CN-370000-HW555-DC045H.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW555|3626b1bfe23ad9cb6d0c11811d472cb2
Contract number
HW555
Issued by
Florida

About this file

Task Assignment Summary

This Task Assignment Notification Form (DC045H) is issued under Florida Department of Environmental Protection (FDEP) Contract No. HW555 to GHD Services, Inc. for environmental remediation services at Jan's Quality Cleaners facility located at 1115 Highway 17 South, Bartow, Polk County, Florida. The work is managed under FDEP Site No. ERIC_5367 with Billy Hessman serving as the DEP Contract Manager and Brian Moore as the Contractor Representative.

The task assignment requires GHD Services, Inc. to conduct well installation and groundwater monitoring activities in accordance with the October 2020 scope of work and cost proposal. The primary deliverable is a Groundwater Monitoring Report, with a due date of February 2, 2021, and a task completion date of May 7, 2021. The work comprises two subtasks: Subtask 1 includes project management calculated at 12.5 percent of direct labor costs, and Subtask 2 encompasses well installation and groundwater sampling, including installation of one interior monitoring well to 28 feet below land surface, groundwater sampling from five wells for volatile organic halocarbons analysis by EPA Method 8260, and preparation of either a Groundwater Monitoring Report or a Site Rehabilitation Completion Report if cleanup targets are met. The total task assignment value is $8,002.92 on a fixed-price basis with no retainage. Invoice payment is contingent upon completion of well installation, groundwater monitoring activities, and FDEP approval of the Groundwater Monitoring Report. The cost proposal includes labor, overhead, general and administrative expenses, fringe benefits, subcontractor services for drilling ($2,624.00), laboratory analytical costs ($365.00), field equipment and expendables ($286.05), travel expenses ($97.00), and a completion fee. Only one drilling bid was obtained due to logistical constraints, as Cascade Remediation Services and Preferred Drilling Solutions indicated inability to access the breezeway location with available equipment.

View the file

Other files

File Type Posted
CN-370000-HW552-TDC007A.pdf PDF
CN-370000-HW555-A10.pdf PDF
CN-370000-HW555-A5.pdf PDF
CN-370000-HW555-CO1.pdf PDF
CN-370000-HW555-DC001A.pdf PDF
CN-370000-HW555-DC001H.pdf PDF
CN-370000-HW555-DC001I.pdf PDF
CN-370000-HW555-DC004F.pdf PDF
CN-370000-HW555-DC004K.pdf PDF
CN-370000-HW555-DC006H.pdf PDF
CN-370000-HW555-DC006L.pdf PDF
CN-370000-HW555-DC007F.pdf PDF
CN-370000-HW555-DC007H.pdf PDF
CN-370000-HW555-DC008E.pdf PDF
CN-370000-HW555-DC010D.pdf PDF
CN-370000-HW555-DC012H.pdf PDF
CN-370000-HW555-DC013H.pdf PDF
CN-370000-HW555-DC019G.pdf PDF
CN-370000-HW555-DC019L.pdf PDF
CN-370000-HW555-DC01ACO6.pdf PDF
CN-370000-HW555-DC01ACO8.pdf PDF
CN-370000-HW555-DC01J.pdf PDF
CN-370000-HW555-DC020J.pdf PDF
CN-370000-HW555-DC021i.pdf PDF
CN-370000-HW555-DC024I.pdf PDF
CN-370000-HW555-DC02C.pdf PDF
CN-370000-HW555-DC02D.pdf PDF
CN-370000-HW555-DC02E.pdf PDF
CN-370000-HW555-DC02HCO4.pdf PDF
CN-370000-HW555-DC02HCO6.pdf PDF
CN-370000-HW555-DC02I.pdf PDF
CN-370000-HW555-DC02K.pdf PDF
CN-370000-HW555-DC02M.pdf PDF
CN-370000-HW555-DC030K.pdf PDF
CN-370000-HW555-DC031K.pdf PDF
CN-370000-HW555-DC032G.pdf PDF
CN-370000-HW555-DC033G.pdf PDF
CN-370000-HW555-DC034O.pdf PDF
CN-370000-HW555-DC034Q.pdf PDF
CN-370000-HW555-DC035F.pdf PDF
CN-370000-HW555-DC035I.pdf PDF
CN-370000-HW555-DC035J.pdf PDF
CN-370000-HW555-DC038B.pdf PDF
CN-370000-HW555-DC039E.pdf PDF
CN-370000-HW555-DC03B.pdf PDF
CN-370000-HW555-DC03CCO1.pdf PDF
CN-370000-HW555-DC03D.pdf PDF
CN-370000-HW555-DC03J.pdf PDF
CN-370000-HW555-DC03J.pdf.crdownload CRDOWNLOAD file
CN-370000-HW555-DC040C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 NADC045H

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_5367

Jan's Quality Cleaners

1115 Highway 17 South, Bartow, Polk County

Monitoring

GHD Services, Inc. will conduct well installation and groundwater monitoring in accordance with the October 2020 scope of work and cost proposal. A Groundwater Monitoring Report will be generated. If all contaminants of concern (COC) remain below their applicable Groundwater Cleanup Target Levels (GCTLs), a Site Rehabilitation Completion Report will be included.

Groundwater Monitoring Report

02/02/2021

05/07/2021

$ 8,002.92 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.10.28 09:41:49 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.10.28 09:41:55 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.10.28 10:35:13 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2020.10.28 10:57:42 -04'00'

$ 8,002.92

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 02/02/2021

Upon completion of well installation and groundwater monitoring activities and FDEP approval of the Groundwater Monitoring Report. $ 8,002.92

$ 8,002.92

HW555

DC045H

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: HW555 Contract File Jan’s Quality Cleaners

ERIC_5367

Bartow, Polk County

From: Billy Hessman, Contract Manager

Date: October 28, 2020

Subject: Negotiation Summary

HW555 DC045H

Monitoring

GHD Services, Inc. will conduct well installation and groundwater monitoring. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Well Installation and Groundwater Sampling Subtask 2 includes costs for GHD to install one interior well and conduct groundwater sampling. Only one bid was obtained for drilling due to logistical difficulties. Cascade and Preferred are unable to complete the scope and provide a bid due to the lack of space inside the building. Upon completion of well installation, GHD will sample the new well and 4 existing wells for VOHs by EPA Method 8260. If all COCs remain below their applicable CTLs, a SRCR will be included in the report.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is February 2, 2021 , and the completion date for the Task Assignment is May 7, 2021.

The final cost total for DC045H is $8,002.92.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/28/20

Task #: DC045H SubTask 1 Project Management SubTask 6

Site: Jan's Quality Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.28 2.277 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 0.75 0.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$47.12 Professional Engineer/Geologist ES 18.50 18.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$22.76 Senior Technician WM 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 2.50 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.27 Staff Assistant SS 2.50 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 37.53 2.277 35.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,428.29 $158.70 $1,269.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,613.97 $179.33 $1,434.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $399.93 $44.44 $355.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $364.22 $40.47 $323.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,806.41 $422.94 $3,383.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $71.42 $7.94 $63.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/28/20

Task #: DC045H SubTask 1 Project Management SubTask 6

Site: Jan's Quality Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $2,624.00 $2,624.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,724.00 $2,724.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $272.40 $272.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,996.40 $2,996.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $330.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $365.00 $365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $253.55 $253.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $286.05 $286.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,622.28 $430.88 $7,191.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $380.64 $42.29 $338.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,002.92 $473.17 $7,529.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Jan's Quality Dry Cleaners

PROJECT NUMBER: 11124287

FDEP NO: ERIC_5367

SUBTASK: Groundwater Monitoring

DATE: 10/28/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer BM Conclusions/Recommendations 0.75 0.75

Professional Geologist ES Specify laboratory data deliverable/Sample Kit 0.5 Professional Geologist ES Field sampling SOW/coordinate site access 0.5 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Project Background 1 Professional Geologist ES Groundwater Sampling Methods 1 Professional Geologist ES Groundwater flow evaluation (shallowp) 1 Professional Geologist ES Water Quality Parameter Summary 1 Professional Geologist ES Groundwater Analtycial Results 2 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Mobilization 2 Professional Geologist ES Oversee Well Installation 5 Professional Geologist ES Prepare SRCR 1 Professional Geologist ES Conclusions/Recommendations 1

18.5

Senior Technician WM Mob/demob 2 Senior Technician WM Survey new well 0.5 Senior Technician WM Water Levels (all wells - 6 total) 1 Senior Technician WM Groundwater Sampling (5 wells) 7.5

Drafting Technician MJ Prepare GW Flow map 1 Drafting Technician MJ Prepare VOC plume figures with updated concentration data 1.5

2.5

Staff Assistant SS Data Entry (6 wls, and 6 monitor wells) 1 Staff Assistant SS Update summary tables (field parameters, wl, analytical) 1.5

2.5

TOTAL LABOR 35.25

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

Groundwater Protection Mobilization $500.00 each 1 $500.00 Groundwater Protection Daily Rate $1,250.00 day 1 $1,250.00 Groundwater Protection Dolly Rig $450.00 day 1 $450.00 Groundwater Protection Well Materials $3.00 ft 28 $84.00 Groundwater Protection Prepack Screens $75.00 each 3 $225.00 Groundwater Protection Expandable Point $15.00 each 1 $15.00 Groundwater Protection Manhole Completion $100.00 each 1 $100.00 Groundwater Protection Well Development $75.00 hr 0 $0.00

Erwin Remediation IDW GW Drum $100.00 drum 1 $100.00

TOTAL SUBS $2,724.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 5 $330.00 Sample Shipping Small Cooler (2 day) $35.00 1 $35.00

TOTAL LAB $365.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

Groundwater Sampling Kit $208.55 day 1 $208.55 Poly Tubing (HDPE) $0.25 ft 140 $35.00 Silicon Tubing $2.00 ft 5 $10.00

Sub-Total $253.55

TOTAL EQUIPMENT $286.05

Copy of TA_045H.xlsx\sub 2 Page 3 10/28/20209:18 AM

COST PROPOSAL FOR TASK DC045H

< Jan’s Quality Dry Cleaners, ERIC_5367>

Groundwater Monitoring

1. INTRODUCTION:

A Site Assessment Report and Interim Source Removal Plan (SAR/ISRP) was submitted in December 2017 for the Jan’s Quality Dry Cleaners facility, located in Bartow, Polk County.

The SAR/ISRP was approved and the Soil Vapor Extraction (SVE) system was installed and operated for one year. The SVE operations were recently discontinued and groundwater sampling was conducted. GHD submitted a Groundwater Monitoring Report (GMR) was submitted in July 2020. The FDEP provided comments on the GMR on September 2, 2020.

Task DC045H includes well installation and groundwater monitoring as recommended by FDEP and detailed below.

Subtask 1 Project Management Sub Task 1 includes all tasks associated with managing groundwater monitoring and reporting at the Jan’s Quality Cleaners.

Subtask 2 Well Installation and Groundwater Sampling As recommended by the Department, well installation and groundwater sampling will be conducted. An additional shallow monitor well will be installed with a remote access rig in the breezeway located to the immediate west of the subject facility (see attached map). The well will be installed to a depth of 28 ft bls and will be constructed with 15 feet of 0.75 inch diameter PVC prepack well screen and blank casing. The annulus of the borehole will be backfilled with 20/30 silica sand to 2 feet above the well screen, will be sealed with 2 ft of fine sand and neat cement grout to land surface. The well will be finished at land surface inside a 6-inch diameter flush steel manhole.

Following well installation, groundwater sampling will be conducted and the new well will be surveyed relative to existing wells. Prior to sampling, depth to water measurements will be gathered at monitor wells MW001 through MW007. Following depth to water measurements, groundwater sampling will be completed at MW001, MW002, MW005, MW006, and the new well. Groundwater sampling will be conducted in accordance with FDEP Standard Operating Procedures and all groundwater samples will be analyzed for the presence of volatile organic halocarbons (VOHs).

Following completion of the sampling and upon receipt of analytical data, GHD will prepare a Groundwater Monitoring Report (GMR) detailing the sampling methodology and analytical results. The GMR will include a summary of sampling methods and analytical results. If criteria are met, the report will also include a Site Rehabilitation Completion Report.

Deliverables:

Deliverable Deliverable Due Date

Groundwater Monitoring Report/SRCR 2/2/21

Proposed Well Location

Drilling

Mobilization $500.00 each 1 $500.00 Daily Rate $1,250.00 day 1 $1,250.00 No Bid No Bid Dolly Rig $450.00 LS 1 $450.00 Well Materials $3.00 ft 28 $84.00 Prepack $75.00 each 3 $225.00 expendable Point $15.00 each 1 $15.00 Manhole $100.00 each 1 $100.00 Well development $75.00 each 0 $0.00 Drum $55.00 each 0 $0.00 Permits $0.00 each 1 $0.00

$2,624.00

IDW

GW IDW Drum $100.00 drum 1 $100.00 $60.00 drum 1 $60.00 No response Transportation $30.00 drum 1 $30.00 Stop Fee $50.00 each 1 $50.00

$100.00 $140.00

Groundwater Protection PreferredCascade

Erwin Clark Clean Management

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Sonic Auger DPT Horizontal Directional Drilling

DATE: 9/24/2020

ESTIMATE #: 920076

Project Description:

ID QTY Unit Rate TOTAL

1 1 ls 500.00$ 500.00$

2 0 night 200.00$ -$

3 Daily Rate: DPT Rig w/ Crew 1 < Day 1,250.00$ 1,250.00$

4 420 M Dolly Rig 1 ls 450.00$ 450.00$

5 28 foot 3.00$ 84.00$

6 Materials: 3/4" x 5' .010 Slot Prepacked screens 3 each 75.00$ 225.00$

7 Materials: 2" Expendable Point 1 each 15.00$ 15.00$

8 3" Brass Manhole Completion 1 each 100.00$ 100.00$

9 1 each 75.00$ Included

10 0 1/2 hour 50.00$ -$

11 0 each -$ -$

12 55 gallon drums (Soil) (As Needed) 0 each 55.00$ -$

13 55 gallon drums (Water) (As Needed) 0 each 55.00$ -$

14 -$

Completion: Subtotal 2,624.00$

Todd Hodgson TOTAL 2,624.00$ Partner

PROJECT

Jan's Quality Cleaners 1115 US Hwy 17 South

CUSTOMER

GHD

Brian Moore

5904 Hampton Oaks Parkway Suite F

< Day

Well Development (up to 1/2 hour w/ pump)

Additional Well Development

Tampa, Florida 33610

(813) 257-0658

Bartow, Florida

(1) MW's 3/4" x 28' w/15' of .010 Pre-Pack Screen & 3" Brass Manhole Completion - No Soil Sampling

"Actual quantities used & days on site will be invoiced"

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

420 M Dolly DPT Rig - Well Installation

DESCRIPTION

Mobilization

Per Diem

THANK YOU FOR YOUR BUSINESS!

Permits: N/A for FDEP Projects

***Utility Locates on Private Property is the responsibility of the client**

Todd Hodgson

Installed w/420 M Dolly Rig

Materials: 3/4" Well Installation

From: Bronson Bartley To: Brian Moore Subject: RE: Michael the Cleaner - Sarasota Date: Monday, October 12, 2020 10:47:24 AM Attachments: image003.png image004.png image005.png image006.png image007.png image008.png image009.png image010.png image011.png image012.png image013.png image014.png image015.png image016.png image017.png image018.png image019.png image020.png image021.png image022.png image023.png image024.png image025.png image026.png image027.png image028.png image057.png image058.png

Brian, Walt went down and took a measurements at the site on Friday, since he was on the last project.

There isn’t enough clearance to get even our smallest rig in there. Also the site is badly overgrown now. I don’t think this is something we are going to be able to complete unless the sample points change to outside the building.

Thank you Bronson

Bronson Bartley | Operations Manager

CASCADE REMEDIATION SERVICES

1020 South 82nd Street Tampa, FL

M: 678.602.6837 | BBARTLEY@CASCADE-ENV.COM

WWW.CASCADE-ENV.COM

EXCELLENCE ON EVERY LEVEL™

mailto:bbartley@cascade-env.com mailto:Brian.Moore@ghd.com mailto:BBARTLEY@CASCADE-ENV.COM https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.cascade-env.com%2F&data=02%7C01%7CBrian.Moore%40ghd.com%7Cd267a2cc4eb84dd97f9508d86ebdb43c%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637381108378868333&sdata=xA7jAy3L7X0tuE3e95v09FU2IeFhD3XMg711xJM2YEg%3D&reserved=0

From: Kevin Bonacum To: Brian Moore Subject: RE: Jan"s Quality Cleaner - Bartow Date: Monday, October 26, 2020 11:39:00 AM Attachments: image001.png image002.png image003.png image004.png

Hi Brian, Unfortunately we don’t have anything that can do that for you. Sorry! I suggest checking with Geotech drillers, most small environmental rigs especially DPT probably won’t get that deep.

Thanks

Kevin J. Bonacum Director of Safety & Business Development Preferred Drilling Solutions, Inc.

8820 66th Street North Pinellas Park, FL 33782 Ph: 727-561-7477 ext 113 Cell: 727-401-5770 kevin@pdsflorida.com www.pdsflorida.com

From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, October 26, 2020 11:36 AM To: Kevin Bonacum <kevin@pdsflorida.com> Subject: Jan's Quality Cleaner - Bartow

Kevin, We need a 28 ft well installed within a breezeway in Bartow with about 7.5-8 ft clearance.

The access area is about 3 ft wide. Does Preferred have any specialized equipment that would accommodate this well installation?

Thank you

Brian Moore, PE

GHD

Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect

WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION

Please consider our environment before printing this email mailto:kevin@pdsflorida.com mailto:Brian.Moore@ghd.com mailto:kevin@pdsflorida.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.pdsflorida.com%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355169476%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=XDRrYy%2Bc%2FbtCL%2F2qOZU4y5vbKdqPt1xxGHwkgoAQ%2BCg%3D&reserved=0 mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https:%2F%2Furl.emailprotection.link%2F%3FbvRS6DCo9Wu4_jAiibArzpca0FEsoH2PcG8bNW118vkyPQ6e4DHRWzEzeYwH2ZaQea8dLVPF4r8T10qAi_iIu0A~~&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355179468%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=Omx4y2dtvJolEAzgtdTQrvXAYhQbb47j1jJ0Od%2Fths8%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https:%2F%2Furl.emailprotection.link%2F%3FblCqFsAgyxi0r6T3mJfd_l_3WMcIh5MNB3N9UFCYzb4PAkJ799eh8Kh_YLd5it0_sX_GRu0Z7r3NvzR-TW_G2zQ~~&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355179468%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=vacbwMdlcSy4gxYTBxIdf3c%2FzT120hZc6MxKm7T4%2FXM%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https:%2F%2Furl.emailprotection.link%2F%3FbUU7m4NfMS_EWGtH1yojBHexl0ArWxQcBNWi1JQ15D5enN1t8bNC_XVPqKdLTtyfwpqZnb2JFSpSk-wd2mXqvzw~~&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355189461%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=urNfuPnbcj%2FjPSoQthjyEYdH0a8bPTD%2F4BVInQNM65Q%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https:%2F%2Furl.emailprotection.link%2F%3FbVO2q0UXR235wN_yOnM0FjsmdVZlXX05JCMXbXLh0YTLKFdCbCHElxH1WviJIYXFNLlHzhk97yY7Qxjl6jMK9ZA~~&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355189461%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=M02DuVishCyqkS2LAlKLD3K1IS5OHjGOGT6wQHGkToI%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3FbH1bmLuRP-9egfczNVLB6hb63GrVthrlQktmbLWCdnlUyywJHj2uHWxwrdXdl08_g_e8_MkpVZA-6nZNgeFPxwKGK5m0uvzngeCISF8ysG3A52L1-VCf-Y9cBSR8DpC3Z&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355199462%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=HTM8MD5Xg%2Bs7Ua8cxFSwmY6Rm3kF%2Bl%2BhAkk1p8gkpd4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3Fb42lUZUY6yqTGHHyn9xf4zonisCQAUUmI7wpimlHUq6Tp_Teig1cxAp_BcHXDlEPcOVf-kNtxTdSlKRqjv1S7ZpAwzpxQix-VMtLb9sRwYdmhA3_ByWsQXJtvsBuyZOxs&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355199462%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=Z8ZLDavMaqVu4c4m76R2FWx%2B5S%2FEkUgIu0Ic0i%2FhkuQ%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3FbAIA20NxDJW4OXwShS-cgklNyVr0B-_VYLJuaAHeitmmkt__wdj1-C4dPbLVe0kh_kNozhumSth0d7_LC4Yowi0oF0aFByRq9i3rfJTLrU_R8kQQznklJOoOrwYeM7GZV&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355209452%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=g3%2FfA5eCJue8F6GFlJzLHS62mWRuSt0rAyNIHXsxZLQ%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3FbZmhT5rHohxOo2svtGn1m-FkBx_drWE-JMnKW1y4HkPWZzacCIRseW_8hlG8x02HQO53Apu-sxaGc1RQ9jkeB71LnUkcHZVE3SvwHggo-L2BKdtqZnU9ozSwEaL0-1310&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355209452%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=bJQdm4cdQUfSsKbj28k%2BtjSqeRUuJqYTx8RLIs1nyJo%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3FbRh2F4peuV_wArS4xo72nh6BUO-5LAYckonHy_6FkDaJLYA0YFsq_KQtDLSAW7XUcNEVB8q-QpOfaGrYNCj-ER_WFI9ZntRfnjcZUvJ8hg4DZq2Be0UqqPXkNFcpN5WST&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355219445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=xU6tYFUsn6zmX%2Bh52WiN%2FnXn5yGPD3C2AJosBIExRCU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.emailprotection.link%2F%3FbdmFbtBVI5fRq-9wNeYkQ-nBA48eAtYzhSlb9Q4vniH_shCmpVYs3dc0kEvecR8C1vsihTzhZm2vHYCUPgeU0uWx8D7CnspcpGc9O-sx2geN7ZoPeLYSG3BgQGsYp0jK0&data=04%7C01%7CBrian.Moore%40ghd.com%7Ce31d55c5e4094955b4b508d879c53b12%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637393235355219445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=rFlZ3onSoZPM3%2F5A0WBGfoLbv4MsyJIk7lMdCO%2BBj%2BE%3D&reserved=0

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

October 26, 2020

Re: Jan’s Quality Cleaners - Bartow, FL

Mr. Moore:

The price for disposal of a single (1) drum of non-hazardous groundwater located in Bartow, FL will be $100.00 per drum, total, for both transportation and disposal.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Brian Moore To: Jamie Infinger Subject: Jan"s Quality Cleaners - Bartow Date: Monday, October 26, 2020 11:39:00 AM Attachments: image009.png image010.png image011.png image012.png

Jamie, Can you provide a quote for disposal of 1 drum of IDW groundwater at the above site. Low level solvents, assume non-haz.

thanks

Brian Moore, PE

GHD

Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect

WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION

Please consider our environment before printing this email mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

S M T W T F S S M T W T F Oct 25, '20 Nov 1, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Project: TA_045H Date: Mon 10/26/20

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

S S M T W T F S S M T W T Nov 8, '20 Nov 15, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

F S S M T W T F S S M T W Nov 22, '20 Nov 29, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

T F S S M T W T F S S M T Dec 6, '20 Dec 13, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

Ed Siersema

Ed Siersema

William McKinney

W T F S S M T W T F S S M Dec 20, '20 Dec 27, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

T W T F S S M T W T F S S Jan 3, '21 Jan 10

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21

M T W T F S S M T W T F S 0, '21 Jan 17, '21

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 10/26/20 Fri 11/6/20

2 Subtask 1: Project Management

62 days Mon 11/9/20 Tue 2/2/21

3 Subtask 2:

Groundwater Montoring

41 days Tue 12/8/20 Tue 2/2/21

4 Field Work Preparat 2 wks Tue 12/8/20 Mon 12/21/20

5 Well Installation 1 day Mon 12/21/20 Mon 12/21/20

6 Groundwater Sampl1 day Wed 12/23/20 Wed 12/23/20

7 Groundwater Monitoring Report

5 wks Wed 12/30/20 Tue 2/2/21 Brian Moore,E

S M T W T F S S M T W T F Jan 24, '21 Jan 31, '21

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045H at the former Jan's Quality Cleaners site located in Bartow, Polk County

Copy of TA_045H.pdf
Cost Estimate
sub 2
sampling plan.pdf
Slide Number 1
Copy of TbidsumA_045H.pdf
Bids