BC25-001 - Addendum No. 1 - 04-04-2025.pdf

PDF 51 KB Posted

Attached to
Smithtown Science Building Roof Replacement
Solicitation number
BC25-002
Issued by
Suffolk County, New York

About this file

This document is Addendum No. 1 for Formal Bid No. BC25-002 issued by Suffolk County Community College for the Smithtown Science Building Roof Replacement project. The addendum, dated April 4, 2025, incorporates sixteen (16) pages of new drawings into the original bid documents while maintaining the original bid submission and opening dates of April 24, 2025 (submission at 11:00 AM, opening at 11:30 AM). The project involves the demolition of existing roofing systems and installation of a new SBS modified roofing assembly at the Smithtown Science Building located in Selden, NY, with electrical work to be performed separately by the Owner.

Bidders are instructed to acknowledge receipt and acceptance of this addendum in their Proposal Form and are recommended to check the Bid Net Direct website to confirm receipt of all addenda. No changes to the original bid terms and conditions are indicated, and the bid remains open to qualified contractors. The addendum is signed by Seema K. Menon, the Associate Administrative Director of Business Operations, affirming the official nature of the document and its modifications to the original bid solicitation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 4, 2025

ADDENDUM NO. 1

FORMAL BID NO. BC25-002

SMITHTOWN SCIENCE BUILDING ROOF REPLACEMENT

Attention to Bidders:

This constitutes Addendum No. 1 to the referenced Formal Bid, and consists of:

• This one (1) page cover letter; and

• Sixteen (16) pages of drawings which are being issued and incorporated as part of the original documents of the referenced solicitation.

The bid submission date and time of April 24, 2025 at 11:00 AM remains unchanged.

The bid opening date and time of April 24, 2025 at 11:30 AM remains unchanged.

All other terms and conditions of the Formal Bid remain unchanged.

Prior to bid submission, please check the Bid Net Direct website to confirm receipt of all

Addenda that may have been issued under the referenced solicitation.

Bidder shall acknowledge receipt and acceptance of this addendum in the Proposal Form.

Seema K. Menon

Seema K. Menon

Associate Administrative Director of Business Operations

File details come from the government source that posted it. Updated .