B08_Attachment_4__KLGO_248830_CM-16_Submittal_Form.doc
DOC document 105 KB Posted
- Attached to
- REPLACE FIRE SUPRESSION - Construction, LYNCH-KENN Federal contract opportunity
- Solicitation number
- 140P9724R0001
About this file
This document is a Transmittal form used by the National Park Service for submitting construction materials and equipment for review and approval under Contract No. CM-16. It provides a standardized format for contractors to list the specification sections, descriptions of items, and signatures for review and approval by the Contracting Officer's Representative.
The related federal contract opportunity is Solicitation Number 140P9724R0001 issued by the Department of the Interior National Park Service Alaska Region for the "REPLACE FIRE SUPRESSION - Construction, LYNCH-KENNEDY BLDG - SKAGWAY, AK". This is a solicitation for construction services to replace the fire suppression system at the Lynch-Kennedy Building located in Skagway, Alaska.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P9724R0001_Amd_0001.pdf | ||
| B09_Q_A_0001.pdf | ||
| B08_Attachment_3_KLGO_248830_Pictures_(1).pdf | ||
| B08_Attchment_13_Subcontracting_Percentage_Worksheet.pdf | ||
| B08_Attachment_11_Performance_Bond.pdf | ||
| B08_Sol_Clauses___Provisions.pdf | ||
| B08_Attachment_6_KLGO_248830_Flow_reading_from_fire_hydrants_.pdf | ||
| B08_Attachment_9_SOW.pdf | ||
| B08_Attachment_7_ITM_Hot_Work_Permit.pdf | ||
| B08_Attachment_2__KLGO_248830_As-Builts.pdf | ||
| Sol_140P9724R0001.pdf | ||
| B08_Attachment_5_KLGO_248830_Structural_Fire_Inventory_Data.pdf | ||
| B08_Attachment_3_KLGO_248830_Pictures_2.pdf | ||
| B08_Attachment_1_General_Specifications.pdf | ||
| B08_Attachment_12_Payment_Bond.pdf | ||
| B08_Attachment_10_Past_Performance_Questionnaire_Aug_2021.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL - NATIONAL PARK SERVICE
Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
| Contractor Signature |
| Recommended by |
| Title, Date |
| Title |
| Date |
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
| Review Comments |
| Action By |
| Date |
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________]
Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-1(CS)
| TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE |
| Transmittal No.: |
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 4/00 (Formerly DSC-1(CS)
File details come from the government source that posted it. Updated .