This is a Task Assignment Notification Form for a Florida Department of Environmental Protection (FDEP) indefinite delivery contract (HW555) awarded to GHD Services, Inc. The task assignment (DC049I) is managed by FDEP Contract Manager Billy Hessman and involves work at the Nu-Touch Cleaners facility located at 190 Barton Boulevard, Rockledge, Brevard County, Florida (Site ERIC_4023). The contractor representative is Brian Moore, and the work is performed under Module D000.

The task assignment involves conducting an Advanced Site Assessment (ASA) at the Nu-Touch Cleaners site in anticipation of potential site closure, with a total not-to-exceed cost of $45,000 and a final task assignment value of $30,454.18. Work is structured in four subtasks: Subtask 1 (Project Management at 12.5% of direct labor); Subtask 2 (Soil and Groundwater Assessment including three soil borings, Modified Active Gas Sampling at three locations, and installation and sampling of seven groundwater monitoring wells); Subtask 3 (IDW Management and Site Survey including surveying and off-site disposal of investigative derived waste); and Subtask 4 (Advanced Site Assessment Report preparation). The fixed-price contract includes three invoice milestones: $18,646.60 upon completion of soil and groundwater sampling with FDEP approval, $5,990.18 upon completion of field activities and IDW manifests approval, and $5,817.40 upon completion of the Advanced Site Assessment Report. The final deliverable due date is January 30, 2019, with task assignment completion by April 26, 2019. Subcontractors include Cascade (well installation at $6,699.00), Environmental Drilling Service (well installation support), Survtech (survey services at $3,882.00), Perma-Fix (IDW disposal), and Clark Environmental (waste transportation and disposal).

View the file

Other files

File Type Posted
CN-370000-HW552-TDC007A.pdf PDF
CN-370000-HW555-A10.pdf PDF
CN-370000-HW555-A5.pdf PDF
CN-370000-HW555-CO1.pdf PDF
CN-370000-HW555-DC001A.pdf PDF
CN-370000-HW555-DC001H.pdf PDF
CN-370000-HW555-DC001I.pdf PDF
CN-370000-HW555-DC004F.pdf PDF
CN-370000-HW555-DC004K.pdf PDF
CN-370000-HW555-DC006H.pdf PDF
CN-370000-HW555-DC006L.pdf PDF
CN-370000-HW555-DC007F.pdf PDF
CN-370000-HW555-DC007H.pdf PDF
CN-370000-HW555-DC008E.pdf PDF
CN-370000-HW555-DC010D.pdf PDF
CN-370000-HW555-DC012H.pdf PDF
CN-370000-HW555-DC013H.pdf PDF
CN-370000-HW555-DC019G.pdf PDF
CN-370000-HW555-DC019L.pdf PDF
CN-370000-HW555-DC01ACO6.pdf PDF
CN-370000-HW555-DC01ACO8.pdf PDF
CN-370000-HW555-DC01J.pdf PDF
CN-370000-HW555-DC020J.pdf PDF
CN-370000-HW555-DC021i.pdf PDF
CN-370000-HW555-DC024I.pdf PDF
CN-370000-HW555-DC02C.pdf PDF
CN-370000-HW555-DC02D.pdf PDF
CN-370000-HW555-DC02E.pdf PDF
CN-370000-HW555-DC02HCO4.pdf PDF
CN-370000-HW555-DC02HCO6.pdf PDF
CN-370000-HW555-DC02I.pdf PDF
CN-370000-HW555-DC02K.pdf PDF
CN-370000-HW555-DC02M.pdf PDF
CN-370000-HW555-DC030K.pdf PDF
CN-370000-HW555-DC031K.pdf PDF
CN-370000-HW555-DC032G.pdf PDF
CN-370000-HW555-DC033G.pdf PDF
CN-370000-HW555-DC034O.pdf PDF
CN-370000-HW555-DC034Q.pdf PDF
CN-370000-HW555-DC035F.pdf PDF
CN-370000-HW555-DC035I.pdf PDF
CN-370000-HW555-DC035J.pdf PDF
CN-370000-HW555-DC038B.pdf PDF
CN-370000-HW555-DC039E.pdf PDF
CN-370000-HW555-DC03B.pdf PDF
CN-370000-HW555-DC03CCO1.pdf PDF
CN-370000-HW555-DC03D.pdf PDF
CN-370000-HW555-DC03J.pdf PDF
CN-370000-HW555-DC03J.pdf.crdownload CRDOWNLOAD file
CN-370000-HW555-DC040C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

.:>1lt:: Nu-1 ouch Cleaners

PROJECT NUMBER. 11147374-11

FDEP NO: ERIC_4023

SUBTASK Soil Sampling, Well Installation, and GW sampling

DATE: 10/1/2018

i[i''iBOR CliTEGOR'i' 11 "PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 !Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data I 1Professiona1 Geologist ES mobfdemob 4 Professional Geologist ES Oversse Well Installation (2.5 days) 20

I 27 fsenior Technician AP Mob/demob 4 �enior Technician AP Soil borings (3 locations) 5 fsenior Technician AP MAGS (3 locations) 5 Senior Technician AP Waler Levels (7 wells) 1 senior Technician AP Groundwater Sampling (3 wells) 4.5

I 19.5

:S1aff Engineer/Scien1ist EG Mob/demob 4 Staff Engineer/Scientist EG Soi! borings (3 locations) 5 !staff Engineer/Scientist EG Restoration (3 locations) 5 IStaff Engineer/Scientist EG Groundwater Sampling (4 wells) 6

I 20

TOTAL LABOR I 66.5

11"1'VCL. II lYPE RATE UNIT USEAGE Miles Free

Truck S97.00 day 5 5485.00

TOTAL VEHICLE I 5485.00

II lYPE RATE UNIT USEAGE Miles Free g�ologist Hotel S85.00 Day 2 SI70.00 eologist Per Diem S36.00 person/day 3 SI08.00

Technician Hotel S85.00 Day 2 SI70.00 Technician Per Diem S36 00 person/day 4 S144.00

TOTAL VEHICLE I S592.00

ISOBCOlilTRliCTOR 11

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

Cascade Mobilization S750.00 each 1 S750.00 Cascade Exterior Shallow Well S610.00 each 5 S3,050.00 Cascade Interior Shallow Well S954.00 each I S954.00 Cascade Exterior Deep Well Sl,495.00 each I S1,495.00 Cascade Drums S60.00 drum 5 S300.00 Cascade Permits S150.00 each 1 SI50.00

TOTAL SUBS I 56,699.00

"' ,v" II

PARAMETER RATE #SAMPLES #QAQC

voes.soil EPA8260 SI35.00 3 5405.00 vocs.gw EPA 8260 S135.00 7 3 SI,350.00 voes-soil gas T0-15 S200.00 3 5600.00 Sample Shipping Small Cooler (2 day) S35.00 I S35.00 Sample Shipping small Cooler (1 day) S63.00 1 563.00

TOTAL LAB I S2,453.00

IFIECD EXPElilSES 11 ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables S32.50 Day 5 S162.50 ISub-Tolal S162.50

Groundwater Sampling Krt S208.55 day 2 5417. 10 Poly Tubing (HOPE) S0.25 n 132 S33.00 Silicon Tubing S2.00 n 7 S14.00 Air Sampling Pump S25.25 Day 1 S25.25 Regeneralive Blower S92 15 Day 1 S92.15 Portable generator S66.00 Day 1 $66.00 Vacuum Gages SI9 40 Day I S19.40 Tedlar Bags SI4 55 Each 3 543.65 Well Screen (5 reet, 2-inch, 0.010-slot) S10.65 each 3 S31.95 Well Point (2-inch) S425 each 3 SI2.75 Soil sampling kit (through concrete) S208.55 Day 1 S208.55

ISub-Tolal S963.80

TOTAL EQUIPMENT I S1.126.30

TA_0049I (002) .Xl.!ix\.sub 2 Page 1 10/1/20182: 07 PM

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 3

SITE: Nu-Touch Cleaners

PROJECT NUMBER: 11147374-11

FDEP NO: ERIC 4023

SUBTASK:

DATE:

IL!:BOR CATEGORY 11

IDW Management and Surveying 10/1/2018

*PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Geologist ES Prepare survey Scope of work 1 Professional Geologist ES Soil and GW IDW profiling 1

I 2

Professional Geologist PM Oversee IDW pickup 6

I 6

TOTAL LABOR I 8

ITRA�E[ 11 TYPE RATE UNIT USEAGE Miles Free

Automobile $68.00 day 1 $68.00

TOTAL VEHICLE I $68.00

IPER DIEM Ii TYPE RATE UNIT USEAGE Miles Free

TOTAL VEHICLE I $0.00

ISOBCOfJTRJi:CTOR 1, Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

Survtech Survey $3,882.00 each 1 $3,882.00 PermaFix IDWSoil $105.00 drum 2 $210.00 PermaFix IDWGW $105.00 drum 3 $315.00

TOTAL SUBS I $4,407.00

![AB ORATORY 1 1

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB I $0.00

IFIE[O EXPE�SES 11 ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 0 $0.00 !Sub-Total $0.00

!Sub-Total $0.00

TOTAL EQUIPMENT I $0.00

TA 00491 (002).xlsx\sub 3 Page 1 10/1/20182:07 PM

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 4

SITE: Nu-Touch Cleaners

PROJECT NUMBER: 11147374-11

FDEP NO: ERIC 4023

SUBTASK: Advanced Site Assessment Report

DATE:

1CABOR CATEGOR'r Ii

10/1/2018 'PROVIDE TIME REQUIRt:D FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Engineer ES QA/QC field and laboratory data 1 Professional Engineer ES Project Background 2 Professional Engineer ES File Review 2 Professional Engineer ES Soil Sampling Methods 1.5 Professional Engineer ES Soil Sampling Results 1.5 Professional Engineer ES MAGS sampling methods 1 Professional Engineer ES MAGS results 1 Professional Engineer ES Well Installation Details 2 Professional Engineer ES Regional Geology 2 Professional Engineer ES Groundwater Sampling Methods 1 Professional Engineer ES Groundwater flow evaluation (shallow/deep) 2 Professional Engineer ES Water Quality Parameter Summary 1 Professional Engineer ES Groundwater Analtycial Results 2 Professional Engineer ES QA/QC Laboratory Data 1.5 r 21.5

Sr Professional Engineer BM Conclusions/Recommendations 2 I 2

Drafting Technician JR Update soil sampling results plan 2 Drafting Technician JR Update MAGS sampling results plan 2 Drafting Technician JR Prepare GW Flow map-shallow 2 Drafting Technician JR Prepare VOC plume figure with updated concentration data 2

I 8

Staff Assistant ss Data Entry (10 wls, and 5 monitor wells) 1 Staff Assistant ss Generate summary tables 1.5 Staff Assistant ss Document Preparation/Publishing 2 Staff Assistant ss Update GIS/ADAPT 1

I 5.5

TOTAL LABOR r 37 'cL II TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 0 $0.00

TOTAL VEHICLE r $0.00 �Ut:!(.;UN I t<.Av I IJt( II

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS I S0.00

l[ABORJ\TOR't' 11

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB I $0.00

11-11::LD -· _, II ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 0 $0.00 I Sub-Total $0.00

I Sub-Total $0.00

TOTAL EQUIPMENT f $0.00