This document is Amendment No. 12 to an Agency Term Contract (GC840) between the Florida Department of Environmental Protection (FDEP) and APEX COMPANIES, LLC. The contract, originally executed on February 23, 2014, provides petroleum contamination site response action services in Florida's South Region. This amendment implements a rate increase for specified pay items, effective for all new work assignments offered on or after the Rate Change Date of May 25, 2022. The amendment does not add, delete, or modify any existing line items; it solely adjusts pricing for designated services.

The amended contract includes 450+ pay items covering site assessment, drilling and boring, well installation and abandonment, sample collection, laboratory analysis, soil source removal, debris disposal, remediation system operations and maintenance, pilot testing, professional services, and reporting. Rate increases range from 5% to 15%, with the majority of items receiving 15% increases. Key service categories include mobilization charges ranging from $176.11 to $1,808.31 per round trip, laboratory analyses from $5.11 to $1,087.03 per sample, well installation costs from $20.52 to $1,453.02 per vault, soil excavation and disposal fees from $24.18 to $182.71 per cubic yard, and professional engineering oversight rates from $1,000 to $4,579.27 per test or system. The revised Rate Schedule (V3.4) applies only to new work assignments issued on or after May 25, 2022, while all pre-rate-change work assignments continue under the previous rate schedule. The Department was required to provide the contractor with tabulated rate changes within five business days of data entry.

View the file

Other files

File Type Posted
CN-370000-GC840-A14.pdf PDF
CN-370000-GC840-A18.pdf PDF
CN-370000-GC840-A3.pdf PDF
CN-370000-GC840-A4.pdf PDF
CN-370000-GC840-A5.pdf PDF
CN-370000-GC840-A8.pdf PDF
CN-370000-GC840-A9.pdf PDF
CN-370000-GC840-AR1.pdf PDF
CN-370000-GC840-A10.pdf PDF
CN-370000-GC840-A16.pdf PDF
CN-370000-GC840-CMC.pdf PDF
CN-370000-GC840-CO1.pdf PDF
CN-370000-GC840-A13.pdf PDF
CN-370000-GC840-A15E1.pdf PDF
CN-370000-GC840-A17E2.pdf PDF
CN-370000-GC840-A19.pdf PDF
CN-370000-GC840-A2.pdf PDF
CN-370000-GC840-A6.pdf PDF
CN-370000-GC840-A7.pdf PDF
CN-370000-GC840-CMC1.pdf PDF
CN-370000-GC840-CMC2.pdf PDF
CN-370000-GC840.pdf PDF
CN-370000-GC840-A11.pdf PDF
CN-370000-GC840-CO2.pdf PDF
PC-370000-GC840.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

4.

5.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Attachment D, Rate Schedule (V3.4) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.4) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change

Date, within five (5) business days from the data entry date.

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.3) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC840 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and APEX

COMPANIES, LLC (hereinafter "Contractor") executed on February 23, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC840

RATE INCREASE

AMENDMENT NO. 12

Amendment No. 12

DEP Agency Term Contract No. GC840

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

NOW THEREFORE, the parties agree as follows:

Amendment No. 12

DEP Agency Term Contract No. GC840

6.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

478.59$ $ 550.37

314.50$ $ 361.67

296.62$ $ 341.11

255.24$ $ 293.52

433.92$ $ 499.00

389.24$ $ 447.62

765.75$ $ 880.61

433.92$ $ 499.00

745.50$ $ 857.32

465.83$ $ 535.70

893.31$ $ 1,027.30

153.14$ $ 176.11

204.19$ $ 234.81

643.24$ $ 739.72

1,065.95$ $ 1,225.84

991.42$ $ 1,140.13

1,572.45$ $ 1,808.31

708.75$ $ 744.19

551.25$ $ 578.81

826.87$ $ 868.21

424.42$ $ 466.86

+15.00%

+15.00%

+5.00%

+5.00%

+5.00%

+10.00%

Pay

Item

No.

1-1.

1-2.

1-3.

1-5.

3-5.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

3-11.

File Review

Site Health & Safety Plan

Notice of Discovery of Contamination Package

(Initial or TPOC)

Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway

Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

Drum Compactor mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule

Activities

Excavator Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

2-1.

2-2.

2-4.

3-1.

3-2.

3-3.

3-4.

3-15.

3-16.

3-19.

Est %

Rate

Change (2)

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

630.00$ $ 693.00

35.33$ $ 40.62

40.83$ $ 46.95

44.64$ $ 51.33

131.25$ $ 150.93

2,169.66$ $ 2,495.10

2,467.50$ $ 2,837.62

28.36$ $ 32.61

31.43$ $ 36.14

36.10$ $ 41.51

33.59$ $ 38.62

36.21$ $ 41.64

40.47$ $ 46.54

44.34$ $ 50.99

47.59$ $ 54.72

51.91$ $ 59.69

35.64$ $ 40.98

41.31$ $ 45.44

46.98$ $ 51.68

44.67$ $ 51.37

50.80$ $ 58.42

+14.98%

+10.00%

+10.00%

+15.00%

+15.00%

+14.99%

+14.99%

+15.00%

+15.00%

+14.99%

+14.99%

+14.99%

+14.97%

+15.00%

+10.00%

+14.97%

+14.99%

5-1.a.3.

5-1.b.

5-3.a.

5-5.a.

5-6.

5-7.

5-17.

5-18.

5-19.

5-12.

5-13.

5-14.

5-15.

5-16.

5-8.

5-1.a.1.

5-1.a.2.

Split Spoon Sampling – 2 foot (during boring) 50 to

100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Drum Compactor mobilization - > 100 miles each way

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)

Direct Push Technology (DPT) Rig and Equipment

Sonic Core Sampling - 5 or 10 foot (during boring)

Split Spoon Sampling – 2 foot (during boring) > 100 feet

3-20.

5-9.

5-10.

5-11. +15.00%

+15.00%

+14.98%

+14.99%

55.56$ $ 63.89

60.95$ $ 70.09

70.88$ $ 81.51

84.67$ $ 97.37

31.97$ $ 35.17

35.73$ $ 41.08

164.59$ $ 172.82

43.37$ $ 49.87

179.55$ $ 188.53

53.55$ $ 58.91

39.36$ $ 45.26

49.07$ $ 56.43

60.18$ $ 69.20

69.51$ $ 79.93

4.45$ $ 5.11

5.71$ $ 6.56

6.99$ $ 8.03

8.41$ $ 9.67

210.57$ $ 242.15

599.83$ $ 689.80

1,263.50$ $ 1,453.02

163.30$ $ 187.79

304.29$ $ 349.93

354.84$ $ 408.06

17.85$ $ 20.52

19.95$ $ 22.94

23.91$ $ 27.49

+15.00%

+15.00%

+14.96%

+14.99%

+14.97%

+14.89%

+14.88%

+14.98%

+15.00%

+15.00%

+15.00%

+15.00%

+14.99%

+15.00%

+15.00%

+15.00%

+10.01%

+14.97%

+5.00%

+14.99%

+5.00%

+10.01%

+14.99%

+15.00%

+14.99%

+14.99%

+14.83%

6-2.b.

5-20.

5-21.

5-22.

5-23.

6-1.

6-2.a.

6-4.

6-3.a.

6-3.b.

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Above Grade Well Completion

Additional Well Screen > 20 feet - 6 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Surface Casing - 12 inch diameter

Surface Casing - 10 inch diameter

Well Installation - 6 inch diameter

Surface Casing - 8 inch diameter

Surface Casing - 6 inch diameter

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Well Installation - 1 inch diameter

6-9.c.

6-9.d.

6-10.

6-11.

6-12.

6-13.

6-14.

6-15.

6-6.

6-7.

6-8.

Well Redevelopment

Installation of Well Vault - 4 x 4 x 2 foot

Installation of Well Vault - 2 x 2 x 2 foot

6-9.a.

7-2.

7-3.

7-1.

6-9.b.

Removal and Reinstallation of 12-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Removal and Reinstallation of 8-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

6-5.

29.18$ $ 33.55

350.95$ $ 403.59

631.74$ $ 726.50

159.52$ $ 183.44

158.56$ $ 182.34

193.66$ $ 222.70

67.04$ $ 77.09

26.25$ $ 28.88

110.25$ $ 121.28

35.73$ $ 41.08

45.86$ $ 52.73

47.25$ $ 51.98

18.47$ $ 21.24

466.01$ $ 535.91

47.40$ $ 54.51

64.05$ $ 73.65

81.84$ $ 94.11

89.32$ $ 102.71

90.14$ $ 103.66

288.75$ $ 317.63

62.52$ $ 71.89

+15.00%

+15.00%

+15.00%

+14.99%

+14.99%

+14.99%

+15.00%

+10.00%

+14.99%

+14.98%

+15.00%

+15.00%

+14.99%

+15.00%

+15.00%

+14.99%

+10.02%

+10.00%

+14.97%

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA

8260)

Grout and Abandon Well, > 6 inch diameter

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Soil, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Electronic Data Deliverables (EDD)

Free Product Gauging & Bailing

Water Level or Free Product Gauging

Soil/Sediment Sample Collection

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram

Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

7-6.

7-7.

8-1.

8-2.

8-13.

7-4.

7-5.

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Removal of Well Pad and Manhole

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Vault - 2 x 2 x 2 foot

8-14.

9-1.

9-2.

9-3.

9-4.

9-5.

9-6.

8-12.

8-6.

8-7.

8-8.

8-11.

9-7.

9-8.

+14.98%

+10.01%

250.14$ $ 287.66

60.80$ $ 69.92

80.49$ $ 92.56

12.38$ $ 14.23

12.38$ $ 14.23

12.38$ $ 14.23

12.38$ $ 14.23

35.73$ $ 41.08

35.73$ $ 41.08

45.60$ $ 52.44

60.06$ $ 69.06

7.64$ $ 8.78

66.87$ $ 76.90

70.18$ $ 80.70

70.18$ $ 80.70

308.75$ $ 324.19

272.82$ $ 313.74

446.37$ $ 513.32

40.83$ $ 46.95

63.00$ $ 69.30

+15.00%

+15.00%

+15.00%

9-21.

9-23.

9-24.

9-25.

9-26.

9-27.

9-28.

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

Soil, PCBs [or Aroclors] (EPA 8082)

Water, Volatile Organic Halocarbons, except EDB

(EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA

8021 or EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM

D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-

Black)

Soil, Synthetic Precipitation Leaching Procedure-

Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure-

Extraction Only (EPA 1311)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority

Pollutant Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, TRPH Fractionation (MADEP-EPH/VPH

Method or TPHCWG Direct Method)

Soil, Texture, (See Gee 7 Bauder [1966])

9-16.

9-17.

9-18.

9-19.

9-20.

9-15.

9-8.a.

9-9.

9-10.

9-11.

9-12.

9-13.

9-14.

+14.99%

+14.92%

+15.00%

+14.99%

+14.99%

+5.00%

+15.00%

+15.00%

+14.99%

+10.00%

+14.94%

+14.94%

+14.94%

+14.94%

+14.97%

+14.97%

76.66$ $ 88.15

90.59$ $ 104.17

44.98$ $ 51.72

51.04$ $ 58.69

82.95$ $ 95.39

82.95$ $ 95.39

246.75$ $ 259.09

254.15$ $ 292.27

63.79$ $ 73.35

60.80$ $ 69.92

11.55$ $ 12.71

11.55$ $ 12.71

11.55$ $ 12.71

11.55$ $ 12.71

18.90$ $ 20.79

11.55$ $ 12.13

11.41$ $ 13.12

11.55$ $ 12.71

+5.00%

+15.00%

+14.99%

+15.00%

+10.04%

+10.04%

+10.04%

+10.04%

+10.00%

+15.00%

+15.00%

+5.02%

+14.99%

+10.04%

9-33.

9-34.

9-35.

9-36.

9-37.

9-38.

9-32.

9-29.

9-30.

9-31.

9-31.a.

9-41.

9-42.

9-43.

9-44.

9-45.

9-39.

9-40.

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including

1-methylnaphthalene + 2-methylnaphthalene (EPA

610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA

624, EPA 6021 or EPA 8260)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA

8270)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Priority Pollutant Volatile Organics (EPA

8260)

+14.99%

+14.99%

+14.98%

11.55$ $ 12.71

11.55$ $ 12.71

11.55$ $ 12.71

14.01$ $ 16.11

18.90$ $ 19.85

15.07$ $ 17.33

13.95$ $ 16.04

15.07$ $ 17.33

15.75$ $ 18.11

15.21$ $ 17.49

22.89$ $ 26.32

16.12$ $ 18.53

13.00$ $ 14.30

13.65$ $ 15.02

15.20$ $ 16.72

47.88$ $ 55.06

945.25$ $ 1,087.03

+10.04%

+10.04%

+14.99%

+5.03%

+15.00%

+14.98%

+15.00%

+14.98%

+14.99%

+14.98%

+14.95%

+10.00%

+10.04%

+10.00%

+15.00%

+15.00%

+10.04%

9-48.

9-46.

9-47.

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM

4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3

C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM

2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

9-56.

9-57.

9-58.

9-59.

9-60.

9-61.

9-62.

491.35$ $ 565.05

378.00$ $ 396.90

94.76$ $ 108.97

262.50$ $ 301.87

61.74$ $ 71.00

50.40$ $ 57.96

71.46$ $ 82.17

96.86$ $ 111.38

231.00$ $ 254.10

231.00$ $ 254.10

285.60$ $ 328.44

13.76$ $ 15.82

13.18$ $ 15.15

5.08$ $ 5.33

9.01$ $ 10.36

33.16$ $ 38.13

26.53$ $ 30.50

131.25$ $ 150.93

+15.00%

+15.00%

+14.99%

+14.99%

+10.00%

+10.00%

+15.00%

+15.00%

+5.00%

+15.00%

+15.00%

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Installation for > 20 feet deep

Excavation

Air, Polycyclic Aromatic Hydrocarbons (EPA

Method TO-13)

Air, Volatile Organic Aromatics (EPA Method TO-

15)

Air, Volatile Organic Compounds (EPA Method TO-

17)

Sheet Piling Installation for ≤ 20 feet deep

Excavation

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, Methane (EPA SOP RSK-175)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

9-67.

9-78.

9-79.

9-80.

9-68.

9-69.

9-70.

9-71.

10-2.b.

10-2.c.

10-7.

10-8.

10-9.

9-66.

9-63.

9-64.

10-2.a.

10-1.a.

+14.99%

+14.96%

+14.99%

+14.97%

+14.95%

+4.92%

+14.98%

120.75$ $ 132.83

158.88$ $ 182.71

307.65$ $ 338.42

154.35$ $ 177.50

255.00$ $ 280.50

122.00$ $ 140.30

43.20$ $ 49.68

40.00$ $ 46.00

21.03$ $ 24.18

17.86$ $ 20.53

70.77$ $ 81.38

58.43$ $ 67.19

4,305.00$ $ 4,520.25

8,925.00$ $ 10,263.75

13,586.92$ $ 15,624.95

9,193.91$ $ 10,113.30

11,584.76$ $ 13,322.47

2.79$ $ 3.20

3.46$ $ 3.81

48.38$ $ 55.63

42.00$ $ 46.20

51.04$ $ 58.69

204.75$ $ 235.46

28.35$ $ 32.60 +14.99%

+15.00%

+15.00%

+14.99%

+5.00%

+10.00%

+15.00%

+14.70%

+10.12%

+14.99%

+10.00%

+14.99%

+15.00%

10-15.

10-15.a.

10-15.b.

10-16.

11-3.

11-4.

12-1.

12-2.

10-11.a.

10-18.

10-20.

10-22.

10-17.

10-11.b.

10-12.a.

10-12.b.

10-13.

10-14.

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Loading, Transport and Disposal/Recycle Clean

Overburden

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete -up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank - >

10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - >

5,000 to 10,000 gal. capacity

#57 Stone

Pea Gravel

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) ≤ 300 cubic yards

Flowable Fill Concrete and Installation

Dewatering System, up to 12 well points (includes installation)

Dewatering System, up to 12 well points (includes installation)

Dewatering System, up to 12 well points (includes installation)

LDA Excavation and Loading With Driven Casing >

300 cubic yards

LDA Excavation and Loading With Surface Casing >

300 cubic yards

LDA Excavation and Loading With Driven Casing <

300 cubic yards

LDA Excavation and Loading With Surface Casing ≤

300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards 10-10.

12-3.

12-4.

12-5.

12-6.

12-7.

+10.00%

+15.00%

+10.00%

+15.00%

+10.00%

+15.00%

+15.00%

+15.00%

+14.98%

+14.95%

42.00$ $ 48.30

36.38$ $ 41.83

35.28$ $ 40.57

36.38$ $ 41.83

35.28$ $ 40.57

204.75$ $ 235.46

1.32$ $ 1.51

227.62$ $ 261.76

1.37$ $ 1.57

798.76$ $ 918.57

8.92$ $ 10.23

2.54$ $ 2.92

8.73$ $ 10.03

2.47$ $ 2.84

2.88$ $ 3.31

1.54$ $ 1.77

0.64$ $ 0.73

4,552.76$ $ 5,235.67

4,882.50$ $ 5,614.87

82.49$ $ 94.86

92.39$ $ 106.24

101.62$ $ 116.86

19.21$ $ 21.13

9,189.22$ $ 10,567.60

+15.00%

+14.98%

+14.99%

+15.00%

+15.00%

+14.98%

+14.99%

+15.00%

+14.39%

+15.00%

+14.60%

+15.00%

+14.69%

+14.96%

+14.89%

+14.98%

+14.93%

+14.94%

+14.06%

+15.00%

12-8.

15-2.a.

15-4.a.

12-9.

12-10.

12-11.

12-12.

12-13.

12-14.

12-15.

12-16.

14-1.a.

12-17.

13-1.

13-2.

13-3.

13-4.

13-5.

13-6.

13-7.

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1

Technology Component - 1-10 Recovery/Treatment

Points

Installation of Plumbing (and Electrical) Lines Above

Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.

Trenching and Installation of 1-10 Plumbing (and

Electrical) Lines in Trench

Groundwater Injection System (not by direct push)

Direct Push Boring with In-Situ Injection

Grass - Seed and Mulch

Grass - Sod

Crushed Lime Rock Cover - 2 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Asphalt Paving - 2 inch thickness (includes sub-base)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-

Off Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product

(includes drum)

Transport and Disposal of Petroleum Contact Water

(bulk)

Transport and Disposal of Petroleum Contact Water

(includes drum)

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) > 450 tons

14-4.

15-1.a.

15-1.b.

15-1.c.

+14.99%

+15.00%

+9.99%

9,827.35$ $ 11,301.45

11,231.27$ $ 12,915.96

4,360.62$ $ 5,014.71

2,528.25$ $ 2,907.48

3,981.98$ $ 4,579.27

3,139.63$ $ 3,610.57

3,420.41$ $ 3,933.47

3,981.98$ $ 4,579.27

3,560.80$ $ 4,094.92

3,981.98$ $ 4,579.27

446.68$ $ 513.68

3,622.50$ $ 3,803.63

7,801.50$ $ 8,581.65

5,040.00$ $ 5,796.00

3,412.50$ $ 3,924.37

2,643.27$ $ 3,039.76

3,095.30$ $ 3,559.59

3,556.19$ $ 4,089.61

3,929.62$ $ 4,519.06

420.00$ $ 462.00

329.17$ $ 362.09

14,000.00$ $ 14,700.00

9,000.00$ $ 10,350.00

2,807.80$ $ 3,228.97

+10.00%

+10.00%

+5.00%

+15.00%

+15.00%

+5.00%

+10.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

15-4.b.

15-4.c.

15-4.d.

15-5.

Air Sparge System - Small - Short Term ≤ 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Large -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large -

Short Term ≤ 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Long Term > 6 mos.

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

System O&M Package - Small

SVE System Package - Medium

AS/MPE System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - 8 hours

System Installation/Integration/Startup – Addition of

1 Technology Component

System Installation/Integration/Startup - 1

Technology Component - 1-10 Additional

Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

System Installation/Integration/Startup - 1

Technology Component - 21-30 Recovery/Treatment

Points

System Installation/Integration/Startup - 1

Technology Component - 11-20 Recovery/Treatment

Points

16-1.

16-3.

16-5.

16-7.

16-9.

16-11.

16-14.

16-21.

16-22.

16-25.

18-9.

18-10.

18-2.

16-27.

17-1.

17-2.

17-3.

17-4.

18-1.

18-11.

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

2,260.33$ $ 2,599.37

3,337.28$ $ 3,837.87

2,486.14$ $ 2,859.06

4,007.51$ $ 4,608.63

3,409.89$ $ 3,921.37

3,369.37$ $ 3,874.77

2,948.19$ $ 3,390.41

3,930.92$ $ 4,520.55

3,369.37$ $ 3,874.77

5,054.05$ $ 5,812.15

4,352.09$ $ 5,004.90

4,331.37$ $ 4,981.07

3,227.65$ $ 3,711.79

5,194.44$ $ 5,973.60

4,350.28$ $ 5,002.82

7,019.53$ $ 8,072.45

5,458.55$ $ 6,277.33

752.98$ $ 865.92

1,340.08$ $ 1,541.09

2,456.83$ $ 2,825.35

395.61$ $ 454.95

752.98$ $ 865.92

1,595.32$ $ 1,834.61

651.00$ $ 683.55 +5.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-35.

18-23.

18-24.

18-25.

18-26.

18-27.

18-28.

Carbon Off Gas Treatment - Add On - Small - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Large - Long

Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long

Term > 6 mos.

Groundwater Treatment - Add On - Small - Long

Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Small - Short

Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

18-21.

18-22.

18-20.

18-12.

18-13.

18-14.

18-15.

18-16.

18-17.

18-18.

18-19.

+15.00%

667.28$ $ 767.37

1,032.41$ $ 1,187.27

330.00$ $ 346.50

346.50$ $ 398.47

3,495.22$ $ 4,019.50

3,912.22$ $ 4,499.05

5,615.63$ $ 6,457.97

3,127.16$ $ 3,596.23

3,646.51$ $ 4,193.48

5,292.00$ $ 6,085.80

3,860.74$ $ 4,439.85

3,505.51$ $ 4,031.33

4,553.67$ $ 5,236.72

4,227.24$ $ 4,861.32

6,468.00$ $ 7,438.20

6,352.50$ $ 6,987.75

6,940.50$ $ 7,634.55

6,384.00$ $ 7,022.40

7,764.75$ $ 8,929.46

7,056.00$ $ 8,114.40

9,322.74$ $ 10,721.15

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+10.00%

+10.00%

+10.00%

+15.00%

+15.00%

+15.00%

+5.00%

+15.00%

18-41.

18-42.

18-38.

18-36.

18-37.

18-39.

Soil Vapor Extraction (SVE) System - Large - Short

Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Large - Long

Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Long

Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On - Large -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Large -

Short Term ≤ 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Short Term ≤ 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

18-43.

18-44.

18-45.

18-46.

18-57.

18-56.

18-47.

18.48.

18-49.

18-50.

18-51.

18-52.

18-53.

18-54.

18-55.

+15.00%

8,584.80$ $ 9,872.52

1,963.94$ $ 2,258.53

3,969.00$ $ 4,365.90

2,188.46$ $ 2,407.31

1,146.60$ $ 1,318.59

1,082.64$ $ 1,245.03

684.65$ $ 787.34

1,460.59$ $ 1,679.67

891.92$ $ 1,025.70

1,418.17$ $ 1,630.89

10,350.62$ $ 11,903.21

14,485.76$ $ 16,658.62

1,604.30$ $ 1,844.94

2,917.35$ $ 3,354.95

5,171.53$ $ 5,947.25

7,912.92$ $ 9,099.85

3,621.54$ $ 4,164.77

711.01$ $ 817.66

2,803.49$ $ 3,224.01

341.77$ $ 393.03

1,842.85$ $ 2,119.27

3,314.85$ $ 3,812.07

1,208.97$ $ 1,390.31

680.30$ $ 782.34

546.00$ $ 627.90

320.24$ $ 368.27

1,275.00$ $ 1,338.75

108.61$ $ 124.90

102.82$ $ 118.24

103.74$ $ 114.11

88.82$ $ 97.70

74.73$ $ 85.93

71.32$ $ 78.45

60.06$ $ 69.06

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+10.00%

+10.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

Level 4 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Remedial Action Plan

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Hydrogeologist/Modeler (Key)

Geologist/Geoscientist (Key)

Engineer (Key)

Interim Assessment Report

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action Interim Report

Remedial Action General Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non-

Annual

Letter/NPDES Report

Level 1 Remedial Action Plan

Pilot Test Report

Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan

Receptor and Exposure Pathway Report

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Long Term > 6 Months

Construction Drawings and Specs Report

Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Draftsperson

Field Technician (Key)

18-58.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

19-18.

19-19.

19-20.

19-21.

19-22.

19-23.

19-24.

19-25.

20-9.

19-17.

19-8.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

20-8.

19-26.

19-27.

20-3.

20-4.

20-5.

20-6.

20-7.

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+5.00%

+15.00%

+15.00%

+10.00%

+10.00%

+14.99%

+10.00%

50.85$ $ 58.47

47.25$ $ 49.61

138.57$ $ 152.43

137.81$ $ 151.59

137.81$ $ 151.59

682.79$ $ 785.20

893.38$ $ 1,027.38

1,116.72$ $ 1,284.22

1,116.72$ $ 1,284.22

1,340.08$ $ 1,541.09

446.68$ $ 513.68

319.05$ $ 366.90

1,116.72$ $ 1,284.22

797.66$ $ 917.30 +15.00%

+14.99%

+4.99%

+10.00%

+10.00%

+10.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

21-2.

21-3.

21-4.

21-5.

21-11.

21-12.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-9.

21-10.

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering

Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a

Conditional NFA

P.E. Design and Certification of Plans and Project

Oversight of Installation for Engineering Controls

(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology

Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil-

Boring Logging (Use hourly rate on site specific basis)

Professional Geologist (Key)

Laborers and Security Guards

Administrative 20-10.

20-11.

431.79$ $ 496.55

545.14$ $ 626.91

335.01$ $ 385.26

223.32$ $ 256.81

317.68$ $ 365.33

223.32$ $ 256.81

367.50$ $ 385.88

223.32$ $ 256.81

335.01$ $ 385.26

446.68$ $ 513.68

893.38$ $ 1,027.38

335.01$ $ 385.26

446.68$ $ 513.68

446.68$ $ 513.68

446.68$ $ 513.68

+15.00%

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

21-13.

21-15.

21-16.

21-17.

21-18.

21-19.

21-20.

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a

Recommendation for NFA

P.E. Review, Evaluation and Certification of a Level

4 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

3 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Non-

Annual Natural Attenuation or Post RA Monitoring

Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved

Monitoring Plan

P.E. Review, Evaluation and Certification of a Level

2 Natural Attenuation Monitoring Plan

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.E. Review, Evaluation and Certification of a Level

1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot

Test Report

P.E. Review, Evaluation and Certification of a Pilot

Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+15.00%

+5.00%

385.87$ $ 443.75

446.68$ $ 513.68

446.68$ $ 513.68

446.68$ $ 513.68

325.48$ $ 374.30

429.82$ $ 494.29

478.59$ $ 550.37

+15.00%

+15.00%

+15.00%

+15.00%

21-30.

21-29.

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

Notes:

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

P.E. Review, Evaluation, and Certification of

Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

21-31.

21-32.

21-33.

21-34.

21-35.

+15.00%

+15.00%

Printed Printed Name: Name:

Title: Title:

Date: Date:

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

The Table 1 rate changes have been entered in the Department’s processing system with an effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D

Version No. V3.4

Department Data Processing Information:

Signature of Authorized Representative Signature of Authorized Representative

Type Letter/Number Description Attachment D (V3.4) Rate Schedule (27 pages)

APEX COMPANIES, LLC FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

FEID No.: 521562320

List of attachments/exhibits included as part of this Amendment:

Signature of Processor Printed Name of Processor Data Entry Date

Nancy J. Rose

Program Manager

05/05/2022

Signature of Authohoohohoohohooooooohooooooooooooooohohoooooooohooooooooooooohohooooohoooooooooooooooooooooooohooohoohoohohh ririiiriiiiiiiiiiiiiiiiiizezzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz d dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd ReReReeReeReReReReeeReReeReReeeReReReReReReeReReReReReReeeeReReeReReReeReeReeReReeReeeeeReReeRReReReRReReeReeRRReeeeReRReReeeeRRRRReeReeRRRRRRRReReeReReRRRRRReeeRRRRRRRReRRRRRRRRRReRRRRRRRRRRRRRRRRRRRRRRRRR pprpppppppppppppp esentative

5/25/2022

John Truitt Digitally signed by John Truitt Date: 2022.05.18 09:55:02 -04'00'

Jamie Luten Lopez

Digitally signed by Jamie Luten Lopez Date: 2022.05.25 13:56:24 -04'00'

PAY

ITEM

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

1.

1-1. Per Review $ 375.00 $ 478.59 $ 550.37

1-2. Per Site $ 250.00 $ 314.50 $ 361.67

1-2.a. Per Site Not Applicable $ - $ -

1-3. Per Package $ 250.00 $ 296.62 $ 341.11

1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-5. Per Agreement $ 200.00 $ 255.24 $ 293.52

1-5.a. Per Agreement Not Applicable $ - $ -

1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-7. % Surcharge Not Applicable $ 0.06 $ 0.06

2.

2-1. Per Visit $ 340.00 $ 433.92 $ 499.00

2-2. Per Survey $ 305.00 $ 389.24 $ 447.62

2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

2-4. Per Day $ 600.00 $ 765.75 $ 880.61

3.

3-1. Per Round Trip $ 340.00 $ 433.92 $ 499.00

3-2. Per Round Trip $ 710.00 $ 745.50 $ 857.32

3-3. Per Round Trip $ 365.00 $ 465.83 $ 535.70

3-4. Per Round Trip $ 775.00 $ 893.31 $ 1,027.30

3-5. Per Round Trip $ 120.00 $ 153.14 $ 176.11

3-6. Per Round Trip $ 160.00 $ 204.19 $ 234.81

DESCRIPTION

OFFICE ACTIVITIES

File Review

Site Health & Safety Plan

Site Health & Safety Plan for Continued Work at no cost to FDEP

Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit

Receptor Survey and Exposure Pathway Identification (Excludes report)

Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items

Off-Site Property Access Agreement

Site Property Access Agreement for Source Property at no cost to FDEP

Project Specific Financial Guarantee Bond (if required by DEP)

6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

DESCRIPTION

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

3-7. Per Round Trip $ 220.00 Not Applicable Not Applicable

3-7.a. Per Round Trip Not Applicable $ 643.24 $ 739.72

3-8. Per Round Trip $ 375.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 1,065.95 $ 1,225.84

3-9. Per Round Trip $ 220.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 991.42 $ 1,140.13

3-10. Per Round Trip $ 375.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,572.45 $ 1,808.31

3-11. Per Round Trip $ 675.00 $ 708.75 $ 744.19

3-12. Per Round Trip $ 1,100.00 $ 1,100.00 $ 1,100.00

3-13. Per Round Trip $ 13,000.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 18,548.75 $ 18,548.75

3-14. Per Round Trip $ 16,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 24,923.25 $ 24,923.25

3-15. Per Round Trip $ 500.00 $ 551.25 $ 578.81

3-16. Per Round Trip $ 750.00 $ 826.87 $ 868.21

3-17. Per Round Trip $ 500.00 $ 500.00 $ 500.00

3-18. Per Round Trip $ 650.00 $ 682.50 $ 682.50

3-19. Per Round Trip Not Applicable $ 424.42 $ 466.86

3-20. Per Round Trip Not Applicable $ 630.00 $ 693.00

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

DPT Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Drill Rig Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤

100 miles each way

Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - > 100 miles each way

Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >

100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

LDA Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig Mobilization - > 100 miles each way

Drum Compactor mobilization - > 100 miles each way

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

DESCRIPTION

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

4.

4-1.a.

Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 38.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 35.33 $ 40.62

5-1.a.2. Per Spoon Not Applicable $ 40.83 $ 46.95

5-1.a.3. Per Spoon Not Applicable $ 44.64 $ 51.33

5-1.b. Per Core $ 125.00 $ 131.25 $ 150.93

5-1.c. Per Core $ 20.00 Not Applicable Not Applicable

5-2. Per Boring $ 195.00 $ 204.75 $ 204.75

5-3. Per Foot $ 18.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,169.66 $ 2,495.10

5-4. Per Foot $ 25.00 Not Applicable Not Applicable

5-5. Per Foot $ 30.00 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 2,467.50 $ 2,837.62

5-6. Per Foot $ 23.00 $ 28.36 $ 32.61

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) > 100 feet

Sonic Core Sampling - 5 or 10 foot (during boring)

DPT Core Sampling - 4 or 5 foot (during boring)

Hand Auger Boring ≤ 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current

State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with

Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

Direct Push Boring

Direct Push Technology (DPT) Rig and Equipment

Direct Push Boring with Cone Penetrometer Test Probe (CPT)

Direct Push Boring with Membrane Interface Probe (MIP)

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT

Base Rate)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

DESCRIPTION

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

5-7. Per Foot $ 25.00 $ 31.43 $ 36.14

5-8. Per Foot $ 30.00 $ 36.10 $ 41.51

5-9. Per Foot $ 30.00 $ 33.59 $ 38.62

5-10. Per Foot $ 33.00 $ 36.21 $ 41.64

5-11. Per Foot $ 34.00 $ 40.47 $ 46.54

5-12. Per Foot $ 41.00 $ 44.34 $ 50.99

5-13. Per Foot $ 44.00 $ 47.59 $ 54.72

5-14. Per Foot $ 48.00 $ 51.91 $ 59.69

5-15. Per Foot $ 33.95 $ 35.64 $ 40.98

5-16. Per Foot $ 39.35 $ 41.31 $ 45.44

5-17. Per Foot $ 44.75 $ 46.98 $ 51.68

5-18. Per Foot $ 39.35 $ 44.67 $ 51.37

5-19. Per Foot $ 44.75 $ 50.80 $ 58.42

5-20. Per Foot $ 50.15 $ 55.56 $ 63.89

5-21. Per Foot $ 50.15 $ 60.95 $ 70.09

5-22. Per Foot $ 55.55 $ 70.88 $ 81.51

5-23. Per Foot $ 66.35 $ 84.67 $ 97.37

6.

6-1. Per Foot $ 29.00 $ 31.97 $ 35.17

6-2. Per Foot $ 31.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 35.73 $ 41.08

6-2.b. Per Foot Not Applicable $ 164.59 $ 172.82

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter

Well Installation - 2 inch diameter (Vertical)

Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

DESCRIPTION

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

6-3. Per Foot $ 40.00 Not Applicable Not Applicable

6-3.a. Per Foot Not Applicable $ 43.37 $ 49.87

6-3.b. Per Foot Not Applicable $ 179.55 $ 188.53

6-4. Per Foot $ 51.00 $ 53.55 $ 58.91

6-5. Per Foot $ 35.00 $ 39.36 $ 45.26

6-6. Per Foot $ 42.00 $ 49.07 $ 56.43

6-7. Per Foot $ 50.00 $ 60.18 $ 69.20

6-8. Per Foot $ 55.00 $ 69.51 $ 79.93

6-9.a. Per Foot $ 3.50 $ 4.45 $ 5.11

6-9.b. Per Foot $ 4.50 $ 5.71 $ 6.56

6-9.c. Per Foot $ 5.50 $ 6.99 $ 8.03

6-9.d. Per Foot $ 6.60 $ 8.41 $ 9.67

6-10. Per Well $ 165.00 $ 210.57 $ 242.15

6-11. Per Vault $ 470.00 $ 599.83 $ 689.80

6-12. Per Vault $ 990.00 $ 1,263.50 $ 1,453.02

6-13. Per Well Not Applicable $ 163.30 $ 187.79

6-14. Per Well Not Applicable $ 304.29 $ 349.93

6-15. Per Well Not Applicable $ 354.84 $ 408.06

7.

7-1. Per Foot $ 17.00 $ 17.85 $ 20.52

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 6 inch diameter

Surface Casing - 6 inch diameter

Surface Casing - 8 inch diameter

Surface Casing - 10 inch diameter

Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter

Well Installation - 4 inch diameter (Vertical)

Installation of Well Vault - 4 x 4 x 2 foot

Well Redevelopment

Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 6 inch diameter

Above Grade Well Completion

Installation of Well Vault - 2 x 2 x 2 foot

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.3)

REVISED

CONTRACTED

ITEM PRICE (V3.4)

DESCRIPTION

Region:

Contractor:

Contract #:

South

APEX COMPANIES, LLC

GC840

DEP Restated Agency Term Contract No. GC840

Amendment No. 12

Attachment D (V3.4) - Rate Schedule

7-2. Per Foot $ 19.00 $ 19.95 $ 22.94

7-3. Per Foot $ 22.00 $ 23.91 $ 27.49

7-4. Per Foot $ 25.00 $ 29.18 $ 33.55

7-5. Per Vault $ 275.00 $ 350.95 $ 403.59

7-6. Per Vault $ 495.00 $ 631.74 $ 726.50

7-7. Per Well Not Applicable $ 159.52 $ 183.44

8.

8-1. Per Well $ 124.25 $ 158.56 $ 182.34

8-2. Per Well $ 151.75 $ 193.66 $ 222.70

8-3. Per Well $ 135.00 $ 128.25 $ 128.25

8-4. Per Sample $ 130.00 $ 130.00 $ 130.00

8-5. Per Sample $ 103.00 $ 97.85 $ 97.85

8-6. Per Sample $ 58.75 $ 67.04 $ 77.09

8-7. Per Well $ 25.00 $ 26.25 $ 28.88

8-8. Per Well $ 105.00 $ 110.25 $ 121.28

8-9. Per Sample $ 75.00 $ 75.00 $ 75.00

8-10. Per Sample $ 90.00 $ 94.50 $ 94.50

8-11. Per Sampling Event Not Applicable $ 35.73 $ 41.08

8-12. Per Well Not Applicable $ 45.86 $ 52.73

8-13. Per Well Not Applicable $ 47.25 $ 51.98

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Monitoring Well Sampling with Water Level, > 100 foot depth

Domestic Water Well Sampling

Other Water Sampling

Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 6 inch diameter

Removal of Well Vault - 2 x 2 x 2 foot

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Pad and Manhole

Survey Latitude/Longitude of Existing Monitor Wells

Survey Latitude/Longitude of New Monitor Wells

Soil/Sediment Sample Collection

Water Level or Free Product Gauging

Free Product Gauging & Bailing

Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent…