This Statement of Work (SOW) details a parkwide Variable Frequency Drive (VFD) replacement project for the Lake Mead National Recreation Area. The project involves replacing existing VFDs at four locations: Katherine Landing, Callville Bay, Echo Bay, and Cottonwood Cove. The scope includes installing sixteen (16) new VFDs across various water system components such as lift stations, water plant intake barges, and water treatment plant feed pumps, with an additional sixteen (16) VFDs to be supplied as spare stock.
Specific requirements include ensuring new VFDs are compatible with existing pumps, motors, programmable logic controllers (PLCs), and SCADA systems, and must fit into existing cabinets. The VFDs must be installed one at a time with a 24-hour test run to maintain continuous operation of sewage lift stations. All installations must comply with NFPA 70 electrical standards. The contractor is required to submit daily progress reports and documentation. The performance period is set at 180 calendar days, with work taking place in developed areas across Arizona and Nevada within the Lake Mead National Recreation Area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8125Q0017_Amd_0004.pdf | ||
| Sol_140P8125Q0017_Amd_0003.pdf | ||
| B09_Amendment_3_-_Attch_1_-_Site_Visit_Sign_In_Sheet_0003.pdf | ||
| Sol_140P8125Q0017_Amd_0002.pdf | ||
| B09_Amendment_1_-_Attch_1_-_Statement_of_Work_4_15_25_0001.pdf | ||
| Sol_140P8125Q0017_Amd_0001.pdf | ||
| Sol_140P8125Q0017.pdf | ||
| B08_Attch_3_-_Mohave_County__AZ_-_SCA_Wage_Determination_2015-5469_rev_27.pdf | ||
| B08_Attch_2_-_Clark_County__NV_-_SCA_Wage_Determination_2015-5593_rev_27.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE – PMIS 255483 STATEMENT OF WORK
STATEMENT OF WORK
VFD Replacement and install PMIS 255483
PART 1 – GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
Project Location:
This project is located at the Lake Mead National Recreation Area.
A. The requirement is to replace existing Variable Frequency Drives (VFDs) at Katherine
Landing, Callville Bay, Echo Bay, and Cottonwood Cove. Additionally, two spare VFDs for each location will be supplied for shelf stock. Sixteen (16) VFDs total in this package to be installed and sixteen (16) VFDs supplied for shelf stock. A total of thirty-two (32) VFDs in all. The sixteen units for shelf stock will consist of a spare per unit that is installed. Submittals must include VFDs that match or exceed the performance level needed to safely operate the motors listed below. If supplier chooses to submit non-identical or alternative VFDs that they believe meets or exceeds the spec they must provide documentation showing that their submittal will be compatible with existing motors and controls. All installations must be NFPA 70 compliant. The COR may opt to review the submittal prior to order but this is just for quality assurance and in no way absolves the contractor from conforming to the specification on this contract. Work will take place at the following location:
Katherine Landing, AZ developed area.
Callville Bay, NV developed area.
Echo Bay, NV developed area.
Cottonwood Cove, NV developed area
B. General work consists of the following at each site:
1. The new VFDs must be installed one at a time and given a 24-hour test run before installing the second VFD to ensure proper operation and to eliminate any chance of down time for the lift station. Existing VFDs will not be removed from the work area until new VFDs have been tested and proven to work properly. Continued operation of the sewage lift stations must be maintained throughout VFD replacement. Switch over to new VFDs will be scheduled with and observed by NPS personnel.
2. New VFDs must be compatible with existing pumps/motors, programmable logic controllers (PLCs) and supervisory control and data acquisition systems (SCADA). The new VFDs must fit in existing cabinets.
3. All installations must be NFPA 70 compliant.
4. New VFDs do not need to be same brand but must be fully compatible with the existing system.
5. Contractor is required to submit at minimum a daily progress report, plan for the next day, before and after pictures that assist in documenting the work process and progress.
6. Work includes associated parts, hardware, fittings, connectors, wire termination and labor to provide a functioning water plant feed pumping system, intake barge and lift station that satisfies the needs of the NPS unit as determined by NPS personnel.
C. The Work at Katherine Landing consists of the following:
1. Supply and install two VFDs at the main lift station. Existing motors/pumps are
Grundfos 99162103, 33.53 hp, 60hz, 3ph, 230/460v. Supply two spare VFDs for bench stock.
2. Supply and install two VFDs on the water plant intake barge. Pump motor sizes are as follows: Special/Custom 25HP 1800RPM TEFC 460/3/60 vertical hollow shaft motor with non-reverse ratchet. Supply two spare VFDs for bench stock
3. Supply and install two VFDs at the water treatment plant on the feed water pumps. The existing motor sizes are as follows: 30hp, 48 amps, 460v, 3ph, 60hz. Supply two spare VFDs for bench stock
D. The Work at Callville Bay consists of the following:
1. Supply and install two VFDs at the main lift station. Existing motor specs: Baldor.
Reliance, 40hp, 230/460v, 1770 rpm, 60hz, Supply two spare VFDs for bench stock
2. Supply and install two VFDS at the campground lift station. Existing motors/pumps:
Baldor, 7.5hp, 22 amp, 240v, 3ph, 60hz, 1725 rpm. Supply two spare VFDs for bench stock
3. Supply and install two VFDs on the finish water pumps. VFDs must be compatible with existing systems. The motor specs are as follows:
Motor: GE Motors, model: 6KS213DTP6020, 5hp, 230/460, 3ph, 60 hz, sn:
YRP0453MK01B. Supply two spare VFDs for bench stock
E. The Work at Echo Bay consists of the following:
1. Supply and install two VFDs on the finish water pumps. VFDs must be compatible with existing systems. The motor specs are as follows:
Motor: GE Motor, Model 5KS213DTP6005, 7.5hp, 230/460v, 3ph, SN:
NPP9034MK01C. Supply two spare VFDs for bench stock.
F. The work at Cottonwood Cove consists of the following:
1. Supply and install two existing VFDs at the main lift station. Existing motors/pumps are Grundfos 98248080, 41.57 hp, 60hz, 3ph, 230/460v. Supply two spare VFDs for bench stock.
G. Performance Period: Period of performance shall be 180 calendar days.
1.2 GOVERNMENT-FURNISHED ITEMS (NOT USED)
1.3 PUBLIC USE OF THE SITE
A. General: The project site is open to the public and open to National Park Service (NPS) employees during this project. The contractor shall at all times conduct his operations to ensure the least inconvenience to the visitors and NPS Staff.
1.4 CONTRACTOR USE OF SITE
A. General: Limit use of the site during the service period to the project area limits as outlined on the attached site maps. Do not disturb portions of the site beyond the project area limits.
B. Park Entry: The contractor shall furnish a list of personnel with phone contact information.
Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
C. Site Access: The contractor shall access the project site as outlined on the attached site maps.
Do not drive vehicles off road or access non-project areas without permission from the contracting officer or park superintendent.
D. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
E. Working Hours: Regular work hours shall be limited to daylight hours from 7:00 a.m. until
5:00 p.m. Monday through Friday, excluding government holidays. Work outside regular hours requires approval from the contracting officer.
F. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.
G. Staging and Storage: Confine storage of equipment and materials to the staging / lay-down / storage areas identified on the attached site maps or as established at the post award meeting.
H. Parking: The contractor shall park vehicles and heavy equipment in designated areas for contractor use or as established at the post award meeting. Vehicles are not permitted within long-term or overnight parking along roads or in associated overlooks / pull-outs.
I. Driveways and Entrances: The contractor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles at all times.
J. Preservation of Natural Features: Prevent damage to natural surroundings. Restored damaged areas and replace damaged trees, vegetation, and grass at no expense to the government.
1.5 REFERENCE DOCUMENTS / REPORTS
A. General: The following reference documents / reports are available upon request to supplement the information specified in the contract documents: Operations and Maintenance Manuals if available.
Pictures:
Echo Bay motor drive example
Katherine Landing example where modern motor control is needed.
KL Intake barge where VFDs need to be installed.
EB Motor drive that needs to be replaced with VFD.
CB location that needs VFD installed in place of existing equipment.