CN-370000-GC863-A14.pdf

PDF 908 KB Posted

Attached to
Master Agreement FL|GC863|331bfd839c4e8bc0b2fd82bdb5ced65d
Contract number
GC863
Issued by
Florida

About this file

Amendment No. 14 to DEP Agency Term Contract No. GC863

This is Amendment No. 14 to an Agency Term Contract (ATC) between the Florida Department of Environmental Protection (DEP) and Geosyntec Consultants, Inc. The original contract, executed on February 17, 2014, provides petroleum contamination site response action services in the South Region of Florida. This amendment modifies only the rate schedule and does not add, delete, or otherwise modify any line items contained in the original contract.

The amendment implements a rate increase to the contractor's Rate Schedule (Attachment D), updating it from Version 3.4 to Version 3.5, effective for all new work assignments offered on or after the Rate Change Date of June 10, 2024. The rate increases, which do not exceed the maximum 5% allowed under contract provision 11.B.ii, apply to approximately 240 pay items covering drilling and boring services, well installation, soil and water sampling and analysis, site remediation systems, professional services, and related environmental restoration work. The increases range from approximately 3.85% to 5.00%, with the majority of line items receiving the full 5% increase. All pre-Rate Change Date work assignments and previously offered work assignments continue to apply the prior rate schedule. The contractor submitted detailed justification for the increases, which the Department reviewed and approved. No contract amount or option period information is specified in this amendment.

View the file

Other files

File Type Posted
CN-370000-GC863-A10.pdf PDF
CN-370000-GC863-A11.pdf PDF
CN-370000-GC863-A4.pdf PDF
CN-370000-GC863-A8.pdf PDF
CN-370000-GC863-AR1.pdf PDF
CN-370000-GC863-CM3.pdf PDF
CN-370000-GC863-A12.pdf PDF
CN-370000-GC863-A16.pdf PDF
CN-370000-GC863-A17.pdf PDF
CN-370000-GC863-A2.pdf PDF
CN-370000-GC863-A5.pdf PDF
CN-370000-GC863-A7.pdf PDF
CN-370000-GC863-A9.pdf PDF
CN-370000-GC863-CMC1.pdf PDF
CN-370000-GC863-CMC2.pdf PDF
CN-370000-GC741-CMC4.pdf PDF
CN-370000-GC863-A13E1.pdf PDF
CN-370000-GC863-A15E2.pdf PDF
CN-370000-GC863-A3.pdf PDF
CN-370000-GC863-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC863-A6.pdf PDF
CN-370000-GC863-CMC.pdf PDF
CN-370000-GC863.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes

WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC863 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEOSYNTEC CONSULTANTS, INC. (hereinafter "Contractor") executed on February 17, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC863

RATE INCREASE

AMENDMENT NO. 14

Amendment No. 14 DEP Agency Term Contract No. GC863

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 14 DEP Agency Term Contract No. GC863

4.

5.

6.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing Rate

Agreed New Rate(1)

716.00$ $751.80

386.58$ $405.90

788.97$ $828.41

1,186.03$ $1,245.33

395.18$ $414.93

903.73$ $948.91

1,291.05$ $1,355.60

860.70$ $903.73

474.22$ $497.93

790.38$ $829.89

553.53$ $581.20

632.55$ $664.17

39.51$ $41.48

47.42$ $49.79

63.24$ $66.40

158.06$ $165.96

97.09$ $101.94

101.87$ $106.96

48.98$ $51.42 58.59$ $61.51 64.95$ $68.19 78.69$ $82.62

Est % Rate

Change(2)

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

3-3.

3-4.

3-15.

3-16.

3-17.

3-18.

Sonic Core Sampling - 5 or 10 foot (during boring) feet

6-6.

6-7.

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

Surface Casing - 8 inch diameter

Drill Rig and Support Vehicles Mobilization (hollow way miles each way

Work Trailer - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way

File Review Notice of Discovery of Contamination Package (Initial or TPOC)

100 feet feet

Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way

Mini Excavator/Loader (BobcatTM

100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Well Installation - 2 inch diameter (vertical)

Surface Casing - 10 inch diameter

Well Installation - 4 inch diameter (vertical)6-3.a.

Pay Item No.

1-1.

1-3.

3-6.

3-7.a.

3-9.a.

3-11.

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-1.b.

5-22.

5-23.

6-2.a.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+4.99% +4.99%

+5.00%

+5.00%

+4.98% +4.98%

90.53$ $95.05

9.47$ $9.94

45.87$ $48.16

103.53$ $108.70

21.64$ $22.72

536.99$ $563.83

55.01$ $57.76

75.58$ $79.35

98.22$ $103.13

101.07$ $106.12

108.28$ $113.69

82.47$ $86.59

311.85$ $327.44

72.16$ $75.76

98.22$ $103.13

14.42$ $15.14 14.42$ $15.14 14.42$ $15.14 14.42$ $15.14

43.30$ $45.46 +4.99%

+4.99% +4.99% +4.99% +4.99%

8-14.

9-1.

9-2.

9-3.

9-4.

9-5.

9-6.

9-18.

8-6.

8-10.

9-8.

9-8.a.

9-9.

9-10.

9-11.

9-12.

9-13.

9-14.

6-8.

6-9.a.

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)

Soil/Sediment Sample Collection

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

Additional Well Screen > 20 feet - 1 inch diameter

Surface Casing - 12 inch diameter

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

Soil, PCBs [or Aroclors] (EPA 8082)

+4.99%

+4.96%

+4.99%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+4.99%

+4.99%

34.63$ $36.36

72.16$ $75.76

303.04$ $318.19

322.19$ $338.29

576.99$ $605.83

55.01$ $57.76

71.50$ $75.07

98.18$ $103.08

101.07$ $106.12

50.53$ $53.05

66.11$ $69.41

103.23$ $108.39

108.28$ $113.69

82.47$ $86.59

72.16$ $75.76

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+4.99%

+4.99%

9-20. Soil, Texture, (See Gee 7 Bauder [1966])

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-32.

9-24.

9-25.

9-26.

9-27.

9-28.

9-29.

9-30.

9-31.

9-31.a.

9-41.

9-39.

9-40.

9-23.

9-33.

9-36.

9-37.

9-38.

+5.00%

+4.99%

+4.95%

+4.95%

+4.95%

+4.95%

+5.00%

+5.00%

21.64$ $22.72

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

13.74$ $14.42

15.86$ $16.65

21.64$ $22.72

17.32$ $18.18

17.32$ $18.18

17.32$ $18.18

18.55$ $19.47

17.32$ $18.18

25.98$ $27.27

19.47$ $20.44

15.12$ $15.87

15.12$ $15.87

17.32$ $18.18

9-57.

9-58.

9-59.

9-60.

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

9-56.

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

9-48.

9-42.

9-43.

9-44.

9-45.

9-46.

9-47.

+4.99%

+4.95%

+4.95%

+4.95%

+4.95%

+4.95%

+4.95%

+4.98%

+4.99%

+4.97%

+4.97%

+4.97%

+4.96%

+4.97%

+4.97%

+4.98%

+4.96%

+4.96%

+4.97%

43.30$ $45.46

72.16$ $75.76

303.04$ $318.19

81.08$ $85.13

62.37$ $65.48

111.32$ $116.88

237.20$ $249.06

358.62$ $376.55

324.89$ $341.13

0.52$ $0.54 +3.85%

9-66.

9-61.

9-72.

9-76.

9-67.

9-78.

9-79.

9-68.

9-69.

9-71.

Air, Volatile Organic Aromatics (EPA Method TO- 15)

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.

The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO- 17)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Heterotrophic Plate Count (SM 9215 B)

+5.00%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

1.05$ $1.10

149.07$ $156.52

135.97$ $142.76

183.94$ $193.13

347.79$ $365.17

175.27$ $184.03

151.57$ $159.14

45.55$ $47.82

79.03$ $82.98 63.24$ $66.40

3.79$ $3.97

52.70$ $55.33 67.73$ $71.11

251.03$ $263.58

36.13$ $37.93

47.42$ $49.79

44.24$ $46.45

44.24$ $46.45

45.17$ $47.42

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+4.99%

+4.98%

+5.00%

+4.76%

12-4.

12-5.

12-6.

12-7.

10-9.

10-10.

9-77.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.

The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

#57 Stone Pea Gravel

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Flowable Fill Concrete and Installation

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards cubic yards

Disposal of Petroleum Impacted Soil at a Landfill

Transport Petroleum Impacted Soil (bulk) > 100 miles

Disposal of Petroleum Impacted Soil at a Thermal

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport and Disposal of Mixed Debris Transport and Disposal of Clean Concrete

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

10-11.a.

10-17.

10-11.b.

10-12.a.

10-13.

10-15.

10-16.

12-8.

12-2.

12-9.

12-10.

12-11.

+5.00%

+4.75%

+4.99% +4.99%

+5.00%

+4.98%

+5.00%

+5.00%

+5.00%

+4.98%

251.03$ $263.58

286.90$ $301.24

1.77$ $1.85

316.25$ $332.06

10.36$ $10.87

3.02$ $3.17

11.67$ $12.25

2.63$ $2.76 3.02$ $3.17

106.92$ $112.26

5,852.81$ $6,145.45

1,134.48$ $1,191.20

566.97$ $595.31

6,353.03$ $6,670.68

5,474.84$ $5,748.58

3,025.27$ $3,176.53

2,722.73$ $2,858.86

3,630.65$ $3,812.18

3,025.27$ $3,176.53

4,235.40$ $4,447.17

3,780.16$ $3,969.16

4,993.16$ $5,242.81

6,051.14$ $6,351.69

16-25.

18-3.

18-4.

18-5.

18-6.

18-11.

18-12.

18-13.

18-14.

18-15.

18-16.

18-18.

18-19.

15-1.a.

Crushed Lime Rock Cover - 2 inch thickness

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Contact Water (includes drum)

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small -

Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity - AS/MPE System Package - Medium

Air Sparge System - Small - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

12-18.

13-1.

13-2.

13-3.

13-4.

13-5.

12-13.

12-15.

12-16.

+4.99%

+5.00%

+5.00%

+4.52%

+5.00%

+4.92%

+4.97%

+4.97%

+4.94% +4.97%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.97%

5,292.17$ $5,556.77

7,563.13$ $7,941.28

6,803.64$ $7,143.82

4,686.96$ $4,921.30 3,780.16$ $3,969.16

5,594.59$ $5,874.31

4,989.34$ $5,238.80 8,315.48$ $8,731.25 6,803.64$ $7,143.82

1,663.11$ $1,746.26

1,815.15$ $1,905.90

2,647.11$ $2,779.46

1,360.72$ $1,428.75

1,512.62$ $1,588.25

1,815.15$ $1,905.90

1,258.44$ $1,321.36

3,932.86$ $4,129.50

4,235.40$ $4,447.17

3,630.65$ $3,812.18

4,384.56$ $4,603.78

6,051.14$ $6,353.69

8,315.48$ $8,731.25

7,340.95$ $7,707.99

9,681.82$ $10,165.91

+5.00%

+5.00%

18-44.

18-45.

18-46.

18-53.

18-54.

18-55.

18-21.

18-22.

18-20.

Thermox/Catox Off Gas Treatment - Add On - Small -

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Groundwater Treatment - Add On - Medium - Short

Groundwater Treatment - Add On - Small - Short MPE System - Large - Long Term > 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Small - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

Air Sparge/Multiphase Extraction (AS/MPE) System -

Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Carbon Off Gas Treatment - Add On - Large - Short

Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-37.

18-23.

18-24.

18-25.

18-26.

18-27.

18-28.

18-41.

18-42.

+5.00%

+5.00% +5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

10,702.69$ $11,237.82

2,297.48$ $2,412.35 4,536.00$ $4,762.80

889.36$ $933.82

1,785.56$ $1,874.83

1,188.00$ $1,247.40 1,808.73$ $1,899.16

14,742.00$ $15,479.10 19,221.30$ $20,182.36

1,871.10$ $1,964.65

3,515.40$ $3,691.17

6,191.64$ $6,469.72

10,120.95$ $10,626.99

4,346.01$ $4,562.31

962.55$ $1,010.62

3,214.89$ $3,375.63 392.92$ $412.56

2,154.60$ $2,262.33

3,742.20$ $3,929.31 1,475.48$ $1,549.00

396.90$ $416.74 114.26$ $119.97

93.15$ $97.80 178.68$ $187.61 170.25$ $178.76

170.25$ $178.76

170.25$ $178.76

825.07$ $866.32

+5.00%

+5.00%

+5.00% +4.98% +5.00% +5.00% +4.99%

19-20.

19-21.

19-22.

19-23.

21-1.

19-17.

19-8.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

20-8.

19-26.

20-6.

18-58.

19-1.

19-3.

19-7.

19-18.

19-19. Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Professional Geologist (Key) Professional Engineer (Key) Field Technician (Key)

Construction Drawings and Specs Report

P.E. Project Oversight for Remediation Technology Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)

Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

General Site Assessment Report Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months

Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Remedial Action Plan

Scientist/Technical Specialist (Key) Well Abandonment/Site Restoration Report Remedial Action General Report Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non- Annual

Letter/NPDES Report

21-2.

21-3.

21-4.

21-5.

+5.00%

+5.00% +5.00%

+5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+4.49%

+5.00%

+4.98%

+4.99%

+5.00%

+5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

357.56$ $375.43

1,430.25$ $1,501.76

495.05$ $519.80

715.06$ $750.81

536.04$ $562.84

1,430.25$ $1,501.76

893.48$ $938.15

278.99$ $292.93

550.10$ $577.60

316.12$ $331.92

268.04$ $281.44

+5.00%

+5.00%

+5.00%

+5.00%

P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Project Oversight for Remediation System Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report

P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-13.

21-15.

21-16.

21-17.

21-7.a.

21-7.b.

21-8.

21-9.

21-10.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

178.68$ $187.61

178.68$ $187.61

268.04$ $281.44

178.68$ $187.61

268.04$ $281.44

1,787.83$ $1,877.22

2,329.93$ $2,446.42

268.04$ $281.44

426.12$ $447.42

715.06$ $750.81

1,168.40$ $1,226.82

178.68$ $187.61

371.08$ $389.63

268.04$ $281.44

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%21-31.

P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot Test Report

P.E. Review, Evaluation and Certification of a Pilot Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan

P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan

P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan

21-29.

21-18.

21-19.

21-20.

21-30.

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

453.61$ $476.29

178.68$ $187.61

178.68$ $187.61

753.46$ $791.13

376.71$ $395.54

21-32.

21-33.

21-34.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of Annual PARM Report

P.E. Review, Evaluation, and Certification of Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report

+5.00%

+5.00%

+5.00%

+5.00%

File details come from the government source that posted it. Updated .