This is a Consultant's Task Assignment Notification for Florida Department of Environmental Protection (FDEP) Contract DC790, Task Assignment No. 14, issued on behalf of the John U. Lloyd Beach State Park Concession Building Restroom Renovation project. The contract involves Jones Edmunds, Inc., serving as the consultant, with Steve Szabo as the consultant's representative and Michael Renard as the FDEP contract manager. The work is performed at John U. Lloyd State Park in Hollywood, Florida, under the oversight of FDEP's Division of Recreation and Parks, Bureau of Design and Construction.
The scope of work encompasses engineering design services for restroom repairs at the beachside concession building, structured in four distinct phases: Conceptual/Schematic Design Phase (15% design completion), Design Development Phase (45% design completion), Construction Document Coordination Phase (90% design completion), and Complete Bid Documents Phase (100% design completion). Additional services include hazardous material sampling for asbestos and lead. The fixed price cost for the task assignment is $50,700.00, with project encumbrances totaling $50,700.00 distributed across two project numbers (50406 and 50400). The work is scheduled to begin upon execution of the task assignment and continue through contract completion, with major milestones occurring at 14 days (Conceptual/Schematic Design), 60 days (Design Development), 100 days (Construction Document Coordination), and 121 days (Complete Bid Documents). Payment is contingent upon completion and approval of deliverables for each phase, with no compensation for unsatisfactory work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .