CN-370000-HW555-DC004J.pdf

PDF 671 KB Posted

Attached to
Master Agreement FL|HW555|3626b1bfe23ad9cb6d0c11811d472cb2
Contract number
HW555
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under Contract No. HW555. The task assignment (DC004J) is issued to GHD Services, Inc. for groundwater monitoring services at the Warrington Village (Former Big B Cleaners) site located at 401 North Navy Boulevard in Warrington, Escambia County, Florida. The contract is managed by Billy Hessman (FDEP Contract Manager) and Brian Moore (Contractor Representative). The work is designated as a monitoring phase task under the indefinite delivery vehicle contract structure.

Task Assignment DC004J is valued at $6,975.57 and consists of two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring. The groundwater monitoring work includes sampling for volatile organic halocarbons using EPA Method 8260 with passive diffusion bags at 16 monitoring wells, water level measurements from 40 wells, and preparation of a Groundwater Monitoring Report. The final deliverable is due August 27, 2020, with task completion by November 13, 2020. The pricing structure is fixed price with no retainage, and the full invoice amount of $6,975.57 is to be invoiced upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. Labor costs total $4,333.88, laboratory analytical costs are $1,116.00, travel expenses are $569.00, and field equipment costs are $442.00.

View the file

Other files

File Type Posted
CN-370000-HW552-TDC007A.pdf PDF
CN-370000-HW555-A10.pdf PDF
CN-370000-HW555-A5.pdf PDF
CN-370000-HW555-CO1.pdf PDF
CN-370000-HW555-DC001A.pdf PDF
CN-370000-HW555-DC001H.pdf PDF
CN-370000-HW555-DC001I.pdf PDF
CN-370000-HW555-DC004F.pdf PDF
CN-370000-HW555-DC004K.pdf PDF
CN-370000-HW555-DC006H.pdf PDF
CN-370000-HW555-DC006L.pdf PDF
CN-370000-HW555-DC007F.pdf PDF
CN-370000-HW555-DC007H.pdf PDF
CN-370000-HW555-DC008E.pdf PDF
CN-370000-HW555-DC010D.pdf PDF
CN-370000-HW555-DC012H.pdf PDF
CN-370000-HW555-DC013H.pdf PDF
CN-370000-HW555-DC019G.pdf PDF
CN-370000-HW555-DC019L.pdf PDF
CN-370000-HW555-DC01ACO6.pdf PDF
CN-370000-HW555-DC01ACO8.pdf PDF
CN-370000-HW555-DC01J.pdf PDF
CN-370000-HW555-DC020J.pdf PDF
CN-370000-HW555-DC021i.pdf PDF
CN-370000-HW555-DC024I.pdf PDF
CN-370000-HW555-DC02C.pdf PDF
CN-370000-HW555-DC02D.pdf PDF
CN-370000-HW555-DC02E.pdf PDF
CN-370000-HW555-DC02HCO4.pdf PDF
CN-370000-HW555-DC02HCO6.pdf PDF
CN-370000-HW555-DC02I.pdf PDF
CN-370000-HW555-DC02K.pdf PDF
CN-370000-HW555-DC02M.pdf PDF
CN-370000-HW555-DC030K.pdf PDF
CN-370000-HW555-DC031K.pdf PDF
CN-370000-HW555-DC032G.pdf PDF
CN-370000-HW555-DC033G.pdf PDF
CN-370000-HW555-DC034O.pdf PDF
CN-370000-HW555-DC034Q.pdf PDF
CN-370000-HW555-DC035F.pdf PDF
CN-370000-HW555-DC035I.pdf PDF
CN-370000-HW555-DC035J.pdf PDF
CN-370000-HW555-DC038B.pdf PDF
CN-370000-HW555-DC039E.pdf PDF
CN-370000-HW555-DC03B.pdf PDF
CN-370000-HW555-DC03CCO1.pdf PDF
CN-370000-HW555-DC03D.pdf PDF
CN-370000-HW555-DC03J.pdf PDF
CN-370000-HW555-DC03J.pdf.crdownload CRDOWNLOAD file
CN-370000-HW555-DC040C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 NADC004J

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_4656

Warrington Village (Former Big B Cleaners)

401 North Navy Boulevard, Warrington, Escambia County

Monitoring

GHD Services, Inc. will conduct groundwater sampling in accordance with the May 2020 scope of work and cost proposal. Groundwater Monitoring Report will be generated.

Groundwater Monitoring Report

08/27/2020

11/13/2020

$ 6,975.57 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.05.19 08:35:28 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.05.19 08:35:35 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.05.20 09:37:55 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2020.06.02 09:53:25 -04'00'

$ 6,975.57

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/27/2020

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 6,975.57

$ 6,975.57

HW555

DC004J

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File Warrington Village (Former Big B Cleaners)

ERIC_4656

Warrington, Escambia County

FROM: Billy Hessman, Contract Manager

DATE: May 19, 2020

SUBJECT: Task Assignment Summary

HW555 DC004J

Monitoring

This Task Assignment is for GHD to conduct annual groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Groundwater sampling for VOHs by EPA Method 8260 using passive diffusion bags will be conducted at 16 wells. Following receipt of analytical results, a Groundwater Monitoring Report will be generated.

This work will be conducted in line with the scope of work included in the GHD proposal, received May 18, 2020.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 27, 2020 and the completion date for the Task Assignment is November 13, 2020.

The final cost total for Task Assignment DC004J is $6,975.57.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 05/19/20

Task #: DC004J SubTask 1 Project Management SubTask 6

Site: Big B Cleaners (Warrington Villa SubTask 2 Groundwater Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.59 2.592 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$47.12 Professional Engineer/Geologist ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$22.76 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.00 Junior Technician SC 32.00 32.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 59.59 2.592 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,626.22 $180.69 $1,445.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,837.63 $204.18 $1,633.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $455.34 $50.59 $404.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $414.69 $46.08 $368.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,333.88 $481.54 $3,852.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $81.31 $9.03 $72.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 05/19/20

Task #: DC004J SubTask 1 Project Management SubTask 6

Site: Big B Cleaners (Warrington Villa SubTask 2 Groundwater Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $278.00 $278.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $569.00 $569.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,056.00 $1,056.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,116.00 $1,116.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $377.00 $377.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $442.00 $442.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,542.19 $490.57 $6,051.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $433.38 $48.15 $385.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,975.57 $538.72 $6,436.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Warrington Village (Former Big B Cleaners)

PROJECT NUMBER: 090125

FDEP NO: 179700278 ERIC_4656

SUBTASK: Groundwater Sampling

DATE: 5/19/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer BM Conclusions/Recommendations 1

Professional Geologist KC Coordinate field sampling kit/site access 0.5 Professional Geologist KC Verify COC and analysis 0.5 Professional Geologist KC Historical assessment/remedial summary 1 Professional Geologist KC Field sampling methodology/analysis 1 Professional Geologist KC Groundwater flow evaluation (shallow, int shallow, intermediate) 3 Professional Geologist KC Groundwater Analytical (shallow, int shallow, int/deep) 3 Professional Geologist KC QA/QC laboratory data 1 Professional Geologist KC Conclusions/Recommendations 1

Junior Technician SC Mob/Demob (from Jacksonville) 10 Junior Technician SC Water Levels (All Wells - 40 total) 8 Junior Technician SC Groundwater Sampling (15 wells) - 16 samples 14

Drafting Technician SM Groundwater flow (shallow, int shallow, int) 3 Drafting Technician SM Groundwater analytical (shallow, int shallow, int, deep) 4

Staff Assistants ET Data Entry (40 water levels 13 well samples) 2 Staff Assistants ET Document Preparation/Publishing generate pdf 2 Staff Assistants ET GIS/ADAPT Update 2

TOTAL LABOR 57

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 3 $291.00

TOTAL VEHICLE $291.00

PER DIEM TYPE RATE UNIT USEAGE Miles Free

Hotel $85.00 night 2 $170.00 Per Diem $36.00 day 3 $108.00

TOTAL VEHICLE $278.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs (Groundwater) $66.00 16 $1,056.00

Sample Shipping 2 day large cooler $60.00 1 $60.00

TOTAL LAB $1,116.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 2 $65.00 Sub-Total $65.00

Water Level Indicator $19.40 day 1 $19.40 Diffusion Bag Sampler (2" Well) $22.35 each 16 $357.60

Sub-Total $377.00

TOTAL EQUIPMENT $442.00

TA_004J.xlsx\sub 2 Page 3 5/19/20208:22 AM

COST PROPOSAL FOR TASK DC004J

<Warrington Cleaners, 179700278 ERIC_4656>

< Annual Groundwater Sampling>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

Following redevelopment of the site as a Walmart Supercenter, GHD completed the installation of replacement groundwater monitoring wells at the Warrington Village Shopping Center (former Big B Cleaners) site in Pensacola, Escambia County. Task DC004J includes annual groundwater monitoring. In accordance with Bill Linn’s memo dated March 13, 2007 and recent recommendations and approvals by the Department.

Subtask 1: Project Management Subtask 1 includes all activities associated with the management of groundwater sampling and reporting at the Warrington Village Site.

Subtask 2: Groundwater Monitoring Task DC004J includes groundwater monitoring in June 2020. The monitoring wells proposed for the sampling event include:

Shallow Zone

MW004, MW117, MW123 & MW125

Intermediate-Shallow Zone

MW047, MW048, MW049, MW050, MW108, MW111, MW125 & IW016

Intermediate Zone

MW107, MW110, & MW124

Deep Zone

MW007

Sampling will include gathering samples from diffusion bags only. Additionally, GHD will gather water levels from all of available monitoring wells screened in the intermediate-shallow and deep zones (40 total). All groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8021.

Upon receipt of analytical data, GHD will prepare a groundwater monitoring report summarizing sampling activities and results of the groundwater analysis. The report will include conclusions regarding current groundwater quality and a schedule for additional testing.

Deliverables:

Deliverable Deliverable Due Date

Groundwater Monitoring Report 8/27/20

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

S M T W T F S S M T W T F S May 17, '20 May 24, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Project: TA_004J Date: Mon 5/18/20

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

S S M T W T F S S M T W T F May 31, '20 Jun 7, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

F S S M T W T F S S M T W T Jun 14, '20 Jun 21, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

Ken Caldwell

Steven Custer

T F S S M T W T F S S M T W Jun 28, '20 Jul 5, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

W T F S S M T W T F S S M T Jul 12, '20 Jul 19, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

T W T F S S M T W T F S S M Jul 26, '20 Aug 2, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20

M T W T F S S M T W T F S S , '20 Aug 9, '20 Au

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Mon 5/18/20Fri 5/29/20

2 Subtask 1: Project Management

63 days Tue 6/2/20 Thu 8/27/20

3 Subtask 2:

Groundwater Monitoring

51 days Thu 6/18/20 Thu 8/27/20

4 Field Work Preparat 2 wks Thu 6/18/20 Wed 7/1/20

5 Groundwater Sampl3 days Tue 6/30/20 Thu 7/2/20

6 Groundwater Monitoring Report

6 wks Fri 7/17/20 Thu 8/27/20 Ken Ca

S M T W T F S S M T W T F S Aug 16, '20 Aug 23, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004J at the Big B (Warrington Village) site located in Warrington, Escambia County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
TA_004J.pdf
Cost Estimate
sub 2