This Standard Form 30 (Amendment of Solicitation/Modification of Contract) is Amendment 0001 for Solicitation 140P8125Q0017, a parkwide variable frequency drive (VFD) replacement project for water treatment plants at Lake Mead National Recreation Area. The amendment provides five questions and answers clarifying project details, including that contractors will need to provide their own transportation to the intake barge site, VFD size is flexible with excess cabinet space available, and no specific manufacturer restrictions exist beyond compatibility with current equipment.
The amendment updates the Statement of Work to add details about the Katherine Landing intake barge site, include a list of submittals, and highlights changes in yellow in the attached document. The period of performance is specified as 05/12/2025 to 11/10/2025, with the project involving replacing existing motor controllers and VFDs across multiple locations. The solicitation is issued by the National Park Service, PWR - Lake Mead in Boulder City, Nevada, and requires contractors to submit VFDs compatible with current specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8125Q0017_Amd_0004.pdf | ||
| Sol_140P8125Q0017_Amd_0003.pdf | ||
| B09_Amendment_3_-_Attch_1_-_Site_Visit_Sign_In_Sheet_0003.pdf | ||
| Sol_140P8125Q0017_Amd_0002.pdf | ||
| B09_Amendment_1_-_Attch_1_-_Statement_of_Work_4_15_25_0001.pdf | ||
| Sol_140P8125Q0017.pdf | ||
| B08_Attch_3_-_Mohave_County__AZ_-_SCA_Wage_Determination_2015-5469_rev_27.pdf | ||
| B08_Attch_1_-_Statement_of_Work.pdf | ||
| B08_Attch_2_-_Clark_County__NV_-_SCA_Wage_Determination_2015-5593_rev_27.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8125Q0017 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
03/31/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/31/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 0001 is to provide a list of answers to questions regarding this solicitation and to update the Statement of Work. See continuation page below for full details.
Period of Performance: 05/12/2025 to 11/10/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Caroline Bachelier
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Continuation Page
Amendment 0001 Questions and Answers:
Q1: Is there a specific size that the VFD must be to fit in the enclosure?
A1: There are no specific sizes, and we do not have the manpower at the moment to measure the available space in each enclosure cabinet; however, each cabinet has excess space, and with the removal existing motor controls, will have room for any standard sized VFD.
Q2: What enclosure rating is required for the VFDs?
A2: The VFDs will be installed inside their own enclosure cabinets, so no specific enclosure rating for the VFD itself is required.
Q3: Is there an approved manufacturer list for this project?
A3: No, the only requirement is that the VFDs be compatible with the current equipment listed in the specifications
Q4: Will the government provide a boat to access the intake barge site on the water in Katherine Landing.
A4: No, the contractor will be responsible for providing their own transportation to access the intake barge site (See updated specifications).
Q5: Are all installations direct replacement for existing VFDs A5: No, in some cases the contractor will be replacing an existing contactor or other motor controller with a
VFD.
Statement of Work updates:
-Added details on the Katherine Landing intake barge site on the water (pg. 2 & 10) -Added a list of submittals (pg. 4) -All changes highlighted in yellow on Amendment 1 - Attch 1 - Statement of Work 4.15.2025
Attachments:
Amendment 1 - Attch 1 - Statement of Work 4.15.2025
File details come from the government source that posted it. Updated .