This is Amendment No. 14 to Agency Term Contract No. GC741 between the Florida Department of Environmental Protection (DEP) and GHD Services, Inc., executed on May 9, 2024. The amendment modifies the Rate Schedule (Attachment D, Version 3.4) for petroleum contamination site response action services provided in the Central Region of Florida. The amendment was processed by the Department on June 10, 2024, with an effective Rate Change Date for new work assignments.
The amendment implements a rate increase across all pay items in the contract, with increases ranging from approximately 3.70% to 5.00%, not exceeding the maximum 5% increase authorized under contract provision 11.B.ii. The rate changes apply exclusively to new work assignments offered on or after the Rate Change Date; all pre-existing work assignments continue under prior rates. The contractor submitted detailed justification for the increases, which the Department reviewed and approved. The Rate Schedule encompasses over 450 line items covering services including site reconnaissance, drilling and boring, well installation, soil and water sampling and analysis, remediation system installation and operations, professional services, and reporting. The new rates become effective upon the Department's data entry and processing, with the Department providing the contractor written notice of the effective Rate Change Date within five business days of data entry.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC741-A10.pdf | ||
| CN-370000-GC741-A15E2.pdf | ||
| CN-370000-GC741-A9.pdf | ||
| CN-370000-GC741-CMC.pdf | ||
| CN-370000-GC741-CMC2.pdf | ||
| CN-370000-GC741.pdf | ||
| CN-370000-GC910-T9.pdf | ||
| CN-370000-GC741-A11.pdf | ||
| CN-370000-GC741-A12.pdf | ||
| CN-370000-GC741-A13E1.pdf | ||
| CN-370000-GC741-A16.pdf | ||
| CN-370000-GC741-A17.pdf | ||
| CN-370000-GC741-A6.pdf | ||
| CN-370000-GC741-A7.pdf | ||
| CN-370000-GC741-A3.pdf | ||
| CN-370000-GC741-A4.pdf | ||
| CN-370000-GC741-CMC1.pdf | ||
| CN-370000-GC741-A1.pdf | ||
| CN-370000-GC741-A5.pdf | ||
| CN-370000-GC741-A8.pdf | ||
| CN-370000-GC741-AR1.pdf | ||
| CN-370000-GC741-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC741-CMC3.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes
WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.3) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC741 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GHD SERVICES, INC. (hereinafter "Contractor") executed on February 19, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC741
RATE INCREASE
AMENDMENT NO. 14
Amendment No. 14 DEP Agency Term Contract No. GC741
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 14 DEP Agency Term Contract No. GC741
4.
5.
6.
Attachment D, Rate Schedule (V3.4) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.4) shall apply.
Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
648.00$ $680.40 324.00$ $340.20
330.75$ $347.28
432.00$ $453.60 648.00$ $680.40
558.90$ $586.84
807.30$ $847.66
540.00$ $567.00
621.00$ $652.00
456.42$ $479.24
745.20$ $782.46
107.57$ $112.94 149.04$ $156.49
748.44$ $785.86
1,190.70$ $1,250.23
1,134.00$ $1,190.70
2,052.00$ $2,154.60
478.17$ $502.07
521.64$ $547.72
10,954.44$ $11,502.16
12,388.95$ $13,008.39
Est % Rate
Change(2)
+5.00% +5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+4.99% +5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way
Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton
Contractor Oversight for Non-Price Schedule Activities miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Pay Item No.
1-1.
1-2.
1-3.
1-5.
3-14.a.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
456.42$ $479.24
521.64$ $547.72
319.80$ $335.79
457.72$ $480.60
456.42$ $479.24
586.83$ $616.17
35.85$ $37.64
43.47$ $45.64
49.68$ $52.16
143.45$ $150.62
150.58$ $158.10
2,293.53$ $2,408.20
2,185.92$ $2,295.21
29.71$ $31.19
36.63$ $38.46
39.49$ $41.46
36.48$ $38.30
37.44$ $39.31
40.85$ $42.89
40.98$ $43.02
44.71$ $46.94
+4.99%
+4.98%
+4.99%
3-15.
3-16.
3-17.
3-18.
3-19.
3-20.
5-9.
5-10.
5-11.
Sonic Core Sampling - 5 or 10 foot (during boring) feet total depth depth
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)
Direct Push Technology (DPT) Rig and Equipment
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth
100 feet feet
Drum Compactor mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-5.a.
5-6.
5-7.
5-12.
5-13.
5-8.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+5.00%
+4.99%
+5.00%
+5.00%
+4.98%
+5.00%
+4.99%
+4.99%
+4.99%
49.68$ $52.16
34.77$ $36.50
38.34$ $40.25
45.95$ $48.24
41.99$ $44.08
47.98$ $50.37
58.67$ $61.60
68.31$ $71.72
74.84$ $78.58
95.04$ $99.79
31.05$ $32.60 32.91$ $34.55
168.00$ $176.40
42.72$ $44.85
183.75$ $192.93
34.92$ $36.66 36.51$ $38.33 47.52$ $49.89 47.52$ $49.89 59.40$ $62.37
7.50$ $7.87
11.00$ $11.55
16.00$ $16.80
18.20$ $19.11
432.00$ $453.60 825.00$ $866.25
1,188.00$ $1,247.40
+4.99%
6-5.
6-6.
6-7.
6-8.
Installation of Well Vault - 4 x 4 x 2 foot Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-12.
Surface Casing - 8 inch diameter Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth depth depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-17.
5-18.
5-19.
5-20.
5-21.
5-22.
5-23.
6-1.
6-2.a.
5-14.
5-15.
5-16.
+5.00%
+4.98% +4.98% +4.99% +4.99% +5.00%
+4.93%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.99%
+4.99%
+5.00%
+5.00%
+4.99% +4.98%
+5.00%
172.26$ $180.87
378.00$ $396.90
378.00$ $396.90
21.82$ $22.91
21.38$ $22.44
25.81$ $27.10
31.75$ $33.33 415.80$ $436.59 594.00$ $623.70 216.00$ $226.80
163.00$ $171.15
169.52$ $177.99
100.00$ $105.00 86.25$ $90.56 54.00$ $56.70 32.59$ $34.21 24.11$ $25.31 97.80$ $102.69
54.00$ $56.70
54.00$ $56.70
65.19$ $68.44
21.72$ $22.80
536.97$ $563.81
8-14.
9-1.
8-3.
8-4.
8-5.
8-6.
8-7.
8-8.
8-9.
8-10.
8-11.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Free Product Sample Collection Other Water Sampling Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, > 100 foot depth foot depth
Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Well Redevelopment
7-2.
7-3.
7-4.
7-5.
7-1.
6-13.
6-14.
6-15.
7-6.
7-7.
8-1.
8-2.
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Electronic Data Deliverables (EDD)
Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)
Vapor/Ambient Air Sample Collection - Passive
Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)
Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
+5.00%
+5.00%
+5.00%
+5.00%
+4.96%
+5.00%
+4.97%
+5.00%
+4.98% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +4.97% +4.98% +5.00%
+5.00%
+5.00%
45.14$ $47.39
70.20$ $73.71
91.80$ $96.39
97.20$ $102.06
85.13$ $89.38
208.65$ $219.08
75.60$ $79.38
283.50$ $297.67
49.89$ $52.38
86.94$ $91.28
14.90$ $15.64 14.90$ $15.64 14.90$ $15.64 14.90$ $15.64
34.22$ $35.93
40.98$ $43.02
37.42$ $39.29
77.22$ $81.08
6.23$ $6.54 59.40$ $62.37
283.50$ $297.67
+5.00%
+4.98% +5.00%
+5.00%
+4.97% +4.97% +4.97% +4.97%
+5.00%
+4.98%
+5.00%
9-2.
9-3.
9-4.
9-5.
9-6.
9-16.
9-17.
9-18.
9-19.
9-20.
9-15.
9-7.
9-8.
9-8.a.
9-9.
9-10.
9-11.
9-12.
9-13.
9-14.
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Soil, Texture, (See Gee 7 Bauder [1966])
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, Organic Carbon, Total (EPA 9060 or Walkey- Black)
Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
9-21.
+4.98%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+4.99%
396.90$ $416.74
56.70$ $59.53
238.14$ $250.04
297.68$ $312.56
532.98$ $559.62
47.19$ $49.54
56.16$ $58.96
86.40$ $90.72
102.60$ $107.73
47.81$ $50.20
52.16$ $54.76
72.36$ $75.97
81.08$ $85.13
153.09$ $160.74
179.30$ $188.26
65.34$ $68.60
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+4.98%
+4.99%
+5.00%
+5.00%
+5.00%
+4.98%
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution
GC/MS)
9-32.
9-24.
9-25.
9-26.
9-27.
9-28.
9-29.
9-30.
9-31.
9-31.a.
9-22.
9-23.
9-33.
9-34.
9-35.
9-36.
+5.00%
+5.00%
+4.99%
+4.99%
49.89$ $52.38
11.17$ $11.72
10.92$ $11.46
10.92$ $11.46
11.12$ $11.67
32.40$ $34.02
21.85$ $22.94
10.92$ $11.46
10.92$ $11.46
32.40$ $34.02
10.92$ $11.46
10.92$ $11.46
10.92$ $11.46
10.92$ $11.46
14.25$ $14.96
21.38$ $22.44
14.25$ $14.96
11.88$ $12.47
14.25$ $14.96
9-49.
9-50.
9-51.
9-52.
9-53.
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-48.
9-41.
9-41.a.
9-42.
9-43.
9-44.
9-44.a.
9-45.
9-46.
9-47.
9-39.
9-40.
9-37.
9-38.
+4.99%
+4.92%
+4.95%
+4.95%
+4.95%
+5.00%
+4.99%
+4.95%
+4.95%
+5.00%
+4.95%
+4.95%
+4.95%
+4.95%
+4.98%
+4.96%
+4.98%
+4.97%
+4.98%
14.25$ $14.96
14.25$ $14.96
21.38$ $22.44
15.12$ $15.87
15.02$ $15.77
15.02$ $15.77
16.39$ $17.20
37.80$ $39.69
1,020.60$ $1,071.63
1,020.60$ $1,071.63
297.00$ $311.85
415.80$ $436.59
51.03$ $53.58
238.14$ $250.04
9-66.
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
9-64.
9-65.
9-54.
9-55.
9-56.
9-67.
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution
GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
+4.98%
+4.98%
+4.96%
+4.96%
+4.99%
+4.99%
+4.94%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
70.20$ $73.71
59.40$ $62.37
71.72$ $75.30
99.97$ $104.96
178.20$ $187.11
171.46$ $180.03
285.12$ $299.37
196.02$ $205.82
196.02$ $205.82
0.50$ $0.50
+5.00%
+0.00%
9-72.
9-73.
9-76.
9-78.
9-79.
9-80.
9-68.
9-69.
9-70.
9-71.
Air, Polycyclic Aromatic Hydrocarbons (EPA Method
TO-13)
Air, Volatile Organic Aromatics (EPA Method TO- 15)
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.
The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Air, Volatile Organic Compounds (EPA Method TO- 17)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA 8260) +5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
1.00$ $1.00
26.97$ $28.31
31.91$ $33.50
18.00$ $18.90
41.58$ $43.65
37.14$ $38.99
130.41$ $136.93
102.64$ $107.77
186.48$ $195.80
195.79$ $205.57
164.31$ $172.52
165.68$ $173.96
143.44$ $150.61
35.91$ $37.70
33.53$ $35.20
22.68$ $23.81
20.41$ $21.43
+5.00%
+4.98%
+4.98%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
+4.98%
+4.98%
+5.00%
+0.00%
+4.97%
+4.98%
10-2.d.
10-7.
10-8.
10-9.
10-10.
10-2.a.
9-77.
10-1.a.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.
The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.
Excavation
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing Flowable Fill Concrete and Installation
LDA Excavation and Loading With Driven Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
10-11.a.
10-11.b.
10-12.a.
10-12.b.
10-13.
10-14.
10-15.
10-15.a.
10-15.b.
66.90$ $70.24 66.90$ $70.24
2,663.28$ $2,796.44
136.92$ $143.76
6,572.66$ $6,901.29
312.98$ $328.62
7,521.55$ $7,897.62
452.52$ $475.14
6,433.00$ $6,754.65
7,992.00$ $8,391.60
8,670.56$ $9,104.08
27.66$ $29.04
31.29$ $32.85 54.50$ $57.22
218.30$ $229.21
25.81$ $27.10
44.71$ $46.94
35.52$ $37.29
35.52$ $37.29
31.17$ $32.72
29.70$ $31.18
218.30$ $229.21
0.88$ $0.92
+4.99%
12-3.
12-4.
12-5.
12-6.
12-7.
#57 Stone Pea Gravel
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Disposal of Petroleum Impacted Soil at a Landfill
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Contact Water (includes drum)
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport and Disposal of Mixed Debris Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean Overburden
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
10-18.
10-19.
10-20.
10-21.
10-22.
10-23.
10-17.
10-16.
12-8.
11-3.
11-4.
11-2.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99% +4.99%
+5.00%
+5.00%
+4.99%
+4.98%
+4.98%
+4.97%
+4.98%
+5.00%
+4.55%
207.90$ $218.29
1.42$ $1.49
1,043.28$ $1,095.44
260.82$ $273.86
9.50$ $9.97
2.37$ $2.48
10.45$ $10.97
2.61$ $2.74 2.18$ $2.28 0.93$ $0.97 0.27$ $0.28
3,974.00$ $4,172.70
3,477.60$ $3,651.48
4,644.00$ $4,876.20
10,300.00$ $10,815.00
86.18$ $90.48
97.52$ $102.39 108.86$ $114.30
13.66$ $14.34
22.68$ $23.81
7,531.17$ $7,907.72
6,161.86$ $6,469.95
5,477.22$ $5,751.08
+4.99% +5.00%
+4.98%
+4.98%
+5.00%
+5.00%
+5.00%
14-4.
14-5.
15-1.a.
15-1.b.
15-1.c.
In-Situ Injection Into Existing Well/Treatment Point
Direct Push Boring with In-Situ Injection Grass - Seed and Mulch Grass - Sod Crushed Lime Rock Cover - 2 inch thickness
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off Container
Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
14-1.a.
12-17.
12-18.
13-1.
13-2.
13-3.
13-4.
13-5.
13-6.
13-7.
15-2.a.
15-4.a.
15-4.b.
15-4.c.
15-1.d.
12-15.
12-16.
14-2.a.
+5.00%
+5.00%
+4.99%
+5.00%
+4.93%
+5.00%
+5.00%
+4.95%
+4.64%
+4.98%
+4.98% +4.59% +4.30% +3.70% +5.00%
4,564.35$ $4,792.56
684.64$ $718.87
3,512.53$ $3,688.15
587.95$ $617.34
3,601.80$ $3,781.89
607.50$ $637.87
4,671.00$ $4,904.55 648.00$ $680.40
5,562.00$ $5,840.10
702.00$ $737.10
4,779.81$ $5,018.80
481.95$ $506.04
5,091.66$ $5,346.24 578.34$ $607.25
5,400.00$ $5,670.00
260.82$ $273.86
8,505.00$ $8,930.25
2,565.85$ $2,694.14 6,279.39$ $6,593.35 3,556.85$ $3,734.69 8,986.95$ $9,436.29 3,332.80$ $3,499.44 8,049.34$ $8,451.80 6,550.00$ $6,877.50
13,197.60$ $13,857.48 2,787.75$ $2,927.13 8,845.20$ $9,287.46
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
16-24.
16-25.
16-26.
16-27.
16-28.
16-5.
16-18.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
16-13.
16-14.
16-19.
16-20.
16-21.
16-22.
16-23.
16-1.
16-2.
16-3.
16-4.
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - 8 hours
1 Technology Component
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
SVE System Package - Medium SVE System Package - Medium AS/MPE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
15-4.d.
15-5.
+5.00% +5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
2,806.65$ $2,946.98 3,454.70$ $3,627.43 3,779.62$ $3,968.60 4,320.54$ $4,536.56
500.00$ $525.00
311.85$ $327.44
187.11$ $196.46
952.56$ $1,000.18
467.74$ $491.12
6,804.00$ $7,144.20
4,429.40$ $4,650.87
8,731.80$ $9,168.39
6,747.67$ $7,085.05
10,773.00$ $11,311.65
9,072.00$ $9,525.60
3,333.55$ $3,500.22
2,227.50$ $2,338.87
3,713.49$ $3,899.16
2,436.17$ $2,557.97
5,386.92$ $5,656.26
3,533.88$ $3,710.57
3,719.10$ $3,905.05
3,560.18$ $3,738.18
18-3.
18-4.
18-5.
18-6.
18-7.
18-8.
18-9.
18-10.
18-2.
17-1.
17-2.
17-3.
17-4.
17-5.
18-1.
18-11.
18-12.
18-13.
18-14.
18-15.
18-16.
18-17.
18-18.
Medium Holding Tank - 2,000 to 6,000 gal. capacity -
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large -
Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone
Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small -
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity -
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small
Air Sparge System - Small - Long Term > 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
3,984.75$ $4,183.98
4,097.60$ $4,302.48
5,313.00$ $5,578.65
5,203.35$ $5,463.51
4,327.00$ $4,543.35 2,973.24$ $3,121.90
6,327.20$ $6,643.56
4,150.44$ $4,357.96 6,490.00$ $6,814.50 5,415.98$ $5,686.77
4,000.00$ $4,200.00
5,200.00$ $5,460.00
7,500.00$ $7,875.00
274.84$ $288.58
547.72$ $575.10
1,047.00$ $1,099.35
143.44$ $150.60
301.23$ $316.29
573.80$ $602.49
2,730.00$ $2,866.50
2,940.00$ $3,087.00
4,200.00$ $4,410.00
2,625.00$ $2,756.25
2,835.00$ $2,976.75
+5.00%
+5.00%
18-43.
18-44.
18-45.
18-21.
18-22.
18-20.
18-19.
Thermox/Catox Off Gas Treatment - Add On - Small -
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Short MPE System - Large - Long Term > 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Small - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Large - Short
Carbon Off Gas Treatment - Add On - Medium -
Carbon Off Gas Treatment - Add On - Small - Short
Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large -
Thermox/Catox Off Gas Treatment - Add On -
18-38.
18-30.
18-33.
18-34.
18-35.
18-36.
18-37.
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
18-39.
18-40.
18-41.
18-42.
+5.00%
+5.00% +5.00%
+5.00%
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
4,095.00$ $4,299.75
3,234.00$ $3,395.70
3,095.82$ $3,250.61
3,638.25$ $3,820.16
3,536.35$ $3,713.16
4,851.00$ $5,093.55
4,750.86$ $4,988.40
7,500.00$ $7,875.00
6,480.00$ $6,804.00
9,000.00$ $9,450.00
8,100.00$ $8,505.00
10,000.00$ $10,500.00
9,720.00$ $10,206.00
2,256.66$ $2,369.49 4,320.00$ $4,536.00 1,080.00$ $1,134.00 1,080.00$ $1,134.00
772.20$ $810.81
1,594.08$ $1,673.78
996.73$ $1,046.56 1,564.92$ $1,643.16 9,483.41$ $9,957.58
13,301.82$ $13,966.91
2,019.49$ $2,120.46
2,875.53$ $3,019.30
+5.00%
+5.00%
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
18-46.
18-57.
18-58.
19-1.
19-3.
19-5.
19-6.
19-7.
18-56.
18-47.
18.48.
18-49.
18-50.
18-51.
18-52.
18-53.
18-54.
18-55.
Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report
Soil Vapor Extraction (SVE) System - Large - Short
Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months
General Site Assessment Report Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Medium -
Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Small - Short
Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Remedial Action Plan
+5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
4,518.69$ $4,744.62
8,476.65$ $8,900.48
3,887.13$ $4,081.48
766.58$ $804.90
2,891.70$ $3,036.28 357.21$ $375.07
1,944.00$ $2,041.20
3,356.64$ $3,524.47 1,294.92$ $1,359.66
681.48$ $715.55 459.00$ $481.95 351.00$ $368.55 822.81$ $863.95 145.00$ $152.25 115.00$ $120.75 100.00$ $105.00 100.00$ $105.00 100.00$ $105.00
99.79$ $104.77 74.00$ $77.70 71.50$ $75.07 67.00$ $70.35 45.00$ $47.25 45.00$ $47.25
154.44$ $162.16 130.68$ $137.21
136.62$ $143.45
136.62$ $143.45
1,179.36$ $1,238.32
1,769.04$ $1,857.49
2,358.72$ $2,476.65
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +4.99% +5.00% +4.99% +5.00%
19-20.
19-21.
19-22.
19-23.
19-24.
19-25.
20-9.
20-10.
20-11.
21-1.
19-17.
19-15.
19-16.
20-8.
19-26.
19-27.
20-1.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
19-18.
19-19. Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key) Professional Engineer (Key) Laborers and Security Guards Administrative Draftsperson Field Technician (Key)
Construction Drawings and Specs Report
P.E. Project Oversight for Remediation System Integration and Startup - Large System
P.E. Project Oversight for Remediation System Integration and Startup - Medium System
P.E. Project Oversight for Remediation System Integration and Startup - Small System
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Engineer (Key) Project Manager (Key) Program Manager (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
21-6.a.
21-6.b.
21-6.c.
21-2.
21-3.
21-4.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
2,948.40$ $3,095.82
177.60$ $186.48
678.13$ $712.03
678.13$ $712.03
561.60$ $589.68
453.60$ $476.28
1,684.80$ $1,769.04
260.82$ $273.86
322.92$ $339.06
645.84$ $678.13
322.92$ $339.06
+5.00%
+5.00%
+5.00%
P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Project Oversight for Remediation System Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System
P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report
P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA
P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
21-11.
21-12.
21-13.
21-15.
21-16.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-10.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
322.92$ $339.06
169.52$ $177.99
322.92$ $339.06
322.92$ $339.06
322.92$ $339.06
508.59$ $534.01
322.92$ $339.06
339.05$ $356.00
1,170.52$ $1,229.04
177.97$ $186.86
508.59$ $534.01
329.47$ $345.94
169.52$ $177.99
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%21-31.
21-33.
P.E. Review, Evaluation and Certification of a Pilot Test Report
P.E. Review, Evaluation and Certification of a Pilot Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan
P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report
P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
21-29.
21-17.
21-18.
21-19.
21-20.
21-30.
21-21.
21-22.
21-25.
21-26.
21-27.
169.52$ $177.99
356.01$ $373.81
322.92$ $339.06
21-34.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of Annual PARM Report
P.E. Review, Evaluation, and Certification of Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
+5.00%
+5.00%