CN-370000-DC852-T6CO1.pdf
PDF 143 KB Posted
- Contract number
- DC852
- Issued by
- Florida
About this file
This is a Change Order document issued by the Florida Department of Environmental Protection for Task Assignment #6 under Contract DC852 with Registe Sliger Engineering, Inc. (RSE), a civil, structural, and water resources engineering firm located in Tallahassee, Florida. The change order was executed on December 20, 2012, and involves professional services for the Werner-Boyce Salt Springs State Park Day Use Area restroom facility project. The contract authority is Scott Cannard (Chief, BDAC, Contract Authority, FDEP), with contract management oversight by Michael Renard (Contract Manager, BDAC, FDEP).
The scope of work encompasses updating the structural component design of the restroom facility to comply with the 2010 Florida Building Code, specifically addressing higher wind speeds and pressures. RSE will provide construction plans and deliverables including 90 percent design drawings in electronic PDF format for FDEP review, followed by three sets of final drawings with professional engineer signatures and seals. The fixed price cost for Change Order #1 is $2,996.36, calculated as 4 hours of Senior Engineer time at $193.13 per hour plus 24 hours of Senior Designer time at $92.66 per hour. The task is scheduled for completion 30 days after final construction completion. Payment is contingent upon satisfactory submission of deliverables, with no additional costs for resubmission of unsatisfactory work within 15 days, and potential contract termination for failure to perform within the specified timeframe.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .