CN-370000-DC796-TA2 CO2.pdf
PDF 219 KB Posted
- Contract number
- DC796
- Issued by
- Florida
About this file
This document is a Change Order No. 2 to Task Assignment No. 2 under Contract DC796 between the Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction, and Dyer, Riddle, Mills & Precourt, Inc. (DRMP). The change order pertains to continuing professional services for the Manatee Springs-Magnolia I Campground project located at Manatee Springs State Park in Florida. The primary contact is Bryant King at DRMP, with project oversight provided by Michael Renard, Contract Manager for FDEP.
The change order authorizes two supplemental tasks with a combined cost increase of $5,370.00. Task 1 addresses additional permit fees required for the Suwannee River Water Management District and Levy County Department of Health, increasing from an estimated $700.00 to $2,500.00 due to floodway classification, plus an additional $135.00 for septic tank approval changes, totaling $1,935.00. Task 2 covers additional surveying work to accommodate project modifications, including full topographic survey of designated camping sites (sites 2, 4, 12, 14, 18, 20, 22, 24, 28, 30, 32, 34, and 38) with detailed ground features, utility locations, contour development, and establishment of benchmarks based on the Florida State Plane coordinate system and North American Vertical Datum of 1988, totaling $3,435.00. The original task amount of $83,238.00 is increased to $90,158.00, with completion required within 30 days of permit receipt but no later than the contract expiration date. The change order was executed on July 17, 2009, and is funded under encumbrance 088140-09 with project number 60771.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .