This document is Addendum #5 for the Fire Station #83 Renovations project by the City of DeLand, Florida, issued on April 25, 2025. The addendum provides clarifications and updates to the original bid package, addressing specific questions from potential contractors regarding roof panels, exterior wall materials, lighting specifications, and piping system details. Key modifications include allowing 36" PBR panels instead of 16" Snap-Lok aluminum panels, confirming the use of a fiber cement siding wall panel system with Hardy Board as the basis of design, and specifying lighting requirements from sheet E-101. The bid submission deadline remains May 1, 2025, at 3:00 P.M., with no changes to the original contract timeline.

The addendum includes technical revisions to multiple specification sections, notably updating Division 07 for metal roof and fiber cement siding, and adding missing Division 21 sections related to fire suppression systems. The changes provide more precise installation instructions, material specifications, and performance requirements for contractors. The document emphasizes compliance with Florida Building Code energy requirements, wind loading criteria, and specific installation techniques for roofing, wall panels, and insulation systems. The comprehensive nature of the addendum suggests a complex renovation project with detailed technical expectations for potential bidders.

View the file

Other files for this state and local contract opportunity

Other files attached to Fire Station #83 Renovations, newest first.
File Type Posted
RCA.pdf PDF
B2505Tabulation.pdf PDF
B2505Tabulation.pdf PDF
B2505ADD5.pdf PDF
B2505ADD5.pdf PDF
B2505ADD5.pdf PDF
B2505ADD4.pdf PDF
B2505ADD4.pdf PDF
B2505ADD4.pdf PDF
B2505ADD4.pdf PDF
B2505ADD3.pdf PDF
B2505ADD3.pdf PDF
B2505ADD3.pdf PDF
B2505ADD3.pdf PDF
B2505ADD2.pdf PDF
B2505ADD2Attachment.pdf PDF
B2505ADD2Attachment.pdf PDF
B2505ADD2.pdf PDF
B2505ADD2Attachment.pdf PDF
B2505ADD2.pdf PDF
B2505ADD2Attachment.pdf PDF
B2505ADD2.pdf PDF
B2505ADD1.pdf PDF
B2505ADD1.pdf PDF
B2505ADD1.pdf PDF
B2505ADD1.pdf PDF
B2505Plans.pdf PDF
B2505Plans.pdf PDF
B2505Plans.pdf PDF
B2505Plans.pdf PDF
B2505Final.pdf PDF
B2505Final.pdf PDF
B2505Final.pdf PDF
B2505Final.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Department 120 S. Florida Ave.

2nd Floor

DeLand, FL 32720

Fire Station #83 Renovations B-25-05

April 25, 2025 Addendum #5

TO ALL PROSPECTIVE CONTRACTORS

This is an Addendum to and shall be considered as part of the original Bid package for the above-mentioned Bid. Contractors are requested to acknowledge receipt of this Addendum with their

Submission.

CLARIFICATION TO QUESTIONS ASKED/RECEIVED:

1. The new plans call for 16" Snap-Lok .040" aluminum panels. This as-built plan you sent out today shows the existing building being 36" PBR panels. Are we really going to mix panels on the same building?

a. AE RESPONSE: Please note that the intent is to match the existing roof panel. 36” PBR panels meeting Risk Category IV wind criteria are acceptable in place of the 16” Snap-

Lok 0.40” aluminum panels. Revised Specification section 07 41 13 Metal Roof Panel is provided.

b. Please note that the panels are to be installed over cover board and rigid insulation as shown on AE515 and AE516. This system is to meet the requirements of the FBC Energy

Code for continuous 4.5” rigid board insulation above deck and meeting R-27ci. No breaks are allowed in the insulation board to meet the continuous insulation requirements. Refer to AE301 for insulation requirements.

2. Our electrical sub is needing some clarification on quoting to replace the existing lighting in Fire

Station #83. Are you wanting all lighting - inside and out - quoted? Do you have a lighting schedule of the existing lighting.

a. AE RESPONSE: Please provide lighting as shown on sheet E-101 LIGHTING PLAN.

3. Wall materials? One place it is calling out HARDY BOARD EXTERIOR PANEL OVER PMB

EXTERIOR, MATCH EXISTING, Another place: 074646.A01 FIBER CEMENT SIDING WALL

PANEL SYSTEM, then the spec says Foamed-insulation-core metal panels and Exterior Wall

System: Manufacturer's standard concealed-fastener, flush-profile, foamed-insulation-core metal wall panels.

a. If wall panels are to be IMPs (Insulated metal wall panels) We need to pick a profile, with, thickness, finish, etc.

i. AE RESPONSE: Please note that the exterior wall finish is a Fiber Cement Siding

Wall Panel System with Hardy Board Exterior Panel as basis of design. Hardy

Board is a fiber cement siding wall panel system. Please refer to C1/AE501 for typical exterior plan detail of corner condition for reference and specification

April 25, 2025 Addendum #5 section 07 46 46. Basis of design product is provided on page 07 46 46 -5, Part

2.2. Revised Section provided for additional clarification.

b. One place it lists the following:

1. Panel Coverage: 36 inches nominal.

2. Panel Thickness: 2 inches.

3. Insulation Core: Modified polyisocyanurate or polyurethane foam using a non-CFC blowing agent, foamed-in-place or board type, with maximum flame-sprea and smoke-developed indexes of 25 and 450, respectively.

i. AE RESPONSE: Please note that the exterior wall finish is a Fiber Cement

Siding Wall Panel System with Hardy Board Exterior Panel as basis of design.

Hardy Board is a fiber cement siding wall panel system. Please refer to

C1/AE501 for typical exterior plan detail of corner condition for reference and specification section 07 46 46. Basis of design product is provided on page 07

46 46 -5, Part 2.2. Revised Section provided for additional clarification.

c. Another place it lists this spec:

1. Panel Coverage: 16 inches.

2. Panel Height: 3 inches.

3. Concealed-Fastener, Flush-Profile, Metal Wall Panels

i. AE RESPONSE: Please note that the exterior wall finish is a Fiber Cement

Siding Wall Panel System with Hardy Board Exterior Panel as basis of design.

Hardy Board is a fiber cement siding wall panel system. Please refer to

C1/AE501 for typical exterior plan detail of corner condition for reference and specification section 07 46 46. Basis of design product is provided on page 07

46 46 -5, Part 2.2. Revised Section provided for additional clarification.

d. Are the wall panels horizontal as drawn or vertical as listed in spec?

i. AE RESPONSE: Wall panels are to match existing texture for hardie board panels (Fiber Cement Wall Panels, 07 46 46). Basis of design product is provided on page 07 46 46 -5, Part 2.2. Revised Section provided for additional clarification.

4. Are we supplying metal girts in the walls or are they using steel stud walls?

i. AE RESPONSE: Please note that all building primary structure which includes girts are to be provided by the premanufactured metal building manufacturer as delegated design to meet the wind loading criteria as indicated.

Attachments: Addendum Summary

Revised Specification

April 25, 2025 Addendum #5

Please note that the proposal opening date and time remains May 1, 2025 @ 3:00 P.M.

All other terms and conditions remain unchanged.

Sincerely, Corey McMillen, CPPB Purchasing Manager

END OF ADDENDUM #5

A D D E N D U M N O. 5 jl2 Architecture | 1678 Kingston Road | Longwood, FL 32750 Direct 407.340.2879 | www.jl2architecture.com | Architectural License AR96099

PROJECT: City of Deland Fire Station 83 Jl2 COMMISION NO: 2023-P031 DATE: April 25, 2025 PURPOSE: Construction Document Updates

APRIL 25, 2025

Addendum No. 5, to Drawings and Specifications dated December 20, 2024, for the City of Deland Fire Station 83 project, as prepared by jl2 Architecture, 1678 Kingston Road, Longwood, FL 32750.

This Addendum No. 5 shall hereby be and become a part of the Contract Documents the same as if originally bound thereto.

The following clarifications, amendments, additions, revisions, changes and modifications change the original Contract Documents only in the amount and to the extent hereinafter specified and set forth in this Addendum No. 5.

SPECIFICATIONS

TABLE OF CONTENTS

1. Removed Section 07 41 13.16 Standing Seam Metal Roof Panels

2. Added Section 07 41 13 Metal Roof Panel

3. Updated 07 46 46 – Fiber Cement Siding

4. Added missing Division 21 sections.

DIVISION 07

1. Added Section 07 41 13 – METAL ROOF PANEL to replace 07 41 13.16 – STANDING SEAM METAL ROOFING.

2. Removed 07 41 13.16 – STANDING SEAM METAL ROOFING and replaced with 07 41 13 – METAL ROOF PANEL.

3. Updated 07 46 46 – FIBER CEMENT SIDING.

a. Revised Part 2.2

b. Revised title of Part 3.3

DIVISION 21

1. Added missing sections:

a. 21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION

b. 21 05 29 - HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

c. 21 05 53 - IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

d. 21 10 00 - WATER-BASED FIRE-SUPPRESSION SYSTEMS

END OF ADDENDUM NO. 5

http://www.jl2architecture.com/

FIRE STATION NO. 83

CITY OF DELAND, FLORIDA

100% CONSTRUCTION DOCUMENTS

PROJECT SPECIFICATIONS

(ADDENDUM NO. 5, 25 APRIL 2025) DECEMBER 20, 2024

CITY OF DELAND, FL

COMMISSION NO. 2023-P031

DECEMBER 20, 2024, ADDENDUM NO. 004, 25 APRIL 2025

PAGE | 1

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 01 PROJECT TITLE PAGE

00 04 00 STATEMENT OF COMPLIANCE

00 21 13 INSTRUCTIONS TO BIDDERS

00 31 19 EXISTING CONDITION INFORMATION

00 31 32 00 41 13 00 52 00

GEOTECHNICAL DATA

BID FORM – STIPULATED SUM, SINGLE PRIME CONTRACT

AGREEMENTS BETWEEN OWNER AND CONTRACT

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 33 PHOTOGRAPHIC DOCUMENTATION

01 31 19 PROJECT MEETINGS

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 42 00 REFERENCES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 60 00 PRODUCT REQUIREMENTS

01 60 20 FLORIDA PRODUCT APPROVAL

01 73 00 EXECUTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39 PROJECT RECORD DOCUMENTS

01 79 00 DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 43 POLISHED CONCRETE FINISHING

DIVISION 04 - MASONRY

04 40 14 MARBLE WINDOW SILLS

PAGE | 2

DIVISION 05 - METALS

05 50 00 METAL FABRICATIONS

DIVISION 06: WOOD AND PLASTICS

06 10 00 ROUGH CARPENTRY

06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 00 THERMAL INSULATION

07 21 19 FOAMED-IN-PLACE INSULATION

07 26 10 UNDERSLAB VAPOR RETARDER

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 07 41 13.16

METAL PANEL ROOF – ADDENDUM NO. 4

STANDING-SEAM METAL ROOF PANELS – ADDENDUM NO. 4

07 42 93 SOFFIT PANELS

07 46 46 FIBER-CEMENT SIDING – ADDENDUM NO. 4

07 62 00 SHEET METAL FLASHING AND TRIM

07 72 00 ROOF ACCESSORIES

07 84 43 JOINT FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 14 16 FLUSH WOOD DOORS

08 31 13 ACCESS DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 71 00 DOOR HARDWARE

08 80 00 GLAZING

08 83 00 MIRRORS

08 91 19 FIXED LOUVERS

DIVISION 09 - FINISHES

09 22 16 NON-STRUCTURAL METAL FRAMING

09 29 00 GYPSUM BOARD

09 51 13 ACOUSTICAL PANEL CEILINGS

09 65 13 09 65 19

RESILIENT BASE AND ACCESSORIES

RESILIENT TILE FLOORING

09 91 13 EXTERIOR PAINTING

09 91 23 INTERIOR PAINTING

PAGE | 3

DIVISION 10 - SPECIALTIES

10 14 23.16 10 26 00

ROOM-IDENTIFICATION PANEL SIGNAGE

WALL AND DOOR PROTECTION

10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES

10 44 13 FIRE PROTECTION CABINETS

10 44 16 10 51 00

FIRE EXTINGUISHERS

GEAR LOCKERS

DIVISION 11 - EQUIPMENT

11 31 13 RESIDENTIAL APPLIANCES

11 94 13 MISCELLANEOUS EQUIPMENT

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 36 16 METAL COUNTERTOPS

12 36 61 SOLID SURFACE COUNTERTOPS (QUARTZ)

DIVISION 13 – SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION – ADDENDUM 004

21 05 29 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT –

ADDENDUM 004

21 05 53 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT – ADDENDUM 004

21 10 00 WATER-BASED FIRE-SUPPRESSION SYSTEMS – ADDENDUM 004

DIVISION 22 – PLUMBING

22 11 16 DOMESTIC WATER PIPING

22 11 19 DOMESTIC WATER PIPING SPECIALTIES

22 13 16 SANITARY WASTE AND VENT PIPING

22 13 19 SANITARY WASTE PIPING SPECIALITIES

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING

23 00 10 BASIC MECHANICAL REQUIREMENTS – TLC

23 05 00 COMMON WORK RESULTS FOR HVAC – TLC

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT – TLC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 31 13 METAL DUCTS – TLC

23 33 00 AIR DUCT ACCESSORIES

PAGE | 4

23 37 13 GRILLES REGISTERS AND DIFFUSERS – TLC

23 81 26 SPLIT-SYSTEMS AIR-CONDITIONERS

DIVISION 26 – ELECTRICAL

26 00 10 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33.13 CONDUITS FOR ELECRTRICAL SYSTEMS

26 05 33.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 09 23 LIGHTING CONTROL DEVICES

26 22 16 LOW-VOLTAGE BUCK-BOOST TRANSFOMERS

26 27 26 WIRING DEVICES

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 50 00 LIGHTING

DIVISION 27 – COMMUNICATIONS

27 00 10 SUPPLEMENTAL REQUIREMENTS FOR COMMUNICATIONS

27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

27 55 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS.

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 46 21.11 ADDRESSABLE FIRE-ALARM SYSTEMS

DIVISION 31 - EARTHWORK

31 31 16 TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS – REFER TO CIVIL DRAWINGS.

DIVISION 33 – UTILITIES – REFER TO CIVIL DRAWINGS.

END OF TABLE OF CONTENTS

CITY OF DELAND

FS NO. 83 ADDITION / RENOVATION

ADDENDUM NO. 4, 25 APRIL 2025

DELAND, FL

PR. NO. 2023-P031

DECEMBER 20, 2024

METAL ROOF PANELS

07 41 13 - 1

SECTION 07 41 13 – METAL PANEL ROOF SYSTEM

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Factory-formed, structural PBR (Purlin Bearing Rib) roof panels.

2. Underlayment

3. Coverboard

4. Roof insulation.

B. Related Requirements:

1. Section 074293 "Soffit Panels" for metal panels used in horizontal soffit applications.

1.2 COORDINATION

A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.

B. Coordinate metal roof panel installation with rain drainage work, flashing, trim, construction of soffits, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, metal roof panel Installer, metal roof panel manufacturer's representative, structural-support Installer, and installers whose work interfaces with or affects metal roof panels, including installers of roof accessories and roof-mounted equipment.

2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review methods and procedures related to metal roof panel installation, including manufacturer's written installation instructions.

4. Examine support conditions for compliance with requirements, including alignment between and attachment to structural members.

5. Review loading limitations of supporting structure during and after roofing.

6. Review flashings, special details, drainage, penetrations, equipment curbs, and condition of other construction that affect metal roof panels.

7. Review governing regulations and requirements for insurance, certificates, and tests and inspections if applicable.

8. Review temporary protection requirements for metal roof panel systems during and after installation.

07 41 13 - 2

9. Review procedures for repair of metal roof panels damaged after installation.

10. Document proceedings, including corrective measures and actions required, and furnish copy of record to each participant.

1.4 ACTION SUBMITTALS

A. Product Data:

1. For metal roof panels, include construction details, material descriptions, dimensions of individual components and profiles, finishes for each type of panel, and accessory.

B. Shop Drawings:

1. Include fabrication and installation layouts of metal roof panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.

2. Accessories: Include details of the flashing, trim, and anchorage systems, at a scale of not less than 1-1/2 inches per 12 inches.

C. Samples for Initial Selection: Manufacturer's standard color charts, showing full range of available colors for each type of exposed finish.

1. Include similar Samples of trim and accessories involving color selection.

D. Samples for Verification: Actual sample of finished products for each type of exposed finish for metal roof panels and metal panel accessories.

1. Size: Manufacturers' standard size.

1.5 INFORMATIONAL SUBMITTALS

A. Certificates for portable roll-forming equipment.

B. Product Test Reports: For standing-seam metal roof panels, for tests performed by a qualified testing agency.

C. Field quality-control reports.

D. Qualification Statements: For roof installers.

E. Florida Building Code; Wind load: Submit certified independent lab test or NOA report on each type of exterior opening. All exterior opening submittals shall include door number, door and frame elevations and all finish hardware as tested as an assembly.

These reports are to be forwarded to the building department.

F. Sample warranties.

07 41 13 - 3

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For metal roof panels.

1.7 QUALITY ASSURANCE

A. Roof Installer Qualifications: Entity that employs a supervisor who is an NRCA ProCertified Roofing Foreman or installers who are NRCA ProCertified Metal Panel Roof Systems Installers.

B. Portable Roll-Forming Equipment Certification: UL-certified, portable roll-forming equipment capable of producing metal roof panels warranted by manufacturer to be the same as factory-formed products. Maintain UL certification of portable roll-forming equipment for duration of Work.

1.8 MOCKUPS

A. Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for fabrication and installation.

1. Build mockups for typical roof area only, including accessories.

a. Each type of exposed seam and seam termination.

2. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Owner specifically approves such deviations by Change Order.

3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver components, metal roof panels, and other manufactured items so as not to be damaged or deformed. Package metal roof panels for protection during transportation and handling.

B. Unload, store, and erect metal roof panels in a manner to prevent bending, warping, twisting, and surface damage.

C. Stack metal roof panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal roof panels to ensure dryness, with positive slope for drainage of water. Do not store metal roof panels in contact with other materials that might cause staining, denting, or other surface damage.

D. Retain strippable protective covering on metal roof panels during installation.

07 41 13 - 4

1.10 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit assembly of metal roof panels to be performed in accordance with manufacturers' written installation instructions and warranty requirements.

1.11 WARRANTY

A. Warranty: Manufacturer agrees to repair or replace components of metal roof panel systems that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Structural failures including rupturing, cracking, or puncturing.

b. Deterioration of metal and other materials beyond normal weathering.

2. Warranty Period: Two years from date of Substantial Completion.

B. Warranty on Panel Finishes: Manufacturer agrees to repair finish or replace metal roof panels that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:

a. Color fading more than 5 Delta E units when tested in accordance with

ASTM D2244.

b. Chalking in excess of a No. 8 rating when tested in accordance with ASTM D4214.

c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.

2. Finish Warranty Period: 20 years from date of Substantial Completion.

C. Weathertightness Warranty: Manufacturer agrees to repair or replace standing-seam metal roof panel systems that fail to remain weathertight, including leaks, within specified warranty period.

1. Warranty Period: 20 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Structural Performance: Provide metal roof panel systems capable of withstanding the effects of the following loads when tested in accordance with ASTM E1592:

1. Wind Loads: As indicated on Drawings.

2. Other Design Loads: As indicated on Drawings.

07 41 13 - 5

3. Deflection Limits: For wind loads, no greater than 1/180 of the span.

B. Hurricane and Wind load tested Systems: Provide a system that meets the hurricane and wind load test requirements in accordance with the Florida Building code and are in compliance with the local authority having jurisdiction.

C. Air Infiltration: Air leakage of not more than 0.06 cfm/sq. ft. when tested in accordance with ASTM E1680 or ASTM E283/E283M at the following test-pressure difference:

1. Test-Pressure Difference: 6.24 lbf/sq. ft..

D. Water Penetration under Static Pressure: No water penetration when tested in accordance with ASTM E1646 or ASTM E331 at the following test-pressure difference:

1. Test-Pressure Difference: 6.24 lbf/sq. ft..

E. Watertightness: No water penetration when tested in accordance with ASTM E2140 for hydrostatic-head resistance.

F. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.

1. Uplift Rating: UL 90.

G. FM Approvals Listing: Provide metal roof panels and component materials that comply with requirements in FM Approvals 4471 as part of a metal panel roofing system and that are listed in FM's "Approval Guide" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.

1. Fire/Windstorm Classification: Class 1A-60105.

2. Hail Resistance: MH.

H. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

2.2 METAL ROOF PANELS, GENERAL

A. Provide factory-formed metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with seamed joint type indicated and mechanically attaching panels to supports using concealed fasteners in side laps.

Include all accessories required for weathertight installation.

2.3 METAL ROOF PANELS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

07 41 13 - 6

1. MBCI, PBR Roof Panel (Basis of Design)

2. Approved Alternates subject to meeting requirements are as follows:

a. Tri County Metals

b. McElroy Metal

c. Metal Building Supplies, LLC

d. First Coast Metal Roofing

e. Ceco Building Systems

f. Nucor Building Systems

B. Metal Roof Panels:

1. Type: PBR (Structural ribbed)

2. Structural Support: Over solid deck.

3. Material: Galvanized Metal

4. Panel Profile: Match existing

5. Panel Coverage: 36inches.

6. Panel Height: 1.25 inches.

7. Clips: One piece, fixed, designed to accommodate thermal movement.

2.4 METAL ROOF PANEL MATERIAL

A. Metal Sheet: ASTM A653 (G90 Galvanized)

1. Thickness: Minimum 24 gauge

2. Surface: Smooth, flat texture.

3. Exterior Finish: FEVE fluoropolymer.

4. Color: Match Existing.

2.5 ROOF INSULATION

A. Insulation over Solid Deck:

1. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 2 coated glass-fiber facer on both major surfaces.

a. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1) Carlisle Syntec Systems

2) Johns Manville; a Berkshire Hathaway company

3) Kingspan Insulation LLC

b. Compressive Strength: Grade 3, 25 psi.

c. Size: 48 by 96 inches.

d. Thickness:

1) Base Layer: 4-1/2 inches (R-Value = 27)

07 41 13 - 7

2.6 COVER BOARD

A. Fiber-Reinforced Cementitious Cover Board: ASTM C1325, fiber-mat-reinforced cementitious board.

1. Thickness: 5/8 inch.

2.7 UNDERLAYMENT

A. Self-Adhering, High-Temperature Underlayment: Provide self-adhering, cold-applied, sheet underlayment, a minimum of 30 mils thick, consisting of slip-resistant, polyethylene-film top surface laminated to a layer of butyl or SBS-modified asphalt adhesive, with release-paper backing. Provide primer when recommended by underlayment manufacturer.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Carlisle WIP Products; a brand of Carlisle Construction Materials

b. Henry Company; a Carlisle company

c. Owens Corning

2. Thermal Stability: Stable after testing at 220 deg F; ASTM D1970/D1970M.

3. Low-Temperature Flexibility: Passes after testing at minus 20 deg F; ASTM

D1970/D1970M.

B. Slip Sheet: Manufacturer's recommended slip sheet, of type required for application.

2.8 MISCELLANEOUS MATERIALS

A. Miscellaneous Metal Subframing and Furring: ASTM C645; cold-formed, metallic-coated steel sheet, minimum ASTM A653/A653M, G90 hot-dip galvanized coating designation or ASTM A792/A792M, Class AZ50 coating designation. Provide manufacturer's standard sections as required for support and alignment of metal panel system.

B. Roof Panel Accessories: Provide components required for a complete, weathertight metal roof panel system including trim, copings, fasciae, mullions, sills, corner units, fasteners, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal roof panels unless otherwise indicated.

1. Closures: Provide closures at eaves and ridges, fabricated of same metal as metal roof panels.

2. Backing Plates: Provide metal backing plates at roof panel end splices, fabricated from material recommended by manufacturer.

3. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch- thick, flexible closure strips; cut or premolded to match metal roof panel profile. Provide closure

07 41 13 - 8 strips where indicated or necessary to ensure weathertight construction.

C. Flashing and Trim: Provide flashing and trim formed from same material as metal roof panels as required to seal against weather and to provide finished appearance.

Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers. Finish flashing and trim with same finish system as adjacent metal roof panels.

D. Gutters: Formed from same material as metal roof panels, complete with end pieces, outlet tubes, and other special pieces as required. Fabricate in minimum 96-inch- long sections, of size and metal thickness in accordance with manufacturer's recommendations. Furnish gutter supports spaced a maximum of 36 inches o.c., fabricated from same metal as gutters. Provide wire ball strainers of compatible metal at outlets. Finish gutters to match metal roof panels.

E. Downspouts: Formed from same material as metal roof panels. Fabricate in 10 ft. long sections, complete with formed elbows and offsets, of size and metal thickness in accordance with manufacturer's recommendations. Finish downspouts to match gutters.

F. Roof Curbs: Fabricated from same material as metal roof panels, 0.048-inch nominal thickness; with bottom of skirt profiled to match metal roof panel profiles and with welded top box and integral full-length cricket. Fabricate curb subframing of 0.060-inch-nominal thickness, angle-, C-, or Z-shaped steel sheet. Fabricate curb and subframing to withstand indicated loads of size and height indicated. Finish roof curbs to match metal roof panels.

1. Insulate roof curb with 1-inch- thick, rigid insulation.

G. Roof Panel Fasteners: Self-tapping screws designed to withstand design loads.

H. Roof Panel Sealants: Provide sealant type recommended by manufacturer that are compatible with metal roof panel materials, are nonstaining, and do not damage panel finish.

1. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch wide and 1/8 inch thick.

2. Joint Sealant: ASTM C920; elastomeric polyurethane or silicone sealant; of type, grade, class, and use classifications required to seal joints in metal roof panels and remain weathertight; and as recommended in writing by metal roof panel manufacturer.

3. Butyl-Rubber-Based, Solvent-Release Sealant: ASTM C1311.

2.9 FABRICATION

A. Fabricate and finish metal roof panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.

07 41 13 - 9

B. On-site Fabrication: Subject to compliance with requirements of this Section, metal roof panels may be fabricated on-site using UL-certified, portable roll-forming equipment if panels are of same profile and warranted by manufacturer to be equal to factory-formed panels. Fabricate in accordance with equipment manufacturer's written instructions and to comply with details shown.

C. Provide roof panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.

D. Fabricate metal roof panel joints with factory-installed captive gaskets or separator strips that provide a weathertight seal and prevent metal-to-metal contact, and that minimize noise from movements.

E. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations that apply to design, dimensions, metal, and other characteristics of item indicated.

1. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.

2. Seams: Fabricate nonmoving seams in accessories with flat-lock seams. Tin edges to be seamed, form seams, and solder.

3. Sealed Joints: Form nonexpansion, but movable, joints in metal to accommodate sealant and to comply with manufacturer's recommendations.

4. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not permitted on faces of accessories exposed to view.

5. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal recommended in writing by metal roof panel manufacturer.

a. Size: As recommended by metal roof panel manufacturer for application, but not less than thickness of metal being secured.

2.10 FINISHES

A. Protect finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in same piece are unacceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

C. Metal Roof Panels and Accessories:

1. FEVE Fluoropolymer: AAMA 2605. Two-coat fluoropolymer finish containing 100 percent FEVE resin in color coat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.

07 41 13 - 10

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal roof panel supports, and other conditions affecting performance of the Work.

1. Examine primary and secondary roof framing to verify that rafters, purlins, angles, channels, and other structural panel support members and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer.

2. Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal roof panel manufacturer.

a. Verify that air- or water-resistive barriers have been installed over sheathing or backing substrate to prevent air infiltration or water penetration.

B. Examine roughing-in for components and systems penetrating metal roof panels to verify actual locations of penetrations relative to seam locations of metal roof panels before installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support members and anchorages in accordance with ASTM C754 and metal roof panel manufacturer's written installation instructions.

3.3 INSTALLATION OF ROOF INSULATION

A. General: Install insulation concurrently with metal roof panel installation, in thickness indicated to cover entire surface, in accordance with manufacturer's written installation instructions.

1. Tape joints and ruptures in vapor retarder and seal each continuous area of insulation to the surrounding construction to ensure airtight installation.

3.4 INSTALLATION OF COVER BOARD

A. Install cover board over insulation in accordance with manufacturer's written installation instructions. Install with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches in each direction.

07 41 13 - 11

3.5 INSTALLATION OF UNDERLAYMENT

A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Apply at locations indicated on Drawings, wrinkle free, in shingle fashion to shed water, and with end laps of not less than 6 inches staggered 24 inches between courses. Overlap side edges not less than 3-1/2 inches. Extend underlayment into gutter trough. Roll laps with roller. Cover underlayment within 14 days.

1. Apply over the entire roof surface.

2. Apply over the roof area indicated below:

a. Roof perimeter for a distance up from eaves of 24 inches beyond interior wall line.

b. Valleys, from lowest point to highest point, for a distance on each side of 18 inches. Overlap ends of sheets not less than 6 inches.

c. Rake edges for a distance of 18 inches.

d. Hips and ridges for a distance on each side of 12 inches.

e. Roof-to-wall intersections for a distance from wall of 18 inches.

B. Felt Underlayment: Apply at locations indicated on Drawings, in shingle fashion to shed water, and with lapped joints of not less than 2 inches.

1. Apply over the entire roof surface.

2. Apply on roof not covered by self-adhering sheet underlayment. Lap over edges of self-adhering sheet underlayment not less than 3 inches, in shingle fashion to shed water.

C. Slip Sheet: Apply slip sheet over underlayment before installing metal roof panels.

D. Flashings: Install flashings to cover underlayment to comply with requirements specified in Section 076200 "Sheet Metal Flashing and Trim."

3.6 INSTALLATION OF METAL ROOF PANELS

A. Install metal roof panels in accordance with manufacturer's written installation instructions and approved Shop Drawings in orientation, sizes, and locations indicated.

Anchor metal roof panels and other components of the Work securely in place, with provisions for thermal and structural movement.

1. Shim or otherwise plumb substrates receiving metal roof panels.

2. Flash and seal metal roof panels at perimeter of all openings. Fasten with self-tapping screws. Do not begin installation until air- or water-resistive barriers and flashings that will be concealed by metal roof panels are installed.

3. Install screw fasteners in predrilled holes.

4. Locate and space fastenings in uniform vertical and horizontal alignment.

5. Install flashing and trim as metal roof panel work proceeds.

6. Locate panel splices over, but not attached to, structural supports. Stagger panel splices and end laps to avoid a four-panel lap splice condition.

7. Align bottoms of metal roof panels and fasten with blind rivets, bolts, or self-

07 41 13 - 12 tapping screws. Fasten flashings and trim around openings and similar elements with self-tapping screws.

8. Provide weathertight escutcheons for pipe- and conduit-penetrating panels.

B. Fasteners:

1. Steel Roof Panels: Use stainless steel fasteners for surfaces exposed to the exterior; use galvanized-steel fasteners for surfaces exposed to the interior.

C. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action as recommended in writing by metal roof panel manufacturer.

D. Roof Panel Joints: Fasten panel joints to substrate in accordance with manufacturer's instructions.

1. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied sealant.

2. Seamed Joint: Crimp standing seams with manufacturer-approved, motorized seamer tool so clip, metal roof panel, and factory-applied sealant are completely engaged.

3. Watertight Installation:

a. Apply a continuous ribbon of sealant or tape to seal joints of metal roof panels, using sealant or tape as recommended in writing by manufacturer as needed to make panels watertight.

b. Provide sealant or tape between panels and protruding equipment, vents, and accessories.

c. At panel splices, nest panels with minimum 6-inch end lap, sealed with sealant and fastened together by interlocking clamping plates.

E. Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting and provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete metal roof panel system including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items. Provide types indicated by metal roof panel manufacturers; or, if not indicated, types recommended by metal roof panel manufacturer.

F. Flashing and Trim: Comply with performance requirements and manufacturer's written installation instructions. Provide concealed fasteners where possible and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

1. Install exposed flashing and trim that is without buckling and tool marks, and that is true to line and levels indicated, with exposed edges folded back to form hems.

Install sheet metal flashing and trim to fit substrates and achieve waterproof and weather-resistant performance.

07 41 13 - 13

2. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 ft. with no joints allowed within 24 inches of corner or intersection. Where lapped expansion provisions cannot be used or would not be sufficiently weather resistant and waterproof, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with mastic sealant (concealed within joints).

G. Gutters: Join sections with riveted and soldered or lapped and sealed joints. Attach gutters to eave with gutter hangers spaced not more than 36 inches o.c. using manufacturer's standard fasteners. Provide end closures and seal watertight with sealant. Provide for thermal expansion.

H. Downspouts: Join sections with telescoping joints. Provide fasteners designed to hold downspouts securely 1 inch away from walls; locate fasteners at top and bottom and at approximately 60 inches o.c. in between.

1. Provide elbows at base of downspouts to direct water away from building.

2. Connect downspouts to underground drainage system indicated.

I. Roof Curbs: Install curbs at locations indicated on Drawings. Install flashing around bases where they meet metal roof panels.

J. Pipe and Conduit Penetrations: Fasten and seal to metal roof panels as recommended by manufacturer.

3.7 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align metal roof panels within installed tolerance of 1/4 inch in 20 ft. on slope and location lines as indicated and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.

3.8 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect metal roof panel installation, including accessories. Report results in writing.

B. Remove and replace applications of metal roof panels where tests and inspections indicate that they do not comply with specified requirements.

C. Additional tests and inspections, at Contractor's expense, are performed to determine compliance of replaced or additional work with specified requirements.

D. Prepare test and inspection reports.

3.9 CLEANING AND PROTECTION

A. Remove temporary protective coverings and strippable films, if any, as metal roof

07 41 13 - 14 panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal roof panel installation, clean finished surfaces as recommended by metal roof panel manufacturer. Maintain in a clean condition during construction.

B. Replace metal roof panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 07 41 13

FIBER-CEMENT SIDING 074646 - 1

SECTION 074243 – FIBER-CEMENT SIDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Exterior panelized fiber-cement rainscreen cladding system and accessories.

1.2 DEFINITIONS

A. DBVR: Drained and back ventilated rainscreen system; designed to drain and dry cavity entering water through drainage channels, weeps, and air ventilation.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, composite panel Fabricator and Installer, composite panel manufacturer's representative, structural-support Installer, and installers whose work interfaces with or affects composite panels, including installers of doors, windows, and louvers.

2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review methods and procedures related to composite panel installation, including manufacturer's written instructions.

4. Examine support conditions for compliance with requirements, including alignment between and attachment to structural members.

5. Review flashings, special siding details, wall penetrations, openings, and condition of other construction that affect composite panels.

6. Review governing regulations and requirements for insurance, certificates, and tests and inspections if applicable.

7. Review temporary protection requirements for composite panel assembly during and after installation.

8. Review procedures for repairing panels damaged after installation.

9. Document proceedings, including corrective measures and actions required, and furnish copy of record to each participant.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.

FIBER-CEMENT SIDING 074646 - 2

B. Shop Drawings:

1. Include details of panel dimensions, profiles, edge conditions, joints, corners, anchorages, attachment assembly, trim, flashings, closures, accessories, and special details.

2. Accessories: Include details of the flashing, trim, and anchorage, at a scale of not less than 1-1/2 inches per 12 inches.

C. Samples for Initial Selection: For each type of composite panel indicated with factory-applied color finishes.

1. Include similar Samples of trim and accessories involving color selection.

D. Samples for Verification: For each type of exposed finish required, prepared on Samples of size indicated below.

1. Composite Panels: 12 inches long by actual panel width. Include fasteners, closures, and other composite panel accessories. Submit custom color samples in paint manufacturer's standard size.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Product Test Reports: For each product, tests are performed by a qualified testing agency.

1. Composite Manufacturer's Material Test Reports: Certified test reports showing compliance with specific performance or third-party listing documenting compliance to comparable code sections IBC 1404.16.1 and IBC 1703.5. with Florida Product Approval meeting the wind loading requirement.

2. Composite Panel System Fabricator's Certified System Tests Reports: Certified system test reports showing system compliance with specific performance or third-party listing documenting compliance code section. Base performance requirements on composite panel system type provided.

a. DBVR System: Tested to AAMA 509.

C. Field quality-control reports.

D. Sample Warranties: For special warranties.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For composite panels to include in maintenance manuals.

FIBER-CEMENT SIDING 074646 - 3

1.7 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by a composite panel fabricator.

B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for composite panel fabrication and installation.

1. Build mockup of typical composite panel assembly, including corner, soffits, supports, attachments, and accessories.

2. Water-Spray Test: Conduct water-spray test of mockup of composite panel assembly, testing for water penetration in accordance with AAMA 501.2.

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver components, composite panels, and other manufactured items so as not to be damaged or deformed. Package composite panels for protection during transportation and handling.

B. Unload, store, handle, and erect composite panels in a manner to prevent bending, cracking, warping, twisting, and surface damage.

C. Stack composite panels on platforms or pallets no more than two pallets high, covered with suitable weathertight and ventilated covering.

D. Store composite panels to ensure dryness, with positive slope for drainage of water. Do not store composite panels in contact with other materials that might cause staining, denting, or other surface damage. Ensure panels are fully dry before installation.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit assembly of composite panels to be performed in accordance with manufacturers' written instructions and warranty requirements.

1.10 COORDINATION

A. Coordinate composite panel installation with rain drainage work, flashing, trim, construction of soffits, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

FIBER-CEMENT SIDING 074646 - 4

1.11 WARRANTY

A. Warranty on Panel Material: Manufacturer agrees to replace fiber cement that fails within specified warranty period.

1. Warranty Period: 15 years from date of Substantial Completion.

B. Warranty on Panel Finishes: Manufacturer agrees to repair finish or replace composite panels that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Finish Warranty Period: 15 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Physical Performance: Provide composite panel system in accordance with

ASTM C1186.

1. Wet Flexural Strength: Result: 1418 psi (9777 kPa), Lower Limit: 1015 psi (6998 kPa).

2. Water Tightness: No water droplets observed on any specimen.

3. Freeze-Thaw: No damage or defects observed.

4. Warm Water: No evidence of cracking, delamination, swelling, or other defects observed.

5. Heat-Rain: No crazing, cracking, or other deleterious effects, or surface or joint changes observed in any specimen.

B. Structural Performance: Provide composite panel systems capable of withstanding the effects of the following loads, based on testing in accordance with ASTM E330/E330M:

1. Design Wind Loads: As indicated on Drawings.

2. Other Design Loads: As indicated on Drawings.

3. Deflection Limits: For wind loads, panel deflection no greater than L/120 of the span.

C. Thermal Expansion: Maximum 0.00000318 deg F to minus 1 (0.000005724 deg C to minus 1) when tested in accordance with ASTM E228.

D. Air Leakage: 1.53 cfm/sq. ft. (7.78 L/s/sq. m) or less in accordance with AAMA5094.

E. Water Penetration under Static Pressure: No water penetration to room side of assembly when tested for 15 minutes in accordance with ASTM E331 at the following test-pressure difference:

1. Test-Pressure Difference: 6.24 lbf/sq. ft. (300 Pa).

FIBER-CEMENT SIDING 074646 - 5

F. Fire Propagation Characteristics: Composite panel wall assembly passes NFPA 285.

G. Surface-Burning Characteristics: Provide composite panels that meet the following values when tested in accordance with ASTM E84:

1. Flame-Spread Index: Zero.

2. Smoke-Developed Index: 5.

H. Fire Resistance: Composite panel wall assembly passes ASTM E119.

I. Ignition Resistance: Composite panel passes NFPA 268.

2.2 COMPOSITE FIBER CEMENT WALL PANELS (CWP-1)

A. Composite Fiber Cement Wall Panel Systems: Provide factory-formed and -assembled, composite wall panels fabricated from a pressed, stamped, and autoclaved mix of portland cement, fly ash, silica, recycled rejects, and wood fiber bundles; formed into profile for installation method indicated. Include attachment assembly components and accessories required for weathertight system.

1. Basis-of-Design Product: Subject to compliance with requirements, provide James Hardie; Hardie Panel Artisan Siding (Shiplap / to match existing adjacent pattern) or comparable product by one of the following:

a. Cembrit.

b. MEW USA Inc.

c. Swisspearl.

B. Moderately Textured, Matte Composite Wall Panels:

1. Panel Dimensions: As indicated on Drawings Manufacturer Standard 10-1/4-inch Wide x 12-fee length.

2. Panel Thickness: 5/16 5/8-inch (16 mm).

3. Panel: Factory sealed on all six sides.

4. Profiles: None Match Existing.

5. Color: As indicated on drawing schedule.

6. Accessory Components: Manufactured corners with 3-1/2-inch (89-mm) returns.

2.3 MISCELLANEOUS MATERIALS

A. Miscellaneous Metal Subframing and Furring: ASTM C645, cold-formed, metallic-coated steel sheet with ASTM A653/A653M, G90 (Z275) hot-dip galvanized coating designation or ASTM A792/A792M, Class AZ50 (Class AZM150) aluminum-zinc-alloy coating designation unless otherwise indicated. Provide Fabricator's standard sections as required for support and alignment of composite panel system.

FIBER-CEMENT SIDING 074646 - 6

B. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items.