Amendment No. 8 to DEP Agency Term Contract No. GC863

This is Amendment No. 8 to an Agency Term Contract between the Florida Department of Environmental Protection (FDEP) and GEOSYNTEC CONSULTANTS, INC., executed on February 17, 2014, for petroleum contamination site response action services in the South Region. The amendment modifies the Rate Schedule (Attachment D) to increase contracted pricing for services previously established under the original contract. The effective date of the rate changes is June 19, 2020, applying only to new work assignments offered on or after the Rate Change Date. All pre-existing and previously offered work assignments continue to apply the prior rate schedule.

The amendment implements rate increases across all pay items in the contract's comprehensive service offerings, including field activities, drilling and boring, well installation and abandonment, sample collection, laboratory analysis, soil source removal, debris removal and disposal, remedial action construction, system operations and maintenance, professional services, and reporting. Rate increases range from approximately 4.74% to 5.00%, with the vast majority at or near the 5% maximum permitted under contract provision 11.B.ii. The contractor submitted detailed justification for the increases, which FDEP reviewed and approved. Attachment D (Version 3.2) of the Rate Schedule comprises 27 pages detailing the revised contracted item prices for over 500 individual pay items, with pricing structures based on various units of measure including per-day, per-hour, per-foot, per-sample, per-month, and fixed pricing for specific services.

View the file

Other files

File Type Posted
CN-370000-GC863-A12.pdf PDF
CN-370000-GC863-A16.pdf PDF
CN-370000-GC863-A17.pdf PDF
CN-370000-GC863-A2.pdf PDF
CN-370000-GC863-A5.pdf PDF
CN-370000-GC863-A7.pdf PDF
CN-370000-GC863-A9.pdf PDF
CN-370000-GC863-CMC1.pdf PDF
CN-370000-GC863-CMC2.pdf PDF
CN-370000-GC863-A10.pdf PDF
CN-370000-GC863-A11.pdf PDF
CN-370000-GC863-A4.pdf PDF
CN-370000-GC863-AR1.pdf PDF
CN-370000-GC863-CM3.pdf PDF
CN-370000-GC741-CMC4.pdf PDF
CN-370000-GC863-A13E1.pdf PDF
CN-370000-GC863-A14.pdf PDF
CN-370000-GC863-A15E2.pdf PDF
CN-370000-GC863-A3.pdf PDF
CN-370000-GC863-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC863-A6.pdf PDF
CN-370000-GC863-CMC.pdf PDF
CN-370000-GC863.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC863 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEOSYNTEC

CONSULTANTS, INC. (hereinafter "Contractor") executed on February 17, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC863

RATE INCREASE

AMENDMENT NO. 8

Amendment No. 8

DEP Agency Term Contract No. GC863

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 8

DEP Agency Term Contract No. GC863

4.

5.

6.

Attachment D, Rate Schedule (V3.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate schedule (V3.2) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

661.32$ $ 694.32

909.56$ $ 954.95

303.04$ $ 318.19

990.00$ $ 1,039.50

363.65$ $ 381.83

606.09$ $ 636.39

424.46$ $ 445.68

485.10$ $ 509.31

30.31$ $ 31.82

36.38$ $ 38.19

48.51$ $ 50.93

121.22$ $ 127.28

68.64$ $ 72.07

74.46$ $ 78.18

78.13$ $ 82.03

69.43$ $ 72.90

7.27$ $ 7.63

9.70$ $ 10.18

14.55$ $ 15.27

1,533.23$ $ 1,609.89

Est %

Rate

Change (2)

+4.99%

+4.99%

+5.00%

2-2.

3-4.

3-15.

3-16.

3-17.

3-18.

Sonic Core Sampling - 5 or 10 foot (during boring)

Split Spoon Sampling – 2 foot (during boring) > 100 feet

6-8.

Installation of Well Vault - 4 x 4 x 2 foot

6-9.a.

6-9.b.

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

6-9.c.

6-12.

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Receptor Survey and Exposure Pathway Identification

(excludes report)

Split Spoon Sampling – 2 foot (during boring) 50 to

100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Mini Excavator/Loader (Bobcat

TM

) Mobilization - >

100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤

100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Surface Casing - 12 inch diameter

Pay

Item No.

3-6.

3-9.a.

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-1.b.

5-21.

5-22.

5-23.

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.98%

+4.98%

+4.99%

+5.00%

+5.00%

+4.95%

+4.95%

+4.95%

+5.00%

+5.00%

+5.00%

+4.99%

266.30$ $ 279.59

35.19$ $ 36.94

86.96$ $ 91.30

18.18$ $ 19.08

82.50$ $ 86.62

84.89$ $ 89.13

90.95$ $ 95.49

60.61$ $ 63.64

12.12$ $ 12.72

12.12$ $ 12.72

12.12$ $ 12.72

12.12$ $ 12.72

51.97$ $ 54.56

57.75$ $ 60.63

36.38$ $ 38.19

29.09$ $ 30.54

60.61$ $ 63.64

254.56$ $ 267.26

442.45$ $ 464.57

46.20$ $ 48.51

84.89$ $ 89.13

+4.98%

+4.98%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

+4.95%

+4.95%

+4.95%

+4.95%

+4.98%

+4.99%

8-14.

9-4.

9-5.

9-6.

9-16.

9-18.

9-20.

8-6.

8-10.

9-15.

9-9.

9-11.

9-12.

9-13.

9-14.

Monitoring Well Sampling with Water Level, > 100 foot depth 8-2.

Soil, Texture, (See Gee 7 Bauder [1966])

Vapor/Ambient Air Sample Collection - SUMMATM

Canister (or equivalent)

Soil/Sediment Sample Collection

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram

Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

Water, Polycyclic Aromatic Hydrocarbons, including

1-methylnaphthalene + 2-methylnaphthalene (EPA

610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA

8021 or EPA 8260)

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA

8260)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM

D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Soil, Synthetic Precipitation Leaching Procedure-

Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure-

Extraction Only (EPA 1311)

Water, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, PCBs [or Aroclors] (EPA 8082)

9-24.

9-26.

9-27.

9-30.

9-23.

+4.95%

+4.99%

+4.99%

+4.99%

+5.00%

+4.99%

+4.97%

42.44$ $ 44.56

90.95$ $ 95.49

60.61$ $ 63.64

11.55$ $ 12.12

11.55$ $ 12.12

11.55$ $ 12.12

18.18$ $ 19.08

11.55$ $ 12.12

11.55$ $ 12.12

11.55$ $ 12.12

11.55$ $ 12.12

11.55$ $ 12.12

11.55$ $ 12.12

13.33$ $ 13.99

18.18$ $ 19.08

14.55$ $ 15.27

14.55$ $ 15.27

14.55$ $ 15.27

15.59$ $ 16.36

14.55$ $ 15.27

21.82$ $ 22.91

+5.00%

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

9-56.

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Priority Pollutant Volatile Organics (EPA

8260)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM

4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3

C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM

2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-31.

9-48.

9-42.

9-43.

9-44.

9-45.

9-46.

9-47.

9-39.

9-40.

9-33.

9-37.

9-38.

+5.00%

+4.94%

+4.94%

+4.94%

+4.95%

+4.99%

+4.94%

+4.94%

+4.94%

+4.94%

+4.94%

+4.94%

+4.95%

+4.95%

+4.95%

+4.95%

+4.95%

+4.94%

+4.95%

+5.00%

16.36$ $ 17.17

14.55$ $ 15.27

36.38$ $ 38.19

990.00$ $ 1,039.50

389.11$ $ 408.53

424.46$ $ 445.68

60.61$ $ 63.64

254.56$ $ 267.26

181.91$ $ 190.99

272.87$ $ 286.51

545.48$ $ 572.75 +5.00%

9-66.

9-57.

9-60.

9-61.

9-63.

9-64.

9-65.

9-72.

9-73.

9-67.

9-69.

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Air, Volatile Organic Aromatics (EPA Method TO-

15)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328

High Resolution GC/FID)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

Water, Heterotrophic Plate Count (SM 9215 B)

+4.99%

+5.00%

+4.95%

+4.95%

+4.98%

+5.00%

+4.99%

+5.00%

+5.00%

0.50$ $ 0.52

1.00$ $ 1.05

5.50$ $ 5.77

6.05$ $ 6.35

125.20$ $ 131.46

258.51$ $ 271.41

34.94$ $ 36.68

22.81$ $ 23.95

22.81$ $ 23.95

60.61$ $ 63.64

48.51$ $ 50.93

2.92$ $ 3.06

27.72$ $ 29.10

36.38$ $ 38.19

+5.00%

+4.99%

+4.98%

+5.00%

+5.00%

+5.00%

+4.00%

+5.00%

+4.91%

+4.96%

12-7.

10-9.

9-76.

9-77.

10-1.b.

10-2.b.

Additional Laboratory % Surcharge authorized in the

ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.

The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

Additional Laboratory % Surcharge authorized in the

ATC contract for 3 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.

The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

#57 Stone

Pea Gravel

Clean Overburden Used As Backfill, Compaction and

Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and

Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Sheet Piling Rental for ≤ 20 feet deep Excavation

LDA Excavation and Loading With Driven Casing >

300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Transport Petroleum Impacted Soil (bulk) > 100 miles

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

10-17.

10-12.b.

10-15.

10-15.a.

10-15.b.

10-16.

12-8.

12-2.

+4.99%

+4.79%

+4.98%

+4.98%

33.94$ $ 35.63

33.94$ $ 35.63

34.65$ $ 36.38

935.00$ $ 981.75

242.55$ $ 254.65

2.42$ $ 2.54

2.11$ $ 2.21

2.42$ $ 2.54

6,405.00$ $ 6,725.25

4,915.95$ $ 5,161.26

3,302.00$ $ 3,467.10

909.56$ $ 954.95

454.57$ $ 477.25

5,093.55$ $ 5,347.72

2,425.50$ $ 2,546.53

2,182.95$ $ 2,291.88

2,910.60$ $ 3,056.13

2,425.50$ $ 2,546.53

3,395.70$ $ 3,565.15

3,030.43$ $ 3,181.95

4,851.00$ $ 5,093.55

4,242.60$ $ 4,454.73

6,063.75$ $ 6,366.33

5,454.78$ $ 5,726.97

3,757.74$ $ 3,945.25

3,030.43$ $ 3,181.95

4,485.04$ $ 4,709.29

4,000.17$ $ 4,199.78

6,666.95$ $ 6,999.63

+5.00%

+4.99%

16-25.

18-3.

18-4.

18-5.

18-21.

18-22.

17-2.

18-20.

18-11.

18-12.

18-13.

18-14.

18-15.

18-16.

18-19.

Direct Push Boring with In-Situ Injection

Crushed Lime Rock Cover - 2 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Additional Rental of 20 Cubic Yard Roll-Off

Container

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-

Off Container

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) > 450 tons

Concrete Paving - additional 1 inch thickness

Asphalt Paving - additional 1 inch thickness

Groundwater Treatment System - Stand Alone Small -

Short Term ≤ 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Short Term ≤ 6 mos.

System O&M Package - Medium

AS/MPE System Package - Medium

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

14-1.a.

12-17.

12-18.

13-2.

13-4.

13-5.

12-9.

12-10.

12-12.

18-23.

18-24.

18-25.

18-26.

18-27.

+4.98%

+4.98%

+4.99%

+5.00%

+4.99%

+4.96%

+4.74%

+4.96%

+5.00%

+4.99%

+5.00%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+4.99%

+4.99%

+5.00%

5,454.78$ $ 5,726.97

1,333.39$ $ 1,399.93

1,455.30$ $ 1,527.92

2,122.31$ $ 2,228.21

1,090.96$ $ 1,145.40

1,212.75$ $ 1,273.27

1,455.30$ $ 1,527.92

3,153.15$ $ 3,310.49

3,395.70$ $ 3,565.15

2,910.60$ $ 3,056.13

3,515.30$ $ 3,690.71

4,851.00$ $ 5,093.55

4,400.00$ $ 4,620.00

6,666.95$ $ 6,999.63

7,761.60$ $ 8,149.68

7,276.50$ $ 7,639.60

10,061.03$ $ 10,564.08

2,300.00$ $ 2,415.00

1,450.00$ $ 1,522.50

5,200.00$ $ 5,460.00

3,650.00$ $ 3,832.50

2,700.00$ $ 2,835.00

330.00$ $ 346.50

55.00$ $ 57.75

143.26$ $ 150.42

136.50$ $ 143.31

+4.99%

+5.00%

+5.00%19-20.

20-10.

21-1.

19-17.

19-10.

19-15.

18-44.

18-45.

18-46.

18-57.

19-4.

19-19.

18-56.

18-47.

18-53.

18-55.

Remedial Action Startup Report

Professional Geologist (Key)

Professional Engineer (Key)

Administrative

Construction Drawings and Specs Report

Thermox/Catox Off Gas Treatment - Add On - Small -

Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Large - Long

Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long

Term > 6 mos.

Groundwater Treatment - Add On - Small - Long

Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Small - Short

Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

Pilot Test Report

Supplemental Site Assessment Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On - Large -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Short Term ≤ 6 mos.

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Letter/NPDES Report

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-28.

21-2.

18-41.

18-42.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

136.50$ $ 143.31

136.50$ $ 143.31

661.50$ $ 694.51

286.65$ $ 300.98

1,146.60$ $ 1,203.93

396.90$ $ 416.71

573.30$ $ 601.91

429.77$ $ 451.22

1,146.60$ $ 1,203.93

716.28$ $ 752.09

223.70$ $ 234.86

441.00$ $ 463.05 +5.00%

+4.99%

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with

Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Remediation System

Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation Technology

Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil-

Boring Logging (Use hourly rate on site specific basis)

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a

Soil Source Removal Report That Includes a

Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering

Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a

Conditional NFA

P.E. Design and Certification of Plans and Project

Oversight of Installation for Engineering Controls

(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-13.

21-15.

21-7.a.

21-7.b.

21-8.

21-9.

21-10.

21-3.

21-4.

21-5.

+5.00%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.99%

+5.00%

253.45$ $ 266.12

214.89$ $ 225.63

143.26$ $ 150.42

143.26$ $ 150.42

214.89$ $ 225.63

143.26$ $ 150.42

214.89$ $ 225.63

1,433.25$ $ 1,504.91

1,867.85$ $ 1,961.24

214.89$ $ 225.63

341.61$ $ 358.69

573.30$ $ 601.91

936.68$ $ 983.51

143.26$ $ 150.42

297.53$ $ 312.38

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

P.E. Review, Evaluation and Certification of a Level 1

Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot

Test Report

P.E. Review, Evaluation and Certification of a Pilot

Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Non-

Annual Natural Attenuation or Post RA Monitoring

Report That Includes a Recommendation for NFA or a

Recommendation to Modify the Approved Monitoring

Plan

P.E. Review, Evaluation and Certification of a Level 2

Natural Attenuation Monitoring Plan

P.G. or P.E. Review, Evaluation and Certification of a

Receptor and Exposure Pathway Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level 4

Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level 3

Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level 2

Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level 1

Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level 2

Remedial Action Plan

21-29.

21-16.

21-17.

21-18.

21-19.

21-20.

21-30.

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

214.89$ $ 225.63

363.65$ $ 381.83

143.26$ $ 150.42

143.26$ $ 150.42

604.03$ $ 634.23

302.00$ $ 317.10

+5.00%21-31.

21-32.

21-33.

21-34.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of Annual

PARM Report

P.E. Review, Evaluation, and Certification of

Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

+5.00%

+5.00%

+5.00%

+5.00%

Printed Printed Name: Name:

Title: Title:

Date: Date:

Signature of Authorized Representative Signature of Authorized Representative

Type Letter/Number Description Attachment D (V3.2) Rate Schedule (27 pages)

GEOSYNTEC CONSULTANTS, INC. FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

FEID No.: 592355134

List of attachments/exhibits included as part of this Amendment:

Signature of Processor Printed Name of Processor Data Entry Date

The Table 1 rate changes have been entered in effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D Version No. V3.2

Department Data Processing Information:

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

Eric Sager

Principal

5/26/2020

06/19/2020

06/19/2020Blake Miller Digitally signed by Blake Miller Date: 2020.06.19 18:25:45 -04'00'

PAY

ITEM

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

1.

1-1. Per Review $ 631.40 $ 631.40 $ 631.40

1-2. Per Site $ 375.00 $ 375.00 $ 375.00

1-2.a. Per Site Not Applicable $ - $ -

1-3. Per Package $ 340.90 $ 340.90 $ 340.90

1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-5. Per Agreement $ 500.00 $ 500.00 $ 500.00

1-5.a. Per Agreement Not Applicable $ - $ -

1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-7. % Surcharge Not Applicable $ 0.06 $ 0.06

2.

2-1. Per Visit $ 850.00 $ 850.00 $ 850.00

2-2. Per Survey $ 600.12 $ 661.32 $ 694.32

2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

2-4. Per Day $ 1,038.74 $ 1,038.74 $ 1,038.74

3.

3-1. Per Round Trip $ 600.12 $ 600.12 $ 600.12

3-2. Per Round Trip $ 855.67 $ 855.67 $ 855.67

3-3. Per Round Trip $ 605.00 $ 635.25 $ 635.25

3-4. Per Round Trip $ 825.00 $ 909.56 $ 954.95

3-5. Per Round Trip $ 275.00 $ 275.00 $ 275.00

3-6. Per Round Trip $ 275.00 $ 303.04 $ 318.19

3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Work Trailer - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items

Off-Site Property Access Agreement

Site Property Access Agreement for Source Property at no cost to FDEP

Project Specific Financial Guarantee Bond (if required by DEP)

6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

DESCRIPTION

OFFICE ACTIVITIES

File Review

Site Health & Safety Plan

Site Health & Safety Plan for Continued Work at no cost to FDEP

Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit

Receptor Survey and Exposure Pathway Identification (Excludes report)

Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

3-7.a. Per Round Trip Not Applicable $ 727.65 $ 727.65

3-8. Per Round Trip $ 825.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 1,212.75 $ 1,212.75

3-9. Per Round Trip $ 650.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 990.00 $ 1,039.50

3-10. Per Round Trip $ 990.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,818.26 $ 1,818.26

3-11. Per Round Trip $ 660.00 $ 693.00 $ 693.00

3-12. Per Round Trip $ 1,045.00 $ 1,045.00 $ 1,045.00

3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 16,500.00 $ 16,500.00

3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 22,000.00 $ 22,000.00

3-15. Per Round Trip $ 330.00 $ 363.65 $ 381.83

3-16. Per Round Trip $ 550.00 $ 606.09 $ 636.39

3-17. Per Round Trip $ 385.00 $ 424.46 $ 445.68

3-18. Per Round Trip $ 440.00 $ 485.10 $ 509.31

3-19. Per Round Trip Not Applicable $ 550.00 $ 550.00

3-20. Per Round Trip Not Applicable $ 825.00 $ 825.00

4.

Drum Compactor mobilization - > 100 miles each way

MEALS AND LODGING

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >

100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

LDA Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

DPT Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Drill Rig Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤

100 miles each way

Drill Rig Mobilization - > 100 miles each way

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

4-1.a.

Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 22.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 30.31 $ 31.82

5-1.a.2. Per Spoon Not Applicable $ 36.38 $ 38.19

5-1.a.3. Per Spoon Not Applicable $ 48.51 $ 50.93

5-1.b. Per Core $ 110.00 $ 121.22 $ 127.28

5-1.c. Per Core $ 16.50 Not Applicable Not Applicable

5-2. Per Boring $ 184.72 $ 203.56 $ 203.56

5-3. Per Foot $ 21.07 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 3,150.00 $ 3,150.00

5-4. Per Foot $ 23.46 Not Applicable Not Applicable

5-5. Per Foot $ 34.88 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 3,753.75 $ 3,753.75

5-6. Per Foot $ 32.68 $ 34.31 $ 34.31

5-7. Per Foot $ 35.50 $ 37.27 $ 37.27

5-8. Per Foot $ 42.14 $ 44.24 $ 44.24

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

Direct Push Boring

Direct Push Technology (DPT) Rig and Equipment

Direct Push Boring with Cone Penetrometer Test Probe (CPT)

Direct Push Boring with Membrane Interface Probe (MIP)

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT

Base Rate)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) > 100 feet

Sonic Core Sampling - 5 or 10 foot (during boring)

DPT Core Sampling - 4 or 5 foot (during boring)

Hand Auger Boring ≤ 10 foot total depth

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current

State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with

Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

5-9. Per Foot $ 40.08 $ 42.08 $ 42.08

5-10. Per Foot $ 43.25 $ 45.41 $ 45.41

5-11. Per Foot $ 49.78 $ 52.27 $ 52.27

5-12. Per Foot $ 52.57 $ 55.20 $ 55.20

5-13. Per Foot $ 57.05 $ 59.90 $ 59.90

5-14. Per Foot $ 63.12 $ 66.27 $ 66.27

5-15. Per Foot $ 39.92 $ 41.91 $ 41.91

5-16. Per Foot $ 44.02 $ 46.22 $ 46.22

5-17. Per Foot $ 48.50 $ 50.92 $ 50.92

5-18. Per Foot $ 49.02 $ 51.47 $ 51.47

5-19. Per Foot $ 55.62 $ 58.40 $ 58.40

5-20. Per Foot $ 60.02 $ 63.02 $ 63.02

5-21. Per Foot $ 65.37 $ 68.64 $ 72.07

5-22. Per Foot $ 67.57 $ 74.46 $ 78.18

5-23. Per Foot $ 70.87 $ 78.13 $ 82.03

6.

6-1. Per Foot $ 33.54 $ 35.21 $ 35.21

6-2. Per Foot $ 32.49 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 39.45 $ 39.45

6-2.b. Per Foot Not Applicable $ 178.50 $ 178.50

6-3. Per Foot $ 33.94 Not Applicable Not Applicable

6-3.a. Per Foot Not Applicable $ 47.18 $ 47.18

6-3.b. Per Foot Not Applicable $ 194.89 $ 194.89

6-4. Per Foot $ 52.01 $ 57.34 $ 57.34

6-5. Per Foot $ 43.21 $ 45.37 $ 45.37

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 6 inch diameter

Surface Casing - 6 inch diameter

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter

Well Installation - 2 inch diameter (Vertical)

Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter

Well Installation - 4 inch diameter (Vertical)

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

6-6. Per Foot $ 49.81 $ 52.30 $ 52.30

6-7. Per Foot $ 57.51 $ 63.37 $ 63.37

6-8. Per Foot $ 63.01 $ 69.43 $ 72.90

6-9.a. Per Foot $ 6.60 $ 7.27 $ 7.63

6-9.b. Per Foot $ 8.80 $ 9.70 $ 10.18

6-9.c. Per Foot $ 13.20 $ 14.55 $ 15.27

6-9.d. Per Foot $ 19.80 $ 21.82 $ 21.82

6-10. Per Well $ 450.00 $ 472.50 $ 472.50

6-11. Per Vault $ 870.55 $ 914.08 $ 914.08

6-12. Per Vault $ 1,390.69 $ 1,533.23 $ 1,609.89

6-13. Per Well Not Applicable $ 210.00 $ 210.00

6-14. Per Well Not Applicable $ 357.00 $ 357.00

6-15. Per Well Not Applicable $ 420.00 $ 420.00

Installation of Well Vault - 4 x 4 x 2 foot

Well Redevelopment

Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 6 inch diameter

Above Grade Well Completion

Installation of Well Vault - 2 x 2 x 2 foot

Surface Casing - 8 inch diameter

Surface Casing - 10 inch diameter

Surface Casing - 12 inch diameter

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

7.

7-1. Per Foot $ 20.14 $ 21.14 $ 21.14

7-2. Per Foot $ 23.70 $ 24.88 $ 24.88

7-3. Per Foot $ 29.00 $ 30.45 $ 30.45

7-4. Per Foot $ 33.96 $ 35.65 $ 35.65

7-5. Per Vault $ 500.00 $ 525.00 $ 525.00

7-6. Per Vault $ 900.00 $ 945.00 $ 945.00

7-7. Per Well Not Applicable $ 210.00 $ 210.00

8.

8-1. Per Well $ 197.22 $ 217.43 $ 217.43

8-2. Per Well $ 241.66 $ 266.30 $ 279.59

8-3. Per Well $ 123.95 $ 130.15 $ 130.15

8-4. Per Sample $ 123.95 $ 123.95 $ 123.95

8-5. Per Sample $ 117.15 $ 117.15 $ 117.15

8-6. Per Sample $ 31.94 $ 35.19 $ 36.94

8-7. Per Well $ 28.09 $ 28.09 $ 28.09

8-8. Per Well $ 120.07 $ 120.07 $ 120.07

8-9. Per Sample $ 78.88 $ 78.88 $ 78.88

8-10. Per Sample $ 78.88 $ 86.96 $ 91.30

8-11. Per Sampling Event Not Applicable $ 157.50 $ 157.50

8-12. Per Well Not Applicable $ 71.06 $ 71.06

8-13. Per Well Not Applicable $ 71.06 $ 71.06

Survey Latitude/Longitude of Existing Monitor Wells

Survey Latitude/Longitude of New Monitor Wells

Soil/Sediment Sample Collection

Water Level or Free Product Gauging

Free Product Gauging & Bailing

Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, Tedlar

TM

Bag

(or Equivalent)

Vapor/Ambient Air Sample Collection - SUMMA

TM

Canister (or Equivalent)

Electronic Data Deliverables (EDD)

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Monitoring Well Sampling with Water Level, > 100 foot depth

Domestic Water Well Sampling

Other Water Sampling

Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 6 inch diameter

Removal of Well Vault - 2 x 2 x 2 foot

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Pad and Manhole

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

8-14. Per Sample Not Applicable $ 18.18 $ 19.08

9.

9.A.

9-1. Per Sample $ 451.00 $ 473.55 $ 473.55

9-2. Per Sample $ 46.20 $ 48.51 $ 48.51

9-3. Per Sample $ 60.50 $ 66.66 $ 66.66

9-4. Per Sample $ 82.50 $ 82.50 $ 86.62

9-5. Per Sample $ 77.00 $ 84.89 $ 89.13

9-6. Per Sample $ 82.50 $ 90.95 $ 95.49

9-7. Per Sample $ 275.00 $ 288.75 $ 288.75

9-8. Per Sample $ 66.00 $ 72.73 $ 72.73

9-8.a. Per Sample Not Applicable $ 275.00 $ 275.00

9-9. Per Sample $ 55.00 $ 60.61 $ 63.64

9-10. Per Sample $ 82.50 $ 86.62 $ 86.62

9-11. Per Sample $ 11.00 $ 12.12 $ 12.72

9-12. Per Sample $ 11.00 $ 12.12 $ 12.72

9-13. Per Sample $ 11.00 $ 12.12 $ 12.72 Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, PCBs [or Aroclors] (EPA 8082)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270])

Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-14. Per Sample $ 11.00 $ 12.12 $ 12.72

9-15. Per Sample $ 49.50 $ 51.97 $ 54.56

9-16. Per Sample $ 55.00 $ 57.75 $ 60.63

9-17. Per Sample $ 44.00 $ 48.51 $ 48.51

9-18. Per Sample $ 33.00 $ 36.38 $ 38.19

9-19. Per Sample $ 14.30 $ 14.30 $ 14.30

9-20. Per Sample $ 26.40 $ 29.09 $ 30.54

9-21. Per Sample $ 352.00 $ 388.08 $ 388.08

9-22. Per Sample $ 532.40 $ 532.40 $ 532.40

9-23. Per Sample $ 55.00 $ 60.61 $ 63.64

9-24. Per Sample $ 231.00 $ 254.56 $ 267.26

9.B.

9-25. Per Sample $ 270.60 $ 284.13 $ 284.13

9-26. Per Sample $ 401.50 $ 442.45 $ 464.57

9-27. Per Sample $ 44.00 $ 46.20 $ 48.51

9-28. Per Sample $ 57.20 $ 63.06 $ 63.06

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple

Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -

96e1 or ASTM D2937-10)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-29. Per Sample $ 82.50 $ 86.58 $ 86.58

9-30. Per Sample $ 77.00 $ 84.89 $ 89.13

9-31. Per Sample $ 38.50 $ 42.44 $ 44.56

9-31.a. Per Sample Not Applicable $ 58.30 $ 58.30

9-32. Per Sample $ 82.50 $ 90.95 $ 90.95

9-33. Per Sample $ 82.50 $ 90.95 $ 95.49

9-34. Per Sample $ 275.00 $ 288.75 $ 288.75

9-35. Per Sample $ 275.00 $ 303.04 $ 303.04

9-36. Per Sample $ 66.00 $ 72.73 $ 72.73

9-37. Per Sample $ 55.00 $ 60.61 $ 63.64

9-38. Per Sample $ 11.00 $ 11.55 $ 12.12

9-39. Per Sample $ 11.00 $ 11.55 $ 12.12

9-40. Per Sample $ 11.00 $ 11.55 $ 12.12

9-41. Per Sample $ 11.00 $ 12.12 $ 12.12

9-41.a. Per Sample Not Applicable $ 34.65 $ 34.65

9-42. Per Sample $ 16.50 $ 18.18 $ 19.08

9-43. Per Sample $ 11.00 $ 11.55 $ 12.12

9-44. Per Sample $ 11.00 $ 11.55 $ 12.12

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for

NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-44.a. Per Sample Not Applicable $ 34.65 $ 34.65

9-45. Per Sample $ 11.00 $ 11.55 $ 12.12

9-46. Per Sample $ 11.00 $ 11.55 $ 12.12

9-47. Per Sample $ 11.00 $ 11.55 $ 12.12

9-48. Per Sample $ 11.00 $ 11.55 $ 12.12

9-49. Per Sample $ 12.10 $ 13.33 $ 13.99

9-50. Per Sample $ 16.50 $ 18.18 $ 19.08

9-51. Per Sample $ 13.20 $ 14.55 $ 15.27

9-52. Per Sample $ 13.20 $ 14.55 $ 15.27

9-53. Per Sample $ 13.20 $ 14.55 $ 15.27

9-54. Per Sample $ 14.85 $ 15.59 $ 16.36

9-55. Per Sample $ 13.20 $ 14.55 $ 15.27

9-56. Per Sample $ 19.80 $ 21.82 $ 22.91

9-57. Per Sample $ 14.85 $ 16.36 $ 17.17

9-58. Per Sample $ 12.10 $ 13.33 $ 13.33

9-59. Per Sample $ 12.10 $ 13.33 $ 13.33

9-60. Per Sample $ 13.20 $ 14.55 $ 15.27

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA

9056, SM 4500-PE or SM 4500-PF)

Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA

9038, EPA 9056 or SM 4500-SO4 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI

C or SM 4500CI E)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-61. Per Sample $ 33.00 $ 36.38 $ 38.19

9-62. Per Sample $ 990.00 $ 1,039.50 $ 1,039.50

9-63. Per Sample $ 990.00 $ 990.00 $ 1,039.50

9-64. Per Sample $ 353.10 $ 389.11 $ 408.53

9-65. Per Sample $ 385.00 $ 424.46 $ 445.68

9-66. Per Sample $ 55.00 $ 60.61 $ 63.64

9-67. Per Sample $ 231.00 $ 254.56 $ 267.26

9-78. Per Sample Not Applicable $ 71.50 $ 71.50

9-79. Per Sample Not Applicable $ 55.00 $ 55.00

9-80. Per Sample Not Applicable $ 110.00 $ 110.00

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, Methane (EPA SOP RSK-175)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Heterotrophic Plate Count (SM 9215 B)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA

2000.0/2002.0)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9.C.

9-68. Per Sample $ 93.50 $ 98.17 $ 98.17

9-69. Per Sample $ 165.00 $ 181.91 $ 190.99

9-70. Per Sample $ 247.50 $ 259.88 $ 259.88

9-71. Per Sample $ 275.00 $ 288.75 $ 288.75

9.D.

9-72. Per Sample $ 247.50 $ 272.87 $ 286.51

9-73. Per Sample $ 495.00 $ 545.48 $ 572.75

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75.

Percent

Surcharge

9-76.

Percent

Surcharge $ 0.50 $ 0.50 $ 0.52

9-77.

Percent

Surcharge $ 1.00 $ 1.00 $ 1.05

10.

10-1. Per Sq. Foot/Day $ 39.18 Not Applicable Not Applicable

10-1.a. Per Sq. Foot Not Applicable $ 39.44 $ 39.44

10-1.b. Per Sq. Foot/Day Not Applicable $ 5.50 $ 5.77

10-1.c. Per Sq. Foot/Week Not Applicable $ 11.00 $ 11.00

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for ≤ 20 feet deep Excavation

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High

Resolution GC/FID)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Air, Volatile Organic Aromatics (EPA Method TO-15)

Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

South

GEOSYNTEC CONSULTANTS, INC.

GC863

DEP Restated Agency Term Contract No. GC863

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

10-1.d. Per Sq. Foot/Month Not Applicable $ 20.79 $ 20.79

10-2. Per Sq. Foot/Week $ 43.58 Not Applicable Not Applicable

10-2.a. Per Sq. Foot Not Applicable $ 51.54 $ 51.54

10-2.b. Per Sq. Foot/Day Not Applicable $ 6.05 $ 6.35

10-2.c. Per Sq. Foot/Week Not Applicable $ 15.40 $ 15.40

10-2.d. Per Sq. Foot/Month Not Applicable $ 24.24 $ 24.24

10-3. Per Sq. Foot/Month $ 46.88 Not Applicable Not Applicable

10-4. Per Sq. Foot/Day $ 39.18 Not Applicable Not Applicable

10-5. Per Sq. Foot/Week $ 53.48 Not Applicable Not Applicable

10-6. Per Sq. Foot/Month $ 56.78 Not Applicable Not Applicable

10-7. Per Cubic Yard $ 42.70 $ 44.83 $ 44.83

10-8. Per Cubic Yard $ 39.40 $ 39.40 $ 39.40

10-9. Per Cubic Yard $ 125.20 $ 125.20 $ 131.46

10-10. Per Cubic Yard $ 114.20 $ 119.91 $ 119.91

10-11.a. Per Cubic Yard $ 147.20 $ 162.21 $ 162.21

10-11.b. Per Cubic Yard $ 306.70 $ 306.70 $ 306.70

10-12.a. Per Cubic Yard $ 147.20 $ 154.56 $ 154.56

10-12.b. Per Cubic Yard $ 246.20 $ 258.51 $ 271.41

10-13. Per Cubic Yard $ 116.25 $ 122.06 $ 122.06

10-14. Per Cubic Yard $ 37.20 $ 41.01 $ 41.01

10-15. Per Cubic Yard $…