This is a Change Order (01) issued by the Florida Department of Environmental Protection (FDEP) for a Task Assignment related to continuing professional services for the Manatee Springs State Park Magnolia I Campground Upgrade project. The document memorializes the cancellation of Task Assignment No. 1 and its re-issuance as Task Assignment No. 2 under Contract No. DC796 with Dyer, Riddle, Mills and Precourt, Inc. (DRMP), with Bryant King serving as the vendor contact. The primary parties involved include FDEP's Bureau of Design and Construction, the project manager James Glenn, and the contractor DRMP, with subcontractors Nodarse & Associates (geotechnical services) and Tomlinson Peterson Associates (electrical services).
The scope of work encompasses comprehensive design and engineering services for campground improvements including conceptual planning, topographical surveys, design/engineering of campsites, stormwater systems, utilities (sewer, water, electrical), roadways, environmental analysis, permitting, post-design certifications, and construction administration. The total project fees are $83,238.00, comprised of nine lump-sum components ranging from $2,500.00 (environmental analysis) to $31,862.00 (design/engineering), plus permit fees of $1,250.00 not-to-exceed and three additional site visit allowances of $1,100.00 each. The change order itself results in a net reduction of $83,238.00, effectively canceling the original task assignment. All services are to be completed within 30 days of permit receipt, subject to contract expiration limitations.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .