This document is a Request for Proposal (RFP) from the Arizona State Parks Board, located in Phoenix, Arizona, with the solicitation number BPM006903. The RFP is for HVAC repairs, service, maintenance, and emergency services, with Evolution Mechanical Services, LLC dba IMCOR as the primary contractor. The document specifically focuses on Attachment J, which details the proposed subcontractors for the project.

The proposed subcontractors include five specialized firms: Wav Electric, LLC (electrical contractor), Rose Mechanical Insulation LLC (insulation contractor), GTAB, LLC (test & balance contractor), Southwest Concrete Coring (concrete coring contractor), and Sure Lift Crane & Rigging Corp. (crane contractor). Four of the five subcontractors are classified as small businesses. Each subcontractor has a standardized quality assurance and quality control (QA/QC) approach, which includes maintaining a long-term relationship, developing a method of procedure (MOP) before starting work, and conducting postmortem evaluations. The percentage of total contract work for each subcontractor is currently marked as "TBD" (to be determined), indicating that the final allocation has not yet been specified.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal

Solicitation No. BPM006903

HVAC: Repairs, Service, Maintenance and Emergency Services

Arizona State Parks Board

1110 W. Washington Street

Suite 100

Phoenix, Arizona 85007

Solicitation Attachment – Proposed Subcontractors | Revision No. 1 | Revised 11-22

Attachment J – Proposed Subcontractors

Contractor Name: Evolution Mechanical Services, LLC dba IMCOR

Check “NO” if you WILL NOT subcontract any portion of the Work and will therefore be performing all of the Work with your own personnel.

☐ NO, the Offeror will not subcontract any portion of the Work.

If you WILL subcontract any portion of the Work, check “YES” below and list the name(s) of persons or companies you propose to use as Subcontractors.

1. Fill in the information for each significant Subcontractor – indicate the type of work the Subcontractor will perform under the

Contract and their approximate percentage of the total Contract work;

2. Provide copies of relevant certifications each person or firm possesses attached to this form; AND

3. Provide a description of quality assurance (QA) and quality control (QC) measures that you will use to ensure that

Subcontractor’s work meets the Contract requirements.

State may demand additional information about proposed Subcontractors as a precondition of Award.

YES, the Offeror will use the Subcontractors listed below:

No. Name and contact information Small business Work to be performed and QA/QC measures %

1. Wav Electric, LLC

Jon Pastick, (623)398-6644 jon@wavelectric.com

Yes

Electrical Contractor

QA/QC: Long term Relationship with consensus on construction. MOP for all work prior to start.

Postmortem evaluation of all work.

TBD

2. Rose Mechanical Insulation LLC

Xavier Campos, (602)525-7372/ lazarocampos@rosemechinsul.com

Insulation Contractor construction. MOP for all work prior to start.

Postmortem evaluation of all work.

TBD

3. GTAB, LLC

Robert Stewart, (480)352-2003 bob.stewart@gtabllc.com

Test & Balance Contractor construction. MOP for all work prior to start.

Postmortem evaluation of all work.

TBD

4. Southwest Concrete Coring

Bryan Jamison, (602)527-0736 southwestcoring@gmail.com

Concrete Coring Contractor construction. MOP for all work prior to start.

Postmortem evaluation of all work.

TBD

5. Sure Lift Crane & Rigging Corp.

Elmo Calfa, (602) 538-5388 elmo@sureliftcrane.com No

Crane Contractor

QA/QC: Long term Relationship with consensus on construction. MOP for all work prior to start.

Postmortem evaluation of all work.

TBD

mailto:jon@wavelectric.com mailto:lazarocampos@rosemechinsul.com mailto:bob.stewart@gtabllc.com mailto:southwestcoring@gmail.com mailto:elmo@sureliftcrane.com