B2505Tabulation.pdf
PDF 36 KB Posted
- Attached to
- Fire Station #83 Renovations State and local contract opportunity
- Solicitation number
- B-25-05
- Issued by
- Volusia County, Florida
About this file
This document is a bid tabulation for the Fire Station #83 Renovations project for the City of DeLand, Florida, detailing construction bids from six contractors: A.G. Pifer Construction, Atlantic Coast Construction Group, Coastal Reconstruction Group, FSV Construction Company, Qualis General Contractors, and Spartan Contracting Corporation. The bid covers a comprehensive renovation spanning 24 construction divisions, including general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, equipment, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, communications, safety systems, earthwork, exterior improvements, and utilities. The tabulation includes a base bid, performance and payment bonds, a 5% contingency, and two alternate bid options: an additive alternate for LED lighting and a deductive alternate for specific room modifications.
The bid prices range from $910,386 to $1,441,654.57 for the base bid, with Spartan Contracting Corporation submitting the lowest base bid at $945,501.55. The document indicates that the tabulation represents the lowest responsive bidder recommended for award, subject to further review. Bids are to be posted on DemandStar and VendorLink for transparency. The total project cost, including base bid, performance and payment bonds, and contingency, ranges from $970,185.30 to $1,513,737.30 across the six bidders. The bid includes line-item pricing for each construction division, allowing for detailed cost analysis and comparison across contractors.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RCA.pdf | ||
| B2505Tabulation.pdf | ||
| B2505ADD5.pdf | ||
| B2505ADD5.pdf | ||
| B2505ADD5.pdf | ||
| B2505ADD5.pdf | ||
| B2505ADD4.pdf | ||
| B2505ADD4.pdf | ||
| B2505ADD4.pdf | ||
| B2505ADD4.pdf | ||
| B2505ADD3.pdf | ||
| B2505ADD3.pdf | ||
| B2505ADD3.pdf | ||
| B2505ADD3.pdf | ||
| B2505ADD2.pdf | ||
| B2505ADD2Attachment.pdf | ||
| B2505ADD2Attachment.pdf | ||
| B2505ADD2.pdf | ||
| B2505ADD2Attachment.pdf | ||
| B2505ADD2.pdf | ||
| B2505ADD2.pdf | ||
| B2505ADD2Attachment.pdf | ||
| B2505ADD1.pdf | ||
| B2505ADD1.pdf | ||
| B2505ADD1.pdf | ||
| B2505ADD1.pdf | ||
| B2505Plans.pdf | ||
| B2505Plans.pdf | ||
| B2505Plans.pdf | ||
| B2505Plans.pdf | ||
| B2505Final.pdf | ||
| B2505Final.pdf | ||
| B2505Final.pdf | ||
| B2505Final.pdf |
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Unit Quantity Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
1 Division 01: General Requirements LS 1 $188,030.00 $188,030.00 $240,355.00 $240,355.00 $129,620.39 $129,620.39 $99,500.00 $99,500.00 $142,303.00 $142,303.00 $204,100.00 $204,100.00 2 Division 02: Existing Conditions (Demo) LS 1 $17,000.00 $17,000.00 $14,910.28 $14,910.28 $24,165.00 $24,165.00 $45,283.00 $45,283.00 $24,150.00 $24,150.00 $56,900.00 $56,900.00 3 Division 03: Concrete LS 1 $27,140.00 $27,140.00 $19,384.60 $19,384.60 $16,540.31 $16,540.31 $15,415.00 $15,415.00 $23,647.00 $23,647.00 $25,000.00 $25,000.00 4 Division 04: Masonry LS 1 $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $17,450.00 $17,450.00 $0.00 $0.00 $0.00 $0.00 5 Division 05: Metals LS 1 $2,500.00 $2,500.00 $0.00 $0.00 $133,813.35 $133,813.35 $46,418.00 $46,418.00 $0.00 $0.00 $3,985.00 $3,985.00 6 Division 06: Wood and Plastics LS 1 $3,878.00 $3,878.00 $0.00 $0.00 $111,918.24 $111,918.24 $8,660.00 $8,660.00 $95,245.00 $95,245.00 $89,501.00 $89,501.00 7 Division 07: Thermal & Moisture Proteection LS 1 $103,925.00 $103,925.00 $24,462.50 $24,462.50 $22,848.75 $22,848.75 $56,672.00 $56,672.00 $16,200.00 $16,200.00 $0.00 $0.00 8 Division 08: Openings LS 1 $115,110.00 $115,110.00 $115,833.80 $115,833.80 $109,879.09 $109,879.09 $71,256.00 $71,256.00 $56,845.00 $56,845.00 $78,946.40 $78,946.40 9 Divison 09: Finishes LS 1 $128,524.00 $128,524.00 $170,089.57 $170,089.57 $219,993.23 $219,993.23 $144,089.00 $144,089.00 $166,858.00 $166,858.00 $151,606.00 $151,606.00
10 Division 10: Specialties LS 1 $51,880.00 $51,880.00 $8,936.28 $8,936.28 $17,537.50 $17,537.50 $45,814.00 $45,814.00 $4,319.00 $4,319.00 $6,893.00 $6,893.00 11 Division 11: Equipment LS 1 $110,000.00 $110,000.00 $106,831.60 $106,831.60 $45,152.05 $45,152.05 $63,114.00 $63,114.00 $0.00 $0.00 $11,826.00 $11,826.00 12 Divison 12: Furnishings LS 1 $96,786.00 $96,786.00 $102,702.33 $102,702.33 $87,565.43 $87,565.43 $129,941.00 $129,941.00 $3,530.00 $3,530.00 $14,538.00 $14,538.00 13 Division 13: Special Construction LS 1 $86,900.00 $86,900.00 $30,900.00 $30,900.00 $0.00 $0.00 $116,595.00 $116,595.00 $90,743.00 $90,743.00 $0.00 $0.00 14 Division 21: Fire Suppression LS 1 $14,500.00 $14,500.00 $24,462.50 $24,462.50 $32,013.18 $32,013.18 $28,277.00 $28,277.00 $17,196.00 $17,196.00 $26,677.00 $26,677.00 15 Division 22: Plumbing LS 1 $23,875.00 $23,875.00 $19,441.25 $19,441.25 $57,078.00 $57,078.00 $27,511.00 $27,511.00 $15,800.00 $15,800.00 $18,500.00 $18,500.00 16 Division 23: Heating Ventilation & Air Conditioning LS 1 $59,370.00 $59,370.00 $80,340.00 $80,340.00 $104,611.50 $104,611.50 $36,660.00 $36,660.00 $66,490.00 $66,490.00 $70,149.15 $70,149.15 17 Division 26: Electrical LS 1 $111,780.00 $111,780.00 $90,125.00 $90,125.00 $140,076.00 $140,076.00 $69,885.00 $69,885.00 $84,606.00 $84,606.00 $108,500.00 $108,500.00 18 Division 27: Communications LS 1 $8,100.00 $8,100.00 $25,235.00 $25,235.00 $0.00 $0.00 $43,610.00 $43,610.00 $15,000.00 $15,000.00 $0.00 $0.00 19 Divison 28: Electronic Safety & Security LS 1 $21,920.00 $21,920.00 $56,989.90 $56,989.90 $0.00 $0.00 $56,290.00 $56,290.00 $30,000.00 $30,000.00 $0.00 $0.00 20 Division 31: Earthwork LS 1 $0.00 $1,030.00 $1,030.00 $0.00 $0.00 $11,950.00 $11,950.00 $0.00 $0.00 $12,245.00 $12,245.00 21 Division 32: Exterior Improvements LS 1 $0.00 $13,678.40 $13,678.40 $188,842.55 $188,842.55 $31,081.00 $31,081.00 $0.00 $0.00 $16,751.00 $16,751.00 22 Divison 33: Utilities LS 1 $0.00 $79,980.53 $79,980.53 $0.00 $0.00 $42,294.00 $42,294.00 $0.00 $0.00 $49,384.00 $49,384.00 23 Allowance for Building & Infrastructure Permits LS 1 $15,000.00 $15,000.00 $4,000.00 $4,000.00 $0.00 $0.00 $15,000.00 $15,000.00 $7,888.00 $7,888.00 $0.00 $0.00 24 Civil Engineering Summary of Pay Items (Sheet 3) LS 1 $178,314.50 $178,314.50 $0.00 $0.00 $0.00 $8,683.00 $8,683.00 $49,566.00 $49,566.00 $0.00 $0.00
Total Base Bid $1,365,132.50 $1,229,688.54 $1,441,654.57 $1,231,448.00 $910,386.00 $945,501.55 LS 1 $14,000.00 $14,000.00 $0.00 $0.00 $0.00 $22,500.00 $22,500.00 $13,600.00 $13,600.00 $0.00 $0.00
LS 1 $68,956.63 $61,484.43 $72,082.73 $62,697.40 $46,199.30 $47,275.08
Item No. Description Unit Quantity Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
24 Additive Alternate No. 1: Provide new LED lighting package for entire facility (existing and new)
LS 1 $28,594.00 $28,594.00 $28,000.00 $28,000.00 $135.00 $135.00 $27,600.00 $27,600.00 $5,187.00 $5,187.00 $0.00 $0.00
Item No. Description Unit Quantity Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
Deductive Alternate No. 1: Do not remove existing window in room 134. Do not provide door number 134.B. Do not provide new exterior concrete slab outside of room 134.
LS 1 -$13,400.00 -$13,400.00 -$10,000.00 -$10,000.00 -$16,129.67 -$16,129.67 -$1,680.00 -$1,680.00 -$13,424.00 -$13,424.00 $0.00 $0.00
Total (Base Bid + PP Bonds + Contingency)
A.G. Pifer Construction, Inc. Atlantic Coast Construction Group Coastal Reconstruction Group
Tabulation represents the lowest-responsive bidder and the recommended awardee of the City of DeLand (all bids subject to further review). Bid tabulations are posted to DemandStar at www.demandstar.com & VendorLink at www.vendorlink.com.
B-25-05 / Fire Station #83 Renovations
Tabulation
Additive Alternates
Deductive Alternates
FSV Construction Company Qualis General Contractors, LLC Spartan Contracting Corporation
$1,448,089.13 $1,291,172.97 $1,513,737.30 $1,316,645.40 $970,185.30 $992,776.63
Performance & Payment Bonds
Contingency (5%)
Sheet1
File details come from the government source that posted it. Updated .