CN-370000-GC655-T18C.pdf
PDF 549 KB Posted
- Contract number
- GC655
- Issued by
- Florida
About this file
This is a Petroleum Preapproval Program Task Assignment issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The document represents a fixed-price task assignment under FDEP Contract GC655 awarded to Aerostar Environmental Services, Inc., with contractor representative K. Dawn Blackledge. The work is being performed at the Cullifers Store facility located at 1857 HWY 17BA in Westville, Florida. The task assignment is designated GC655-018C with a facility ID of 30873555, and is managed by FDEP/LP Site Manager Tara P. Mitchell and FDEP Contract Manager Grant Willis.
The task assignment covers a supplemental site assessment and remedial action interim report for the facility, with a fixed total cost of $6,676.49 including a 10% retainage of $667.65. The work includes installation of one soil boring adjacent to monitoring well MW-1RR to collect confirmatory soil samples at 16 feet below land surface for BTEX/MTBE and SPLP analysis, collection of a second soil sample between 12 and 14 feet based on OVA readings, advancement of four step-out borings with continuous soil sampling and screening, and collection of contingency samples. The deliverable is a Remedial Action Interim Report with a due date of May 4, 2012. The period of performance extends through October 31, 2012, with no cost-plus provisions. The cost breakdown includes field activities totaling $810.78, subcontractor costs of $3,120.70, other field work of $2,214.93, and office activities including report preparation totaling $530.10.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .