather of 4.5, we are confident we can acquire the imagery in the timeframe required.
All existing ground control points are illustrated on the map below. Sanborn will utilize existing ground control on this project to the fullest extent possible, and augment it with new, ground control points where needed. The final ground control dataset will contain 20 ground control points and 25 checkpoints for a total of 45 ground control points.
P0144 Task Order 02 FY 2019-20
DocuSign Envelope ID: F77ED118-1C48-4FF2-9CDA-4D81D65DA982
| FY 19-20 Sanborn Proposal Baker Co Project Area 1 FINAL.pdf |
| 01 Letter_Rev1_KS_ESN_ESN |
| 01 Letter_Rev1_KS_ESN_ESN_signature |
| 01a Form_esn_ESN_printed |
File details come from the government source that posted it. Updated .