This document is a Task Work Order (TWO #05) issued by the State of Florida Department of Transportation (FDOT) to BCC Engineering, Inc., under Contract No. CAA38. The task work order is specifically for the Wabasso Road Bridge No. 880053 TL-3 Railing Plans project, with a Project Manager from FDOT named Ramon Otero.

The scope of services involves providing structural and roadway engineering services to produce final plans and a specifications package for adding a pedestrian/bicycle railing to an existing bridge. The total compensation for these services is $46,279.54, to be paid on a lump sum basis tied to percentage of completion. The work includes project general tasks, roadway analysis, roadway plans, and structures-related activities such as preparing detailed sheets, general notes, quantities reports, and cost estimates. The project has a specific deliverable date of 4/8/22 for final plans, with the consultant responsible for design, plans, and coordination, while FDOT will provide necessary project information.

View the file

Other files

File Type Posted
CN-550000-CAA38-W0030100.pdf PDF
CN-550000-CAA38-00040000.pdf PDF
CN-550000-CAA38-W0040000.pdf PDF
CN-550000-CAA38-W0050000.pdf PDF
CN-550000-CAQ64-W0060000.pdf PDF
CN-550000-CAA38-00030000.pdf PDF
CN-550000-CAA38-W0020000.pdf PDF
CN-550000-CAA38-W0030000.pdf PDF
CN-550000-CAA38.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

9/2/2025

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Procurement, Financial Services, PM, File

Vice President

$46,279.54

$0.00

(name) (title)

Luis Rodriguez

$46,279.54

Total authorizations to date (including this one):

Departmental Approval:

$46,279.54 Limit

Plans Preparation Services for Wabasso Road Bridge (Bridge No. 880053) Pedestrian Railing

BCC Engineering, Inc.

4901 NW 17th Way, Suite 506, Fort Lauderdale, FL 33309

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$46,279.54

(LS2) Lump sum paid based on % of completion

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

$168,888.29

(name) (title) Signature

Luciana Amato Contract Coordinator

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAA38 230068-6-32-01

DocuSign Envelope ID: EA0CB2DB-07E6-4CA3-8E6F-599F07F7E397

4/5/2022 | 12:52 PM EDT

SCOPE OF SERVICES

Contract No. CAA38

FPID No. 230068-6-32-01

TWO #05

Wabasso Road Bridge No. 880053 TL-3 Railing Plans

FPID 450590-1-52-01

FDOT PM: Ramon Otero, PE

(954) 777-4162 | Ramon.Otero@dot.state.fl.us

Plans Preparation Services for TL-3 Railing

1.0 BACKGROUND:

The Prime Consultant (BCC Engineering) was retained by the Department for Contract CAA38 to provide Districtwide Structures Design Services for various projects on a Task Work Order basis. The Wabasso Road Bridge No. 880053 was retrofitted with an Index 521-480 vertical face traffic railing barrier in 2005. The bridge carries two 12’ traffic lanes with 4’-6” shoulders. The shoulders are used by bicyclists so there is a need to provide drop off protection. As a result, District Structures had requested the participation of the Prime Consultant to provide the structural engineering services to prepare Plans for a pedestrian/bicycle railing mounted to the back of the vertical face traffic railing barrier retrofit.

This TWO involves updating those Plans to be let as a standalone construction contract to include Structural as well as Roadway (Maintenance of Traffic) Plans with Structures as the lead component, and the Specifications Package.

2.0 PURPOSE:

The purpose of this TWO is to provide Structural and Roadway engineering services to produce Final Plans and a Specifications Package.

3.0 SCOPE:

Under this TWO, the Consultant will provide the following services (reference the attached Staff Hour Estimate for additional detail):

o Activity 3: Project General Tasks

▪ Specifications Package Preparation

▪ Contract Maintenance

▪ Digital Delivery

▪ Other Project General Tasks o Activity 4: Roadway Analysis

▪ Temporary Traffic Control Plan Analysis

▪ Quantities for EQ Report

▪ Cost Estimate

▪ Quality Assurance/Quality Control

▪ Supervision

▪ Coordination

▪ Technical Meetings o Activity 5: Roadway Plans

▪ Temporary Traffic Control Detail Sheets o Activity 9: Structures - Miscellaneous Tasks, Drawings, and Non-Technical

▪ Key Sheet and Index of Drawings

▪ General Notes and Bid Item Notes

▪ Miscellaneous Common Details

▪ Quantities and EQ Report

▪ Cost Estimate

▪ Quality Assurance/Quality Control

▪ Supervision

▪ Technical Meetings

The work shall be performed under a Lump Sum method of compensation.

4.0 DELIVERABLES AND SCHEDULE:

Deliverables: Plans and Specifications Package.

Schedule: The project schedule and important project dates are as follows:

o Final Plans: 4/8/22

5.0 CONSULTANT RESPONSIBILITIES:

The Consultant’s responsibilities are to perform engineering services as requested by the Department. The Consultant will provide the necessary design, Plans, and coordination. Post-design services are not included in this scope.

6.0 DEPARTMENT RESPONSIBILITIES:

The Department’s responsibilities are to provide all necessary information to the Consultant to perform the engineering services.

File details come from the government source that posted it. Updated .