CN-550000-CAA38-W0050000.pdf
PDF 348 KB Posted
- Contract number
- CAA38
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT), involving BCC Engineering, LLC and Hardesty & Hanover as consultants. The contract is part of the Districtwide Structures Design Services under Contract No. CAA38, focusing on a Value Engineering Workshop for the SR-838/Sunrise Boulevard Bridge rehabilitation project over the Intracoastal Waterway in Broward County.
The task work order authorizes a Value Engineering Workshop for two bridges (Nos. 860466 and 860467), with a total contract amount of $26,487.36. The scope includes project general tasks such as contract maintenance, documentation, and a multi-disciplinary team review of proposed bridge improvements. These improvements include replacing/improving movable span drive systems, span locks, strengthening girder ends, adjusting live load shoes, repairing concrete deck, replacing sidewalk plating, installing new control systems, and adding pedestrian safety features. The contract is set to be completed by September 2, 2025, with the Value Engineering Workshop specifically scheduled for March 20-24, 2023. The funding is approved for fiscal year 2023 with a total contract budgetary ceiling of $1,500,000.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAA38-W0030100.pdf | ||
| CN-550000-CAA38-00020000.pdf | ||
| CN-550000-CAA38-00040000.pdf | ||
| CN-550000-CAA38-W0040000.pdf | ||
| CN-550000-CAQ64-W0060000.pdf | ||
| CN-550000-CAA38-00030000.pdf | ||
| CN-550000-CAA38-W0020000.pdf | ||
| CN-550000-CAA38-W0030000.pdf | ||
| CN-550000-CAA38.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
9/2/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAA38 44145613201
$195,375.65
(name) (title) Signature
Ninoy Lucero Contracts Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
BCC Engineering, Inc.
4901 NW 17th Way Suite 506, Fort Lauderdale, FL 33309
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$26,487.36
$26,487.36 Limit
Value Engineering Workshop - SR-838/Sunrise Blvd. Over the Intracoastal Waterway Bridge #'s 860466 and 860467.
Signature
Procurement, Financial Services, PM, File
Director of Structures
$26,487.36
$0.00
(name) (title)
Daniel Raymat
$26,487.36
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
DocuSign Envelope ID: 0029FDEC-7837-4990-B8D8-CBA91929B806
02/21/2023 | 1:10 PM EST
SCOPE OF SERVICES
Contract No. CAA38
FPID No. 230068-6-32-01
TWO #06
SR 838 / Sunrise Boulevard Over the Intracoastal
Waterway Bridge Nos. 860466 & 860467
FPID 441456-1-32-01
FDOT PM: Ramon Otero, PE
(954) 777-4162 | Ramon.Otero@dot.state.fl.us
Value Engineering Workshop
1.0 BACKGROUND:
The Prime Consultant (BCC Engineering) was retained by the Department for Contract CAA38 to provide Districtwide Structures Design Services for various projects on a Task Work Order basis. A Value Engineering Workshop will take place regarding the bridge rehabilitation of the intracoastal waterway bascule bridge along SR-838/SUNRISE BLVD (BRIDGE #860466 & 860467). The project will be proposing the following improvements on and in the vicinity of the bascule bridge:
Replace/Improve movable span drive system.
Replace Span locks -Mechanical.
Replace Span locks – Structural.
Girder End Strengthening
Span Lock Access Improvements
Adjust Live Load Shoes
Remove Buffer Cylinders
Repair Concrete Filled Deck
Replace Sidewalk Plating
F&I inboard span lights
F&I new control system (complete)
Replace tender house windows.
Reconfigure tender house floor for space.
Replace bathroom tile.
Replace bathroom fixtures.
Replace A/C
F&I Submarine conduit
Paint existing steel structure
Clean & Coat Concrete Surface with Class 5 Surface Finish
Add stairs and platform to West Bascule pier.
Also Included as a part of the scope is:
Tender parking access platform, Aluminum Deck Justification Memo, replacing the movable span deck to a proposed Aluminum Deck, 2 New pedestrian gates (off-going), New generator platform, and modifying the existing pedestrian railing (add cable).
MSE wall replacement along south side Bridge Approaches. Replacement will require new sidewalk, reconstruction of the existing roadway, barrier wall, and traffic railing.
Inclusion of Pedestrian/Bicycle safety features that include pedestrian detection systems like Thermal Detection or LiDAR Detection, installing countdown timer to alert pedestrians and traffic of bridge opening, new signage wording on pedestrian gates, pre-recorded audio Message warnings for the PA system (multiple languages), and internally illuminated pavement markers across the roadway/sidewalk at the gates.
2.0 PURPOSE:
The purpose of this TWO is to provide Value Engineering Workshop participation involving Structural engineering services.
3.0 SCOPE:
Under this TWO, the Consultant will provide the following services (reference the attached Staff Hour Estimate for additional detail):
o Activity 3: Project General Tasks
▪ 3.4 Contract Maintenance and Project Documentation
▪ 3.5 Value Engineering (Multi-Discipline Team) Review
▪ 3.13 Other Project General Tasks
The work shall be performed under a Lump Sum method of compensation.
4.0 DELIVERABLES AND SCHEDULE:
Deliverables: Value Engineering Report
Schedule: The project schedule and important project dates are as follows:
o Value Engineering Workshop: 3/20/23 – 3/24/23
5.0 CONSULTANT RESPONSIBILITIES:
The Consultant’s responsibilities are to perform engineering services as requested by the Department. The Consultant will provide the necessary participation, coordination, and task management.
6.0 DEPARTMENT RESPONSIBILITIES:
The Department’s responsibilities are to provide all necessary information to the Consultant to perform the engineering services.
Name of Consultant Project Information Sheet
Financial Project Identification Number: 441456-1-32-01 N/A
Name of Prime / Subconsultant: BCC Engineering, LLC County: Broward
Project Description: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
Begin Milepost: N/A Miles
Number of Lanes: (Urban / Rural / Int.) Lane Configuration: Divided (Divided / Undivided)
Project Type: Minor N/A Roadway Classification: NHS (NHS/FIHS/Off Sys.)
CAP Level: N/A
Design Variations:
Proposed Design Contract Time: 3 months/days Date of Negotiation: 2/6/2023 Context Classification:
3. Project Common & Project General Tasks - BCC
3. Project Common & Project General Tasks - H&H
Access Management Classification:
N/A TTCP Level: Survey Level:
1. Design Exceptions: 1.
Bob Forand | BCC Engineering Ramon Otero | Structures Bob Forand | BCC Engineering Ramon Otero | Structures Henri Sinson | Hardesty & Hanover Ramon Otero | Structures Henri Sinson | Hardesty & Hanover Ramon Otero | Structures
Federal Aid Project Identification Number:
N/A End Milepost: N/A Project Length:
6 Typical Section: Urban
Project Activity:
Estimated By: Negotiated By: (name - firm)
Consultant FDOT Consultant FDOT
2. 2.
3. 3.
4. 4.
5. 5.
(Minor / Major)
441454613201_VE_Workshop_2_6_23.xlsx Project Information Page 1 of 1 2/6/2023
Project Staff Hour Summary
Name of Consultant: BCC Engineering, LLC
Activity No. Activity BCC Engineering, LLC
Hardesty &
Hanover Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours
3 Project Common and General Tasks 12.99769 68 80.99769
12.99769 68 0 0 0 0 0 0 0 0 0 0 0 80.99769Project Total
441456-1-32-01 Project Staff Hours
SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
441454613201_VE_Workshop_2_6_23_V2.xlsx Summary Page 1 of 1 2/20/2023
Financial Project Number: 441456-1-32-01 Project Name: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
FAP Number: N/A Date: 2/20/2023 Name of Consultant: BCC Engineering, LLC
EMPLOYEE CLASSIFICATION
ON CADD
Grand Total
Project Manager 3
Home
Chief Engineer 2
Home
Chief Engineer 1
Home
Senior Engineer 2 Home
Senior Engineer 1 Home
Engineer 2 Home Engineer 1 Home
Chief Designer
Home
Senior Designer
Home
Designer Home
Senior Engineering Technician Home
Engineering Technician
Home
Engineering Intern Home
CADD/Computer Technician Home
Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours PERCENT
3. Project General and Project Common Tasks - BCC 12.99769 12.99769 0 0 0 0 0 0 0 0 0 0 0 0 0 12.99769 14
TOTALS 12.99769 12.99769 0 0 0 0 0 0 0 0 0 0 0 0 0 12.99769 14
Field Survey Estimate:
Notes: 0 4-person crew days 12.99769 14
1. This worksheet provides the distribution of the grand total staff hours for a project.
2. Percentages for staff hour distribution by classification are entered below in rows 65 to 99 of this sheet.
3. Total Staff Hours (column O) may not match staff hours from Summary worksheet (column B) due to rounding. Staff hours calculated for employee classifications are to be adjusted so totals in columns B and O match.
4. Formulas under "Total Staff Hours Range" (columns O & P) may be adjusted to provide desired range.
5. This spreadsheet to be provided in Technical Proposals for Districts that require a breakdown of hours by classification.
Financial Project Number: 441456-1-32-01 Project Name: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
FAP Number: N/A Date: 2/20/2023 Name of Consultant: BCC Engineering, LLC
Hours from "Summary" sheet Grand Total
Project Manager 3
Home
Chief Engineer 2
Home
Chief Engineer 1
Home
Senior Engineer 2 Home
Senior Engineer 1 Home
Engineer 2 Home Engineer 1 Home
Chief Designer
Home
Senior Designer
Home
Designer Home
Senior Engineering Technician Home
Engineering Technician
Home
Engineering Intern Home
CADD/Computer Technician Home
Total
3. Project General and Project Common Tasks - BCC 12.99769 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00%
(Prime Consultant)
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - GRAND TOTAL
Staff Hour Distribution Percentages - Grand Total
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - GRAND TOTAL
WORK ACTIVITY
Hours from "Summary" sheet
TOTAL
STAFF HOURS
RANGE
441454613201_VE_Workshop_2_6_23_V2.xlsx Staff Hour Summary - BCC Page 1 of 1 2/20/2023 4:43 PM
Financial Project Number: 441456-1-32-01 Project Name: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
FAP Number: N/A Date: 2/6/2023 Name of Consultant: Hardesty & Hanover
WORK EMPLOYEE CLASSIFICATION
ACTIVITY ON CADD
Firm Total
Chief Engineer 2
Home
Engineer 1 Home
Engineer 2 Home
Engineering Intern Home
Engineering Technician
Home
Senior Engineer 1
Home
Senior Engineering Technician Home
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 12
Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours PERCENT
3. Project General and Project Common Tasks 68 68 0 0 0 0 0 0 0 0 0 0 0 68 75
TOTALS 68 68 0 0 0 0 0 0 0 0 0 0 0 68 75
Field Survey Estimate:
Notes: 0 4-person crew days 68 75
1. This worksheet provides the distribution of a firm's total staff hours for a project.
2. Percentages for staff hour distribution by classification are entered below in rows 64 to 98 of this sheet.
3. Total Staff Hours (column O) may not match staff hours from Summary worksheet (column B) due to rounding. Staff hours calculated for employee classifications are to be adjusted so totals in columns B and O match.
4. Formulas under "Total Staff Hours Range" (columns O & P) may be adjusted to provide desired range.
Financial Project Number: 441456-1-32-01 Project Name: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
FAP Number: N/A Date: 2/6/2023 Name of Consultant: Hardesty & Hanover
Hours from "Summary" sheet Firm Total
Chief Engineer 2
Home Engineer 1
Home Engineer 2
Home Engineering Intern Home
Engineering Technician
Home
Senior Engineer 1
Home Senior Engineering Technician Home
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 12 Total
3. Project General and Project Common Tasks 68 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00%
Hours from "Summary" sheet
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - FIRM TOTAL
Staff Hour Distribution Percentages - Firm Total
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - FIRM TOTAL
STAFF HOURS
TOTAL
FIRM TOTAL
RANGE
441454613201_VE_Workshop_2_6_23.xlsx Staff Hour Summary - H&H Page 1 of 1 2/6/2023 5:09 PM
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467) Consultant Name: BCC Engineering, LLC County: Broward Consultant No.: 1020152.06 FPN: 441456-1-32-01 Date: 2/20/2023 FAP No.: N/A Estimator: Bob Forand
SH Salary Average
By Cost By Rate Per $258.76 $258.44 $248.76 $237.13 $243.90 $203.41 $152.01 $132.42 $121.01 $108.67 $105.44 $109.18 $114.65 $109.25 Activity Activity Task
3. Project General and Project Common Tasks 12.99769 12.99769 0 0 0 0 0 0 0 0 0 0 0 0 0 12.99769 $3,363 $258.76 Total Staff Hours 12.99769 12.99769 0 0 0 0 0 0 0 0 0 0 0 0 0 12.99769 Total Staff Cost $3,363.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,363.28 $258.76
Check = $3,363.28 Survey Field Days by Subconsultant SALARY RELATED COSTS: $3,363.28 4 - Person Crew: OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 0.00% $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) 0 4-person crew days @ -$ / day $0.00
SUBTOTAL ESTIMATED FEE: $3,363.28
Subconsultant: Hardesty & Hanover $23,124.08 Subconsultant: Sub 2 $0.00 Subconsultant: Sub 3 $0.00 Subconsultant: Sub 4 $0.00 Subconsultant: Sub 5 $0.00 Subconsultant: Sub 6 $0.00 Subconsultant: Sub 7 $0.00 Subconsultant: Sub 8 $0.00 Subconsultant: Sub 9 $0.00 Subconsultant: Sub 10 $0.00 Subconsultant: Sub 11 $0.00 Subconsultant: Sub 12 $0.00
SUBTOTAL ESTIMATED FEE: $26,487.36
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $26,487.36
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $26,487.36
Chief Engineer 2
Home
Chief Engineer 1
Home
Senior Engineer 2
Home
Senior Engineer 1
Home Staff Classification
Total Staff Hours From
"SH
Summary -
Firm"
Project Manager 3
Home
CADD/Computer Technician Home
Senior Engineering Technician
Home
Engineering Technician
Home
Engineering Intern Home
Engineer 2 Home
Engineer 1 Home
Designer Home
Chief Designer
Home
Senior Designer
Home
441454613201_VE_Workshop_2_6_23_V2.xlsx Fee Sheet - BCC Page 1 of 1 2/20/2023 4:44 PM
ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT
Name of Project: SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467) Consultant Name: Hardesty & Hanover County: Broward Consultant No.:
FPN: 441456-1-32-01 Date: 2/6/2023 FAP No.: N/A Estimator: Henri Sinson
SH Salary Average
By Cost By Rate Per $340.06 $132.41 $166.08 $92.80 $89.98 $205.90 $114.06 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project General and Project Common Tasks 68 68 0 0 0 0 0 0 0 0 0 0 0 68 $23,124 $340.06 Total Staff Hours 68 68 0 0 0 0 0 0 0 0 0 0 0 68 Total Staff Cost $23,124.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23,124.08 $340.06
Check = $23,124.08
SALARY RELATED COSTS: $23,124.08
OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $23,124.08
Survey (Field) 0 4-person crew -$ / day $0.00 Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $23,124.08
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $23,124.08
Staff Classi-fication 12
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11Staff Classification
Senior Engineer 1
Home
Senior Engineering Technician Home
Staff Classi-fication 8
Chief Engineer 2
Home
Engineer 1 Home
Engineer 2 Home
Engineering Intern Home
Engineering Technician
Home Total Staff
Hours From "SH Summary -
Firm"
441454613201_VE_Workshop_2_6_23.xlsx Fee Sheet - H&H Page 1 of 1 2/6/2023 5:18 PM
Project Activity 3: General Tasks
SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
441456-1-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Task No. Task Units No of Units Hours/ Unit Total
Hours Comments
3.4 Contract Maintenance and Project Documentation LS 1 9 9
Setup and maintenance of files, electronic folders and documents, developing progress reports, review of sub's work, and compilation and submttal of project documentation. Not a typical contract, TWO demands less. Use below low range (4 hrs to set up vs. 16) + (Average 1 hr per month vs. 3 hrs per month for 3 month contract duration) + (2 hrs vs. 4 hrs for final project documentation) = 4 + 3 + 2 = 9 hrs total.
3.13 Other Project General Tasks LS 1 3.99769 3.99769 Review VE Workshop findings/comments. Clarify as needed. Compile and submit.
12.997693. Project Common and Project General Tasks Total
BCC Engineering Bob Forand, PE
Estimator: Bob Forand
Representing Print Name
FDOT District IV Ramon Otero, PE
441454613201_VE_Workshop_2_6_23_V2.xlsx
3. Project General Tasks - BCC Page 1 of 1 2/20/2023
Project Activity 3: General Tasks
SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY ( BRIDGE #860466 & 860467)
441456-1-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
3.5 Value Engineering (Multi-Discipline Team) Review LS 1 68 68
VE Workshop (40hrs) VE Presentation (4 hrs) Review of Draft Report (8 hrs) Review of Contract Documents (16 hrs) Total: 68 hrs
Estimator: Henri Sinson
3. Project Common and Project General Tasks Total
Hardesty & Hanover Henri Sinson, PE
Representing Print Name
FDOT District IV Ramon Otero, PE
441454613201_VE_Workshop_2_6_23.xlsx
3. Project General Tasks - H&H Page 1 of 1 2/6/2023
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAA38
2/17/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 2/17/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55043010452
Expansion Option: A1
Object Code: 131512
Amount: $26,487.36
Financial Project: 44145613201
Work Activity (FCT): 119
CFDA:
Fiscal Year: 2023
Budget Entity: 55100100
Category/Category Year: 088849/23
Amendment ID: W005
Sequence: 00
User Assigned ID: 6
Enc Line (6s)/Status: 0007/04
Total Amount: $26,487.36
Contract: CAA38
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: BCC ENGINEERING LLC
Vendor ID: F650540100005
Beginning Date of This Agreement: 09/03/2020
Ending Date of This Agreement: 09/02/2025
Contract Total/Budgetary Ceiling: bc = $1,500,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Districtwide Structures Design Services
Page1 of 1