About this file
The document is a comprehensive set of construction documents for the roof replacement project at Suffolk County Community College's Smithtown Science Building, located at 533 College Rd, Selden, NY 11784. The project involves a complete roof replacement for the Science Building, including removing existing roof coverings, repairing substrate damage, and installing a new SBS modified roofing assembly. The construction documents are dated March 31, 2025, with the project number SCCC Project No. 2149 and WFC Project No. 24-15885. The documents include detailed technical specifications, code compliance tabulations, roof construction plans for multiple building levels, and specific roofing installation details.
The project requires compliance with the Existing Building Code of New York State (2020) and the Energy Conservation Construction Code of New York State (2020). Key technical requirements include installing roof coverings that meet Class "B" roof assembly standards, using polyisocyanurate board insulation complying with ASTM C 1289, and ensuring wind resistance and impact resistance testing for the new roofing system. The project is classified as a Risk Category III building, with wind speeds estimated between 130-140 MPH. The roofing system must also meet specific energy efficiency requirements, including a minimum R-30 continuous insulation for Climate Zone 4. The documents provide extensive technical guidance for contractors, including detailed installation methods, flashing techniques, and specific requirements for penetrations, drains, and roof edges.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLAN:
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
DRAWING TITLEDWG. NO.
T-101.00
G-101.00
G-102.00
DRAWING INDEX
AREA MAP
SITE LOCATION
CONSTRUCTION DOCUMENTS FOR:
ROOF REPLACEMENT
SUFFOLK COUNTY COMMUNITY COLLEGE
SMITHTOWN SCIENCE BUILDING
533 COLLEGE RD, SELDEN, NY 11784
SCCC PROJECT NO: 2149
WFC PROJECT NO: 24-15885
March 31, 2025
ARCHITECTURAL
A-101.00
ARCHITECT:
PROJECT CONTACTS
OWNER CONTACT:
DOUGLAS DARGIS, RA, CEO, LEED AP
SUFFOLK COUNTY COMMUNITY COLLEGE
ADMINISTRATIVE DIRECTOR OF PROJECTS AND COMPLIANCE
533 COLLEGE ROAD, SELDEN, NY 11784
P: (631) 451-4232
DARGISD@SUNYSUFFOLK.EDU
WILLIAM S. BRADY, AIA, LEED AP
WILLIAM F. COLLINS, AIA ARCHITECTS, LLP
12-1 TECHNOLOGY DRIVE, SETAUKET, NY 11733
(P) (631) 689-8450 EXT. 130
WILLIAM.BRADY@WFCAIA.COM
GENERAL NOTES
010/30/2024
MISC. DETAILS
A-102.00
A-103.00
A-201.00
LATEST
REVISION NO. & DATEINITIAL ISSUANCE
TITLE SHEET, GENERAL NOTES, AREA MAP AND CODE COMPLIANCE TABULATIONS
NOTES
KEY PLANS, TYPICAL ACCESSIBILITY DETAILS, ABBREVIATIONS AND LEGEND
FIRST FLOOR ROOF CONSTRUCTION PLAN
T-101
A-104.00
ENLARGED CONSTRUCTION PLANA-105.00
CODE COMPLIANCE TABULATIONS
ROOF REPLACEMENT CODE ANALYSIS
EXISTING BUILDING CODE OF NEW YORK STATE (2020)
1. SECTION 202 - DEFINITIONS
a. ROOF REPLACEMENT: PROCESS OF REMOVING EXISTING ROOF COVERING, REPAIRING ANY DAMAGED SUBSTRATE, AND INSTALLING NEW ROOF COVERING.
2. SECTION 503.3 - EXISTING BUILDING ELEMENTS CARRYING GRAVITY LOADS
a. A GREATER THAN 5% INCREASE IN LOADS NECESSITATES REPLACEMENT OR ALTERATION OF SUCH ELEMENTS AS NEEDED TO CARRY THE NEW LOADING CONDITION.
b. TASK: CHECK LOAD CASE OF NEW VS. EXISTING ROOFING SYSTEM. REFER TO STRUCTURAL REPORT PREPARED BY CONLON ENGINEERING DATED OCTOBER 9, 2024.
3. SECTION 503.12 - WIND SPEED
a. WHERE WIND SPEED IS GREATER THAN 115 MPH, DECK / FRAMING, AND FRAMING / WALL CONNECTIONS SHALL BE EVALUATED FOR WIND LOADS AND UPLIFT.
TASK: EVALUATION FOR WIND LOADS AND UPLIFT REQUIRED. REFER TO STRUCTURAL REPORT PREPARED BY CONLON ENGINEERING DATED OCTOBER 9, 2024.
4. SECTION 602 - ALTERATION LEVEL 1
a. LEVEL 1 ALTERATIONS INCLUDE THE REMOVAL AND REPLACEMENT OF THE COVERING OF EXISTING MATERIALS, ELEMENTS, EQUIPMENT, OR FIXTURES USING NEW MATERIALS, ELEMENTS, EQUIPMENT, OR FIXTURES THAT SERVE THE SAME PURPOSE.
5. CHAPTER 7 - ALTERATIONS LEVEL 1
a. SECTION 704 - MEANS OF EGRESS: 704.1 GENERAL - ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS THE LEVEL OF PROTECTION PROVIDED FOR THE MEANS OF EGRESS.
THIS INDICATES THAT RAILINGS AT THE EDGE OF THE ROOF NEAR EQUIPMENT ARE NOT REQUIRED. SECTION 704.1 OF THE EXITING BUILDING CODE DOES NOT DIRECT UTILIZATION OF THE PROVISIONS OF THE BUILDING CODE OF NEW YORK STATE IN THIS INSTANCE. HOWEVER, INSTALLING SUCH GUARDS AT COMPONENTS REQUIRING SERVICE AND AT ROOF HATCHES (BC NYS SECTIONS 1015.6 AND 1015.7, RESPECTIVELY) MAY BE A PRUDENT THING TO DO.
b. SECTION 705 - REROOFING: COMPLY WITH CHAPTER 15 OF THE BUILDING CODE OF NEW YORK STATE.
c. SECTION 705.1 - EXCEPTIONS
i. MINIMUM SLOPE OF ¼” PER FOOT NOT APPLICABLE TO EXISTING BUILDINGS.
ii. NEW SECONDARY (OVERFLOW) DRAINS NOT APPLICABLE TO EXISTING BUILDINGS.
d. SECTION 705.3 - ROOF REPLACEMENT SHALL INCLUDE THE REMOVAL OF ALL EXISTING LAYERS OF ROOF COVERINGS DOWN TO THE ROOF DECK.
i. SECTION 705.3.1.1 - EXCEPTION NO. 3 PROHIBITS A “ROOF RECOVER” WHERE THE EXISTING ROOF HAS TWO OR MORE APPLICATIONS OF ANY TYPE OF ROOF COVERING.
e. SECTION 705.6 - FLASHINGS. METAL FLASHINGS TO WHICH BITUMINOUS MATERIALS ARE ADHERED SHALL BE PRIMED PRIOR TO INSTALLATION.
f. SECTION 707.1 - ALTERATIONS SHALL CONFORM TO THE ENERGY REQUIREMENTS OF THE ENERGY CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE AS THEY RELATE TO
NEW CONSTRUCTION ONLY.
BUILDING CODE OF NEW YORK STATE (2020)
1. CHAPTER 10, SECTION 1015 - GUARDS
a. 1014.4 OPENING LIMITATIONS, EXCEPTION 3. AT ELEVATED WALKING SURFACES FOR ACCESS TO AND USE OF ELECTRICAL, MECHANICAL OR PLUMBING SYSTEMS OR EQUIPMENT, GUARDS SHALL NOT HAVE OPENINGS THAT ALLOW PASSAGE OF A SPHERE 21 INCHES IN DIAMETER.
2. CHAPTER 15, SECTION 1502 - SECONDARY ROOF DRAINS NOT REQUIRED PER EBC NYS SECTION 705.1, EXCEPTION
3. SECTION 1504.3 - WIND RESISTANCE OF NON-BALLASTED ROOFS
a. REFER TO SECTION 1507 FOR ROOF COVERINGS.
b. REFER TO SECTION 1609.5.2 FOR WIND LOAD PRESSURES
c. SECTION 1504.3.1 - TESTING OF ROOFING SHALL BE IN ACCORDANCE WITH FM 4474, UL 580, OR UL 1897.
3. SECTION 1504.5 - EDGE SECUREMENT FOR LOW-SLOPE ROOFS.
a. EDGE SECUREMENT SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH BC NYS CHAPTER 16 AND TESTED IN ACCORDANCE WITH TEST METHODS RE-1, RE-2, AND RE-3 OF
ANSI / SPRI ES-1, EXCEPT BASIC DESIGN WIND SPEED, V, SHALL BE DETERMINED FROM FIGURES 1609.3(1) THROUGH 1609.3(8) AS APPLICABLE.
4. SECTION 1054.6 - LOW-SLOPE ROOF SLOPING LESS THAN 2:12 SHALL BE WEATHER TESTED IN ACCORDANCE WITH ASTM G 152, ASTM G 154, OR ASTM G 155.
5. SECTION 1504.7 - IMPACT RESISTANCE ON LOW-SLOPE ROOF SLOPING LESS THAN 2:12 SHALL BE TESTED IN ACCORDANCE WITH ASTM D 3746, ASTM D 4272, OR THE “RESISTANCE TO FOOT
TRAFFIC TEST” IN SECTION 4.6 OF FM 4470.
6. SECTION 1505.1 - TABLE 1505.1 CLASSIFICATION OF ROOF COVERINGS
a. THE BUILDING APPEARS TO BE CONSTRUCTION CLASSIFICATION TYPE IIA. THEREFORE, A CLASS “B” ROOF ASSEMBLY IS REQUIRED. ROOF COVERINGS SHALL BE TESTED IN
ACCORDANCE WITH ASTM E 108 OR UL 790.
7. SECTION 1506.3 - ROOF PRODUCT IDENTIFICATION
a. ROOF COVERING MATERIALS PACKAGING SHALL BEAR THE MANUFACTURER'S IDENTIFYING MARKS AND APPROVED TESTING AGENCY LABELS IN ACCORDANCE WITH SECTION 1505.
FOR MATERIALS IN BULK, THIS INFORMATION MAY BE PROVIDED IN THE FORM OF A CERTIFICATE OR A BILL OF LADING PROVIDED BY THE MANUFACTURER.
8. SECTION 1507.11 - MODIFIED BITUMEN ROOFING
a. SECTION 1507.11.1 - ROOF SLOPE OF ¼” PER FT. MINIMUM IS NOT APPLIABLE PER EBC NYS SECTION 705.1 EXCEPTION 1, AND SECTION 1511.1 EXCEPTION 1.
b. SECTION 1507.11.2 - MATERIAL STANDARDS SHALL COMPLY WITH ASTM D 6162, D 6163, D 6164, D 6222, D 6223, D 6298, OR D 6509.
i. SECTION 1507.11.2.1 - A BASE SHEET COMPLYING WITH SECTION 1507.11.2, ASTM D 1970 OR D 4601 IS PERMITTED TO BE USED WITH A MODIFIED BITUMEN CAP SHEET.
9. SECTION 1508 ROOF INSULATION
a. SECTION 1508.1 - ABOVE DECK INSULATION IS PERMITTED WHEN COVERED WITH AN APPROVED ROOF COVERING AND PASSES THE TESTS OF NFPA 276 OR UL 1256, WHEN TESTED AS
AN ASSEMBLY.
b. SECTION 1508.2 - POLYISOCYANURATE BOARD SHALL COMPLY WITH ASTM C 1289, TYPE I OR TYPE II. IF A DIFFERENT TYPE OF INSULATION IS SELECTED FOR USE ON THIS PROJECT, REFER TO TABLE 1508.2 FOR TESTING CRITERIA APPLICABILITY TO THE TYPE OF INSULATION SELECTED.
10.SECTION 1604.5 - RISK CATEGORY
a. RISK CATEGORY III.
11.SECTION 1609.3 - BASIC WIND SPEED
a. FIGURE 1609.3(2) FOR BUILDINGS IN RISK CATEGORY III IS APPLICABLE.
b. FROM FIGURE 1609.3(2), THE BUILDING APPEARS TO BE BETWEEN THE 130 - 140 MPH WIND CONTOUR LINES.
12.SECTION 1609.4 - EXPOSURE CATEGORY
a. SECTION 1609.4.3 - THE BUILDING LIES WITHIN TERRAIN DESCRIBE FOR THE EXPOSURE B CATEGORY.
ENERGY CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE (2020)
1. SECTION C301.1 - CLIMATE ZONES GENERAL
A. CLIMATE ZONE FOR NASSAU COUNTY: 4A (TABLE C 301.1)
B. THERMAL CRITERIA: CDD 50 DEG. F LESS THAN OR EQUAL TO 4500 AND HDD 65 DEG. F LESS THAN OR EQUAL TO 5400 (TABLE C301.3(2))
2. SECTION C 401.2 - COMPLIANCE PATH
A. THE PRESCRIPTIVE COMPLIANCE PATH HAS BEEN UTILIZED AS THE BASIS OF THIS ANALYSIS.
3. SECTION 402.1.3 - INSULATION
A. INSULATION PLACED ENTIRELY ABOVE THE ROOF DECK IN CLIMATE ZONE 4: R-30 CI (CONTINUOUS INSULATION) (TABLE C402.1.3 - “R”-VALUE METHOD)
4. SECTION 402.2.1 - ROOF INSULATION SHALL BE INSTALLED IN A MINIMUM OF TWO LAYERS WITH JOINTS STAGGERED. (EXCEPTION 3, TWO LAYERS ARE NOT REQUIRED WHERE INSULATION
TAPERS TO THE ROOF DECK SUCH AS AT ROOF DRAINS.)
5. SECTION 503.1 - ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE IS NOT LESS CONFORMING TO THE PROVISIONS OF THIS CODE THAN THE EXISTING BUILDING OR STRUCTURE PRIOR TO THE ALTERATION. THIS MAY ENABLE MAKING THE CASE THAT BETWEEN THE WALLS AT THE HIGH ROOF / LOW ROOF CONDITIONS AND THE NEAREST ADJACENT LINE OF ROOF DRAINS, THE SAME THICKNESS OF INSULATION CURRENTLY IN PLACE MAY BE USED AS PART OF THE ROOF REPLACEMENT ALTERATION DESIGN. THERE IS A POTENTIAL THAT WHILE THE SAME THICKNESS IS BEING USED, THE NEW INSULATION MAY HAVE A HIGHER “R” VALUE THAN THE EXISTING. IN ADDITION, GIVEN THE NEED TO ESTABLISH A POSITIVE DRAINAGE ROOF SLOPE, THE THICKNESS OF INSULATION BETWEEN THE DRAINS AND THE ROOF SURFACE HIGH POINTS WILL LIKELY BE HIGHER THAN “R”30.
A. SECTION 503.1 - EXCEPTION 7. AIR BARRIERS ARE NOT REQUIRED FOR ROOF REPLACEMENT WHERE ALTERATIONS DO NOT INCLUDE ALTERATIONS TO THE REMAINDER OF THE BUILDING ENVELOPE. WHILE AN AIR BARRIER MAY NOT BE REQUIRED, YOU MAY WANT TO CONSIDER INCLUDING IT AS A GOOD PRACTICE.
SECOND FLOOR ROOF CONSTRUCTION PLAN
MAIN ROOF CONSTRUCTION PLAN
PENTHOUSE ROOF CONSTRUCTION PLAN
D-101.00 ROOF DEMOLITION PLAN, PROTECTION NOTES AND PROTECTION DETAILS
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
ROOFING DETAILSA-301.00
ROOFING DETAILSA-302.00
ROOFING DETAILSA-303.00
CONSTRUCTION DOCUMENTS 95%3 01/24/25
10/30/2024
10/30/2024
10/30/2024
10/30/2024
10/30/2024
10/30/2024
10/30/2024
10/30/2024
10/30/2024
12/17/2024
12/17/2024
12/17/2024
MISC. DETAILSA-202.00 10/30/2024 0
4 01/31/25
DOOR AND MISC. DETAILSA-203.00 10/30/2024 0
CONSTRUCTION DOCUMENTS 100 %
A-204.00 0MISC. DETAILS
5 03/13/25 CONSTRUCTION DOCUMENTS 100 %
03/13/2025
03/31/2025
6 03/31/25 CONSTRUCTION DOCUMENTS FOR BID
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
03/31/2025
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
PERFORMANCE DISCLAIMER
EGRESS NOTES
CONTRACT MODIFICATIONS
GENERAL REMOVAL NOTES
DELIVERY AND STORAGE
DRAIN PROTECTION AND CLEANING
PRODUCTS AND SUBSTITUTIONS
CUTTING AND PATCHING ROOF GENERAL NOTES
EXISTING ROOF SYSTEM
NEW ROOF SCOPE OF WORK
GUARANTEE
BUILDING DEPARTMENT NOTES
COORDINATION NOTE
UNIT PRICES
ALTERNATES
CONSTRUCTION NOTES
G-101
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
SAFETY AND MOP NOTES
SCCC CRANE PERMIT
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
HAZARDOUS MATERIALS
5 03/13/25 CONSTRUCTION DOCUMENTS 100 %
6 CONSTRUCTION DOCUMENTS FOR BID03/31/25
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A.O.R.
G-102
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
CONSTRUCTION NOTES
DIMENSION AND REFERENCE NOTES
A-101
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
A-102
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
A-103
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
A-104
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
A-105
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
8"
EXISTING CONCRETE DECK
M
I N
KEY PLAN:
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-201
PRELIMINARY DESIGN1 10/30/24
CONSTRUCTION DOCUMENTS 75%2 12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/17/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-202
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-203
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-204
J
M
A
P
P
R
O
V
E
D
C
K
PRIME FLANGE OF LEAD FLASHING WITH
PRIMER ON BOTH SIDES, (SEE NOTES)
SET LEAD FLANGE IN MBR UTILITY
CEMENT, OR MBR FLASHING CEMENT.
HEAT WELD
BITUMEN
ROUND CORNERS
OF TARGET PATCHES
AS SHOWN
CANTED BEAD OF MBR UTILITY CEMENT
APPROVED SBS OR AP FLASHING
PLUMBING VENT STACK
ROLL TOP OF LEAD FLASHING DOWN
INTO PIPE APPROXIMATELY 1"
LEAD FLASHING
I
N
N
N
R
I
G
N
S
U
L
A
T
I
O
N
C
O
V
R
B
O
A
R
D
J
P
R
O
V
C
K
M
A
S
O
N
Y
W
L
L
4" MIN. COUNTER FLASHING
OVERLAP OVER TOP OF
BASE FLASHING
M
I N
T
O
M
A X
B A
S
F
L A
S H
I N
G
H
T
HEAT WELD
BITUMEN
APPROVED SBS OR
APP FLASHING
APPROVED SBS OR
APP BACKER PLY
T
Y
E
O
F
I
N
G
FESCANT PLUS
ASPHALT PRIMER
REGLET
FOR SAWCUT REGLET
USE POLYURETHANE CAULK
METAL COUNTER FLASHING
3 COURSING (OPTIONAL)
*MASONRY FASTENERS
WITH 1" MIN. PLATE Ø
6" O.C. AT TOP EDGE
N
CUT PEANUT
SHAPED TARGET
PATCHES AND
HEAT WELD TO
BASE FLASHING
AS SHOWN
PLAN VIEW
OF PEANUT SHAPED
TARGET PATCH
M
I N
KEY PLAN:
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-301 anyone as a substitute for professional engineering design and documentation required by building
MAXIMUM GUARANTEE TERM:
MEMBRANE TYPE:
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
ISSUE DATESCALE
FLASHING WALL BUR
N.T.S 02-08-19
HW-1 (LB)
BASE FLASHING FOR LOAD BEARING MASONRY WALL W/ COUNTERFLASHING
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
DRAINS & VENTS BUR
N.T.S 7-7-14
HW-9
PLUMBING VENT
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
CURB & CORNER BUR
N.T.S 02-08-19
HW-26
BASE FLASHING AT OUTSIDE CORNER
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
CURB & CORNER BUR
N.T.S 02-08-19
HW-27
BASE FLASHING AT INSIDE CORNER
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
N.T.S 06-24-20
VB-1
JM VAPOR BARRIER - WALL BASE DETAIL
2 CONSTRUCTION DOCUMENTS 75%12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
END LAPS STAGGERED
3' APART (MIN.)
KEY PLAN:
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-302
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
N.T.S 06-24-20
VB-2
JM VAPOR BARRIER - PIPE PENETRATION DETAIL
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
N.T.S 06-24-20
VB-3
JM VAPOR BARRIER - DRAIN DETAIL
ISSUE DATE
DRAWING NO.
SCALE
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MEMBRANE TYPE:
MAXIMUM GUARANTEE TERM:
N.T.S
06-24-20
VB-4
JM VAPOR BARRIER - DETAIL AT FIELD LAPS
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
N.T.S 06-24-20
VB-5
JM VAPOR BARRIER - OUTSIDE CURB DETAIL
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
N.T.S 06-24-20
VB-6
JM VAPOR BARRIER - INSIDE CURB DETAIL
2 CONSTRUCTION DOCUMENTS 75%12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
DRAINS & VENTS JM PERMAFLASH
N.T.S 04-10-24
PMF-5
JM PERMAFLASH TO DRAIN DETAIL
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
20 YEAR / 30 YEAR
A.
B.
C.
USE THIS DETAIL IN CONJUNCTION WITH THE PERMAFLASH
PIPE PENETRATION SCRIM LAYOUT, DRAWING PMF-6S.
ENSURE TOTAL TARGET AREA OF FLASHING IS NO LESS THAN 16" x 16".
D.
REFER TO PERMAFLASH APPLICATION INSTRUCTIONS FOR GENERAL
GUIDELINES REGARDING THE PERMAFLASH SYSTEM.
AN EXTRA COAT OF MBR FLASHING CEMENT MUST BE PLACED
BETWEEN SCRIM LAYERS WHERE THEY OVERLAP TO ENSURE A
PROPER BOND.
BASE COAT OF
MBR FLASHING
CEMENT (APPLIED
1/2" BEYOND
SCRIM OUTLINE)
PERMAFLASH
SCRIM (SET IN
MBR FLASHING
CEMENT)
MASK TARGET
AREA FOR
APPLICATION
PIPE, STACK OR
CONDUIT
SCRIM OUTLINE
(SEE PMF-6S)
FINISH COAT OF
MBR FLASHING
CEMENT (APPLIED
1/2" BEYOND
SCRIM OUTLINE)
ROOF MEMBRANE
NOTES:
PERMAFLASH
SCRIM (SET IN
MBR FLASHING
CEMENT)
MASK TARGET AREA ON ROOF MEMBRANE AND PENETRATION.
CLEAN & PRIME ALL NON-POROUS AREAS (METAL, ETC.)
REQUIRING LIQUID MEMBRANE WITH PERMAFLASH PRIMER.
APPLY 30 MIL. BASE COAT OF MBR FLASHING CEMENT WITHIN
TARGET AREA. (A BRUSH WORKS BEST).
EMBED SCRIM(S) INTO WET BASE COAT OF MBR FLASHING
CEMENT, 1/2" SHORT OF TARGET AREA.
IMMEDIATELY AFTER EMBEDDING THE SCRIM, APPLY 60 MIL.
FINISH COAT OF MBR FLASHING CEMENT OVER SCRIM AND 1/2"
BEYOND, ENSURING SCRIM IS COMPLETELY EMBEDDED.
REMOVE MASKING TAPE IMMEDIATELY AFTER APPLICATION OF
FINISH COAT.
ASSEMBLY
KEY PLAN:
SUBMISSIONNO. DATE
CONSULTANT:
CONSULTANT:
SHEET NO:
DATE:
DRAWING NO:
SCALE:
DRAWN BY:
PROJECT NO:
CHECKED BY:
TITLE:
wfcwfc
A-303
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
DRAINS & VENTS BUR
N.T.S 7-9-14
HW-23
VENT STACK (WARM)
2 CONSTRUCTION DOCUMENTS 75%12/17/24
CONSTRUCTION DOCUMENTS 95%3 01/24/25
4 01/31/25 CONSTRUCTION DOCUMENTS 100 %
6 03/31/25 CONSTRUCTION DOCUMENTS FOR BID
| Sheets and Views |
| 01_15885_T-101-T-101 |
| 02_15885_G-101-G-101 |
| 03_15885_G-102-G-102 |
| 04_15885_D-101-D-101 |
| 06_15885_A-101-A-101 |
| 07_15885_A-102-A-102 |
| 08_15885_A-103-A-103 |
| 09_15885_A-104-A-104 |
| 10_15885_A-105-A-105 |
| 11_15885_A-201 A-202 A-203-A-201 |
| 11_15885_A-201 A-202 A-203-A-202 |
| 11_15885_A-201 A-202 A-203-A-203 |
| 11_15885_A-201 A-202 A-203-A-204 |
| 12_15885_A-301-A-301 |
| 12_15885_A-302-A-302 |
| 12_15885_A-303-A-303 |
File details come from the government source that posted it. Updated .