CN-370000-DC796-TA2 CO1.pdf
PDF 213 KB Posted
- Contract number
- DC796
- Issued by
- Florida
About this file
This is a Change Order issued by the Florida Department of Environmental Protection (FDEP) for Task Assignment No. 02 under Contract No. DC796 with Dyer, Riddle, Mills and Precourt, Inc. (DRMP). The change order pertains to work at Manatee Springs State Park and is executed between the FDEP Bureau of Design and Construction and the contractor Bryant King, serving as vendor/contact person. The project is located at Manatee Springs State Park in Chiefland, Levy County, Florida.
The change order authorizes additional geotechnical consulting services for the Magnolia I Campground Upgrade project. The scope of work involves soil borings and geotechnical testing for foundation design of a proposed bathhouse structure at the site. DRMP engaged Nodarse and Associates, Inc. to perform two soil test borings to 25 feet depth, sample collection, laboratory testing, and preparation of a geotechnical report with engineering recommendations. The total contract modification increases the project cost by $1,550.00, with the original task amount of $83,238.00 and the new task amount of $84,788.00. The lump sum fee for the geotechnical services is $1,550.00. Task completion is required within 30 days after receipt of permits but not to exceed contract expiration. The change order is effective as of January 23, 2009, and includes encumbrance information with project number 60771 and an allocated amount of $1,550.00.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .