CN-370000-CN804-T9.pdf

PDF 578 KB Posted

Attached to
Master Agreement FL|HW510|fd893374290baa5d49b37a4219a7929f
Contract number
HW510
Issued by
Florida

About this file

This is a Consultant's Task Assignment Notification (Form DRP-084) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for professional architectural and engineering services related to the Gregory House assessment and repair project at Torreya State Park. The contract is executed under FDEP Contract No. CN804, Project No. 61574, Task Assignment No. 9, with Dodstone Architects serving as the primary consultant. Additional consulting firms include MLD Architects, McGinniss + Fleming Engineering, Nova Engineering, Southern Earth Sciences, and Bliss & Nyitray. The contract is authorized to commence upon execution with a completion date of October 27, 2028.

The contract encompasses comprehensive design and construction administration services valued at a total task amount of $90,598.34, comprising a fixed price component of $80,098.34 and a cost reimbursement (not-to-exceed) allowance of $10,500.00. Services are organized into five primary phases: pre-design phase activities including field verification, materials testing, and forensic testing ($27,284.01); construction documents preparation at 60%, 90%, and 100% levels ($31,115.51); bidding and permitting services ($8,151.11); construction administration services ($11,818.21); and interim and final site visits ($12,229.50). The contract assumes project startup within five days of authorization and requires field verification completion within 30 days, with construction documents deliverables due at specified intervals. The project schedule targets permit acquisition by June 30, 2026, with final construction documents delivery by May 15, 2026, contingent upon timely responses and site access coordination with park staff.

View the file

Other files

File Type Posted
A12-45936.pdf PDF
A13-45942.pdf PDF
A2-45715.pdf.crdownload CRDOWNLOAD file
A4-45718.pdf PDF
A5-45726.pdf PDF
A7-45741.pdf PDF
CN-370000-HW510-TD28G.pdf PDF
CN-370000-WQ179-T9.pdf PDF
ContractVendorExport.csv CSV file
A10-45921.pdf PDF
A6-45736.pdf PDF
CN-370000-HW510-FIL20.pdf PDF
CN-370000-WQ179-T8CO2.pdf PDF
ContractDeliverablesExport.csv CSV file
FIL10-45739.pdf PDF
FIL14-45762.pdf PDF
FIL17-45927.pdf PDF
A3-45716.pdf PDF
A9-45766.pdf PDF
CN-370000-HW510-A14.pdf PDF
CN-370000-HW510-CO004.pdf PDF
CN-370000-HW510-TD06L.pdf PDF
CN-370000-WQ179-T9CO1.pdf PDF
ContractPaymentsExport.csv CSV file
FIL1-45709.pdf PDF
FIL15-45923.pdf PDF
FIL16-45925.pdf PDF
A1-45705.pdf PDF
A10-45921.pdf.crdownload CRDOWNLOAD file
A11-45932.pdf PDF
A2-45715.pdf PDF
A8-45746.pdf PDF
CN-370000-HW510-CO001.pdf PDF
CN-370000-HW510-CO002.pdf PDF
CN-370000-HW510-CO003.pdf PDF
CN-370000-WQ179.pdf PDF
ContractBudgetExport.csv CSV file
FIL11-45740.pdf PDF
FIL12-45745.pdf PDF
FIL13-45749.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Schedule:

Start Date: Completion Date:

Fixed Price Cost: Cost Reimbursement (Not to Exceed):

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Signature Date

4.

Signature Date

5.

Contract Authority, FDEP Signature Date

CN804 61574 9

Torreya State Park Gregory House Assessment

Dodstone Architects Karin Zawrotny, AIA

(850) 656-7326 kzawrotny@dodstone.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

Professional services for the Gregory House assessment project as per the attached proposal dated December 9, 2025.

Vivian Kain

Upon Execution 10/27/2028

$80,098.34 $10,500.00 $90,598.34

Tamika Bass

Vivian Kain

Karin Zawrotny, AIA

Vu Nguyen

David Matson

Tamika Bass Digitally signed by Tamika Bass Date: 2025.12.16 14:49:15 -05'00'

Vivian Kain Digitally signed by Vivian Kain Date: 2025.12.17 09:13:32 -05'00'

Karin I. Zawrotny Digitally signed by Karin I. Zawrotny Date: 2025.12.17 09:56:41 -05'00'

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.12.17 11:47:45 -05'00'

David Matson Digitally signed by David Matson Date: 2025.12.17 13:08:30 -05'00'

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total:

61574 37501000077 080039/23 423001 U3200 131500 QK $90,598.34

$90,598.34

Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211

Subtask 1a

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 3 $466.95 $466.95

Principal $195.27 6 $1,171.62 Registered Architect 3 $158.48 6 $950.88 Project Manager $155.65 6 $933.90 Graduate Architect 3 $101.88 6 $611.28 CAD Operator 3 $101.88 4 $407.52 Support Staff 2 $56.60 2 $113.20

$4,188.40

Subtask 1a $4,655.35

Field Verification

Dodstone Architects

Firm Name

Field Verification

MLD Architects

Subtask 1b

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 5 $778.25 CAD Operator 2 $84.90 1 $84.90 Support Staff 2 $56.60 3 $169.80

$1,032.95

Senior Consultant $210.00 3 $630.00 Environ.Project Manager $120.00 13 $1,560.00

$2,190.00 Subtask 1b $3,222.95

Materials Testing

Firm Name

Dodstone Architects

Southern Earth Sciences

Materials Testing

Subtask 1c

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 5 $778.25 Support Staff 2 $56.60 2 $113.20

$891.45

Principal Engineer $225.00 8 $1,800.00 Staff Professional $101.97 58 $5,914.26 Clerical/Aministrative $75.00 4 $300.00

$8,014.26 Subtask 1c $8,905.71

Forensic Testing

Firm Name

Dodstone Architects

Nova Engineering

Forensic Testing

Subtask 2a 60% Construction Documents

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 8 $1,245.20 Support Staff 2 $56.60 2 $113.20

$1,553.67

Principal $195.27 3 $585.81 Registered Architect 3 $158.48 4 $633.92 Project Manager $155.65 5 $778.25 Graduate Architect 3 $101.88 6 $611.28 CAD Operator 3 $101.88 5 $509.40 Support Staff 2 $56.60 4 $226.40

$3,345.06

Principal/PE $180.00 10 $1,800.00 Engineer III $137.50 6 $825.00

$2,625.00

Principal $248.73 1 $248.73 Project Manager $159.61 6 $957.66 CAD Technician $139.66 8 $1,117.28 Admin. Assistant $83.80 2 $167.60

$2,491.27

Subtask 2a 60% Construction Documents $10,015.00

Bliss & Nyitray

Firm Name

Dodstone Architects

McGinniss + Fleming

Subtask 2b 90% Construction Documents

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 12 $1,867.80 Support Staff 2 $56.60 4 $226.40

$2,289.47

Principal $195.27 8 $1,562.16 Registered Architect 3 $158.48 12 $1,901.76 Project Manager $155.65 16 $2,490.40 Graduate Architect 3 $101.88 22 $2,241.36 CAD Operator 3 $101.88 23 $2,343.24 Support Staff 2 $56.60 4 $226.40

$10,765.32

Principal/PE $180.00 6 $1,080.00 Engineer III $137.50 6 $825.00

$1,905.00

Subtask 2b 90% Construction Documents $14,959.79

Firm Name

Dodstone Architects

Subtask 2c 100% Construction Documents

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 10 $1,556.50 Support Staff 2 $56.60 4 $226.40

$1,978.17

Principal $195.27 2 $390.54 Registered Architect 3 $158.48 2 $316.96 Project Manager $155.65 2 $311.30 Graduate Architect 3 $101.88 2 $203.76 CAD Operator 3 $101.88 10 $1,018.80 Support Staff 2 $56.60 8 $452.80

$2,694.16

Principal/PE $180.00 6 $1,080.00 $1,080.00

Principal $248.73 1 $248.73 CAD Technician $139.66 1 $139.66

$388.39

Subtask 2c 100% Construction Documents $6,140.72

Firm Name

Dodstone Architects

MLD Architects

Bliss & Nyitray

Subtask 3a Bidding Services

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 2 $311.30 Support Staff 2 $56.60 2 $113.20

$619.77

Principal $195.27 2 $390.54 Registered Architect 3 $158.48 2 $316.96 Project Manager $155.65 2 $311.30 Graduate Architect 3 $101.88 2 $203.76 CAD Operator 3 $101.88 3 $305.64 Support Staff 2 $56.60 4 $226.40

$1,754.60

Principal/PE $180.00 6 $1,080.00 $1,080.00

Subtask 3a Bidding Services $3,454.37

Firm Name

Dodstone Architects

MLD Architects

McGinniss + Fleming

Subtask 3b Pre-Bid Meeting

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 5 $778.25 Support Staff 2 $56.60 2 $113.20

$891.45

Registered Architect 3 $158.48 0.5 $79.24 Project Manager $155.65 5 $778.25 Support Staff 2 $56.60 2 $113.20

$970.69 Subtask 3b Pre-Bid Meeting $1,862.14

Firm Name

Dodstone Architects

Subtask 3c Permitting Services

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 2 $311.30 Support Staff 2 $56.60 2 $113.20

$619.77

Principal $195.27 1 $195.27 Registered Architect 3 $158.48 1 $158.48 Project Manager $155.65 2 $311.30 Graduate Architect 3 $101.88 2 $203.76 CAD Operator 3 $101.88 1.5 $152.82 Support Staff 2 $56.60 2 $113.20

$1,134.83

Principal/PE $180.00 6 $1,080.00 $1,080.00

Subtask 3c Permitting Services $2,834.60

Firm Name

Dodstone Architects

Subtask 4a Pre-Construction Meeting

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 5 $778.25 Support Staff 2 $56.60 2 $113.20

$1,086.72

Principal $195.27 4 $781.08 Registered Architect 3 $158.48 1 $158.48 Project Manager $155.65 1 $155.65 Support Staff 2 $56.60 2 $113.20

$1,208.41

Subtask 4a Pre-Construction Meeting $2,295.13

Firm Name

Dodstone Architects

MLD Architects

Subtask 4b Shop Review

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 2 $311.30 CAD Operator 2 $84.90 6 $509.40 Support Staff 2 $56.60 2 $113.20

$1,129.17

Principal $195.27 1 $195.27 Registered Architect 3 $158.48 4.5 $713.16 Project Manager $155.65 3.5 $544.78 Graduate Architect 3 $101.88 2.5 $254.70 CAD Operator 3 $101.88 1 $101.88 Support Staff 2 $56.60 3 $169.80

$1,979.59

Principal/PE $180.00 5 $900.00 $900.00

Subtask 4b Shop Review $4,008.76

Firm Name

Dodstone Architects

Subtask 4c MLD Site Visits and RFI responses

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 2 $311.30 CAD Operator 2 $84.90 6 $509.40 Support Staff 2 $56.60 2 $113.20

$1,129.17

Principal $195.27 1 $195.27 Registered Architect 3 $158.48 14 $2,218.72 Project Manager $155.65 3.5 $544.78 Graduate Architect 3 $101.88 2.5 $254.70 CAD Operator 3 $101.88 1 $101.88 Support Staff 2 $56.60 3 $169.80

$3,485.15

Principal/PE $180.00 5 $900.00 $900.00

Subtask 4c MLD Site Visits and RFI responses $5,514.32

Firm Name

Dodstone Architects

Subtask 5a Site Visit DS

Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 6 $933.90 Support Staff 2 $56.60 2 $113.20

$1,242.37 Subtask 5a Site Visit DS $1,242.37

Firm Name

Dodstone Architects

Subtask 5b Site Visit Mech/Plumb

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 2 $311.30 Support Staff 2 $56.60 2 $113.20

$424.50

Principal/PE $180.00 6 $1,080.00 $1,080.00

Subtask 5b Site Visit Mech/Plumb $1,504.50

Firm Name

Subtask 5c Site Visit Mech/Plumb

Price Cost

Project Manager $155.65 2 $311.30 Support Staff 2 $56.60 2 $113.20

$424.50

Principal/PE $180.00 6 $1,080.00 $1,080.00

Subtask 5c Site Visit Mech/Plumb $1,504.50

Firm Name

McGinniss + Fleming

Dodstone Architects

Subtask 5d Site Visit Electrical

Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 2 $311.30 Support Staff 2 $56.60 2 $113.20

$424.50

Principal/PE $180.00 6 $1,080.00 $1,080.00

Subtask 5d Site Visit Electrical $1,504.50

Firm Name

Subtask 5e Site Visit DS

Price Cost

Principal $195.27 1 $195.27 Project Manager $155.65 6 $933.90 Support Staff 2 $56.60 2 $113.20

$1,242.37 Subtask 5e Site Visit DS $1,242.37

Firm Name

Dodstone Architects

Subtask 5f Substantial

Position Classification Hourly Rate Hours Total Fixed Price Cost

Principal $195.27 0.5 $97.64 Project Manager $155.65 6 $933.90 Support Staff 2 $56.60 2 $113.20

$1,144.74

Principal $195.27 6 $1,171.62 Registered Architect 3 $158.48 2 $316.96 Support Staff 2 $56.60 2 $113.20

$1,601.78 Subtask 5f Substantial $2,746.52

Firm Name

Subtask 5g Final

Price Cost

Project Manager $155.65 2 $311.30 Graduate Architect 2 $76.41 6 $458.46 Support Staff 2 $56.60 2 $113.20

$882.96

Principal $195.27 6 $1,171.62 Registered Architect 3 $158.48 2 $316.96 Project Manager $155.65 $0.00 Graduate Architect 3 $101.88 $0.00 CAD Operator 3 $101.88 $0.00 Support Staff 2 $56.60 2 $113.20

$1,601.78 Subtask 5g Final $2,484.74

MLD Architects

Firm Name

Summary Provider Base Service Additional

Service Subtotal Reimb. Total

Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8 Column9 Subtask 1a Field Verification DS $466.95 $4,655.35 $4,655.35

MLD $4,188.40

MFE

BNI

Subtask 1b Materials Testing DS $1,032.95 $3,222.95 $3,222.95

SESI $2,190.00

Subtask 1c Forensic Testing DS $891.45 $8,905.71 10,500.00 $19,405.71

NOVA $8,014.26

Subtask 2a 60% Construction DS $1,553.67 $10,015.00 $10,015.00

MLD $3,345.06

MFE $2,625.00

BNI $2,491.27

Subtask 2b 90% Construction DS $2,289.47 $14,959.79 $14,959.79

MLD $10,765.32

MFE $1,905.00

BNI

Subtask 2c 100% Construction DS $1,978.17 $6,140.72 $6,140.72

MLD $2,694.16

MFE $1,080.00

BNI $388.39

Subtask 3a Bidding Services DS $619.77 $3,454.37 $3,454.37

MLD $1,754.60

MFE $1,080.00

BNI

Subtask 3b Pre-Bid Meeting DS $891.45 $1,862.14 $1,862.14

MLD $970.69

MFE

BNI

Subtask 3c Permitting Services DS $619.77 $2,834.60 $2,834.60

MLD $1,134.83

MFE $1,080.00

BNI

Subtask 4a Pre-Construction DS $1,086.72 $2,295.13 $2,295.13

MLD $1,208.41

MFE

BNI

Subtask 4b Shop Review DS $1,129.17 $4,008.76 $4,008.76

MLD $1,979.59

MFE $900.00

BNI

Subtask 4c MLD Site Visits and RFI DS $1,129.17 $5,514.32 $5,514.32

MLD $3,485.15

MFE $900.00

BNI

Subtask 5a Site Visit DS DS $1,242.37 $1,242.37 $1,242.37

MLD

MFE

BNI

BASE CONTRACT

Subtask 5b Site Visit Mech/Plumb DS $424.50 $1,504.50 $1,504.50

MLD

MFE $1,080.00

BNI

Subtask 5c Site Visit Mech/Plumb DS $424.50 $1,504.50 $1,504.50

MLD

MFE $1,080.00

BNI

Subtask 5d Site Visit Electrical DS $424.50 $1,504.50 $1,504.50

MLD

MFE $1,080.00

BNI

Subtask 5e Site Visit DS DS $1,242.37 $1,242.37 $1,242.37

MLD

MFE

BNI

Subtask 5f Substantial DS $1,144.74 $2,746.52 $2,746.52

MLD $1,601.78

MFE

BNI

Subtask 5g Final DS $882.96 $2,484.74 $2,484.74

MLD $1,601.78

MFE

BNI

1a, 1b, 1c $0.00 $16,784.01 $16,784.01 $10,500.00 $27,284.01 2a, 2b, 2c $31,115.51 $0.00 $31,115.51 $0.00 $31,115.51 3a, 3b, 3c $8,151.11 $0.00 $8,151.11 $0.00 $8,151.11 4a, 4b, 4c $11,818.21 $0.00 $11,818.21 $0.00 $11,818.21 5a,5b,5c,5d,5e,5f,5g $12,229.50 $0.00 $12,229.50 $0.00 $12,229.50

$63,314.33 $16,784.01 $80,098.34 10,500.00 $90,598.34Project Total

Pre-Design Phases

Bidding & Permitting

Site Visits

Construction Documents

Const. Administration

File details come from the government source that posted it. Updated .