BLDG-CKL-25-0003_DEMOLITION_OF_BLDG_(2025).pdf
PDF 233 KB Posted
- Solicitation number
- 2026-IFB-051
- Issued by
- Riverside County, California
About this file
This file is a building permit requirements document from the City of Palm Desert, California, Building & Safety Division, that outlines the procedures and requirements for obtaining a demolition permit for building demolition projects. The document provides comprehensive guidance for contractors and property owners seeking to demolish structures within the City's jurisdiction. Key requirements include obtaining South Coast Air Quality Management District (SCAQMD) notification for asbestos removal and demolition activities, which may require up to 14 days to process, and submitting a Building Department Permit Application through the Development Services Permit Center. Applicants must provide the SCAQMD notification form, a Demolition Conditions of Approval Form if applicable, and either a Performance Bond with security agreement or cash payment equal to 110 percent of the demolition contract value to the City. The City retains the bond or cash for the project duration plus 30 days, after which funds may be released upon request. Pre-site meetings with inspectors are available, and contractors must contact Dig Alert and coordinate utility disconnections with providers including Coachella Valley Water District, Southern California Edison, Imperial Irrigation District, and The Gas Company before commencing work.
The inspection process includes five stages: pre-site demolition inspection, utility abandonment verification, septic tank removal and abandonment, Construction Waste Management Plan compliance with disposal documentation, and final demolition verification. Site safety and environmental requirements mandate adequate fencing, barricades, and signage; proper excavation protection; containment of all equipment and debris on private property; complete removal of foundation, slab, septic tanks, and drywells; proper site grading; dust control compliance with PDMC Chapter 24.12; and tarped haul trucks to prevent material spillage. Debris hauling options include contractor self-hauling with their own equipment or use of the City's franchise waste hauler if contractor self-hauling does not apply. The document applies to the related City contract opportunity for demolition and site stabilization of two City-owned properties located at 44911 Cabrillo Avenue and 44845 San Clemente Circle in Palm Desert, requiring contractors to meet all outlined regulatory, permitting, and inspection requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PALM DESERT
Building & Safety Division 73-510 Fred Waring, Palm Desert, CA (760) 776-6420
DEMOLITION OF A BUILDING (BLDG-CKL-25-0003)
This handout includes items required to obtain a permit to demolish a building and guidance throughout construction. Please read carefully.
1. Please contact South Coast Air Quality Management District (909) 396-2336 for proper notification of demolition and or asbestos removal. Contractors are now required to start the process online and homeowners still by paper form. The process to receive the notification may take 14 days, please allow enough time before applying for your City permit.
The link is: https://www.aqmd.gov/home/rules-compliance/compliance/asbestos-demolition-removal#
STATE LAW REQUIRES THAT YOU PROVIDE A COPY OF THE DEMOLITION NOTIFICATION TO BUILDING
AND SAFETY BEFORE ISSUANCE OF A DEMOLITION PERMIT.
2. A Demolition Permit can be applied for online with the Development Services Permit Center:
The link is: https://www.palmdesert.gov/our-city/departments/planning/palm-desert-permit-center
Items required at the time of permit submittal:
• Building Department Permit Application.
• SCAQMD Notification form.
• Demolition Conditions of Approval Form (If applicable).
• Demolition Performance Bond or Cash in Lieu of:
If the applicant posts a bond with a company, then the Performance Security Agreement for Demolition Projects form is required (Plus a copy of the Bond Documentation). If the applicant chooses to do Cash in Lieu of a check (payable to the City of Palm Desert), equal to the amount of the contract for the demolition work, plus ten (10) percent at the time of permit issuance. The City retains the bond for the duration of the project and for thirty days thereafter. At that point, the applicant may contact the Building Department for the dispersal of funds.
• Once submitted, the Planning Division and Building and Safety will review for approval.
Once a Demolition permit has been issued, here are some important steps to consider before construction and as the work is being completed:
• A pre-site meeting with the inspector is available before starting work.
• Contact Dig Alert is required.
• All utilities shall be disconnected per the requirements of individual utility companies before commencing demolition.
- Coachella Valley Water District (CVWD) Sewer & Water (760) 398-2651
- Southern California Edison (SCE) (800) 655-4555
- Imperial Irrigation District (IID) (760) 398-5811
- The Gas Company (800) 772-5050 https://www.aqmd.gov/home/rules-compliance/compliance/asbestos-demolition-removal https://www.palmdesert.gov/our-city/departments/planning/palm-desert-permit-center
• The site shall be maintained in a safe manner with adequate fencing, barricades, and signage to protect the general public. Excavations shall be adequately protected. (CBC – Chapter 33)
• All demolition equipment, debris, dumpsters, and trucks must always remain on private property (PDMC 8.70.080). If public areas are used, please contact the Public Works Department for additional information at (760) 776-6450, or email PublicWorks@palmdesert.go
• All demolition debris shall be removed from the property, including but not limited to foundation, slab, septic tanks, drywells, and be properly graded for proper drainage to protect adjacent properties.
• Vehicles are not allowed to track mud or debris onto public streets. All fugitive or loose dust and debris must be controlled and not allowed to blow on public streets or adjacent properties. (PDMC Chapter 24.12 Fugitive Dust (PM10) Control.
• Haul trucks shall be covered with tarps or other protective coverings to prevent material from falling off or blowing out of trucks.
Inspection Process
1. Pre-Site Demo Inspection
2. Utility Abandonment: Removal of all underground utilities to approved locations, cap-off of sewer and water connections, and verification that the remaining irrigation system has been adequately repaired and is operational.
3. Abandon Septic Tank-Pit: Remove septic systems, leach lines, and drywells if applicable.
4. Construction Waste Management Plan – CWMP: Proof of proper/legal disposal may be required, by providing disposal tickets from landfill, transfer station, and/or recycling facility. Please see the Permit Center.
5. Demolition Final: Verification that all debris has been removed from the site.
Hauling of Debris
Per PDMC 15.30.010, there are a few options on how to haul debris from the job site:
• Contractor – The contractor can haul debris only if using their own equipment.
• Demolition Contractor – can haul debris only if doing the demolition work and using own equipment.
• City’s Franchise Waste Hauler – must be used if the above does not apply. Please see the Permit
Center for more information.