B08_Attachment_6_KLGO_248830_Flow_reading_from_fire_hydrants_.pdf

PDF 18 KB Posted

Attached to
REPLACE FIRE SUPRESSION - Construction, LYNCH-KENN Federal contract opportunity
Solicitation number
140P9724R0001
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document appears to be a hydrant flow test record for the Skagway Fire Department. It contains detailed data on water flow readings from multiple fire hydrants located at 2nd Avenue & Broadway, 3rd Avenue & Broadway, 4th Avenue & Broadway, and 5th Avenue & Broadway. The records include static pressure, residual pressure, pitot readings, and flow rates in gallons per minute (GPM) for each hydrant, with test dates ranging from 1976 to 2021.

The related federal contract opportunity is for a construction project to REPLACE FIRE SUPRESSION at the LYNCH-KENNEDY BLDG in Skagway, Alaska. The solicitation number is 140P9724R0001, and the contracting agency is the Department of the Interior National Park Service Alaska Region. No additional details about the contract requirements, response dates, pricing, or set asides are provided in the information given.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Skagway Fire Dept.

Hydrant Flow Test By Hydrant

All Applicable Records

Max:

Avg:

Min:

Subtotal Flow Tests: 2

BR-02 MUELLER

Static Residual Pitot Pitot 2 GPM 20 PSI 10 PSI 0 PSIDate

2nd AVE & Broadway

61 0 0.00 0.00 1010 0 0 008/31/1976

<No Staff Member Listed>

63 0 52.00 0.00 1248 0 0 006/04/1983

<No Staff Member Listed>

57 0 46.00 0.00 1138 0 0 006/01/1990

<No Staff Member Listed>

58 0 47.00 0.00 1275 0 0 010/23/1997

<No Staff Member Listed>

62 60 0.00 0.00 1240 0 0 006/18/2017

2955 Ackerman, Richard

Max:

Avg:

Min:

Subtotal Flow Tests: 5

BR-03 MUELLER

Static Residual Pitot Pitot 2 GPM 20 PSI 10 PSI 0 PSIDate

3rd AVE & Broadway

60 0 0.00 0.00 1138 0 0 008/31/1976

<No Staff Member Listed>

62 0 52.00 0.00 1213 0 0 006/04/1983

<No Staff Member Listed>

56 0 48.00 0.00 1162 0 0 006/01/1990

<No Staff Member Listed>

58 0 55.00 0.00 1290 0 0 011/04/1993

<No Staff Member Listed>

58 0 47.00 0.00 1275 0 0 010/23/1997

<No Staff Member Listed>

61 59 0.00 0.00 1230 0 0 006/18/2017

2955 Ackerman, Richard

60 52 0.00 0.00 1220 0 0 006/10/2021

<No Staff Member Listed>

12/28/2021 15:24 Page 11

* Scheduled Flow Test

12/11/2023

Skagway Fire Dept.

Hydrant Flow Test By Hydrant

All Applicable Records

Max:

Avg:

Min:

Subtotal Flow Tests: 7

BR-04 MUELLER

Static Residual Pitot Pitot 2 GPM 20 PSI 10 PSI 0 PSIDate

4th AVE & Broadway

60 0 0.00 0.00 1112 0 0 008/31/1976

<No Staff Member Listed>

62 0 52.00 0.00 1180 0 0 006/04/1983

<No Staff Member Listed>

55 0 46.00 0.00 1138 0 0 006/01/1990

<No Staff Member Listed>

58 0 50.00 0.00 1316 0 0 011/04/1993

<No Staff Member Listed>

58 0 44.00 0.00 1236 0 0 010/23/1997

<No Staff Member Listed>

60 60 0.00 0.00 1220 0 0 006/18/2017

2955 Ackerman, Richard

62 60 0.00 0.00 1240 0 0 006/10/2021

<No Staff Member Listed>

Max:

Avg:

Min:

Subtotal Flow Tests: 7

BR-05 MUELLER

Static Residual Pitot Pitot 2 GPM 20 PSI 10 PSI 0 PSIDate

5th AVE & Broadway

62 0 0.00 0.00 980 0 0 008/31/1976

<No Staff Member Listed>

63 0 52.00 0.00 1213 0 0 006/04/1983

<No Staff Member Listed>

54 0 46.00 0.00 1138 0 0 006/01/1990

<No Staff Member Listed>

56 0 49.00 0.00 1303 0 0 011/04/1993

<No Staff Member Listed>

57 0 46.00 0.00 1261 0 0 010/23/1997

<No Staff Member Listed>

12/28/2021 15:24 Page 12

* Scheduled Flow Test

File details come from the government source that posted it. Updated .