CN-370000-GC863-A7.pdf
PDF 266 KB Posted
- Contract number
- GC863
- Issued by
- Florida
About this file
Document Summary
This is Amendment No. 7 to an indefinite delivery agency term contract (No. GC863) executed between the Florida Department of Environmental Protection (FDEP) and GEOSYNTEC CONSULTANTS, INC. The contract provides petroleum contamination site response action services in the South Region of Florida. The amendment modifies the contractor's rate schedule effective for new work assignments following the Rate Change Date of May 17, 2019. The rate changes apply only to work assignments offered on or after this effective date, while all pre-Rate Change Date work assignments continue under the previously applicable rate schedule.
The amendment updates rates for 176 pay items across multiple service categories including drilling and boring, well installation, sample collection and field testing, laboratory analysis (soil, water, and air), remedial action construction, pilot testing packages, system operation and maintenance, debris removal and disposal, resurfacing, and professional engineering and geology services. The requested rate increases range from approximately 4.66% to 5.00%, with most increases falling at the 5% maximum threshold allowed under provision 11.B.ii of the contract. Updated rates are provided in detailed tables covering services such as sonic boring (ranging from $41.91 to $78.13 per foot), well installation (ranging from $35.21 to $57.34 per foot), laboratory analysis samples (ranging from $11.55 to $545.48 per sample), and professional engineer oversight services (ranging from $136.50 to $1,433.25 per task). The new Attachment D (V3.1) Rate Schedule, comprising 27 pages, supersedes the previous version and applies to all work assignments issued on or after the Rate Change Date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC863-A12.pdf | ||
| CN-370000-GC863-A16.pdf | ||
| CN-370000-GC863-A17.pdf | ||
| CN-370000-GC863-A2.pdf | ||
| CN-370000-GC863-A5.pdf | ||
| CN-370000-GC863-A9.pdf | ||
| CN-370000-GC863-CMC1.pdf | ||
| CN-370000-GC863-CMC2.pdf | ||
| CN-370000-GC863-A10.pdf | ||
| CN-370000-GC863-A11.pdf | ||
| CN-370000-GC863-A4.pdf | ||
| CN-370000-GC863-A8.pdf | ||
| CN-370000-GC863-AR1.pdf | ||
| CN-370000-GC863-CM3.pdf | ||
| CN-370000-GC741-CMC4.pdf | ||
| CN-370000-GC863-A13E1.pdf | ||
| CN-370000-GC863-A14.pdf | ||
| CN-370000-GC863-A15E2.pdf | ||
| CN-370000-GC863-A3.pdf | ||
| CN-370000-GC863-A3.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC863-A6.pdf | ||
| CN-370000-GC863-CMC.pdf | ||
| CN-370000-GC863.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Signature of Authorized Representative Signature of Authorized Representative
Signature of Processor Printed Name of Processor Data Entry Date ignature offfffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAuth
Eric Sager
Principal
5/2/19
John J. Truitt Digitally signed by John J. Truitt Date: 2019.05.08 12:24:29 -04'00'
John Truitt Deputy Secretary (see signature block)
5/17/19
Blake Miller Digitally signed by Blake Miller Date: 2019.05.17 12:21:29 -04'00'
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
1.
1-1. Per Review $ 631.40 $ 631.40 $ 631.40 1-2. Per Site $ 375.00 $ 375.00 $ 375.00
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 340.90 $ 340.90 $ 340.90 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 500.00 $ 500.00 $ 500.00
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 850.00 $ 850.00 $ 850.00 2-2. Per Survey $ 600.12 $ 630.13 $ 661.32 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 1,038.74 $ 1,038.74 $ 1,038.74 3.
3-1. Per Round Trip $ 600.12 $ 600.12 $ 600.12 3-2. Per Round Trip $ 855.67 $ 855.67 $ 855.67 3-3. Per Round Trip $ 605.00 $ 605.00 $ 635.25 3-4. Per Round Trip $ 825.00 $ 866.25 $ 909.56 3-5. Per Round Trip $ 275.00 $ 275.00 $ 275.00 3-6. Per Round Trip $ 275.00 $ 288.75 $ 303.04
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order) Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 693.00 $ 727.65 3-8. Per Round Trip $ 825.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 1,155.00 $ 1,212.75 3-9. Per Round Trip $ 650.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 990.00 $ 990.00
3-10. Per Round Trip $ 990.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,732.50 $ 1,818.26
3-11. Per Round Trip $ 660.00 $ 693.00 $ 693.00 3-12. Per Round Trip $ 1,045.00 $ 1,045.00 $ 1,045.00 3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 16,500.00 $ 16,500.00 3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 22,000.00 $ 22,000.00 3-15. Per Round Trip $ 330.00 $ 346.50 $ 363.65 3-16. Per Round Trip $ 550.00 $ 577.50 $ 606.09 3-17. Per Round Trip $ 385.00 $ 404.25 $ 424.46 3-18. Per Round Trip $ 440.00 $ 462.00 $ 485.10 3-19. Per Round Trip Not Applicable $ 550.00 $ 550.00 3-20. Per Round Trip Not Applicable $ 825.00 $ 825.00
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way
Drum Compactor mobilization - > 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
4.
4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 22.00 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 28.87 $ 30.31 5-1.a.2. Per Spoon Not Applicable $ 34.65 $ 36.38 5-1.a.3. Per Spoon Not Applicable $ 46.20 $ 48.51 5-1.b. Per Core $ 110.00 $ 115.50 $ 121.22 5-1.c. Per Core $ 16.50 Not Applicable Not Applicable 5-2. Per Boring $ 184.72 $ 193.96 $ 203.56 5-3. Per Foot $ 21.07 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 3,150.00 $ 3,150.00 5-4. Per Foot $ 23.46 Not Applicable Not Applicable 5-5. Per Foot $ 34.88 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 3,753.75 $ 3,753.75
5-6. Per Foot $ 32.68 $ 34.31 $ 34.31 5-7. Per Foot $ 35.50 $ 37.27 $ 37.27
Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
5-8. Per Foot $ 42.14 $ 44.24 $ 44.24 5-9. Per Foot $ 40.08 $ 42.08 $ 42.08
5-10. Per Foot $ 43.25 $ 45.41 $ 45.41 5-11. Per Foot $ 49.78 $ 52.27 $ 52.27 5-12. Per Foot $ 52.57 $ 55.20 $ 55.20 5-13. Per Foot $ 57.05 $ 59.90 $ 59.90 5-14. Per Foot $ 63.12 $ 66.27 $ 66.27 5-15. Per Foot $ 39.92 $ 41.91 $ 41.91 5-16. Per Foot $ 44.02 $ 46.22 $ 46.22 5-17. Per Foot $ 48.50 $ 50.92 $ 50.92 5-18. Per Foot $ 49.02 $ 51.47 $ 51.47 5-19. Per Foot $ 55.62 $ 58.40 $ 58.40 5-20. Per Foot $ 60.02 $ 63.02 $ 63.02 5-21. Per Foot $ 65.37 $ 68.64 $ 68.64 5-22. Per Foot $ 67.57 $ 70.95 $ 74.46 5-23. Per Foot $ 70.87 $ 74.41 $ 78.13
6.
6-1. Per Foot $ 33.54 $ 35.21 $ 35.21 6-2. Per Foot $ 32.49 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 37.59 $ 39.45 6-2.b. Per Foot Not Applicable $ 178.50 $ 178.50 6-3. Per Foot $ 33.94 Not Applicable Not Applicable
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 4 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
6-3.a. Per Foot Not Applicable $ 47.18 $ 47.18 6-3.b. Per Foot Not Applicable $ 194.89 $ 194.89 6-4. Per Foot $ 52.01 $ 54.61 $ 57.34 6-5. Per Foot $ 43.21 $ 45.37 $ 45.37 6-6. Per Foot $ 49.81 $ 52.30 $ 52.30 6-7. Per Foot $ 57.51 $ 60.38 $ 63.37 6-8. Per Foot $ 63.01 $ 66.16 $ 69.43
6-9.a. Per Foot $ 6.60 $ 6.93 $ 7.27 6-9.b. Per Foot $ 8.80 $ 9.24 $ 9.70 6-9.c. Per Foot $ 13.20 $ 13.86 $ 14.55 6-9.d. Per Foot $ 19.80 $ 20.79 $ 21.82 6-10. Per Well $ 450.00 $ 472.50 $ 472.50 6-11. Per Vault $ 870.55 $ 914.08 $ 914.08 6-12. Per Vault $ 1,390.69 $ 1,460.22 $ 1,533.23 6-13. Per Well Not Applicable $ 210.00 $ 210.00
6-14. Per Well Not Applicable $ 357.00 $ 357.00
6-15. Per Well Not Applicable $ 420.00 $ 420.00
7.
7-1. Per Foot $ 20.14 $ 21.14 $ 21.14 7-2. Per Foot $ 23.70 $ 24.88 $ 24.88
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter (Vertical)
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
Grout and Abandon Well, > 2 to 4 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
7-3. Per Foot $ 29.00 $ 30.45 $ 30.45 7-4. Per Foot $ 33.96 $ 35.65 $ 35.65 7-5. Per Vault $ 500.00 $ 525.00 $ 525.00 7-6. Per Vault $ 900.00 $ 945.00 $ 945.00 7-7. Per Well Not Applicable $ 210.00 $ 210.00 8.
8-1. Per Well $ 197.22 $ 207.08 $ 217.43 8-2. Per Well $ 241.66 $ 253.74 $ 266.30 8-3. Per Well $ 123.95 $ 130.15 $ 130.15 8-4. Per Sample $ 123.95 $ 123.95 $ 123.95 8-5. Per Sample $ 117.15 $ 117.15 $ 117.15 8-6. Per Sample $ 31.94 $ 33.53 $ 35.19 8-7. Per Well $ 28.09 $ 28.09 $ 28.09 8-8. Per Well $ 120.07 $ 120.07 $ 120.07
8-9. Per Sample $ 78.88 $ 78.88 $ 78.88
8-10. Per Sample $ 78.88 $ 82.82 $ 86.96 8-11. Per Sampling Event Not Applicable $ 157.50 $ 157.50 8-12. Per Well Not Applicable $ 71.06 $ 71.06 8-13. Per Well Not Applicable $ 71.06 $ 71.06
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
Survey Latitude/Longitude of Existing Monitor Wells Survey Latitude/Longitude of New Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
8-14. Per Sample Not Applicable $ 17.32 $ 18.18
9.
9.A.
9-1. Per Sample $ 451.00 $ 451.00 $ 473.55
9-2. Per Sample $ 46.20 $ 46.20 $ 48.51 9-3. Per Sample $ 60.50 $ 63.52 $ 66.66 9-4. Per Sample $ 82.50 $ 82.50 $ 82.50 9-5. Per Sample $ 77.00 $ 80.85 $ 84.89 9-6. Per Sample $ 82.50 $ 86.62 $ 90.95
9-7. Per Sample $ 275.00 $ 288.75 $ 288.75
9-8. Per Sample $ 66.00 $ 69.30 $ 72.73 9-8.a. Per Sample Not Applicable $ 275.00 $ 275.00 9-9. Per Sample $ 55.00 $ 57.75 $ 60.61
9-10. Per Sample $ 82.50 $ 86.62 $ 86.62
9-11. Per Sample $ 11.00 $ 11.55 $ 12.12 9-12. Per Sample $ 11.00 $ 11.55 $ 12.12 9-13. Per Sample $ 11.00 $ 11.55 $ 12.12
Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Soil, Chromium (EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
9-14. Per Sample $ 11.00 $ 11.55 $ 12.12 9-15. Per Sample $ 49.50 $ 51.97 $ 51.97 9-16. Per Sample $ 55.00 $ 57.75 $ 57.75 9-17. Per Sample $ 44.00 $ 46.20 $ 48.51
9-18. Per Sample $ 33.00 $ 34.65 $ 36.38
9-19. Per Sample $ 14.30 $ 14.30 $ 14.30 9-20. Per Sample $ 26.40 $ 27.72 $ 29.09
9-21. Per Sample $ 352.00 $ 369.60 $ 388.08
9-22. Per Sample $ 532.40 $ 532.40 $ 532.40
9-23. Per Sample $ 55.00 $ 57.75 $ 60.61
9-24. Per Sample $ 231.00 $ 242.55 $ 254.56 9.B.
9-25. Per Sample $ 270.60 $ 284.13 $ 284.13
9-26. Per Sample $ 401.50 $ 421.58 $ 442.45
9-27. Per Sample $ 44.00 $ 46.20 $ 46.20 9-28. Per Sample $ 57.20 $ 60.06 $ 63.06
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods) Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
9-29. Per Sample $ 82.50 $ 82.50 $ 86.58
9-30. Per Sample $ 77.00 $ 80.85 $ 84.89
9-31. Per Sample $ 38.50 $ 40.42 $ 42.44 9-31.a. Per Sample Not Applicable $ 58.30 $ 58.30 9-32. Per Sample $ 82.50 $ 86.62 $ 90.95 9-33. Per Sample $ 82.50 $ 86.62 $ 90.95
9-34. Per Sample $ 275.00 $ 288.75 $ 288.75
9-35. Per Sample $ 275.00 $ 288.75 $ 303.04
9-36. Per Sample $ 66.00 $ 69.30 $ 72.73 9-37. Per Sample $ 55.00 $ 57.75 $ 60.61 9-38. Per Sample $ 11.00 $ 11.55 $ 11.55 9-39. Per Sample $ 11.00 $ 11.55 $ 11.55 9-40. Per Sample $ 11.00 $ 11.55 $ 11.55 9-41. Per Sample $ 11.00 $ 11.55 $ 12.12
9-41.a. Per Sample Not Applicable $ 34.65 $ 34.65
9-42. Per Sample $ 16.50 $ 17.32 $ 18.18 9-43. Per Sample $ 11.00 $ 11.55 $ 11.55 9-44. Per Sample $ 11.00 $ 11.55 $ 11.55
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470) Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
9-44.a. Per Sample Not Applicable $ 34.65 $ 34.65
9-45. Per Sample $ 11.00 $ 11.55 $ 11.55 9-46. Per Sample $ 11.00 $ 11.55 $ 11.55 9-47. Per Sample $ 11.00 $ 11.55 $ 11.55 9-48. Per Sample $ 11.00 $ 11.55 $ 11.55 9-49. Per Sample $ 12.10 $ 12.70 $ 13.33
9-50. Per Sample $ 16.50 $ 17.32 $ 18.18
9-51. Per Sample $ 13.20 $ 13.86 $ 14.55
9-52. Per Sample $ 13.20 $ 13.86 $ 14.55 9-53. Per Sample $ 13.20 $ 13.86 $ 14.55
9-54. Per Sample $ 14.85 $ 15.59 $ 15.59
9-55. Per Sample $ 13.20 $ 13.86 $ 14.55 9-56. Per Sample $ 19.80 $ 20.79 $ 21.82
9-57. Per Sample $ 14.85 $ 15.59 $ 16.36
9-58. Per Sample $ 12.10 $ 12.70 $ 13.33 9-59. Per Sample $ 12.10 $ 12.70 $ 13.33
9-60. Per Sample $ 13.20 $ 13.86 $ 14.55
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C) Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
9-61. Per Sample $ 33.00 $ 34.65 $ 36.38
9-62. Per Sample $ 990.00 $ 990.00 $ 1,039.50
9-63. Per Sample $ 990.00 $ 990.00 $ 990.00
9-64. Per Sample $ 353.10 $ 370.76 $ 389.11
9-65. Per Sample $ 385.00 $ 404.25 $ 424.46
9-66. Per Sample $ 55.00 $ 57.75 $ 60.61
9-67. Per Sample $ 231.00 $ 242.55 $ 254.56 9-78. Per Sample Not Applicable $ 71.50 $ 71.50 9-79. Per Sample Not Applicable $ 55.00 $ 55.00 9-80. Per Sample Not Applicable $ 110.00 $ 110.00 9.C.
9-68. Per Sample $ 93.50 $ 98.17 $ 98.17 9-69. Per Sample $ 165.00 $ 173.25 $ 181.91 9-70. Per Sample $ 247.50 $ 259.88 $ 259.88 9-71. Per Sample $ 275.00 $ 288.75 $ 288.75
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Air, Volatile Organic Compounds (EPA Method TO-17)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
9.D.
9-72. Per Sample $ 247.50 $ 259.88 $ 272.87
9-73. Per Sample $ 495.00 $ 519.75 $ 545.48
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75. Percent Surcharge $ - $ - $ -
9-76. Percent Surcharge $ 0.50 $ 0.50 $ 0.50
9-77. Percent Surcharge $ 1.00 $ 1.00 $ 1.00
10.
10-1. Per Sq. Foot/Day $ 39.18 Not Applicable Not Applicable
10-1.a. Per Sq. Foot Not Applicable $ 39.44 $ 39.44 10-1.b. Per Sq. Foot/Day Not Applicable $ 5.50 $ 5.50 10-1.c. Per Sq. Foot/Week Not Applicable $ 11.00 $ 11.00 10-1.d. Per Sq. Foot/Month Not Applicable $ 20.79 $ 20.79 10-2. Per Sq. Foot/Week $ 43.58 Not Applicable Not Applicable
10-2.a. Per Sq. Foot Not Applicable $ 51.54 $ 51.54
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID) Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for ≤ 20 feet deep Excavation
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
10-2.b. Per Sq. Foot/Day Not Applicable $ 5.77 $ 6.05 10-2.c. Per Sq. Foot/Week Not Applicable $ 15.40 $ 15.40 10-2.d. Per Sq. Foot/Month Not Applicable $ 23.10 $ 24.24 10-3. Per Sq. Foot/Month $ 46.88 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 39.18 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 53.48 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 56.78 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 42.70 $ 44.83 $ 44.83 10-8. Per Cubic Yard $ 39.40 $ 39.40 $ 39.40 10-9. Per Cubic Yard $ 125.20 $ 125.20 $ 125.20
10-10. Per Cubic Yard $ 114.20 $ 119.91 $ 119.91 10-11.a. Per Cubic Yard $ 147.20 $ 154.56 $ 162.21 10-11.b. Per Cubic Yard $ 306.70 $ 306.70 $ 306.70 10-12.a. Per Cubic Yard $ 147.20 $ 147.20 $ 154.56 10-12.b. Per Cubic Yard $ 246.20 $ 258.51 $ 258.51 10-13. Per Cubic Yard $ 116.25 $ 122.06 $ 122.06 10-14. Per Cubic Yard $ 37.20 $ 39.06 $ 41.01 10-15. Per Cubic Yard $ 31.70 $ 33.28 $ 34.94
10-15.a. Per Cubic Yard Not Applicable $ 21.73 $ 22.81 10-15.b. Per Cubic Yard Not Applicable $ 21.73 $ 22.81 10-16. Per Ton $ 55.00 $ 57.75 $ 60.61 10-17. Per Ton $ 44.00 $ 46.20 $ 48.51
Sheet Piling Rental for > 20 feet deep Excavation
Conventional Soil Excavation and Loading ≤ 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing ≤ 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel #57 Stone
LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
10-18. Per Day $ 5,083.35 $ 5,083.35 $ 5,083.35 10-19. Per Day $ 375.00 $ 375.00 $ 375.00 10-20. Per Week $ 9,483.34 $ 9,483.34 $ 9,483.34 10-21. Per Week $ 450.00 $ 450.00 $ 450.00 10-22. Per Month $ 15,533.34 $ 16,310.01 $ 16,310.01 10-23. Per Month $ 627.30 $ 627.30 $ 627.30
11.
11-1. Per Tank $ 6,450.00 $ 6,450.00 $ 6,450.00 11-2. Per Tank $ 8,500.00 $ 8,500.00 $ 8,500.00 11-3. Per Tank $ 11,500.00 $ 11,500.00 $ 11,500.00 11-4. Per Tank $ 14,500.00 $ 14,500.00 $ 14,500.00 12.
12-1. Per Square Foot $ 3.91 $ 4.10 $ 4.10 12-2. Per Square Foot $ 2.66 $ 2.79 $ 2.92 12-3. Per Ton $ 57.15 $ 57.15 $ 57.15 12-4. Per Ton $ 38.50 $ 40.42 $ 42.44 12-5. Per Ton $ 49.50 $ 51.97 $ 54.54 12-6. Per Drum $ 192.50 $ 202.13 $ 202.13 12-7. Per Ton $ 26.40 $ 27.72 $ 27.72 12-8. Per Ton $ 33.00 $ 34.65 $ 36.38 12-9. Per Ton $ 30.80 $ 32.34 $ 33.94
12-10. Per Ton $ 30.80 $ 32.34 $ 33.94
Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation)
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness Additional Removal/Loading Cost for Concrete - > 4 inch thickness Loading, Transport and Disposal/Recycle Clean Overburden
Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation)
PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL
Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) ≤ 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
12-11. Per Ton $ 33.00 $ 34.65 $ 36.38 12-12. Per Ton $ 33.00 $ 34.65 $ 34.65 12-13. Per Drum $ 192.50 $ 202.13 $ 202.13 12-14. Per Gallon $ 1.43 $ 1.43 $ 1.43 12-15. Per Drum $ 220.00 $ 231.00 $ 231.00 12-16. Per Gallon $ 1.43 $ 1.43 $ 1.43 12-17. Per Week Not Applicable $ 935.00 $ 935.00 12-18. Per Week Not Applicable $ 231.00 $ 242.55
13.
13-1. Per Square Foot $ 8.72 $ 8.72 $ 8.72 13-2. Per Square Foot $ 2.20 $ 2.31 $ 2.42 13-3. Per Square Foot $ 9.82 $ 9.82 $ 9.82 13-4. Per Square Foot $ 1.92 $ 2.01 $ 2.11 13-5. Per Square Foot $ 2.20 $ 2.31 $ 2.42 13-6. Per Square Foot $ 1.98 $ 1.98 $ 1.98 13-7. Per Square Foot $ 1.21 $ 1.21 $ 1.21 14.
14-1. Per Foot $ 32.61 Not Applicable Not Applicable 14-1.a. Per Day Not Applicable $ 6,100.00 $ 6,405.00 14-2. Per Injection Point $ 479.54 Not Applicable Not Applicable
14-2.a. Per Day Not Applicable $ 6,000.00 $ 6,000.00 14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Contact Water (bulk) Transport and Disposal of Petroleum Product (includes drum)
Concrete Paving - 4 inch thickness (includes sub-base) Concrete Paving - additional 1 inch thickness Crushed Lime Rock Cover - 2 inch thickness Grass - Sod Grass - Seed and Mulch
IN-SITU INJECTION
Transport and Disposal of Petroleum Product (bulk) Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container Additional Rental of 20 Cubic Yard Roll-Off Container
RESURFACING
Asphalt Paving - 2 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness
Direct Push Boring with In-Situ Injection
In-Situ Injection Into Existing Well/Treatment Point
Materials to be Injected
Direct Push Boring with In-Situ Injection
In-Situ Injection Into Existing Well/Treatment Point
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
14-4. Per Week Not Applicable $ 7,000.00 $ 7,000.00 14-5. Per Month Not Applicable $ 15,000.00 $ 15,000.00 15.
15.A.
15-1. Per Linear Foot $ 40.63 Not Applicable Not Applicable
15-1.a. Per Linear Foot of Trench Not Applicable $ 90.00 $ 90.00
15-1.b. Per Linear Foot of Trench Not Applicable $ 105.00 $ 105.00
15-1.c. Per Linear Foot of Trench Not Applicable $ 115.00 $ 115.00
15-1.d. Per Linear Foot of Trench Not Applicable $ 86.45 $ 90.77
15-2. Per Linear Foot $ 3.30 Not Applicable Not Applicable
15-2.a. Per Foot Not Applicable $ 30.00 $ 30.00
15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00
TRENCHING
Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Groundwater Injection System (not by direct push) Groundwater Injection System (not by direct push)
REMEDIAL ACTION CONSTRUCTION
Trenching and Installation - Additional 2 plumbing lines Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order) Traffic Bearing Trench Plates (materials) Infiltration Gallery Installation
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
15.B.
15-4. Per Integration / Startup $ 19,000.00 Not Applicable Not Applicable
15-4.a. Per Startup Not Applicable $ 20,000.00 $ 20,000.00
15-4.b. Per Startup Not Applicable $ 24,150.00 $ 24,150.00
15-4.c. Per Startup Not Applicable $ 30,000.00 $ 30,000.00
15-4.d. Per Startup Not Applicable $ 5,885.06 $ 5,885.06
15-5. Per Additional Tech Component $ 4,250.00 $ 4,250.00 $ 4,250.00
15-6. Per 2 Recovery / Treatment Points $ 1,500.00 Not Applicable Not Applicable
15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00
System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.
System Installation/Integration/Startup – Addition of 1 technology component
REMEDIATION SYSTEM INTEGRATION AND STARTUP
System Installation/Integration/Startup – Addition of 2 recovery/treatment points
Compound Construction/fencing (materials) Utility Drop Utility Connection Utility Disconnect
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
16.
16.A.
16-1. Per Test $ 4,568.52 $ 4,568.52 $ 4,568.52 16-2. Per 2 Hrs $ 740.70 $ 740.70 $ 740.70 16-3. Per Test $ 4,100.00 $ 4,100.00 $ 4,100.00 16-4. Per 2 Hrs $ 725.00 $ 725.00 $ 725.00 16-5. Per Test $ 4,400.00 $ 4,400.00 $ 4,400.00 16-6. Per 2 Hrs $ 725.00 $ 725.00 $ 725.00 16-7. Per Test $ 4,348.52 $ 4,565.95 $ 4,791.97 16-8. Per 2 Hrs $ 795.55 $ 795.55 $ 795.55 16-9. Per Test $ 5,200.00 $ 5,200.00 $ 5,200.00
16-10. Per 2 Hrs $ 725.00 $ 725.00 $ 725.00 16-11. Per Test $ 5,778.52 $ 5,778.52 $ 5,778.52 16-12. Per 2 Hrs $ 795.55 $ 795.55 $ 795.55 16-13. Per Test Not Applicable $ 6,000.00 $ 6,000.00 16-14. Per 2 Hours Not Applicable $ 915.56 $ 915.56
16.B.
16-17. Per Day $ 6,988.90 $ 6,988.90 $ 6,988.90 16-18. Per Week $ 15,400.00 $ 15,400.00 $ 15,400.00 16-19. Per Day $ 3,500.00 $ 3,500.00 $ 3,500.00
PILOT TEST PACKAGES (Including Remediation System Equipment) Groundwater Recovery System Pilot Test - 8 hours Groundwater Recovery System Pilot Test - Additional Time Air Sparging or Biosparging Pilot Test - 8 hours Air Sparging or Biosparging Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)
Multi-Phase Extraction Pilot Test - Additional Time Air Sparging/Multiphase Extraction Pilot Test - 8 hours Air Sparging/Multiphase Extraction Pilot Test - Additional Time SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment) Groundwater Treatment System Package - Medium Groundwater Treatment System Package - Medium
Vapor Extraction Pilot Test - Additional Time Vapor Extraction/Aquifer Pumping Test - 8 hours Vapor Extraction/Aquifer Pumping Test - Additional Time Air Sparging/Vapor Extraction Pilot Test - 8 hours Air Sparging/Vapor Extraction Pilot Test - Additional Time Multi-Phase Extraction Pilot Test - 8 hours
Air Sparge System Package - Medium
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
16-20. Per Week $ 9,300.00 $ 9,300.00 $ 9,300.00 16-21. Per Day $ 4,458.90 $ 4,458.90 $ 4,458.90 16-22. Per Week $ 10,670.00 $ 10,670.00 $ 10,670.00 16-23. Per Day $ 4,458.90 $ 4,458.90 $ 4,458.90 16-24. Per Week $ 10,757.83 $ 10,757.83 $ 10,757.83 16-25. Per Day Not Applicable $ 4,681.86 $ 4,915.95 16-26. Per Week Not Applicable $ 13,320.06 $ 13,320.06 16-27. Per Day Not Applicable $ 4,458.91 $ 4,458.91 16-28. Per Week Not Applicable $ 9,500.00 $ 9,500.00
17.
17-1. Per Month $ 2,883.00 $ 2,883.00 $ 2,883.00 17-2. Per Month $ 3,302.00 $ 3,302.00 $ 3,302.00 17-3. Per Month $ 3,888.00 $ 3,888.00 $ 3,888.00 17-4. Per Month $ 4,443.00 $ 4,443.00 $ 4,443.00 17-5. Per Month $ 617.00 $ 617.00 $ 617.00 18.
18-1. Per Month $ 660.00 $ 660.00 $ 660.00 18-2. Per Month $ 660.00 $ 660.00 $ 660.00 18-3. Per Month $ 825.00 $ 866.25 $ 909.56 18-4. Per Month $ 412.50 $ 433.13 $ 454.57 18-5. Per Month $ 4,620.00 $ 4,851.00 $ 5,093.55
AS/MPE System Package - Medium AS/MPE System Package - Medium SVE System Package - Medium SVE System Package - Medium MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES (Excluding Remediation System Equipment) System O&M Package - Small
Air Sparge System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium MPE System Package - Medium MPE System Package - Medium
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.
System O&M Package - Medium System O&M Package - Large System O&M Package - Extra Large Supplemental System O&M Package - Add Thermox or Catox Treatment REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M) Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
18-6. Per Month $ 4,180.00 $ 4,389.00 $ 4,608.45 18-7. Per Month $ 11,000.00 $ 11,000.00 $ 11,000.00 18-8. Per Month $ 9,000.00 $ 9,000.00 $ 9,000.00 18-9. Per Month $ 14,300.00 $ 14,300.00 $ 14,300.00
18-10. Per Month $ 12,100.00 $ 12,100.00 $ 12,100.00 18-11. Per Month $ 2,200.00 $ 2,310.00 $ 2,425.50 18-12. Per Month $ 1,980.00 $ 2,079.00 $ 2,182.95 18-13. Per Month $ 2,640.00 $ 2,772.00 $ 2,910.60 18-14. Per Month $ 2,200.00 $ 2,310.00 $ 2,425.50 18-15. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70 18-16. Per Month $ 2,750.00 $ 2,887.50 $ 3,030.43 18-17. Per Month $ 6,488.00 $ 6,488.00 $ 6,488.00 18-18. Per Month $ 4,203.00 $ 4,203.00 $ 4,203.00 18-19. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00 18-20. Per Month $ 3,850.00 $ 4,042.50 $ 4,242.60 18-21. Per Month $ 5,500.00 $ 5,775.00 $ 6,063.75 18-22. Per Month $ 4,950.00 $ 5,197.50 $ 5,454.78 18-23. Per Month $ 3,410.00 $ 3,580.50 $ 3,757.74 18-24. Per Month $ 2,750.00 $ 2,887.50 $ 3,030.43 18-25. Per Month $ 4,070.00 $ 4,273.50 $ 4,485.04 18-26. Per Month $ 3,630.00 $ 3,811.50 $ 4,000.17 18-27. Per Month $ 6,050.00 $ 6,352.50 $ 6,666.95
Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
18-28. Per Month $ 4,950.00 $ 5,197.50 $ 5,454.78 18-29. Per Month $ 1,210.00 $ 1,270.50 $ 1,333.39 18-30. Per Month $ 1,320.00 $ 1,386.00 $ 1,455.30 18-31. Per Month $ 1,925.00 $ 2,021.25 $ 2,122.31 18-32. Per Month $ 990.00 $ 1,039.50 $ 1,090.96 18-33. Per Month $ 1,100.00 $ 1,155.00 $ 1,212.75 18-34. Per Month $ 1,320.00 $ 1,386.00 $ 1,455.30 18-35. Per Month $ 837.00 $ 837.00 $ 837.00 18-36. Per Month $ 852.50 $ 852.50 $ 852.50 18-37. Per Month $ 1,059.30 $ 1,059.30 $ 1,059.30 18-38. Per Month $ 358.60 $ 358.60 $ 358.60 18-39. Per Month $ 513.00 $ 513.00 $ 513.00 18-40. Per Month $ 770.00 $ 770.00 $ 770.00 18-41. Per Month $ 2,860.00 $ 3,003.00 $ 3,153.15 18-42. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70 18-43. Per Month $ 6,380.00 $ 6,699.00 $ 6,699.00 18-44. Per Month $ 2,640.00 $ 2,772.00 $ 2,910.60 18-45. Per Month $ 3,190.00 $ 3,349.50 $ 3,515.30 18-46. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00 18-47. Per Month Not Applicable $ 4,400.00 $ 4,400.00
18.48. Per Month Not Applicable $ 4,070.00 $ 4,070.00
18-49. Per Month Not Applicable $ 5,060.00 $ 5,060.00
MPE System - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Soil Vapor Extraction (SVE) System - Small - Short Term ≤ 6 Months Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months Soil Vapor Extraction (SVE) System - Medium - Short Term ≤ 6 Months
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.0)
REVISED
CONTRACTED
ITEM PRICE (V3.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GEOSYNTEC CONSULTANTS, INC.
GC863
DEP Restated Agency Term Contract No. GC863 Amendment No. 7
Attachment D (V3.1) - Rate Schedule
18-50. Per Month Not Applicable $ 4,840.00 $ 4,840.00 18-51. Per Month Not Applicable $ 7,276.50 $ 7,276.50 18-52. Per Month Not Applicable $ 6,600.00 $ 6,600.00 18-53. Per Month Not Applicable $ 6,352.50 $ 6,666.95 18-54. Per Month Not Applicable $ 6,179.25 $ 6,179.25 18-55. Per Month Not Applicable $ 7,392.00 $ 7,761.60 18-56. Per Month Not Applicable $ 6,930.00 $ 7,276.50 18-57. Per Month Not Applicable $ 9,586.50 $ 10,061.03 18-58. Per Month Not Applicable $ 9,009.00 $ 9,009.00
19.
19-1. Per Report $ 2,026.00 $ 2,026.00 $ 2,026.00 19-2. Per Report $ 1,937.00 Not Applicable Not Applicable 19-3. Per Report $ 4,000.00 $ 4,000.00 $ 4,000.00 19-4. Per Report $ 2,300.00 $ 2,300.00 $ 2,300.00 19-5. Per Report $ 1,550.00 $ 1,550.00 $ 1,550.00 19-6. Per Plan $ 1,236.00 $ 1,236.00 $ 1,236.00 19-7. Per Report $ 748.63 $ 748.63 $ 748.63 19-8. Per Report $ 1,503.00 $ 1,503.00 $ 1,503.00 19-9. Per Plan $ 1,000.00 $ 1,000.00 $ 1,000.00
19-10. Per Report $ 1,450.00 $ 1,450.00 $ 1,450.00 19-11. Per Plan $ 13,000.00 $ 13,000.00 $ 13,000.00
Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months Soil Vapor Extraction (SVE) System - Large - Short Term ≤ 6 Months Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Small - Short Term ≤ 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Short Term ≤ 6 Months
General Site Assessment Report Supplemental Site Assessment Report Receptor and Exposure Pathway Report Level 2 Natural Attenuation Monitoring Plan Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual Natural Attenuation or Post RA Monitoring Report, Annual
Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Large - Short Term ≤ 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
REPORTS (Excluding Professional Engineering and Professional Geology Services)
Soil Source Removal Report Site Characterization Screening Report
Pilot Test Plan Pilot Test Report Level 1 Remedial Action Plan
ORIGINAL
CON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .