This is a Task Assignment Change Order Form (CO1) issued by the Florida Department of Environmental Protection's Division of Recreation and Parks for the Cypress Room Demolition project at Silver Springs State Park. The document establishes a contractual modification between FDEP and Dodstone Architects, with Janus Research serving as a subconsultant. The contract manager for FDEP is Vu Nguyen, and the consultant representative is Jodie Dodson, AIA. The project contract number is CN804, project number 61570, and task assignment number 06.

Change Order 1 adds $16,554.31 in fixed fee services to finalize the draft Historic American Building Survey (HABS) documentation report for the Cypress Room and submit a final copy to the Florida Department of Historic Resources. The work is divided into three subtasks: Subtask 2c (HABS Documentation Final Submittal) at $4,049.32, Subtask 4b (Interpretive Exhibit Final Submittal) at $6,452.01, and Subtask 5b (Walkway Preservation Plan Final Submittal) at $6,052.98. The original task amount was $48,051.98 ($3,500.00 reimbursement, $44,551.98 fixed fee), and with all change orders, the revised contract amount is $64,606.29 ($3,500.00 reimbursement, $61,106.29 fixed fee). The task execution date is 04/28/2025 with a task end date of 12/31/2025, with no net change in days. Funding is allocated via FLAIR code 61570-37503000203-100718/00-675005-U1300-131500-X2. Deliverables include architectural and research documentation in PDF format, with review and approval requirements from FDEP and the Florida Department of Historic Resources before payment is issued.

View the file

Other files

File Type Posted
CN-370000-CN804-T3.pdf PDF
CN-370000-CN804-T3CO1.pdf PDF
CN-370000-CN804-T7.pdf PDF
CN-370000-CN804-CMC1.pdf PDF
CN-370000-CN804-T2.pdf PDF
CN-370000-CN804-T2CO1.pdf PDF
CN-370000-CN804-T8CO1.pdf PDF
CN-370000-CN804-CN804.pdf PDF
CN-370000-CN804-T1.pdf PDF
CN-370000-CN804-T8CO2.pdf PDF
CN-370000-CN804.pdf PDF
CN-370000-CN804-T1CO1.pdf PDF
CN-370000-CN804-T2.pdf.crdownload CRDOWNLOAD file
CN-370000-CN804-T4.pdf PDF
CN-370000-CN804-T5.pdf PDF
CN-370000-CN804-T6.pdf PDF
CN-370000-CN804-T8.pdf PDF
CN-370000-CN804.pdf.crdownload CRDOWNLOAD file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Task Assignment Change Order Form

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-085

Rev. 0 /2025 1 of 2

FDEP Contract No: Project Number:

Task Assignment No: Change Order No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Description of Change:

Change in Task Amount

Item Reimbursement Fixed Fee Total Original Task Amount Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders

CN804 61570

06 01

Cypress Room Demolition

Dodstone Architects Jodie Dodson, AIA

(850) 656-7326 jdodson@dodstone.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

Provide the services necessary to finalize the draft HABS documentation report for the Silver Springs State Park Cypress Room and submit a final copy to the Florida Department of Historic Resources, per the attached proposal dated August 20, 2025.

$ 3,500.00 $ 44,551.98

$ 3,500.00 $ 44,551.98

$ 0.00 $ 16,554.31

$ 3,500.00 $ 61,106.29

$ 48,051.98

$ 48,051.98

$ 16,554.31

$ 64,606.29

Silver Springs State Park

FFLORIDAA DEPARTMENTT OF Divisionn off Recreationn andd Parks ENVIRONMENTALL PROTECTIONN Task Assignment Change Order Form

Change in Task Time

Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date

Funding Information

29 Digit FLAIR Code:

Project # Grant # Org Code Cat/Year Fund Module Object Code

EO Amount

Total

Approval Signatures

Budget Representative, FDEP

Project Manager, FDEP

Contract Authority, FDEP

Signature

Signature

Signature

Signature

Signature

Date

Date

Date

Date

Date

DRP-085

Rev. 2 of 2 d nta atu

04/28/2025 12/31/2025 12/31/2025 12/31/2025

61570 37503000203 100718/00 675005 U1300 131500 X2 $ 16,554.31

$ 16,554.31

Tamika Bass

Terry McCullum Jr.

Jodie Dodson, AIA

Vu Nguyen

Michael W. Foster Jr., P.E.

Tamika Bass Digitally signed by Tamika Bass Date: 2025.09.03 14:54:57 -04'00'

Terry McCullum Jr.

Digitally signed by Terry McCullum Jr.

Date: 2025.09.04 08:10:29 -04'00'

Joel L Dodson Digitally signed by Joel L Dodson Date: 2025.09.04 10:08:57 -04'00'

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.09.04 13:41:57 -04'00'

Michael W.

Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2025.09.04 14:25:44 -04'00'

Dodstone Architects | 3011-1 Powell Road | Tallahassee, FL 32308 | 850.656.7326 | #AR0015211

Subtask 2c HABS Documentation (Final Submittal)

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Dodstone Architects Principal $195.27 1 $195.27 Project Manager $155.65 6 $933.90 Graduate Architect 3 $101.88 6 $611.28

$1,740.45

Janus Project Manager 1 $230.92 2 $461.84 Chief Scientist $167.22 6 $1,003.32 Scientist $72.41 9 $651.69 Graphics Designer $72.79 2 $145.58 Secretary/Clerical $46.44 1 $46.44

$2,308.87

Subtask 2c HABS Documentation (Final Submittal) $4,049.32

Subtask 4b Interpretive Exhibit (Final Submittal)

Firm Name Position Classification

Hourly Rate Hours

Total Fixed Price

Cost

Project Manager $155.65 6 $933.90 Graduate Architect 3 $101.88 4 $407.52 Support Staff 1 $33.96 0 $0.00 CAD Operator 2 $84.90 0 $0.00

$1,536.69

Janus Project Manager 1 $230.92 1 $230.92 Chief Scientist $167.22 15 $2,508.30 Scientist $72.41 20 $1,448.20 Graphics Designer $72.79 10 $727.90

$4,915.32

Subtask 4b Interpretive Exhibit (Final Submittal) $6,452.01

Subtask 5b Walkway Preservation Plan (Final Submittal)

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Project Manager $155.65 8 $1,245.20 Graduate Architect 3 $101.88 4 $407.52 Support Staff 1 $33.96 0 $0.00 CAD Operator 2 $84.90 0 $0.00

$1,847.99

Janus Project Manager 1 $230.92 1 $230.92 Chief Scientist $167.22 19 $3,177.18 Scientist $72.41 10 $724.10 Graphics Designer $72.79 1 $72.79

$4,204.99

Subtask 5b Walkway Preservation Plan (Final Submittal) $6,052.98

Summary Provider Base Service Additional

Service Subtotal Reimb. Total

Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8 Column9 Subtask 2c HABS Documentation DS $1,740.45 $4,049.32 $4,049.32

Janus $2,308.87 Subtask 4b Interpretive Exhibit (Final DS $1,536.69 $6,452.01 $6,452.01

Janus $4,915.32 Subtask 5b Walkway Preservation Plan DS $1,847.99 $6,052.98 $6,052.98

Janus $4,204.99

2c, 4b, 5b $0.00 $16,554.31 $16,554.31 $0.00 $16,554.31

$0.00 $16,554.31 $16,554.31 0.00 $16,554.31

Original Contract Amount $0.00 $44,551.98 $44,551.98 $3,500.00 $48,051.98

CO1 $0.00 $16,554.31 $16,554.31 $0.00 $16,554.31

Revised Contract Amount $0.00 $61,106.29 $61,106.29 $3,500.00 $64,606.29

Site Visits CO1 Total

CO1 - Final FDHR Submittals

Pre-Design Phases Construction Doc Phase Bidding & Permitting Basic CA Services

File details come from the government source that posted it. Updated .