Summary

This is Amendment No. 16 to DEP Agency Term Contract No. GC840, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and APEX Companies, LLC on May 8, 2024. The contract, originally executed on February 23, 2014, provides petroleum contamination site response action services in the South Region of Florida. The amendment updates the Rate Schedule (Attachment D) from Version 3.5 to Version 3.6, effective for new work assignments offered on or after the Rate Change Date of June 10, 2024.

The amendment modifies rates for 271 pay items across multiple service categories including site mobilization, drilling and boring operations, well installation and abandonment, soil and water sampling and analysis, excavation and disposal, remediation systems and pilot testing, and professional services. Rate increases range from 0% to 5.00%, with the majority of adjustments at or near the maximum 5% threshold permitted under contract provision 11.B.ii. The Agreed New Rates serve as the maximum authorized compensation for each line item. Rates for pre-amendment work assignments remain unchanged under the prior Rate Schedule. The FDEP provided notice of the rate changes to the contractor within five business days of data entry, with the effective date established in the Department's processing system.

View the file

Other files

File Type Posted
CN-370000-GC840-A14.pdf PDF
CN-370000-GC840-A18.pdf PDF
CN-370000-GC840-A3.pdf PDF
CN-370000-GC840-A4.pdf PDF
CN-370000-GC840-A5.pdf PDF
CN-370000-GC840-A8.pdf PDF
CN-370000-GC840-A9.pdf PDF
CN-370000-GC840-AR1.pdf PDF
CN-370000-GC840-A13.pdf PDF
CN-370000-GC840-A15E1.pdf PDF
CN-370000-GC840-A17E2.pdf PDF
CN-370000-GC840-A19.pdf PDF
CN-370000-GC840-A2.pdf PDF
CN-370000-GC840-A6.pdf PDF
CN-370000-GC840-A7.pdf PDF
CN-370000-GC840-CMC1.pdf PDF
CN-370000-GC840-CMC2.pdf PDF
CN-370000-GC840.pdf PDF
CN-370000-GC840-A10.pdf PDF
CN-370000-GC840-CMC.pdf PDF
CN-370000-GC840-CO1.pdf PDF
CN-370000-GC840-A11.pdf PDF
CN-370000-GC840-A12.pdf PDF
CN-370000-GC840-CO2.pdf PDF
PC-370000-GC840.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes

WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.5) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC840 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and APEX COMPANIES, LLC (hereinafter "Contractor") executed on February 23, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC840

RATE INCREASE

AMENDMENT NO. 16

Amendment No. 16 DEP Agency Term Contract No. GC840

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 16 DEP Agency Term Contract No. GC840

4.

5.

6.

Attachment D, Rate Schedule (V3.6) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.6) shall apply.

Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing Rate

Agreed New Rate(1)

594.39$ $624.09 390.60$ $398.41

341.11$ $358.16

317.00$ $332.85 538.92$ $565.86

483.42$ $507.59

924.64$ $970.87

538.92$ $565.86

925.90$ $972.19

578.55$ $607.47

1,109.48$ $1,164.95

190.19$ $199.69 253.59$ $266.26

789.90$ $829.34

1,323.90$ $1,390.09

1,231.34$ $1,268.28

1,952.97$ $2,050.61

803.72$ $827.83

1,155.00$ $1,212.75

937.66$ $965.78

737.10$ $759.21

Est % Rate

Change(2)

+5.00% +2.00%

+5.00%

+5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00% +5.00%

+4.99%

+5.00%

2-1.

2-2.

2-4.

3-1.

3-2.

3-3.

3-4.

3-16.

3-18.

Description

3-12.

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization (hollow way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way

Work Trailer - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton

Contractor Oversight for Non-Price Schedule Activities

Excavator Mobilization - > 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Pay Item No.

1-1.

1-2.

1-3.

1-5.

3-5.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

3-11.

+3.00%

+5.00%

+3.00%

+5.00%

+3.00%

+3.00%

504.20$ $519.32

693.00$ $727.64

43.86$ $46.05

50.70$ $53.23

55.43$ $58.19

150.93$ $158.47

214.99$ $225.73

2,694.70$ $2,829.43

34.24$ $35.95

37.95$ $39.84

41.51$ $43.58

40.55$ $42.57

41.64$ $43.72

46.54$ $48.86

50.99$ $53.53

56.36$ $58.05

61.48$ $63.32

42.21$ $44.32

46.80$ $49.14

52.91$ $54.49

63.89$ $65.79

75.69$ $77.96

+4.98%

+4.98%

+3.00%

+2.99%

3-19.

3-20.

5-9.

5-10.

5-11.

Sonic Core Sampling - 5 or 10 foot (during boring) feet total depth depth

Direct Push Technology (DPT) Rig and Equipment

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth

100 feet feet

Drum Compactor mobilization - > 100 miles each way

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-1.b.

5-2.

5-3.a.

5-6.

5-7.

5-18.

5-20.

5-21.

5-12.

5-13.

5-14.

5-15.

5-16.

5-8.

+3.00%

+5.00%

+4.99%

+4.99%

+4.98%

+5.00%

+5.00%

+5.00%

+4.99%

+4.98%

+4.99%

+4.98%

+5.00%

+5.00%

+5.00%

+2.99%

+2.97%

35.17$ $36.92 44.36$ $46.57

164.18$ $169.11

52.36$ $54.97

188.53$ $194.18

58.91$ $61.85 47.52$ $49.89 54.74$ $57.47

5.11$ $5.36

6.56$ $6.88

8.03$ $8.43

9.67$ $10.15

261.52$ $274.59 744.98$ $782.22 197.18$ $207.03

360.43$ $378.45

22.16$ $22.82

24.77$ $25.51

28.86$ $30.29

435.87$ $457.66 784.62$ $823.85

196.92$ $206.76

240.51$ $252.53

109.01$ $114.46 83.25$ $87.41

56.25$ $59.06

44.36$ $46.57

51.98$ $54.57 +4.98%

8-3.

8-6.

8-9.

8-11.

6-5.

Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, > 100 foot depth foot depth

Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot

Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

6-6.

Well Redevelopment Installation of Well Vault - 2 x 2 x 2 foot

6-9.a.

7-2.

7-3.

7-5.

7-1.

6-9.b.

6-9.c.

6-9.d.

6-10.

6-11.

6-13.

6-14.

7-6.

8-1.

8-2.

8-13.

Surface Casing - 8 inch diameter Surface Casing - 6 inch diameter

Well Installation - 1 inch diameter Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Survey Latitude/Longitude of New Monitor Wells

Electronic Data Deliverables (EDD)

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)

Soil/Sediment Sample Collection

Above Grade Well Completion

Additional Well Screen > 20 feet - 6 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Well Installation - 6 inch diameter

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

6-3.a.

6-3.b.

6-4.

6-2.b.

6-1.

6-2.a.

+3.00%

+4.99% +4.99% +4.99%

+4.89%

+4.88%

+4.98%

+4.96%

+5.00% +5.00% +5.00%

+4.98% +4.98%

+3.00%

+4.98%

+5.00%

+2.98%

+2.99%

+4.95%

+5.00% +5.00%

+5.00%

+5.00%

+5.00% +5.00%

+5.00%

+4.98%

58.87$ $61.81

101.63$ $106.71

110.92$ $116.46

77.64$ $81.52

310.67$ $326.19

69.92$ $73.41

44.36$ $46.57

44.36$ $46.57

52.44$ $55.06

69.06$ $72.51

8.78$ $9.21 76.90$ $80.74

80.70$ $84.73

80.70$ $84.73

50.70$ $53.23

95.20$ $99.96

112.50$ $118.12

63.38$ $66.54

103.02$ $108.17

+5.00%

+4.90% +4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.99%

+4.98%

+4.98%

+5.00%

9-2.

9-4.

9-5.

9-16.

9-17.

9-18.

9-19.

9-20.

9-15.

9-8.

9-8.a.

9-9.

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Soil, Organic Carbon, Total (EPA 9060 or Walkey- Black)

Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Soil, PCBs [or Aroclors] (EPA 8082)

9-27.

9-29.

9-30.

9-31.a.

9-21.

9-23.

9-33.

+4.99%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

+5.00%

79.21$ $83.17

69.92$ $73.41

12.71$ $13.34

12.71$ $13.34

12.71$ $13.34

13.72$ $14.39

34.00$ $35.69

12.13$ $12.73

34.00$ $35.69

12.71$ $13.34

19.85$ $20.84

17.33$ $18.19

16.04$ $16.84

17.33$ $18.19

26.32$ $27.63

18.53$ $19.45

14.30$ $15.01

15.02$ $15.77

9-57.

9-58.

9-59.

9-50.

9-51.

9-52.

9-53.

9-56.

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-48.

9-41.

9-41.a.

9-43.

9-44.a.

9-39.

9-40.

9-36.

9-37.

9-38.

+5.00%

+4.99%

+4.96%

+4.96%

+4.96%

+4.88%

+4.97%

+4.95%

+4.97%

+4.96%

+4.99%

+4.96%

+4.99%

+4.96%

+4.98%

+4.96%

+4.97%

+4.99%

15.05$ $15.79

49.55$ $52.02

610.25$ $640.76

76.68$ $80.51

88.74$ $93.17

120.29$ $126.29

328.44$ $344.86

289.00$ $303.45

500.25$ $525.26

17.08$ $17.93

8.47$ $8.89

16.36$ $17.17

41.18$ $43.23

32.94$ $34.58

143.38$ $150.54

132.83$ $139.47

182.71$ $191.84

+4.98%

+4.98%

+4.99%

+5.00%

+5.00%

+5.00%

+4.98%

+4.96%

+4.95%

10-7.

10-8.

10-9.

10-10.

9-60.

9-61.

9-63.

10-2.a.

9-72.

9-73.

10-1.a.

10-1.c.

9-78.

9-80.

9-68.

9-71.

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO- 17)

Excavation

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, Methane (EPA SOP RSK-175)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)

Water, Heterotrophic Plate Count (SM 9215 B)

300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards cubic yards

Sheet Piling Installation for > 20 feet deep Excavation

10-11.a.

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.92%

+4.98%

338.42$ $355.34

168.63$ $177.06

280.50$ $294.52

151.52$ $159.09

22.17$ $23.27

72.56$ $76.18

14,843.70$ $15,585.88

3.45$ $3.62

3.81$ $3.99

63.38$ $66.54

254.29$ $266.99

35.20$ $36.96

45.17$ $47.42

43.81$ $45.99

39.74$ $41.72

38.54$ $40.46

992.05$ $1,041.65

11.04$ $11.59

3.15$ $3.29

10.83$ $11.37

3.06$ $3.21 3.57$ $3.74 1.91$ $1.99 0.78$ $0.81

5,654.52$ $5,937.24

4,621.05$ $4,852.09

+5.00%

+5.00%

+5.00%

+5.00%

+4.96%

12-5.

12-6.

12-7.

#57 Stone

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Flowable Fill Concrete and Installation

Dewatering System, up to 12 well points (includes installation)

LDA Excavation and Loading With Driven Casing > 300 cubic yards

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

In-Situ Injection Into Existing Well/Treatment Point

Direct Push Boring with In-Situ Injection Grass - Seed and Mulch Grass - Sod Crushed Lime Rock Cover - 2 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill

Asphalt Paving - 2 inch thickness (includes sub-base)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport and Disposal of Mixed Debris

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

10-22.

14-1.a.

12-17.

13-1.

13-2.

13-3.

13-4.

13-5.

13-6.

13-7.

10-17.

10-11.b.

10-12.a.

10-12.b.

10-13.

10-15.b.

12-1.

12-2.

12-9.

12-10.

12-11.

12-12.

14-2.a.

+5.00%

+4.99%

+4.93%

+4.72%

+4.99%

+4.99%

+5.00%

+4.98%

+4.98%

+4.98%

+4.98%

+5.00%

+4.98%

+4.44%

+4.99%

+4.90% +4.76% +4.19% +3.85% +5.00%

102.44$ $105.51

114.73$ $118.17

21.13$ $22.18

11,413.00$ $11,983.65

12,205.56$ $12,815.83

13,949.23$ $14,646.69

3,899.41$ $4,094.38

4,422.51$ $4,643.63

619.50$ $650.47

4,945.61$ $5,192.89

5,900.00$ $6,194.99

554.77$ $582.49

4,322.50$ $4,538.62

3,039.76$ $3,191.74 3,559.59$ $3,737.56 4,089.61$ $4,294.09 4,519.06$ $4,745.01

540.00$ $566.99

462.00$ $485.09

3,837.87$ $4,029.76

3,087.78$ $3,180.41

4,977.32$ $5,226.18

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+3.00%

+4.97%

+5.00%

+5.00%

+5.00%

17-1.

17-2.

17-3.

17-4.

17-5.

18-1.

18-13.

18-14.

18-15.

16-17.

16-9.

16-10.

16-11.

16-13.

16-14.

15-1.a.

15-1.b.

16-3. Air Sparging or Biosparging Pilot Test - 8 hours

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points

Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Supplemental System O&M Package - Add Thermox or Catox Treatment

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Air Sparge System - Medium - Long Term > 6 mos.

15-2.a.

15-4.a.

15-4.b.

15-4.c.

+3.00%

+5.00%

+5.00% +5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+3.00%

4,184.75$ $4,393.98

3,661.64$ $3,844.72

4,882.19$ $5,126.29

4,184.75$ $4,393.98

6,277.12$ $6,590.97

5,405.29$ $5,675.55

4,981.07$ $5,230.12 3,711.79$ $3,897.37

6,451.48$ $6,774.05

5,002.82$ $5,252.96 8,072.45$ $8,476.07 6,277.33$ $6,591.19

935.19$ $981.94

1,664.37$ $1,747.58

3,051.37$ $3,203.93

491.34$ $515.89

935.19$ $981.94

1,981.37$ $2,080.43

790.39$ $829.89

1,187.27$ $1,246.63

346.50$ $356.89

398.47$ $418.39

7,373.52$ $7,594.72

8,357.83$ $8,608.56

+5.00%

+5.00%

+3.00%18-56.

18-54.

18-21.

18-22.

18-20.

18-17.

18-18.

18-19.

Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Groundwater Treatment - Add On - Medium - Short

Groundwater Treatment - Add On - Small - Short MPE System - Large - Long Term > 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Small - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Carbon Off Gas Treatment - Add On - Medium -

18-38.

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-36.

18-37.

18-23.

18-24.

18-25.

18-26.

18-27.

18-28.

18-39.

+5.00%

+5.00% +5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+3.00%

+5.00%

9,872.52$ $10,366.14

2,439.21$ $2,561.17 2,599.89$ $2,729.84 1,424.07$ $1,495.24

850.32$ $892.83

1,814.04$ $1,904.74

1,107.75$ $1,163.13 1,761.36$ $1,849.42

12,855.46$ $13,498.23 17,991.30$ $18,890.86

1,992.53$ $2,092.15

3,623.34$ $3,804.49

6,423.03$ $6,744.18

9,827.83$ $10,319.22

4,497.95$ $4,722.84

883.07$ $927.22

3,481.93$ $3,656.02 424.47$ $445.69

2,288.81$ $2,403.25

4,117.03$ $4,322.88 1,501.53$ $1,576.59

844.92$ $887.16 397.73$ $417.61 131.25$ $137.81 124.90$ $131.14 118.24$ $124.15 114.11$ $119.81

97.70$ $102.58 85.93$ $90.22 84.72$ $88.95 69.06$ $72.51 58.47$ $61.39 53.57$ $53.57

160.00$ $167.99

+5.00%

+5.00%

+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +4.99% +4.99% +4.99% +5.00%

19-20.

19-21.

19-22.

19-23.

19-24.

20-9.

20-10.

20-11.

21-1.

19-17.

19-8.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

20-8.

19-26.

20-2.

20-3.

20-4.

20-5.

20-6.

20-7.

18-58.

19-1.

19-4.

19-5.

19-7.

19-18.

19-19. Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Professional Engineer (Key) Laborers and Security Guards Administrative Draftsperson Field Technician (Key)

Construction Drawings and Specs Report

Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Receptor and Exposure Pathway Report Supplemental Site Assessment Report Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months

Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Remedial Action Plan

Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Engineer (Key) Project Manager (Key) Well Abandonment/Site Restoration Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non- Annual

Letter/NPDES Report

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99% +0.00% +4.99%

+5.00%

152.43$ $160.05

848.01$ $890.41

1,109.57$ $1,165.04

1,386.95$ $1,456.29

1,386.95$ $1,456.29

1,664.37$ $1,747.58

554.77$ $582.49

396.25$ $416.06

1,386.95$ $1,456.29

990.68$ $1,040.21

536.27$ $563.08

677.06$ $710.91 +5.00%

+5.00%

Professional Geologist (Key)

P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology Pilot Testing

P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-13.

21-15.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-9.

21-10.

21-2.

21-5.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

416.08$ $436.88

277.35$ $291.21

277.35$ $291.21

416.75$ $437.58

277.35$ $291.21

416.08$ $436.88

554.77$ $582.49

1,109.57$ $1,165.04

416.08$ $436.88

554.77$ $582.49

554.77$ $582.49

554.77$ $582.49

554.77$ $582.49

554.77$ $582.49

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%21-31.

P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot Test Report

P.E. Review, Evaluation and Certification of a Pilot Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report

P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan

21-16.

21-17.

21-19.

21-20.

21-30.

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

554.77$ $582.49

404.24$ $416.36

594.39$ $624.09

453.60$ $467.19

21-32.

21-33.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of Annual PARM Report

P.E. Review, Evaluation, and Certification of Construction Drawings

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report

+5.00%